10/06/2015 1 www.europhit.eu EuroPHit: Retrofit step by step to NZEB Practical examples & certification of phased renovation Simon Camal Project Engineer, La Maison Passive Renofase Meeting, Gent, 09/06/2015 www.europhit.eu Summary 1. EuroPHit 2. Audit 3. Design 4. Reduce costs 5. Finance and certify
31
Embed
EuroPHit: Retrofit step by step to NZEB Practical examples ... · Practical examples & certification of phased renovation Simon Camal Project Engineer, La Maison Passive Renofase
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
10/06/2015
1
www.europhit.eu
EuroPHit: Retrofit step by step to NZEB
Practical examples & certification of phased renovation
Simon Camal
Project Engineer, La Maison Passive
Renofase Meeting, Gent, 09/06/2015
www.europhit.eu
Summary
1. EuroPHit
2. Audit
3. Design
4. Reduce costs
5. Finance and certify
10/06/2015
2
www.europhit.eu
La Maison Passive
French association promoting Passive house
• 400 members
• 200 professionals trained per year
• Organizer of french Passive House / NZEB Congress Passibat, 17-18/12/2015, Paris
Accredited Passive house / EnerPHit building certifier since 2009
• 40 000 m² certified / 200 projects
www.europhit.eu
1. EUROPHIT
10/06/2015
3
www.europhit.eu
EPBD – National implementationNZEB – MS report
on progressEED – Entry into
force
EPBD – MS list of measures and instruments
RES Directive – Minimum levels of RES
EED – Assessment of national transposition
NZEB – MS report on progress
NZEB – All new public buildingsNZEB - MS report
on progress
EPBD – Applicationbetween 9/01/2013
and 9/07/2013EED – National
implementation
EPBD – MS updated list of measures and instruments
NZEB – All new/refurbished
buildings
2012
2013
2014 2017
2015 2018
2020
Here we are
EuroPHit project starts
EuroPHit project ends
2013
Strategic objectives
2016 20202014
The policy background
www.europhit.eu
High efficiency
Low efficiency
Reduce consumption!
EU’s 2020 objective:
All new/refurbished buildings asNZEBs (Nearly Zero Energy Buildings)
10/06/2015
4
www.europhit.eu
Quality renovation...achieved with the Passive House principles
Is it worth?Heating demand reduction = - 1 kWh/(m².a)
Needed here to reach EnerPHit
Investment ~ 40 €/m²TFA
Negative Net Present Value, but…
Cheaper than insulate slabs from the inside!
Wufi 2d Observer Project Sauvage, Lyon, FR
www.europhit.eu
Total annual cost
Here EnerPHit can be reached without additional total cost
White certificates : - 3% to -10% investment in opaque components
Assessment on 20 years + Residual values on extra 10 years
10/06/2015
23
www.europhit.eu
Couple interventions when ripe
Windows+Walls or Walls before Windows?
Windows+Walls:Take out window+shutter
= 190 €/window
Lost residual value
~ 100 €/window
Install new window+shutter
= 1250 €/window
Walls before Windows:Invest = 300 €/window
www.europhit.eu
Innovative window installation
Prefabricated window installation with
aerogel and cork• Thought for interior insulation of listed
buildings, step-by-step possible
• 745 €/m² (excl. VAT) installed
• Ψinstalled,lateral=0.06 W/(m.K)
• Ψinstalled,bottom=0.03 W/(m.K)
Tillieux Menuiseries, Reawin A+ Tip Tep
10/06/2015
24
www.europhit.eu
Step-by-step window connection
Manufacturer competition (Component Award, 2015)• Change windows first
• Insulate walls 10 years after (exterior insulation)
• Half of solutions with windows staying in place
www.europhit.eu
Cascade ventilation
• Supply air in bedrooms (20 m3/h each), living room (60 m3/h)
• Transfer vent from living room to kitchen
• Cellar: 10 m3/h supply air to minimize duct length
• Extract (existing) in kitchen, bathroom and WC, total 120 m3/h / 0,5 h-1
Reuse existing extract ducts
• Total investment: 8.6 k€/dwelling
Expanded cascade ventilation?
• Can we delete the air inlet in the living room?
• Can we blow fresh air from the corridor?
10/06/2015
25
www.europhit.eu
Cascade ventilation
Expanded cascade ventilation• Air quality would be too low here if no supply air in living room
• Works better if bedrooms have direct link to living room
SdbHall
Living Room
Cascade VentilationExpanded Cascade Ventilation
Air quality (CO2)
Re
lativ
e H
um
idity
(H2
O)
Tool: Univeristät Innsbruck
www.europhit.eu
Air/Water Heat Pump on extract air
A suitable solution for EnerPHit ?
• Outdoor unit 20 kW, Hydraulic modules with 150 L storage in cellars
• Outdoor air pre-heating via air/water heat exchanger
and variable flow from damper and small fan CO2-regulated
• Heating demand 20 kWh/(m².a)
• Primary energy demand 115 kWh/(m².a)
10/06/2015
26
www.europhit.eu
Make ventilation cheaper
Atrea Duplex RS4
• 900 m3/h Air Handling Unit with 90% heat recovery, air heating and cooling
• suitable for decentralised ventilation of refurbished offices
• Average price 2000€/unit
www.europhit.eu
4. FINANCE AND CERTIFY
10/06/2015
27
www.europhit.eu
What banks require
Creditworthiness more important than cash flow or Net Present Value
www.europhit.eu
Focus on initial consultation
10/06/2015
28
www.europhit.eu
Finance commissioning
www.europhit.eu
Step-by-step certification
Release Late 2015
10/06/2015
29
www.europhit.eu
Overall Refurbishment Plan
www.europhit.eu
Communication platform for consultancy and certification
Guidance for design, building and certification
User-friendly
Ensure energy efficiency
10/06/2015
30
www.europhit.eu
Communication platform for consultancy and certification
www.europhit.eu
Primary EnergyRenewable
Consumption
RES Production
CLASSIC
≤ 60 kWh/(m².a)
PLUS
≥ 60 kWh/(m²grounda)
≤ 45 kWh/(m².a)
PREMIUM
≥ 120 kWh/(m²ground.a)
≤ 30 kWh/(m².a)
Certify NZEBs
Renewable Energy Sources will get the higher share in our energy mix in the next decades
PHPP9 proposes an assessment based on analysis of renewable potential
10/06/2015
31
www.europhit.eu
Conclusion
Overall Refurbishment Plan• Upgrade existing plan with EnerPHit quality is possible: budget shifts towards envelope
• Identify intermediate states
• Check quality via certification process
Prove cost-efficiency• PHPP9 Variants and Comparison Worksheets
• Capital cost up to 90% of total cost for EnerPHit
Reduce costs• Reproductible solutions
• Cascade ventilation
• New products which make EnerPHit easier : window connection, window+ventilation
• Financial support for design, quality insurance and product development
www.europhit.eu
Join the EuroPHit network
Thank you for your attention!Suscribe for free to the technical forum !