European Commission Directorate General Research NCP training - Parallel session on aeronautics and space 16 October 2002 - Brussels Aeronautics UROPEAN COMMISSION - DG RTD - Directorate H.3 - Aeronautics 1 Involvement of the supply chain and SMEs in aeronautics European R&TD projects 6 6 th th EU Framework Programme for EU Framework Programme for
23
Embed
European Commission Directorate General Research NCP training - Parallel session on aeronautics and space 16 October 2002 - Brussels Aeronautics EUROPEAN.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
European CommissionDirectorate General Research
NCP training - Parallel session on aeronautics and space16 October 2002 - Brussels
The actions of the aeronautics NCPs should aim at better integrate the entire supply chain in the projects.
The “Guiding principles for setting up NCP systems for FP6” indicates the vital role of NCPs for assuring transparency and equal access to the new structures and instruments of FP6, by providing information and assistance to potential participants.
Aeronautics is a very well structured sector with a small number of major players that coordinate, trough structure like IMG³, and lead most of the EU funded RTD project.
The role of aeronautics NCPs is then even more important, in order to facilitate access to these projects to the entire supply chain.
European CommissionDirectorate General Research
NCP training - Parallel session on aeronautics and space16 October 2002 - Brussels
During the last few years, the European aeronautics industry experienced major reorganisations leading to a reduced number of final customers.
In addition, the main player have set-up organisations, like the IMG³, which role is to co-ordinate the research effort of the main players done at European level.
The consequence is that, in FP5,
most of the Critical Technologies projects and all Technology Platforms were led by one of the major players of the sector,
with a low participation of the whole supply chain from 2d tiers to SMEs.
European CommissionDirectorate General Research
NCP training - Parallel session on aeronautics and space16 October 2002 - Brussels
In order to achieve a significant funding share for SMEs, it is necessary to combine the participation of a very large number of SMEs together with a limited number of major players.
In order to achieve an important SME funding share, projects have to combine the involvement of a very large number of SMEs together with a limited number of major players.
On the other hand, the composition of the projects consortia should not be to far from the real situation of the supply chain where the trend is to limit, at each level, the number of direct suppliers.
The direct involvement of SMEs in projects with big players presents a limit above which this involvement could become artificial.
In consequence, the entire supply chain must be better involved in order to increase the share of SMEs avoiding artificial situations.
European CommissionDirectorate General Research
NCP training - Parallel session on aeronautics and space16 October 2002 - Brussels
SME share (excluding CRAFT) is around 5%, even much more that 10% of the participating organisation are SME.
5%
62%
15%
13%
5%
SMEs
I ndustries
ResearchOrganisations
Universities
Others
In FP5, about 6 % (including CRAFT) of the 700 M€ aeronautic budget has been spend on SMEs, mainly through participation of SMEs to critical technologies projects. There was also 12 SME led projects.
European CommissionDirectorate General Research
NCP training - Parallel session on aeronautics and space16 October 2002 - Brussels
SMEs participation has increased from call to call iin FP5
Several measures have been taken during FP5 by the EC and the industry to stimulate the participation of SMEs, amongst other, the funding of different stimulation actions.
SMEs participation to aeronautics KA RTD calls( EC funding )
22
7,5 10,8 12
15,7
30,7
0
10
20
30
40
50
1st call 2d call 3rd call
MEuros
Submittedproposals
Recommendedproposals
European CommissionDirectorate General Research
NCP training - Parallel session on aeronautics and space16 October 2002 - Brussels
Aeronautics NCPs have a clear role to play in order to better integrate the supply chain into RD projects and especially IPs.
The effort to better integrate SMEs and the whole supply chain started under FP5 has to be pursued and further developed in order to contribute to the challenge of allocating to SMEs 15% of the budget of the thematic priorities.
In particular, the action of NCPs in aeronautics should be reinforced and present the following characteristics :
focus on the supply chain and specially the SMEs,
work in close relationship with the running accompanying measures AeroSME (major players proposals (IPs)) and SACTCH (for STP).
European CommissionDirectorate General Research
NCP training - Parallel session on aeronautics and space16 October 2002 - Brussels