EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer Svemar, Fernando Huertas and Roland Pusch
12

EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.

Dec 14, 2015

Download

Documents

Jamel Longyear
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.

EURADWASTE´04

Large-scale Experiments in Underground Research Laboratories

Experience in EBS Engineering Development and Handling Feasibility

Christer Svemar, Fernando Huertas and Roland Pusch

Page 2: EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.

EURADWASTE´04

The two projectsFEBEX

Prototype Repository

Page 3: EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.

EURADWASTE´04

Horizontal vs vertical emplacement modes

Page 4: EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.

EURADWASTE´04

Excavation of drifts and holes

Prototype Repository

FEBEX

Page 5: EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.

EURADWASTE´04

Excavation Damaged Zone (EDZ)

EDZ HOLE 3

0,0

0,2

0,4

0,6

0,8

1,0

1,2

0 20 40 60 80distance (mm)

po

ros

ity

(%

)

3:1A

3:1B

3:2A

3:2B

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0 1 2 3 4 5 6 7

distance (cm)

po

rosi

ty (

%)

FEBEX

Prototype Repository

Page 6: EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.

EURADWASTE´04

Emplacement of bentonite blocks (liner) and pelletsPrototype Repository

FEBEX

Page 7: EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.

EURADWASTE´04

Canister emplacementFEBEX

Prototype Repository

Page 8: EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.

EURADWASTE´04

Retrieval

Horizontal emplacement mode Vertical emplacement mode

Page 9: EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.

EURADWASTE´04

Results and conclusions 1(2)

• TBM excavation of drifts is a proven technology• Vertical boring of deposition holes has been shown possible to do with a

higher accuracy than assumed• Bentonite blocks can be pre-compacted to the size needed• Installation of brick-size bentonite blocks and liner in the horizontal mode

can be done in the assumed way, but the humidity in a drift puts time constraint on the installation

• Vertical installation of large blocks can meet accuracy requirements, but humidity in the air and, even more, dripping water demands protection of the bentonite blocks

• Both horizontal and vertical emplacement of canisters meet the high requirement on alignment

• In situ compaction of backfill can meet quality requirements with 30/70 mixtures of bentonite and crushed rock

• Retrieval of emplaced canisters is technically feasible

Page 10: EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.

EURADWASTE´04

Results and conclusions 2 (2)

• Main technical difficulty in horizontal emplacement was the alignment of the canister, and

• the water inflow in the vertical emplacement mode, both into holes and into the drift

• In both projects were practical manufacturing and emplacement methods simulated with good result, including measures taken to overcome the difficulties mentioned above

• Further development can be directed toward optimisation of concepts

Page 11: EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.

EURADWASTE´04

The futureTesting of horizontal emplacement techniques at Aspo HRL

Objectives

• To continue the technical development of practically applicable techniques

• To provide the basis for PA of the KBS-3H concept

• To demonstrate technical feasibility in field test in ÄHRL