May 2016
May 2016
Agenda
1) Introduction to our panel
2) Enkom’s nuclear experience
3) Q&A
Existing fleet - Decommissioning Timeline
New Build - Funded Decommissioning Plan
Differences - what are they ?
Lessons learned and applied.
Challenges / Opportunities ahead.
Page 2 of 16May 2016
Panel
Martyn Jenkins - Chair - Enkom Consulting Ltd
Kat Ferguson - Head of Cost (Magnox Ltd)
Amanda French - Head of Portfolio Assurance (NDA)
John Millington - Head Estimating (Sellafield Ltd)
Tony Free - Head of Environmental Planning /
Decommissioning (Edf Nuclear New Build)
Page 3 of 16 May 2016
May 2016
Who we are, what we do & who we’ve worked with
Independent consultancy offering professional services to the Nuclear & Energy sectors
Lifecycle Baselines & Whole Life Costing
Establish Programme Management Offices and Project Controls teams with clients
Develop Contract Strategies and Project Execution Plans which are aligned with business objectives
Independently verify scope, schedule & costs at Project, Programme & Enterprise level
Provide Subject Matter Expertise and Assurance for all phases of nuclear projects
Page 5 of 16 May 2016
Timeline of nuclear projects our team has supported
May 2016 Page 6 of 16
Major Clients / Projects 02/03 03/04 04/05 05/06 06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/ 14 14/ 15 15/ 16 16/ 17
Environmental Services (BNG) Baseline Decommissioning Plans
(BDP)
British Nuclear Group Ltd Preparation of LCBL /
NTWP
British Energy Verification of
DWMP
Magnox North Limited Consultancy support to central Project
Controls
Magnox South Limited Consultancy support
Optimised Plan
Magnox Limited Strategic Programmes
Cost Capture & Benchmarking
Magnox Limited (Business) Consultancy support - Central Cost
Function
Nuclear Decom Authority (NDA), Magnox & MWH
Benchmarking Report
Cost Reviews
Sellafield Limited and Tier 2 Contractors
Commercial Assistance
Nuclear Decommissioning Authority (NDA) – SpecialNuclear Services – Lot 6
SNS - GDF Estimate Review
NDA - IR & BCP - Deloitte Review &
Benchmarking
NuGeneration Limited –Assurance of DWMP
Cost & Technical
Our story is one of evolution .. and strong relationships
The Enkom team has evolved from our work on;
the development of early Baseline Decommissioning Plans,
drafting procedures and processes to allow best practice to be applied,
establishing SLC internal Integrated Assurance processes to allow challenge,
developing Benchmarking methodologies to support value for money,
providing Subject Matter Expertise on national decommissioning portfolios, and
advisors on Decommissioning Waste Management Plans for nuclear New Build
Page 7 of 16 May 2016
May 2016
Question & Answers ... areas to explore
Existing fleet – Decommissioning timeline
New Build – Energy Act 2008 : Funded Decommissioning
Plan & Decommissioning Waste Management Plan
Differences – what are they ?
How much can we learn from previous experience ?
Challenges and opportunities ahead !
Page 9 of 16 May 2016
Existing fleet vs New Build – the journey
Do we all want the same
things ?
Robust Cost Estimates
Certainty in out-turn costs
Value for Money
How do we get there ?
Page 10 of 16 May 2016
Insight into Lifecycle Baselines - Decommissioning Timeline
May 2016 Page 11 of 16
Energy Act 2008 – Funded Decommissioning Plan (FDP)
The FDP must set out realistic, clearly
defined and achievable plans
Decommissioning Waste Management
Plan (DWMP) – means the part of the
FDP that sets out and costs the steps
involved in decommissioning a
Nuclear Power Station...
Page 12 of 16 May 2016
Are there differences ... what are they ?
Demonstrate value for money vs provide return on investment
Designed to be decommissioned vs legacy issues & unknown inventory
Existing sites currently being decommissioned vs New build where some facilities have never been built before
Page 13 of 16
Confidence vs Uncertainty
May 2016
Lessons Learned ... how can we improve ?
Capturing Cost data Well defined scope with clear
interfaces and end state
Standardised approaches applied
Benchmarking against completed projects using cost and time data
Appropriate contract strategies and supply chain engagement
Ensure early capture of data at workable level, that can be easily transferred and applied
COST ENGINEERINGCost forecast and reporting, EVM,
assignment to cost coding,
COMMERCIAL Tender Document and Assessments, Establish
KPIs, payment of subcontractors
ESTIMATING Preparation of Estimate and underpinning data,
benchmark, support tender preparation
PROJECT MANAGEMENT
Project delivery, project
phase reporting and close out
COST DATA
Page 14 of 16May 2016
Challenges and Opportunities ahead
Challenges Opportunities
Resource availability -competing between each other
Competing markets – results in tender costs being higher than estimated
Availability of out-turn project data - who’s responsible for it’s capture and use
Integrated teams sharing resources and data
Early engagement of supply chain to draw on experience and build understanding
Advances in Technology - BIM / decommissioning techniques
Page 15 of 16May 2016
Contact Details
Martyn Jenkins - Managing Director
Email - [email protected]
Website - www.enkom.co.uk
Phone - 00 44 (0) 7968 756 695
Page 16 of 16May 2016