exemple mtr gros-oeuvreAFFAIRE : Repre Niveau Nb Petite Long
(ml) Grd Long (ml) Larg (ml)
SHOT
Spcifique (m ens)
S/Total (m)
Totaux (m)
Dont Logt (m)
Dont balcons (m)
Dont Ter (m) (m)
S/SOL (Dallage)
1.00 1.00 1.00 1.00
22.60 6.20 8.70 5.50
27.90 13.50 8.70 10.20
15.60 15.50 7.65 15.50
393.90 152.68 66.56 121.68 393.90 152.68 66.56 121.68 393.90
152.68 66.56 121.68 10.29 6.29 -
734.81
RDC (PH SOUS-SOL) 1.00 1.00 1.00 1.00
22.60 6.20 8.70 5.50
27.90 13.50 8.70 10.20
15.60 15.50 7.65 15.50
734.81
R+1 (PH RDC)
1.00 1.00 1.00 1.00 1.00 1.00
22.60 6.20 8.70 5.50 5.50 2.40
27.90 13.50 8.70 10.20 6.60 5.00
15.60 15.50 7.65 15.50 1.70 1.70
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvreAFFAIRE : Repre Niveau Nb Petite Long
(ml) Grd Long (ml) Larg (ml)
SHOT
Spcifique (m ens)
S/Total (m)
Totaux (m)
Dont Logt (m)
Dont balcons (m)
Dont Ter (m) (m)
-
751.38
709.76
41.62
R+2 (PH R+1)
1.00 1.00 1.00 1.00
22.60 6.20 8.70 5.50
27.90 13.50 8.70 10.20
15.60 15.50 7.65 15.50
393.90 152.68 66.56 121.68 -
734.81
709.77 350.30
25.04 dont emprise logt
359.47
TOITURE (PH R+2) (solution plancher SEAC Bois) 1.00 13.60 16.50
1.00 12.30 6.80 1.00 7.30 7.30 1.00 7.75 5.00
10.00 10.00 4.75 10.05
150.50 95.50 34.68 64.07 -
344.74
344.74
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvreAFFAIRE :
TERRASSEMENTS
Terrassements Gnraux 9.66 9.58 9.56 9.57 9.58 Niveau fini
sous-sol Ep. Dallage Ep. Forme sous dallage TN moyen Niveau fond de
forme Hauteur terrassement Angle talus en radian Angle talus en
degr Cube talus Larg 1.00 5.00 735.00 65.25 119.60 3 100.58 952.85
m m ml m m 7.05 0.13 0.25 9.59 6.67 2.92 0.79 45.00 7.18 Rdc =
9.82
TN Point n 1 - PR1 TN Point n 2 - PR2 TN Point n 3 - PR3 TN
Point n 4 - RG4 TN Point n 5 - RG5 TN Point n 6 TN Point n 7 TN
Point n 8 TN Point n 9 TN Point n 10 Nb de point
m
5.00 Long
m/ml
S.H.O.T. S/Sol S.H.O.T. Rampe pk Primtre S/Sol Fouille en pleine
masse
735.00 13.05 119.60
Remblai au pourtour construction
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvreAFFAIRE : Couleur Repre Long Larg
FONDATIONS
Ht
Nb
a.s.
a.i.
a.s.t.
Surf S. (m)
Ha (kg/m)
Ts (kg/m)
Bpe (m)
GBton (m)
Bton (m)
Fouille (m)
Ht Gb (ml)
coffrage (m)
ha (kg)
ts (kg)
Semelles Filantes & Isoles SF1e SF1i SF2 M1 M2 M3 M4 M5 M6
M7 M8 M9 M10 125.20 26.20 4.30 1.05 1.20 0.85 0.85 0.75 1.00 0.90
0.80 0.50 1.00 0.50 0.50 0.80 1.40 1.55 1.20 1.40 1.30 1.90 2.70
1.50 0.90 0.45 0.20 0.20 0.20 0.30 0.30 0.25 0.25 0.25 0.30 0.25
0.25 0.20 0.25
0.00 = 7.05 (sous-sol) 1.00 1.00 1.00 8.00 2.00 1.00 1.00 1.00
1.00 1.00 1.00 2.00 1.00 6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67
6.67 6.67 6.67 6.67 6.67 6.47 6.47 6.47 6.37 6.37 6.42 6.42 6.42
6.37 6.42 6.42 6.47 6.42 6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67
6.67 6.67 6.67 6.67 6.67 62.60 13.10 3.44 11.76 3.72 1.02 1.19 0.98
1.90 2.43 1.20 0.90 0.45 104.69 45.00 45.00 45.00 55.00 55.00 55.00
55.00 55.00 55.00 55.00 55.00 55.00 55.00 3.130 0.655 0.172 0.588
0.186 0.051 0.060 0.049 0.095 0.122 0.060 0.045 0.023 5.234 12.520
2.620 0.688 3.528 1.116 0.255 0.298 0.244 0.570 0.608 0.300 0.180
0.113 23.038 18.780 3.930 1.032 4.704 1.488 0.357 0.417 0.341 0.760
0.851 0.420 0.270 0.158 33.507 563 118 31 194 61 14 16 13 31 33 17
10 6 1 109
1.920
-
Semelles Filantes rampes et esc extrieurs SF SF 23.70 14.00 1.90
1.30 0.25 0.25 1.00 1.00 2.00 45.03 18.20 63.23 130.00 130.00 2.252
0.910 3.162 11.258 4.550 15.808 11.258 4.550 15.808 1 463 592 2
055
-
-
Bche retombe dalle porte faux PH SOUS-SOL 23.80 0.16 0.40
1.00
8.57 -
65.00
0.428 0.428
1.523 1.523
1.523 1.523
19.04 19.04
99 99
Bche dpart accs rampe sous-sol 5.00 0.20 0.50
1.00
2.00 -
50.00
0.100 0.100
0.500 0.500
0.500 0.500
5.00 5.00
25 25
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvreAFFAIRE : Repre Trmies Emp Dallage
SOUS-SOL asc ve 1 1 1 734.80 1.80 23.92 1.00 1.60 1.00 0.13 0.13
0.13 Nbre
DALLAGES
Couleur
Long
Larg
Epais. Dallage
Epais. Herisson
Epais. Sable
ha (kg/m2)
ts
Shot (m2)
Surface relle (m2)
Hrisson (m3)
Sable (m3)
Bton (m3)
ha (kg)
ts (kg)
Surfaage (m2)
2.30 2.30
734.80 734.80
-
734.80 2.88 23.92 708.00
-
-
-
95.52 0.37 3.11 92.04
-
1 690 1 690
-
734.80 2.88 23.92 708.00
Dallage RAMPE ACCES S/SOL 1
13.05
5.00
0.15
2.30
65.25 65.25
65.25 65.25
-
-
9.79 9.79
-
150 150
65.25 65.25
Chasse Roue Rampe accs PK
26.10
ml
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvre
POTEAUX
AFFAIRE : Couleur Repre Type poteaux
Larg Section Long Ht/Ml Diam Nb (u) Quant. Unitaire (m3/ml)
(m2/ml) ha (kg/m3) Cof. droit (m2) Cof 15 (ml) Cof 20 (ml) Cof 30
(ml) Cof 40 (ml) Cof 50 (ml) Cof. Circul. (m2) Bton (m3) ha (kg)
Polystyrne (m2) Ragrage (m2)
Poteaux SOUS-SOL d d d d d d djd d d
0.25 0.25 0.20 0.25 0.25 0.25 0.25 0.25
0.60 0.65 0.65 0.82 0.45 0.81 0.60 0.57
2.40 2.40 2.40 2.35 2.40 2.40 2.40 2.40
3.00 4.00 1.00 1.00 1.00 1.00 1.00 1.00
0.150 0.163 0.130 0.205 0.113 0.203 0.150 0.143 -
1.70 1.80 1.70 2.14 1.40 2.12 1.70 1.64 -
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
12.24 17.28 4.08 5.03 3.36 5.09 4.08 3.94 55.09
-
-
-
-
-
-
1.08 1.56 0.31 0.48 0.27 0.49 0.36 0.34 4.89
108 156 31 48 27 49 36 34 489
1.44
1.44
-
Poteaux RDC d ds voile d d d d
0.20 0.20 0.20 0.20
0.25 0.40 0.35 0.45
2.22 2.50 2.50
1.00 1.00 1.00 2.00
0.050 0.080 0.070 0.090 -
0.90 1.20 1.10 1.30 -
100.00 100.00 100.00 100.00
2.00 2.75 6.50 11.25
-
-
-
-
-
-
0.11 0.18 0.45 0.74
11 18 45 74 -
Poteaux R+1 d d d 0.20 0.20 0.35 0.45 2.52 2.52 1.00 2.00 0.070
0.090 1.10 1.30 100.00 100.00 2.77 6.55 9.32 0.18 0.45 0.63 18 45
63 -
-
Poteaux R+2 (en plus solution plancher Seac Bois en toiture) d
0.20 0.60 2.52 d 0.20 0.40 2.52 d
1.00 1.00
0.120 0.080 -
1.60 1.20 -
100.00 100.00
4.03 3.02 7.06
-
-
-
-
-
-
0.30 0.20 0.50
30 20 50 -
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvre
POUTRES
Couleur
AFFAIRE : Repre Type poutres Poutres SOUS-SOL T d T d T d T d T
d T d T d T djd T d T d T d T d T d T d T d T d d d
Larg
Section Ht
Ep pl.
Ht/Ml
Nb (u)
Quant. Unitaire (m3/ml) (m2/ml)
ha (kg/m3)
Cof. droit (m2)
Cof. Courbe (m2)
Bton (m3)
ha (kg)
Polystyrne JD (m2)
Ragrage (m2)
Impact (m2)
Linaire (ml)
C35/45 C30/37
0.60 0.60 0.60 0.45 0.50 0.35 0.25 0.25 0.50 0.35 0.40 0.35 0.35
0.30 0.25 0.30
0.65 0.65 0.65 0.65 0.65 0.55 0.65 0.65 0.65 0.55 0.55 0.50 0.60
0.50 0.40 0.45
0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.23 0.23 0.23 0.23 0.23
0.23 0.23 0.23
24.50 47.90 7.20 7.90 5.20 5.20 7.20 5.60 4.50 8.80 4.40 4.40
7.90 3.70 4.70 5.50
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 1.00 1.00
0.162 0.162 0.162 0.122 0.135 0.060 0.068 0.068 0.210 0.112
0.128 0.095 0.130 0.081 0.043 0.066 -
1.14 1.14 1.14 0.99 1.04 0.69 0.79 0.79 1.34 0.99 1.04 0.89 1.09
0.84 0.59 0.74 -
180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00
180.00 180.00 180.00 180.00 180.00 180.00 180.00
27.93 54.61 8.21 7.82 5.41 3.59 5.69 4.42 6.03 8.71 4.58 3.92
8.61 3.11 2.77 4.07 159.47
-
3.97 7.76 1.17 0.96 0.70 0.31 0.49 0.38 0.95 0.99 0.56 0.42 1.02
0.30 0.20 0.36 20.53 8.80 3.97 7.76
1 720 3 363 505 416 304 180 211 164 263 305 174 139 299 100 85
134 8 360 dont bton C25/30 dont bton C35/45 dont bton C30/37 -
3.64
3.64
27.93 54.61 8.21 7.82 5.41 3.59 5.69 4.42 6.03 8.71 4.58 3.92
8.61 3.11 2.77 4.07 159.47
14.70 28.74 4.32 3.56 2.60 1.82 1.80 1.40 2.25 3.08 1.76 1.54
2.77 1.11 1.18 1.65
24.50 47.90 7.20 7.90 5.20 5.20 7.20 5.60 4.50 8.80 4.40 4.40
7.90 3.70 4.70 5.50
74.27
154.60
Poutres RDC d -
-
-
-
-
-
Poutres R+1 d -
Poutres R+2 d d 0.18 0.85 11.40 1.00 0.153 1.88 95.00 21.43
21.43 1.74 1.74 166 166 21.43 21.43 2.05 2.05 11.40 11.40
-
-
Poutres R+2 (en plus solution plancher Seac Bois eb toiture) d
0.20 0.60 0.17 25.10 d
1.00
0.086 -
1.06 -
150.00
26.61 26.61
-
2.16 2.16
452 452
-
26.61 26.61
5.02 5.02
25.10 25.10
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvre
VOILES INTERIEURS
Couleur
AFFAIRE : Repre Type d/c/vpm voile
# # Ouv. p/f
Nbre
Linaire
Ht
Epais.
ha (kg/m2)
ts
Surface (m2)
Coffrage (m2)
PV Cof. Cages (m2)
PV Cof. Ght (m2)
PV Cof. Courbe (m2)
Cof. About V (ml)
PV Prmur (m2)
Polystyrne (m2)
Bton (m3)
ha (kg)
ts (kg)
Ngatif (u)
Pose Huis (u)
Ragrage (m2)
Emp. v (m2)
Lin. voile (ml)
Voiles refends intrieurs SOUS-SOL vi 1 15.40 vi 1 30.00 p - 2
0.90 o - 1 1.60 Aciers complmentaires incorpors P 2 0.60 P 2 0.30 P
1 0.82 P 1 1.25 P 1 0.65 P 1 0.60 P 1 0.90 p 1 0.65 L 1 4.60 AV 3
1.00 CV 5 1.00
2.77 2.77 2.10 2.10
0.20 0.25 0.20 0.20
2.30 2.30 -
42.66 83.10 3.78 3.36 -
85.32 166.20
27.70 -
8.53 20.78 0.76 0.67 -
83 42 57 87 45 42 62 45 16 17 69 564
98 191 -
85.32 166.20 2 1 2
3.08 7.50
15.40 30.00
-
-
2.77 2.77 2.77 2.77 2.77 2.77 2.77 2.77 1.00 2.77 2.77
0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 1.00 1.00 1.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 3.50
2.00 5.00
118.62
251.52
-
-
-
27.70
-
-
27.88
289
3
2
251.52
10.58
45.40
Voiles refends intrieurs RDC vi 1 p - 13 o - 1
129.80 0.90 1.60
2.50 2.10 2.10
0.18 0.18 0.18
2.30 -
324.50 24.57 3.36 -
649.00
30.00 -
58.41 4.42 0.60 -
13 66 150 70 299
746 -
649.00 13 1 13
23.36
129.80
-
-
Aciers complmentaires incorpors P 1 0.28 L 1 18.90 CV 12 1.00 AV
14 1.00
2.50 1.00 2.50 2.50
0.18 1.00 1.00 1.00
100.00 3.50 5.00 2.00 296.57 53.38
649.00
-
-
-
30.00
-
-
746
14
13
649.00
23.36
129.80
Voiles refends intrieurs R+1 vi 1 p - 13 o - 1
130.90 0.90 1.60
2.52 2.10 2.10
0.18 0.18 0.18
2.30 -
329.87 24.57 3.36 -
659.74 -
59.38 4.42 0.60 -
66 150 70 286
759 -
659.74 13 1 13
23.56
130.90
-
-
Aciers complmentaires incorpors P 1 L 1 18.90 CV 12 1.00 AV 14
1.00
2.50 1.00 2.50 2.50
1.00 1.00 1.00
100.00 3.50 5.00 2.00
301.94 Voiles refends intrieurs R+2 vi 1
659.74
-
-
-
-
-
-
54.35
759
14
13
659.74
23.56
130.90
48.50
2.65
0.18
2.30
128.53
257.05
23.13
-
296
257.05
8.73
48.50
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvre
VOILES INTERIEURS
Couleur
AFFAIRE : Repre Type d/c/vpm voile
# # Ouv. Nbre p/f p - 5 o - 1
Linaire 0.90 1.60
Ht 2.10 2.10
Epais. 0.18 0.18
ha (kg/m2)
ts -
Surface (m2) 9.45 3.36 -
Coffrage (m2)
PV Cof. Cages (m2)
PV Cof. Ght (m2)
PV Cof. Courbe (m2)
Cof. About V (ml)
PV Prmur (m2)
Polystyrne (m2) -
Bton (m3) 1.70 0.60 -
ha (kg) 30 53 21 104
ts (kg) -
Ngatif (u) 5 1
Pose Huis (u) 5
Ragrage (m2)
Emp. v (m2)
Lin. voile (ml)
-
-
Aciers complmentaires incorpors P 1 L 1 8.50 CV 4 1.00 AV 4
1.00
2.50 1.00 2.65 2.65
1.00 1.00 1.00
100.00 3.50 5.00 2.00
115.72
257.05
-
-
-
-
-
-
20.83
296
6
5
257.05
8.73
48.50
1 817.30 180.00 1 637.30 ded zone double
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvre
VOILES EXTERIEURS
Couleur
AFFAIRE : Repre Type d/c/vpm voile
# # Ouv. p/f
Nbre
Linaire
Ht
Epais.
ha (kg/m2)
ts
Surface (m2)
Coffrage (m2)
PV Cof. Ght (m2)
PV Cof. Courbe (m2)
Cof. About V (ml)
Polystyrne (m2)
Bton (m3)
ha (kg)
ts (kg)
Ngatif (u)
Pose Huis (u)
Ragrage (m2)
Emp. v (m2)
Lin. voile (ml)
Voiles priphriques sous-sol ve 1 p - 1 o - 1
119.60 0.90 1.70
2.82 2.10 1.00
0.20 0.20 0.20
-
10.00 -
337.27 1.89 1.70 -
674.54 -
67.45 0.38 0.34 -
68 20
3 373 -
337.27 1 1 1
23.92
119.60
-
-
Aciers complmentaires incorpors P 2 0.60 P 1 0.35
2.82 2.82
0.20 0.20
100.00 100.00 333.68 66.74 -
674.54
-
-
-
-
87
3 373
2
1
23.92
119.60
Esc Ramp Ramp
Voiles rampe et escalier ext. sous-sol ve 1 11.20 ve 1 6.80 c ve
1 5.00 C ve 1 13.90
4.10 4.10 4.10 3.20
0.20 0.20 0.20 0.20
14.00 14.00 14.00 14.00
8.00 8.00 8.00 8.00
45.92 27.88 20.50 44.48 138.78
91.84 55.76 41.00 88.96
91.84 55.76 41.00
41.00 88.96
277.56
188.60
129.96
-
-
9.18 5.58 4.10 8.90 27.76
643 390 287 623 1 943
367 223 164 356 1 110
45.92 27.88 20.50 44.48
-
-
2.24 1.36 1.00 2.78 7.38
11.20 6.80 5.00 13.90 36.90
Voiles faade RDC ve p -
1 5
16.30 1.00
2.50 2.10
0.20 0.20
-
2.30 -
40.75 10.50 -
81.50 -
8.15 2.10 -
20 23
94 5 5
3.26 -
16.30 -
Aciers complmentaires incorpors P 1 0.40 L 1 6.50
2.50 1.00
0.20 1.00
100.00 3.50 30.25 6.05 -
43 94 5 5
81.50
-
-
-
-
3.26
16.30
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvre
PLANCHERS
Couleur
AFFAIRE : Repre Trmies Emp
Nbre
Long
Larg
Epais.
ha (kg/m2)
ts
Surface SHOT (m2)
Coffrage (m2)
Coffrage rive (ml)
PV Cof. Dbord (m2)
Planelles brique (ml)
Planelle Agglo (ml)
Bton (m3)
ha (kg)
ts (kg)
Ragrage s/face (m2)
Surfaage (m2)
Plancher dalle pleine PH SOUS-SOL 1 277.20 1 457.60 asc 1
1.80
1.00 1.00 1.60
0.38 0.23 0.23
0.50 0.50
36.00 10.00
pou 1 74.27 1.00 vi 1 10.58 1.00 ve 1 119.60 0.20 mb 1 ma Aciers
complmentaires bandes pleines et chainages BN35/37 1 1.30 1.00
1.00
277.20 457.60 -
-
277.20 457.60 2.88 74.27 10.58 23.92 -
-
119.60 -
-
105.34 105.25 0.66 -
139 229 51 418
9 979 4 576 -
-
277.20 457.60 2.88 74.27 10.58 23.92 -
-
277.20 457.60 2.88 -
-
23.92 -
38.85 734.80 623.16 209.92
119.60
-
-
-
14 555
623.16
708.00
Plancher Dalle Porte faux PH SOUS-SOL 1 52.80
1.00
0.23
2.00
18.00
52.80 52.80
52.80 52.80
54.30
54.30
-
12.14 12.14
106 106
950 950
52.80 52.80
52.80 52.80
Plancher Casquette PH SOUS-SOL (au droit rampe accs PK) 1 5.00
0.50 0.23
2.00
18.00
2.50 2.50
2.50 2.50
6.00
6.00
-
0.58 0.58
5 5 -
45
45
2.50 2.50
2.50 2.50
Plancher dalle pleine PH RDC 1 asc 1 esc 1
709.80 1.80 7.65
1.00 1.60 1.00
0.22 0.22 0.22
0.50
13.00
pou 1 1.00 vi 1 23.36 1.00 ve 1 16.30 0.20 mb 1 128.30 0.25 ma
Aciers complmentaires bandes pleines et chainages BN35/22 1 3.50
1.00 BN25/22 1 2.00 1.00 BN55/22 1 3.80 1.00 CH 1 138.50 1.00
-
709.80 -
-
-
709.80 2.88 7.65 23.36 3.26 32.08 -
-
16.30 128.30 -
128.30 -
156.16 0.63 1.68 -
355 81 33 138 346
9 227 -
-
-
709.80 2.88 7.65 23.36 3.26 32.08 -
-
709.80 2.88 7.65 -
-
3.26 32.08 -
1.00 1.00 1.00 1.00
23.10 16.50 36.30 2.50
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvre
PLANCHERS
Couleur
AFFAIRE : Repre Trmies Emp
Nbre
Long
Larg
Epais.
ha (kg/m2)
ts
Surface SHOT (m2) 709.80
Coffrage (m2) 640.57
Coffrage rive (ml)
PV Cof. Dbord (m2)
Planelles brique (ml)
Planelle Agglo (ml)
Bton (m3) 153.84
144.60
-
128.30
-
ha (kg) 953
ts (kg) 9 227
Ragrage s/face (m2) 640.57
Surfaage (m2) 663.94
Plancher Dalle Balcons PH RDC 1
41.60
1.00
0.18
2.00
14.00
41.60 41.60
41.60 41.60
33.70
33.70
-
7.49 7.49
83 83
582 582
41.60 41.60
41.60 41.60
Plancher dalle pleine PH R+1 1 asc 1 esc 1
709.80 1.80 7.65
1.00 1.60 1.00
0.23 0.23 0.23
0.50
18.00
pou 1 1.00 vi 1 23.56 1.00 ve 1 mb 1 144.70 0.25 ma Aciers
complmentaires bandes pleines et chainages BN35/23 1 10.20 1.00
BN25/23 1 2.00 1.00 BN55/23 1 1.00 CH 1 144.70 1.00 Aciers
complmentaires dalle en dbord 1 25.10 1.00
-
709.80 -
-
-
709.80 2.88 7.65 23.56 36.18 -
25.10 -
144.70 -
144.70 -
163.25 0.66 1.76 -
355 246 35 362 -
12 776 -
-
-
709.80 2.88 7.65 23.56 36.18 -
-
709.80 2.88 7.65 -
-
36.18 -
1.00 1.00 1.00 1.00
24.15 17.25 37.95 2.50
1.00
1.50
-
4.00 709.80 639.53 160.83
144.70
25.10
144.70
-
38 1 035
-
100 12 676
639.53
663.10
Plancher Dalle Balcons PH R+1 Compte dans plancher avec P.V.
cof. Dbord
-
-
-
-
-
-
-
-
-
1 255.00
Ragrage int
69.20
Ragrage ext
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvre
PLANCHERS
Couleur
AFFAIRE : Repre Trmies Emp
Nbre
Long
Larg
Epais.
ha (kg/m2)
ts
Surface SHOT (m2)
Coffrage (m2)
Coffrage rive (ml)
PV Cof. Dbord (m2)
Planelles brique (ml)
Planelle Agglo (ml)
Bton (m3)
ha (kg)
ts (kg)
Ragrage s/face (m2) 7.94 77.14
Surfaage (m2) Rive
Plancher dalle pleine PH R+2 (solution Plancher Seac Bois) 1
344.70 1.00 asc 1 1.80 1.60 pou 1 5.02 1.00 vi 1 8.73 1.00 ve mb 1
86.80 0.25 ma Aciers complmentaires bandes pleines et chainages
344.70 -
-
344.70 2.88 5.02 8.73 21.70 -
86.80 -
86.80 -
-
-
-
-
344.70 2.88 5.02 8.73 21.70 -
-
344.70 2.88 -
-
21.70 -
344.70
306.37
86.80
-
86.80
-
-
-
306.37
320.12
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvre
MACONNERIES FACADES
Couleur
AFFAIRE : Repre
Ouv. p/f
Nbre
Linaire
Ht
Surface vnd (m2)
Surface (m2)
PV S. courbe (m2)
Appuis (ml)
Seuils (ml)
Calfeutr. (ml)
Linteaux (ml)
Tableaux R (ml)
Emp. m (m2)
Lin. m (ml)
Ramp. (ml)
Nb ouv (u)
Cof
Maonneries faades bloc cellulaire RDC 1 128.30 pf - 10 1.80 pf -
1 1.60 pf - 16 0.90 f - 1 0.40 f - 1 0.90
2.50 2.15 2.15 2.15 0.40 1.15
320.75 320.75
320.75 38.70 3.44 30.96 0.16 1.04 246.46
25.66 18.00 1.60 14.40 0.40 0.90 61.00 5.90 83.20 1.20 3.20
22.00 2.00 20.80 0.80 1.30 43.00 4.30 68.80 0.80 2.30 25.66
128.30 10.00 1.00 16.00 1.00 1.00 128.30
-
1.30
34.00
154.50
46.90
119.20
-
29.00
1.30
Maonneries faades bloc cellulaire R+1 1 144.70 pf - 11 1.80 pf -
1 1.60 pf - 18 0.90 f - 1 0.40 f - 1 0.90
2.52 2.15 2.15 2.15 0.40 1.15
364.64 364.64
364.64 42.57 3.44 34.83 0.16 1.04 282.61
28.94 19.80 1.60 16.20 0.40 0.90 67.10 5.90 93.60 1.20 3.20
24.20 2.00 23.40 0.80 1.30 47.30 4.30 77.40 0.80 2.30 28.94
144.70 11.00 1.00 18.00 1.00 1.00 144.70
-
1.30
37.60
171.00
51.70
132.10
-
32.00
1.29
Maonneries faades bloc cellulaire R+2 1 86.80 pf - 5 1.80 pf - 9
0.90 f - 1 0.40
2.61 2.15 2.15 0.40
226.55 226.55
226.55 19.35 17.42 0.16 189.62
17.36 9.00 8.10 0.40 30.50 46.80 1.20 11.00 11.70 0.80 21.50
38.70 0.80 17.36
86.80 5.00 9.00 1.00 86.80
-
0.40 3.00
17.10 88.70
78.50
23.50
61.00
-
15.00 76.00
1.19
Plot BA dans maonnerie R+2 22 u
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvre
AUTRES MACONNERIES
Couleur
AFFAIRE : Repre
Ouv. p/f
Nbre
Linaire
Ht
Surface vnd (m2)
Surface (m2)
PV S. courbe (m2)
Appuis (ml)
Seuils (ml)
Calfeutr. (ml)
Linteaux (ml)
Tableaux R (ml)
Emp. m (m2)
Lin. m (ml)
Ramp. (ml)
Nb ouv (u)
Cof
Maonneries locaux techniques RDC 1 19.55 p - 1 0.90
2.50 2.10
48.88 48.88
48.88 1.89 46.99
3.91 0.90 5.10 1.30 4.20 3.91
19.55 1.00 19.55
-
-
0.90
5.10
1.30
4.20
-
1.00
1.04
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvre
OSSATURES DS MACONNERIES
AFFAIRE : Repre Type Section Ht/Ml Nb Quant. Unitaire r/c/l Larg
Long (u) (m3/ml) (m2/ml) "cr" chainage rive "cp" chainage planelle
"cu" chainage bloc U "cc" chainage coffr "lu" linteau bloc U "lc"
linteau coffr Raidisseurs Chainages Linteaux RDC R LC 0.20 0.20 CC
LU CR CP
ha (kg/m3)
Coffrage (m2)
Planelles (ml)
Bton (m3)
ha (kg)
Raidisseurs (ml)
Chainages (ml)
Chainages U (ml)
Linteaux U (ml)
Linteaux cof (ml)
2.50 46.90
36.00 1.00
0.040 -
90.00 0.60 87.50 28.14 28.14 46.90 1.88 1.88 164 46.90 164 90.00
46.90 46.90
Raidisseurs Chainages Linteaux R+1 R LC 0.20 0.20 CC LU CR
CP
2.52 51.70
36.00 1.00
0.040 -
90.72 0.60 87.50 31.02 31.02 51.70 2.07 2.07 181 51.70 181 90.72
51.70 51.70
Raidisseurs Chainages Linteaux R+2 R LC 0.20 0.20 CC LU CR
CP
2.61 23.50
19.00 1.00
0.040 -
49.59 0.60 87.50 14.10 14.10 23.50 0.94 0.94 82 23.50 82 49.59
23.50 23.50
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvre
OUVBA
Couleur
AFFAIRE : Repre Type d/c
Larg
Section Ht
Ep pl.
Ml
Nb (u)
Quant. Unitaire (m3/ml) (m2/ml)
ha (kg/m3)
ts (kg/m3)
Cof. droit (m2)
Cof. Courbe (m2)
Bton (m3)
ha (kg)
ts (kg)
Polystyrne (m2)
Ragrage (m2)
Glacis (ml)
Relevs BA sous maonnerie RDC d 0.15 0.17 d
35.40
1.00
0.026 -
0.34 -
65.00
12.04 12.04
-
0.90 0.90
59 59
-
-
-
35.40 35.40
Relevs BA 16/15 sur dalle en dbord RDC d 0.16 0.15 d
54.30
1.00
0.024 -
0.30 -
65.00
16.29 16.29
-
1.30 1.30
85 85
-
-
16.29 16.29
54.30 54.30
Relevs BA 16/12 sur dalle balcons PH RDC d 0.16 0.15 d
20.10
1.00
0.024 -
0.30 -
65.00
6.03 6.03
-
0.48 0.48
31 31
-
-
6.03 6.03
20.10 20.10
Releves BA sous maonnerie R+2 d 0.15 d
0.30
86.80
1.00
0.045 -
0.60 -
65.00
52.08 52.08
-
3.91 3.91
254 254
-
-
-
86.80 86.80
Acrotres Relevs R+2 (Terrasses) d 0.20 d 0.20 d 0.16 d 0.18
d
0.50 0.45 0.30 0.30
89.90 35.10 7.70 4.80
1.00 1.00 1.00 1.00
0.100 0.090 0.048 0.054 -
1.00 0.90 0.60 0.60 -
90.00 90.00 65.00 65.00
89.90 31.59 4.62 2.88 128.99 60.75
Planelle bce
8.99 3.16 0.37 0.26 12.78
809 284 24 17 1 134
-
-
89.90 31.59 4.62 2.88 128.99
89.90 35.10 7.70 4.80 137.50
Acrotres R+2 (Tte de mur Toiture) d 0.16 0.70 d
86.80
1.00
0.112 -
1.40 -
90.00
121.52 121.52 25.00 36.54 36.54
-
9.72 9.72 2.74 2.74
875 875 55 55
69 69
-
-
86.80 86.80 6.30 6.30
Gaine VB SOUS-SOL d d
0.15
2.90
6.30
1.00
0.435 -
5.80 -
20.00
-
-
-
Edicule Asc
d d
0.20
1.70
7.40
1.00
0.340 -
3.40 -
20.00
25.00
25.16 25.16
-
2.52 2.52
50 50 -
63 63 -
7.40 7.40
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvreAFFAIRE : ESCALIERS B.A. Escalier vole
droite Nbre de marches Emmarchement Hauteur marches Giron
Epais.paillasse Ferraillage u ml ml ml ml Kg / m3 Rsultat Coffrage
m2 Bton m3 Acier kg Chape m2 Ragrage m2 Linaire marches ml Coffrage
m2 / ml Bton m3 / ml Acier kg / m3 Surface paillasse m2
ESCALIERS
#DIV/0! #DIV/0! #DIV/0! -
Escalier vole balance Marches droites Emmarch.droit Marches
balances Emmarch.balanc Hauteur marches Giron Epais.paillasse
Ferraillage u ml u ml ml ml ml Kg / m3 Rsultat Coffrage m2 Bton m3
Acier kg Chape m2 Ragrage m2 Linaire marches ml Coffrage m2 / ml
Bton m3 / ml Acier kg / m3 Surface paillasse m2
#DIV/0! #DIV/0! #DIV/0! -
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvreAFFAIRE : Longueur 1.80 Dimensions
intrieures largeur hauteur 1.60 1.40 - Fouilles - Remblai extrieur
- Evacuation aux D.P. - Radier bton de propret coffrage bton acier
ha (kg/m3) acier ts (kg/m3) - Parois coffrage bton acier ha (kg/m3)
acier ts (kg/m3) - Cuvelage - Contre dalle m2 m3 kg kg m2 m2 m2 ml
m3 kg kg
FOSSE ASC
pais.mur 0.20
u nb 1 m3 m3 m3
Quantits
23.520 17.360 8.008
14 80
6.24 10.00 1.560 22 125
25 50
21.28 2.128 53 106 12.40 2.88
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :
[email protected]
exemple mtr gros-oeuvre
M_EXT
AFFAIRE : Repre Type mur (ma mb ba)
Type pf / f / p Larg ht Nbre Surface (m2) Appuis (ml) Seuils
(ml)
Quantits Unitaires Linteaux (ml)
Calfeut. (ml)
T.V. (ml)
Tab Rectifi (ml)
Surf. Ds agglo (m2)
Surf. Ds brique (m2)
Surf. Ds bton (m2)
Appuis (ml)
Quantits Totales Seuils Linteaux (ml) (ml)
Calfeut. (ml)
T.V. (ml)
Tab rectifi (ml)
Ngatif (u)
ma = mur agglos ; mb = mur brique ; ba = voile bton Menuiseries
SOUS-SOL ba
p
1.00
2.10
1.00
2.10 -
1.00
5.20 -
2.10
1.00
1.00 Menuiseries RDC ma ma ma ma ma ba
2.10
-
1.00
-
-
5.20 5.20
1
-
1
pf pf pf f f p
1.80 1.60 0.90 0.40 0.90 1.00
2.15 2.15 2.15 0.40 1.15 2.10
10.00 1.00 16.00 1.00 1.00 5.00
3.87 3.44 1.94 0.16 1.04 2.10 -
1.80 1.60 0.90 0.40 0.90 1.00
2.20 2.00 1.30 0.80 1.30
6.10 5.90 5.20 1.20 3.20
6.10 5.90 5.20 1.20 3.20 5.20 -
38.70 3.44 30.96 0.16 1.04 10.50
18.00 1.60 14.40 0.40 0.90 5.00
22.00 2.00 20.80 0.80 1.30
61.00 5.90 83.20 1.20 3.20
34.00 Menuiseries R+1 ma ma ma ma ma
74.30
-
10.50
1.30
39.00
46.90
154.50
61.00 5.90 83.20 1.20 3.20 26.00 180.50
5
-
5
pf pf pf f f
1.80 1.60 0.90 0.40 0.90
2.15 2.15 2.15 0.40 1.15
11.00 1.00 18.00 1.00 1.00
3.87 3.44 1.94 0.16 1.04 -
1.80 1.60 0.90 0.40 0.90
2.20 2.00 1.30 0.80 1.30
6.10 5.90 5.20 1.20 3.20
6.10 5.90 5.20 1.20 3.20 -
42.57 3.44 34.83 0.16 1.04
19.80 1.60 16.20 0.40 0.90
24.20 2.00 23.40 0.80 1.30
67.10 5.90 93.60 1.20 3.20
32.00 Menuiseries R+2 ma ma ma
82.04
-
-
1.30
37.60
51.70
171.00
67.10 5.90 93.60 1.20 3.20 171.00
-
-
pf pf f
1.80 0.90 0.40
2.15 2.15 0.40
5.00 9.00 1.00
3.87 1.94 0.16 -
1.80 0.90 0.40
2.20 1.30 0.80
6.10 5.20 1.20
6.10 5.20 1.20 -
19.35 17.42 0.16
9.00 8.10 0.40
11.00 11.70 0.80
30.50 46.80 1.20
15.00
36.93
-
-
0.40
17.10
23.50
78.50
30.50 46.80 1.20 78.50
-
-
3.00
94.70
Cabinet HL.BTIMTR Hubert LE BALC'H Mtreur - conomiste de la
construction Tl : 06 15 67 74 06 - Mail :