Page 1: Ewms presentation feb22 meeting   final
Page 2: Ewms presentation feb22 meeting   final

Based on the 2012 Accomplishment Report

Page 3: Ewms presentation feb22 meeting   final

Monitored implementation of LGUs SWM

Plans and compliance to RA 9003

Page 4: Ewms presentation feb22 meeting   final

Formulated questionnaire on data

gathering for MENROs in coordination

with Provincial Planning and

Development Office (PPDO)questionnaire for menro.docx

Formulated questionnaire on perception

of MENROs on SWM in coordination with

PPDOPerception on SWM (for MENRO and staff).docx

Page 5: Ewms presentation feb22 meeting   final

Formulated checklist on SWMCHECKLIST swm monitoring Agoncillo.docx

Formulatedchecklist on piggery farmsCHECKLIST piggery poultry farm Bauan.docx

Page 6: Ewms presentation feb22 meeting   final
Page 7: Ewms presentation feb22 meeting   final

Name of City/

Municipality

Office/s in-

charge

of SWM

No. of SWM

Personnel

SWMPMSWMB

Present

AbsentPresent Absent Active

Inactive

AGONCILLOMEO,

MAO3 / /

ALITAGTAG MEO 11 / /

BALETEMPDO,

GSO10 / /

CUENCAMPDO,

MEO10 / /

LAUREL GSO 5 / /

LIPA CITYCity-

ENRO7 / /

Page 8: Ewms presentation feb22 meeting   final

Name of City/

Municipality

Office/s in-

charge

of SWM

No. of SWM

Personnel

SWMPMSWMB

Present

AbsentPresent Absent Active

Inactive

MALVAR MTO 8 / /

MATAASNAKAHOY MAO 3 / /

SAN NICOLAS MPDO 1 / /

STA. TERESITA MAO 2 / /

TALISAY HRMO 11 / /

TANAUANCity-

ENRO10 / /

Page 9: Ewms presentation feb22 meeting   final

Name of City/

MunicipalityNo. of

Barangays

No. of

Barangays

included

in waste

collection

BSWMC MRF

Present

Absent

Present

Absent

Active Inactive FunctionalNot

functional

AGONCILLO 21 1 0 21 0 1 0 20

ALITAGTAG 19 19 15 4 0 16 2 1

BALETE 13 1 13 0 0 1 0 12

CUENCA 21 1 21 0 0 11 10 0

LAUREL 21 5 14 0 7 1 0 20

LIPA CITY 72 31 46 26 0 15 5 52

Page 10: Ewms presentation feb22 meeting   final

Name of City/

MunicipalityNo. of

Barangays

No. of

Barangays

included

in waste

collection

BSWMC MRF

Present

Absent

Present

Absent

Active Inactive FunctionalNot

functional

MALVAR 15 5 0 15 0 0 15 0

MATAASNAKAHOY 16 6 9 7 0 2 15 0

SAN NICOLAS 18 N/A ND ND ND 0 0 18

STA. TERESITA 17 1 17 0 0 9 0 8

TALISAY 21 8 zones 14 3 4 0 0 21

TANAUAN 48 1 0 0 48 1 0 47

Page 11: Ewms presentation feb22 meeting   final

Name of City/

Municipality

Type of Disposal

Facility

Location AreaMRF

(Disposal

Facility)

WACS Equipments

AGONCILLOOpen

DumpsiteSan Jacinto 500 sqm Absent None Dump truck

ALITAGTAG SLF San Juan 1.3 has Present YESDump truck, composting

drum

BALETEOpen

DumpsiteAlangilan 5,000 sqm Present YES Dump truck

CUENCA SLF Poblacion 8 3,414 sqm Present YESShredder, Hammermill,

Composter, Dump trucks

LAURELOpen

DumpsitePoblacion 2 8,090 sqm Present YES Dump truck

LIPA CITYTransfer

StationMarauoy

Approx.

5,000 sqmAbsent YES Dump truck

Page 12: Ewms presentation feb22 meeting   final

Name of City/

Municipality

Type of Disposal

Facility

Location AreaMRF

(Disposal

Facility)

WACS Equipments

MALVAROpen

Dumpsite

San

Pioquinto

15, 000

sqmPresent YES Dump truck

MATAASNAKAHOYTransfer

StationBarangay II 5,000 sqm Present YES

Composter, shredder,

Pulverizer, Compactor,

Garbage Truck

SAN NICOLAS None N/A N/A N/A None N/A

STA. TERESITAControlled

Dumpsite

Municipal

Hall vicinityND N/A None Dump truck

TALISAYOpen

DumpsiteTranca 1 ha Present YES Dump truck, shredder

TANAUANTransfer

StationSambat 2,480 sqm Absent YES Dump truck, compactor

Page 13: Ewms presentation feb22 meeting   final

Name of

City/

Municipality

Waste

Generation

Diverted

Waste

Mode of

diversion

Disposed

waste

Programs

AGONCILLO 36 tons/year None None36

tons/year

Planning to acquire 3,000

sqm lot intended for

waste disposal facility

ALITAGTAG3,227

tons/year

2,130

tons/year

Composting,

sold to

junkshops

1,093

tons/yearIEC

BALETE 240 tons/year None None240

tons/yearIEC

CUENCA 365 tons/year242

tons/year

Composting,

sold to

junkshops

153

tons/yearIEC

LAUREL547.5

tons/yearND

Composting,

sold to

junkshops,

brick-making

492.75

tons/yearIEC

LIPA CITY53,699

tons/year

8,055

tons/year

Sold to

junkshops

45,644

tons/year

Clean&Green,

Regulatory functions

enforcement, IEC, river

clean-up

Page 14: Ewms presentation feb22 meeting   final

Name of City/

Municipality

Waste

Generation

Diverted

Waste

Mode of

diversion

Disposed

waste

Programs

MALVAR1,538

tons/year365 tons/year Composting

1,173

tons/year

IEC, vermi-

composting

MATAASNAKAHOY1-2 trucks

quarterly2 tons/year

Pulverization

for brick-

making

purposes

1-2 trucks

quarterly

SWM

trainings

and

seminars

SAN NICOLAS ND N/A N/A N/A

Acquisition

of grinding

machine

STA. TERESITALess than 1

ton/dayNone None

Less than 1

ton/day

IEC, land

acquisition

for waste

disposal

facility

TALISAY 829 kg/day ND ND 829 kg/day

IEC,

seminars/

trainings

TANAUAN 50.8 tons/day NDSold to

junkshops45 tons/day IEC

Page 15: Ewms presentation feb22 meeting   final

Attended to the complaints of the

community having pollution problems

Page 16: Ewms presentation feb22 meeting   final

Conducted seminars/ workshops on

SWM

Page 17: Ewms presentation feb22 meeting   final

Monitored establishments with ECC

(Environmental Compliance Certificate)

Page 18: Ewms presentation feb22 meeting   final

Participated in the monitoring activities

of different industries having multipartite

monitoring teams

Page 19: Ewms presentation feb22 meeting   final
Page 20: Ewms presentation feb22 meeting   final

Capacity Building of EWMS personnel

Limited fund

Scope and limitations of powers and

functions of EWMS

Visitorial powers (ECC)

Transportation

Lack of commitment of LGU Officials

Page 21: Ewms presentation feb22 meeting   final