Top Banner
EVITHERM kick-off meeting, NPL, 27-28 January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier 75015 Paris France Jean-Rémy FILTZ ([email protected])
12

EVITHERM kick-off meeting, NPL, 27-28 January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier 75015 Paris France Jean-Rémy.

Dec 25, 2015

Download

Documents

Kenneth Tyler
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: EVITHERM kick-off meeting, NPL, 27-28 January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier 75015 Paris France Jean-Rémy.

EVITHERM kick-off meeting, NPL, 27-28 January 2003

WORKPACKAGE 8WORKPACKAGE 8

Contact Thermometry

WP Leader : LNE1, rue Gaston Boissier

75015 Paris France

Jean-Rémy FILTZ

([email protected])

Page 2: EVITHERM kick-off meeting, NPL, 27-28 January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier 75015 Paris France Jean-Rémy.

EVITHERM kick-off meeting, NPL, 27-28 January 2003

WP8 : Members WP8 : Members

• LNE : Jean-Rémy Filtz, Georges Bonnier, Véronique Le Sant

• INM/CNAM : Georges Bonnier

• NPL : John Redgrove, Richard Rusby,...

• PTB : Joachim Fischer, Steffen Rudtsch

• CNR-IMGC : Piero Marcarino

• LMK : Janko Drnovšek, Jovan Bojkovski

• CAP : Thierry Vigneron

• INSA : Séverine Gomes

Page 3: EVITHERM kick-off meeting, NPL, 27-28 January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier 75015 Paris France Jean-Rémy.

EVITHERM kick-off meeting, NPL, 27-28 January 2003

Humidity

WP8 : Interrelation with other WPs WP8 : Interrelation with other WPs

In GasBNM-LNE

In solidBNM-LNE

Conductivity

BNM-LNE

Diffusivity

BNM-LNE

Heat Capacity

BNM-LNE

In GasCETIAT

Emissivity

BNM-LNE

Temperature national standards

BNM-INM Temperature CalibrationBNM-LNE

Thermal properties

Thermal Quantities (example : French Organisation)

TemperatureNational Standards

BNM-INM

Page 4: EVITHERM kick-off meeting, NPL, 27-28 January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier 75015 Paris France Jean-Rémy.

EVITHERM kick-off meeting, NPL, 27-28 January 2003

WP8 : Key actions WP8 : Key actions

• To collect relevant information

• To develop data base- Relevant R&D projects.

Institutional Bodies (project and funding) and SMEs involved 8.1)

- Equipment, manufacturers (8.0) and providers (8.2) data base link with MRA (CIPM)

• To set up on line library- Best practice guides for calibration and measurement (8.3)

and for on-site measurement (8.4) link with accreditation or standardization bodies (EA, ISO, CEN,…)

- Software Validation Tools (8.5) link with SofTool Metronet

Page 5: EVITHERM kick-off meeting, NPL, 27-28 January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier 75015 Paris France Jean-Rémy.

EVITHERM kick-off meeting, NPL, 27-28 January 2003

WP8: Sensor MarketWP8: Sensor Market

From Jesse Yoder, Flow Research , jan. 2000

Example: American market

Page 6: EVITHERM kick-off meeting, NPL, 27-28 January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier 75015 Paris France Jean-Rémy.

EVITHERM kick-off meeting, NPL, 27-28 January 2003

WP8: Temperature Scale and Sensors WP8: Temperature Scale and Sensors

• High Temperature

• Low Temperature

Infrared thermometer(-50 to 3000°C)(non contact Thermometry WP9)

Thermocouples( 0 to 2000°C)

RTDs (-250 to 1000°C)ThermistorsArgon’s triple point

Oxygen’s triple pointNeon’s triple pointe-Hydrogen’s triple point

302,9146273,16234,3156

29,76460,01

-38,8344

Page 7: EVITHERM kick-off meeting, NPL, 27-28 January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier 75015 Paris France Jean-Rémy.

EVITHERM kick-off meeting, NPL, 27-28 January 2003

WP8 : End-user industriesWP8 : End-user industries

Process Industries

• oil and gas

• food processing

• chemical

• metal and mining

• pharmaceutical

• pulp and paper

• power

• water and wastewater

Non Process Industries

• automotive

• aerospace

• heat treating

• plastic

• heating

• food transportation

• industrial electronic/semiconductor

Page 8: EVITHERM kick-off meeting, NPL, 27-28 January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier 75015 Paris France Jean-Rémy.

EVITHERM kick-off meeting, NPL, 27-28 January 2003

WP8: Society Needs WP8: Society Needs

Low and Medium Temperature Ranges

• Health : pharmacy, chemistry, medicine

• Legal metrology: clinical thermometer, energy meter

• Energy: liquid gas convey, cryogeny

• Food: frozen food storage, food processing

Page 9: EVITHERM kick-off meeting, NPL, 27-28 January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier 75015 Paris France Jean-Rémy.

EVITHERM kick-off meeting, NPL, 27-28 January 2003

WP8: Society Needs WP8: Society Needs

Medium and High Temperature Ranges

• Environment : pollution control

• New technologies: Electronic, “nanothermometry of chip”

• Defense : engine performance, turbine blade

• Others: material processing (ceramics, steel,…)

Page 10: EVITHERM kick-off meeting, NPL, 27-28 January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier 75015 Paris France Jean-Rémy.

EVITHERM kick-off meeting, NPL, 27-28 January 2003

WP 8 : Evitherm Partnership WP 8 : Evitherm Partnership

Task 8.4

NPL+LMKTask 8.4

NPL+LMK

Task 8.0INM - CNAM

Task 8.5LMK

Task 8.1

CNR-IMGC

INSA

Task 8.3

LNE + PTB

Task 8.2CAP

Page 11: EVITHERM kick-off meeting, NPL, 27-28 January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier 75015 Paris France Jean-Rémy.

EVITHERM kick-off meeting, NPL, 27-28 January 2003

WP8 : Tasks WP8 : Tasks

Leader LNE

Task 8.0 Task 8.1 Task 8.2 Task 8.3 Task 8.4 Task 8.5

CNAM-INM CNR-IMGC+ INSA

CAP LNE + PTB NPL + LMK LMK

Equipmentmanufacturers

R&D projects Equipmentproviders

Best practicescalibration,

measurement

Best practicesOn site

measurment

Softwarevalidation tools

Page 12: EVITHERM kick-off meeting, NPL, 27-28 January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier 75015 Paris France Jean-Rémy.

EVITHERM kick-off meeting, NPL, 27-28 January 2003

WP8 : Plan WP8 : Plan

Year 2003 2004 2005

Month 3 6 9 12 3 6 9 12 3 6 9 12Task 8.0

Task 8.1

Task 8.2

Task 8.3

Task 8.4

Task 8.5

Draft report (M8.0)* x

M8.0 : Draft report defining the form and the content of the EVITHERM data base as regards contactthermometry