Top Banner
International Telecommunication Union ITU WORKSHOP on SHORT RANGE DEVICES (SRDs) AND ULTRA WIDE BAND (UWB) (Geneva, 3 June 2014*) * in conjunction with the June 2014 block of meetings of ITU-R Study Group 1 Dr. Michael Mahler "European UWB activities and worldwide UWB harmonization needs"
12

European UWB activities and worldwide UWB harmonization ......ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 11 planed till the end of 2014:

Oct 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: European UWB activities and worldwide UWB harmonization ......ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 11 planed till the end of 2014:

International Telecommunication Union

ITU WORKSHOP on SHORT RANGE DEVICES (SRDs) AND ULTRA WIDE BAND (UWB)

(Geneva, 3 June 2014*)

* in conjunction with the June 2014 block of meetings of ITU-R Study Group 1

Dr. Michael Mahler

"European UWB activities and

worldwide UWB harmonization

needs"

Page 2: European UWB activities and worldwide UWB harmonization ......ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 11 planed till the end of 2014:

ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 2

UWB applications in ECC/ETSI

Generic UWB indoor (fixed use) Location

Tracking (in- & outdoor + fixed)

Automotive and railway vehicles (in & outside)

(Tank) Level Probing radar

(on-board) Aircraft use

Automotive radar (ShortRangeRadar)

Ground & Wall probing radar

Building Material Analysis

Object Discrimination for Power tools Mobile Device

in- & outdoor

UWB? SRDs in 122 – 123GHz 507 – 64GHz

Other?

Page 3: European UWB activities and worldwide UWB harmonization ......ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 11 planed till the end of 2014:

ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 3

UWB generic rule in ECC

-95

-90

-85

-80

-75

-70

-65

-60

-55

-50

-45

-40

001 002 003 004 005 006 007 008 009 010 011

Mea

n e.

i.r.p

[dBm

/MHz

]

f[GHz]

GenericwithoutMitigationGeneric LDC

Generic DAA

Example: mean power spectrum mask, average over 1ms, with / without mitigation

Note: peak limit: 0dBm/50MHz

Page 4: European UWB activities and worldwide UWB harmonization ......ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 11 planed till the end of 2014:

ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 4

UWB interference potential

conventional narrow-band system (+20dBm)

UWB signal (-41.3dBm/MHz)

Noise / EMC emissions

ETSI covers this situation with TS 102 883

UWB has lower PSD than an unintentional emission

Notes: - Details for different UWB signals are given in draft ETSI TR 103 181-1 - TS 102 883: Ultra Wide Band (UWB); Measurement Techniques

Page 5: European UWB activities and worldwide UWB harmonization ......ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 11 planed till the end of 2014:

ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 5

UWB framework in ECC/EC/ETSI-1

LT: Location Tracking

BMA: Building Material Analysis

Below 10GHz

Page 6: European UWB activities and worldwide UWB harmonization ......ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 11 planed till the end of 2014:

ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 6

UWB framework in ECC/EC/ETSI-2

Below 10GHz and specific

Page 7: European UWB activities and worldwide UWB harmonization ......ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 11 planed till the end of 2014:

ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 7

UWB framework in ECC/EC/ETSI-3

Vehicular / range radar applications

Page 8: European UWB activities and worldwide UWB harmonization ......ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 11 planed till the end of 2014:

ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 8

Example: comparison FCC versus CEPT/ECC

Note: For details, see Draft ETSI TR 103 181-1 & -3

Page 9: European UWB activities and worldwide UWB harmonization ......ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 11 planed till the end of 2014:

ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 9

Some UWB ranges in the world

Note: Part out of Draft ETSI TR 103 181-3

Page 10: European UWB activities and worldwide UWB harmonization ......ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 11 planed till the end of 2014:

ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 10

no certification process defined in many countries if defined, rules vary for:

- frequency ranges - application restrictions (e.g. vehicle, tracking, medical…) - user restrictions (e.g. public, professional, government,..) - environment restrictions (indoor & outdoor) - mitigation techniques - signal definitions

- conformance testing procedure

minimum BW requirement

modulation requirement (on/off) during “test”

open issues for harmonization

Page 11: European UWB activities and worldwide UWB harmonization ......ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 11 planed till the end of 2014:

ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 11

planed till the end of 2014:

finalization of TR 103 181-1 (UWB signals - ECC/EC regulation)

finalization of TR 103 181-3 (UWB situation worldwide)

finalization of TS 102 883 (UWB measurement for LDC, “slow” signals)

stable Draft EN 302 065-4 (BMA and ODC)

validation results (TR/TS work) and decision on: necessary amendments in ETSI standards amendments to the existing or new regulations ? new work items for new applications / Use-cases ?

e.g. medical, assisted healthcare, object identification, material investigation, outdoor use,..

Next ETSI TC ERM/TG UWB meetings: - 9th/10th September 2014 - 12th/13th November 2014

Next actions in ETSI

Page 12: European UWB activities and worldwide UWB harmonization ......ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 11 planed till the end of 2014:

ITU Workshop on Short Range Devices (SRDs) and Ultra Wide Band (UWB), 3 June 2014, Geneva 12

Dr.-Ing. Michael Mahler Chairman ETSI TG ERM TG UWB and TG SRR Robert Bosch GmbH External Affairs, Governmental and Political Relations Frequency Affairs (C/AGT) Postfach 10 60 50 70049 Stuttgart GERMANY www.bosch.com

+49 (0)711 811 47863

+49 (0)151 14290544 [email protected]