“EURORAIL” Project Organizational model
Mar 26, 2015
“EURORAIL” ProjectOrganizational model
EURORAIL Project
Initiator: Ministry of transport and communications of Ukraine Lviv Oblast State Administration Lviv City Council
Cost: 500 mln. EUR
Terms: 2010-2015
Prerequisites: • Discrepancy of Ukrainian and CIS countries’ railways
(1520) with the EU railway standard UIC (1435) • Increased demand for fast and qualified
communication between Ukraine (CIS) and Europe
EURORAIL Project
Project main statements
Project subject: The construction of 84 km long EU standard rail track and all required infrastructure between Lviv and Polish-Ukrainian border (Prezemysl/Mostyska and Krakivets).
Goal: to provide high speed railway connection between Lviv and Polish-Ukrainian border within III Euro transport corridor.
Mechanism: Concession for construction and further operation of the rail track and its infrastructure.
Participants: Cabinet of Ministers of Ukraine, Ministry of transport and communication of Ukraine, Lviv Oblast State Administration, Lviv City Council, private companiesЛьвівська обласна Рада, Львівська міська Рада, приватні компанії. Participation of Ministry of infrastructure of Poland is also needed.
Implementation algorithm
1. JSC “Evrokoliya” set up by experienced in this field companies. 2. The Cabinet of Ministers of Ukraine is to issue the Resolution
regarding “Eurorail” Project implementation and assign core Ministry (Ministry of transport and communication of Ukraine) to be responsible for its realization.
3. The Concession Agreement is to be signed with the Company-contractor identified through the Tender.
4. The Concession Agreement is to be prepared and signed by Ministry of transport and communication of Ukraine, Lviv Oblast State Administration, Lviv City Council and JSC “Evrokoliya” and is to contain Project implementation mechanisms.
5. JSC “Evrokoliya” attracts all required financial funds and contractors for the Project implementation.
6. After the project is implemented it is to be managed and used by Ministry of transport and communication of Ukraine. The last is to make payments for the benefit of JSC “Evrokoliya”.
Project schemeJSC
“Eurokoliya
Ministry of transport
Rail track and infrastructure
opera
tion
Ow
ners
hip
for
the r
ail
track
and t
he p
art
of
infr
ast
ruct
ure
JSC “Eurokoliya”
Plo
ts
Speci
fica
tions
ІInfo
rmati
on
Ministry of transportLviv Oblast
Administration
Investm
ents
Lviv City Council
Founders
Const
ruct
ion p
roce
ss
Eu
ro r
ail
track
usa
ge p
aym
ents
acc
ord
ing t
o t
he
Conce
ssio
n A
gre
em
ent
as
the in
vest
ments
re
turn
sourc
eOw
ners
hip
for
the p
art
of
infr
ast
ruct
ure
JSC “Evrokoliya” set up “Evrokoliya” is to be joint-stock company
JSC “Evrokoliya” founders (companies) are to be able to provide qualified Project implementation.
Company’s dominant task – is to develop contract and legal platform for its further activity (including possible relations coordination between core Ministers of Ukraine and Poland and between Lviv Oblast Administration and Lviv City Council).
JSC “Evrokoliya” is to hold a research on a Project, provide its feasibility study and approve the Project with all Participants.
The last stage – Project Business Plan, investments attraction and Project implementation.
Concession Agreement
Main regulations: Project participant’s collaboration mechanism.
Participant’s obligations (land plots, information, specifications provision for the Project by its Participants).
Constructed object’s ownership (tracks, terminals, technical buildings, warehouses etc.).
Relations among Project Participants on the after construction stage when the rail track and its infrastructure will be operated.
Rail track and its infrastructure usage payments as the investments return source
Implementation phases Phase I: 2008 - 2009•Pre-feasibility study• Memorandum of Understanding with Dutch MOVARES and NEA for pre-feasibility study, 133,000 EUR attracted from the Dutch government. •Additional investment required for Phase 1 – 250,000 eur
Phase II: 2009 – 2010•Pre-feasibility study presentation to all the stakeholders for final decision-making•The establishment of the International Project Implementation Consortium•Finalizing Project Finance Structure and Legal Model (PPP)
Phase III: 2010 – 2013Project Implementation: •Construction the rail track from Polish/Ukrainian border to Lviv (86 km)•New rail infrastructure development, including modern passenger and goods terminal near and in Lviv
Project impact assessment
Increase of passenger and cargo flowsMaximum shortening of the travel time
Social and economic development of the regionUkraine’s integration with main European cities
Leonid Bogdanov, CEO [email protected] Stetskiv, CFO [email protected]
Kyiv, Ukraine 011339 Lesi Ukrainki Blvd, Tel.: +38 044 585 10 80Fax: +38 044 585 10 79www.unidevelop.com