Page 1: Ewijk Präsentation

Design and constructionaspects

Munich | July 02, 2013

Waalbridge EwijkNetherlands

Thomas Kahl

Page 2: Ewijk Präsentation

Waalbridge Ewijk | July 13

Contents

Tender – competitive dialog

Bridge layout and construction

Incremental launching

Free balanced cantilever section

Bearings

Pylon and cables

Page 3: Ewijk Präsentation

Waalbridge Ewijk | July 13

Contents

Tender - competitive dialog

Free balanced cantilever section

Incremental launching

Bearings

Pylon and cables

Bridge layout and construction

Page 4: Ewijk Präsentation

Waalbridge Ewijk | July 13

Existing Waalbridge

Page 5: Ewijk Präsentation

Waalbridge Ewijk | July 13

General requirements

55

Page 6: Ewijk Präsentation

Waalbridge Ewijk | July 13

Extract of important requirements

66

Technical requirements (VS1): Bridge Width of the bridge between the barriers 19,85m 4m emergency lane, 4 traffic lanes in one direction EMVI-criterium minimal running maintenance costs concrete bridge Eigen eisen: construction cost and construction time Binding documents (like NBD’s) and eurocode + project specific NB’s

Process requirements (VS2): Systems Engineering for design and construction EVP’s en EVR’s and approval plans Transparent track of decision : trade-off / LCC / KALM Ontwerpnota’s / UGP’s / beheer- en onderhoudsplan en tekeningen als bewijsdocumenten Open riscmanagment Responsible for all agent approval, like environmental approvals…

Aestetic requirments Archictacral design required EMVI-criterium vormgeving: integartion of old and new Waalbridge Open structure and transpereant

Page 7: Ewijk Präsentation

Waalbridge Ewijk | July 13

Concept of DYWIDAG and Mobiles

Page 8: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 9: Ewijk Präsentation

Waalbridge Ewijk | July 13

Contents

Tender - competitive dialog

Free balanced cantilever section

Incremental launching

Bearings

Pylon and cables

Bridge layout and construction

Page 10: Ewijk Präsentation

Waalbridge Ewijk | July 13

Bridge layout on South side

Page 11: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 12: Ewijk Präsentation

Waalbridge Ewijk | July 131212

Main crosssection

19,85m 4m

Page 13: Ewijk Präsentation

Waalbridge Ewijk | July 13

Backspan 105m Approach span 85m or 90m Slenderness construction stage: L/h 11 Slenderness final stage: L/h = 22,5

Frist span ILM concrete C70/85, rest C45/55 Precast elements C53/65 Pylon bottom also C70/85 (after 91 days)

Page 14: Ewijk Präsentation

Waalbridge Ewijk | July 13

Transverse PT

Page 15: Ewijk Präsentation

Waalbridge Ewijk | July 1315

Page 16: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 17: Ewijk Präsentation

Waalbridge Ewijk | July 13

Drainasphalt

Page 18: Ewijk Präsentation

Waalbridge Ewijk | July 1318

Page 19: Ewijk Präsentation

Waalbridge Ewijk | July 13

Special features of the Waalbridge

Cable utilization 0,5 GUTS Free balanced cantilever without PT (10m) External PT in the mainspan (cement grouted) Centrical PT in approach bridges partly released after reaching final launching

position Self compacting concrete at the pylon socket C53/C65 after 91 days C70/85 for pylon socket and first incremental launching

section (standard concrete - no height strength concrete)

Page 20: Ewijk Präsentation

Waalbridge Ewijk | July 13

Riverpiers

Page 21: Ewijk Präsentation

Waalbridge Ewijk | July 13

Contents

Tender - competitive dialog

Free balanced cantilever section

Incremental launching

Bearings

Pylon and cables

Bridge layout and construction

Page 22: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 23: Ewijk Präsentation

Waalbridge Ewijk | July 13

Incrementral launching

section A section B section C

Boxconstruction PC- elements Insitu deck concrete

Page 24: Ewijk Präsentation

Waalbridge Ewijk | July 13

PT layout for approach bridge south

Centrical PT 41kg/m²Excentrical PT 28,8kg/m²

Page 25: Ewijk Präsentation

Waalbridge Ewijk | July 13

Launching nose connection

Page 26: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 27: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 28: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 29: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 30: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 31: Ewijk Präsentation

Waalbridge Ewijk | July 13

Boxgirder construction

Page 32: Ewijk Präsentation

Waalbridge Ewijk | July 133232

Blisters approach bridge

Page 33: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 34: Ewijk Präsentation

Waalbridge Ewijk | July 13

Centric stressing

Prestressing

Page 35: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 36: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 37: Ewijk Präsentation

Waalbridge Ewijk | July 13

Contents

Tender - competitive dialog

Free balanced cantilever section

Incremental launching

Bearings

Pylon and cables

Bridge layout and construction

Page 38: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 39: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 40: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 41: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 42: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 43: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 44: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 45: Ewijk Präsentation

Waalbridge Ewijk | July 13

External PT in the main span

Page 46: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 47: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 48: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 49: Ewijk Präsentation

Waalbridge Ewijk | July 13

Height FBC section 350cm

Page 50: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 51: Ewijk Präsentation

Waalbridge Ewijk | July 13

External Prestressing

Page 52: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 53: Ewijk Präsentation

Waalbridge Ewijk | July 13

Contents

Tender - competitive dialog

Free balanced cantilever section

Incremental launching

Bearings

Pylon and cables

Bridge layout and construction

Page 54: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 55: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 56: Ewijk Präsentation

Waalbridge Ewijk | July 13

Bearings

Page 57: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 58: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 59: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 60: Ewijk Präsentation

Waalbridge Ewijk | July 13

Bearing arrangement pier 3 Construction stage Final stage Bearing exchange

Page 61: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 62: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 63: Ewijk Präsentation

Waalbridge Ewijk | July 13

Contents

Tender - competitive dialog

Free balanced cantilever section

Incremental launching

Bearings

Pylon and cables

Bridge layout and construction

Page 64: Ewijk Präsentation

Waalbridge Ewijk | July 13

1

2

3

4

5

6

7

8

910

51,5

3m +

13,

7cm

3,50/3,00m

2,50/2,00m

Pylon, staycables

Page 65: Ewijk Präsentation

Waalbridge Ewijk | July 13

Pylon area

Page 66: Ewijk Präsentation

Waalbridge Ewijk | July 13

Layout drawing of section 1

Page 67: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 68: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 69: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 70: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 71: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 72: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 73: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 74: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 75: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 76: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 77: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 78: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 79: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 80: Ewijk Präsentation

Waalbridge Ewijk | July 13

Page 81: Ewijk Präsentation

Local Presence – Global Competence

Thank you!