Europa Oil & Gas (Holdings) plc 2006 AGM
21

Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Dec 20, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Europa Oil & Gas(Holdings) plc

2006 AGM

Page 2: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

• Timelines– Established 1995– First well drilled 1999– First UK Production 2003– Floated on AIM 2004– First Romania production 2006

• Focus on Europe and North Africa

• Currently producing c.600 BOEPD (240 BOPD in the UK, 360 BOEPD (2 mmscf/d) in Romania/Ukraine

• Anticipate up to 6 wells in 2007:– 2 in the UK– 4 in Romania (possibly as many as 5 if supported by technical work)

Synopsis

Page 3: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Current Portfolio Europe and North Africa

Page 4: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Financial ResultsTo 31 July 2006

• Turnover £2.83 million, up 18%

• Operating Profit £1.09 million, up 29%

• Profit before tax £0.91 million, up 157%

• Profit after tax on 2006 activity £0.51 million, up 43%

• Provision for £1.08 million Deferred Tax which may come due in over one year’s time

• Loss after total tax provision of £0.57 million

Page 5: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Historic Performance and Projections

Turnover

0

1

2

3

4

5

2003 2004 2005 2006 2007

Year

£ m

illio

n

Pre-Tax Profit

0

0.5

1

1.5

2

2003 2004 2005 2006 2007

Year

£ m

illio

n

Production

0

250

500

750

2003 2004 2005 2006 2007

Year

BO

EP

D

Note:2004 Accounts covered an 18 month period and figures have been rebased to 12 months.

Page 6: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

2006 Achievements

• Production Start-up at Bilca (Romania)

• Acquired Crosby Warren Oilfield (UK Onshore)

• Diversity of production streams allowed for first debt financing for Crosby Warren acquisition

• Successful Licence Round Applications:– Egypt – West Darag Concession– Western Sahara – Bir Lehlou and Hagounia Concessions– France – Bearn des Gaves Concession

• 3 Seismic surveys undertaken in Romania

• Secured extension to EPI-3 Concession (Romania)

Page 7: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

2006 Achievements

Page 8: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

2007 Capital Programme

• Drilling Programme– Romania

• Arbore-1 Firm Exploration Q1• Costisa-1Y Firm Appraisal Q1• E Radauti-1 Firm Exploration Q1• Boistea-1 Firm Exploration Q2• Voitinel Contingent (S) Exploration Q2• Siretu-1 Contingent (S) Exploration Q2

– UK• Holmwood-1 Contingent (P) Exploration H2• PEDL150 Contingent (S) Exploration H2

• Seismic Programme– UK

• PEDL150 Firm 50km 2D Feb

(P) Planning Permission (S) Outcome of Seismic Evaluation

Page 9: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

2007 Planned Activity

Page 10: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

2007 Drilling Programme Details

Page 11: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Bilca Play ExplorationPlenty of potential

Bilca 2 Bilca 1EW

Extending the Miocene AVO gas play

Large area between Fratauti and Todiresti totally unexplored, 260km data acquired in 2006 –

Initial results confirms Arbore and E Radauti Prospects for 2007 drilling.

ArboreNE Codru

NE Radauti

Voitinel – up to 300 bcf gross potentialWork in progress - Drilling ?2007

Area of 2006 Seismic

Infill

Page 12: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Bilca Play ExplorationBoistea-1 well

Extending the Miocene AVO gas play southwards

Seismic anomalies developed in area to north of Roman (600bcf) Gasfield.

Page 13: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Costisa-1 Re-entryTesting a potential gas reservoir

Costisa well encountered a 25 metre gas column, well to be tested early 2007

Delays have been due to access issues

Costisa feature difficult to map

Currently up to 100 bcf potential – will need new 3D for development

Page 14: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Weald ExplorationHigh Quality Prospect – Holmwood-1

Low risk exploration prospect 1:2 chance of success

Reserve size on prospect of 10 – 20mmbo gross. Combined net risked valuation of $28mm, unrisked $90mm

Holmwood ready to drill subject to planning permission

Page 15: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

East Midlands ExplorationPEDL150

Seismic programme planned for Q1/07 to choose well location

Whisby-4 well encountered new reservoir zone – Loxley edge

Reservoir performance to date is very encouraging for large volumes in Loxley

2006 Seismic reprocessing developed 4 leads

Page 16: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Production Forecasts

Page 17: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Near TermRevenue Potential

Existing Production Assets

Near -ter m Monthl y Revenue St r eam - no new wel l s

0

0.2

0.4

0.6

0.8

1

1.2

Nov

-06

Feb

-07

May

-07

Aug

-07

Nov

-07

Feb

-08

May

-08

$ m

illi

on

Horodok

Crosby Warren

Bilca

West Firsby

Whisby

Assumes $50/bbl, Romania gas price on ramp to $220/mcm

Page 18: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Crosby Warren

Immediate Upside Realised

Page 19: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Peer Group analysisSustainability & Value

Page 20: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Summary

• Ending 2006 with c.600 boepd production, • Rising to c.700 boepd in Q2 07.• Current Monthly wellhead revenues c.$560k per month.• Equates to £3.7 mm per annum,• Set to rise in the next 6 months.• £8 mm net assets and only £200k debt.• Strong Drilling programme to bring exploration into Appraisal• And Appraisal into development in 2007• Portfolio contains:

bankable production, Appraisal projects to increase reserves,low risk step-out exploration andCompany-making exploration projects (up to 100 bcf net potential to be tested in 2007 alone).

Page 21: Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines –Established 1995 –First well drilled 1999 –First UK Production 2003 –Floated on AIM 2004 –First Romania.

Europa Oil & Gas(Holdings) plc

2006 AGM