  • 8/12/2019 Exhibit 2 - Agendas Largely Redacted

    1/13

    From:Sent:To:

    RST01 HocThursday. Anril 28. 2011 5:28 PM

    b) 6)

    SubjectAttachments:

    FW: 11 am meeting minutesApril 28 1100 Agenda Minutes.docx

    Here are the minutes from the 11am call.lAndy KuglerReactor Safety Team

    DK 30 of 1892

  • 8/12/2019 Exhibit 2 - Agendas Largely Redacted

    2/13

    Agenda11: am Consortium Call4/28/2011

    1 Plant status update/ information from 0300 call and 0830 call

    (b)(5)

    2.b) 5)

    b) 5)

    3.(b)(5)

    b) 5)

    4.(b)(5)

    b) 5)

    DK 31 of 1892

  • 8/12/2019 Exhibit 2 - Agendas Largely Redacted

    3/13

    6

    bX) 5

    b) 5)

    7. Concerns still exist about the Unit 4 SFP, Site team would like us to address

    b) 5)

    8. RST took an action to determine how the Safety Culture was added to the Analysis of the TEPCOroad map.

    DK 32 of 1892

  • 8/12/2019 Exhibit 2 - Agendas Largely Redacted

    4/13

    From: RST01 Ho cSent: Thursday, April 28, 2011 2:17 PMTo:

    b) 6)

    Cc: Norton, CharlesSubject: 11 am call minutesAttachments: April 28 1100 Agenda Minutes.docx

    Here are the minutes from the 11 am call.The one major change is that I mis-spoke on when we need comments back on the TEPCO roadmap.Apparently, we will have the TEPCO roadmap analysis out today and we need to have comments back by COB;tomorrow.

    -Sorry for the rapid turnaround.MikeMike BrownReactor Safety Team

    DK 33 of 1892

  • 8/12/2019 Exhibit 2 - Agendas Largely Redacted

    5/13

    Agenda11: am Consortium Call4/28/2011

    1 Plant status update/information from 0300 call and 0830 call

    b) 5)

    2.

    b) 5)

    b) 5)

    3 b) 5)(b)(5)

    4.(b)(5)

    b) 5)

    DK 34 of 1892

  • 8/12/2019 Exhibit 2 - Agendas Largely Redacted

    6/13

    5

    6

    (b)(5)

    b) 5)

    7. Concerns still exist about the Unit 4 SFP. Site team would like us to address

    (b)(5)

    8. RST took an action to determine how the Safety Culture was added to the Analysis of theTEPCO road map.

    DK 35 of 1892

  • 8/12/2019 Exhibit 2 - Agendas Largely Redacted

    7/13

    From:Sent:To:

    Subject:Attachments:

    RSTO1 Ho cTuesday, April 26, 2011 10:08 AM

    (b)(6)

    Consortium Agenda for 4/26April 26 1100 Agenda.docx

    All:

    Attached is the April 26th meeting Agenda.Thanks,Steve CampbellReactor Safety Team

    DK 36 of 1892

  • 8/12/2019 Exhibit 2 - Agendas Largely Redacted

    8/13

    Agenda11:00 am Consortium al l4 26 2011

    2.(b)(5)

    3. When RPV / PCV level above TAF, need strategies on possible recirculation path andheat exchange system. Discuss any options that the Consortium has come up with.

    DK 37 of 1892

  • 8/12/2019 Exhibit 2 - Agendas Largely Redacted

    9/13

    F I

    From:Sent:To:

    Cc:

    RST01 Ho cMonday, April 25, 2011 11:14 AM

    b) 6)

    SubjectAttachments:

    Kokajko, Lawrence1100hrs Consortium ConfCall: Meeting Summary And 04.25.11 Meeting AgendaApril 22 rev 1 1100 Agenda.docx; April 22 rev 1 1100 Agenda Minutes.docx; April 251100 Agenda.docx

    All:

    Please find attached the meeting minutes that covers the 04.22.11 1100hrs Consortium Conference call. If there anyicomments, etc please forward to RSTO1.Also find attached the April 2 5 th meeting Agenda.IThanks,DonReactor Safety Team

    I

    DK 58 of 1892

  • 8/12/2019 Exhibit 2 - Agendas Largely Redacted

    10/13

    Consortium CallSummary04.22.11 1100hrsDocument Instructions:This meeting summary follows the Agenda that has been provided for the 04.22.11 consortiummeeting where appropriate.Definitions Used:

    Consortium: refers to all members of the conference call Site Team: refers to NRC members located inJapan

    Attendees:NRC Ops Center; Naval Reactors, INPO ERC, DOE and Mike BrownMeeting Summary:1. Follow-up items from 1100hrs

    a. Site Team is working on the questions. Upon completion w ll be provided by theNRC Ops Center to the Consortium2. Source of Leakage to the Turbine Buildinga. NRC Ops Center requests that those in he Consortium able to work on thisrequest, to do so. Please provide any data to the NRC Ops Center RST01.3. RPV/PCV Level Above TAF, Strategies on Possible Recirculation Path and HeatExchange System.a. No updates were provided by the Consortium

    FOLLOWING ITEMS WERE ADDITIONAL TO THE PROVIDED AGENDA4. Roadma r5

    b) 5)

    b 56 E PV Breack Document to RST01 b 57 NRC Ops Center Status

    DK 59 of 1892

  • 8/12/2019 Exhibit 2 - Agendas Largely Redacted

    11/13

    a. The NRC Ops Center will be standing down for the Easter weekend starting on04.21.11 at 1700hrs, and will be stood up on 04.25.11 at 0700hrs. However,NRC staff will remain on-call during this weekend.

    Next Consortium Call on 04.25.11 1100hrs

    DK 60 of 1892

  • 8/12/2019 Exhibit 2 - Agendas Largely Redacted

    12/13

    Agenda11:00am Consortium Call4/22/20111. Followup items from 11am:a. I

    b) 5)

    b. Japan Site team to ask TEPCO about

    b) 5)

    2

    b) 5)

    b) 5)

    b) 5)

    3 b) 5)

    DK 61 of 1892

  • 8/12/2019 Exhibit 2 - Agendas Largely Redacted

    13/13

    Agenda11:00am Consortium Call4/25/2011

    b) 5)

    2.b) 5)

    4. Is there any additional input from Consortium members related to source of leakage intothe turbine building?