ETSI Grid – Sophia Antipolis – 2005/05/24 A-WARE summary for ETSI A-WARE summary for ETSI Andrea Rodolico Andrea Rodolico CTO, NICE srl, Italy CTO, NICE srl, Italy
Mar 27, 2015
ETSI Grid – Sophia Antipolis – 2005/05/24
A-WARE summary for ETSIA-WARE summary for ETSI
Andrea RodolicoAndrea Rodolico
CTO, NICE srl, ItalyCTO, NICE srl, Italy
INSERT PROJECT ACRONYM HERE BY EDITING THE MASTER SLIDE (VIEW / MASTER / SLIDE MASTER)
ETSI Grid – Sophia Antipolis – 2005/05/24
Overview of ProjectOverview of Project
• Project goals Project goals Simplify users’
life (focus on problems)
way of perceiving the GRID
Fill an existing gap between middleware and portals
Portals + A-WARE + UNICORE/GS aim to be a completely integrated, commercially exploitable solution
Contribute to the standards
An easy Way to An easy Way to Access GRID Access GRID
REsourcesREsources
ETSI Grid – Sophia Antipolis – 2005/05/24
The Grid Portal / GatewayThe Grid Portal / Gateway
InteractiveApplications
Intranet Clients
Win LX
UXMac
Grid / Compute Farm
Internal Users
BatchApplications
Storage, DataGrids
Grid Portal/ Gateway
Home Users
Managers
Partners
Standard protocols
Licenses
EnterprisePortals
ETSI Grid – Sophia Antipolis – 2005/05/24
Who uses EnginFrame Grid Portal?Who uses EnginFrame Grid Portal?
• Mechanical Mechanical Audi, BMW, Delphi, Elasis,
FIAT Auto, Ferrari, GDX Automotive, Magneti Marelli, P+Z, Simpson Strong-Tie, Swagelok, Toyota, TRW
• Manufacturing Manufacturing Bridgestone, Procter &
Gamble, Galileo Avionica
• Oil&Gas Oil&Gas British Gas, Rosneft,
Slavneft, Schlumberger, TOTAL, VNIIGaz
• Electronics Electronics STMicroelectronics, Accent,
SensorDynamics, Motorola
• Others Others Telecom Italia
• Research Research ASSC, CCLRC, CERN, CILEA,
CINECA, CNR, CNRS/IN2P3, ENEA, FzU, ICI, IFAE, INFN, ITEP, JSC G.G.M., KU Leuven, SSC-Russia, SDSC
• Education Education Dresda University, Ferrara
University, ITU, Messina University, Politecnico of Milan, Technische Universität Dresden, Trinity College Dublin, Salerno University, S-PACI, Huazhong University
ETSI Grid – Sophia Antipolis – 2005/05/24
How users work with the GridHow users work with the Grid
INSERT PROJECT ACRONYM HERE BY EDITING THE MASTER SLIDE (VIEW / MASTER / SLIDE MASTER)
ETSI Grid – Sophia Antipolis – 2005/05/24
Research ChallengesResearch Challenges
Non OGSA middlewares
Os/StorageOs/Storage
Unicore/GSUnicore/GS GTK4GTK4 gLitegLite
OtherOther LSFLSF
UAS interface
OGSAinterface
Workflow repository
Service(WRS)
Workflow orchestrator service (WOS)
Workflow validation service (WVS)
OtherOther
Workflow designer application (WDA)
Portal standard compliant(open source)
Portal standard compliant(open source)
EU
-1 t
echn
olog
y co
mpo
nent
s
Other consumersOther consumers
UAS interface
INSERT PROJECT ACRONYM HERE BY EDITING THE MASTER SLIDE (VIEW / MASTER / SLIDE MASTER)
ETSI Grid – Sophia Antipolis – 2005/05/24
Research ChallengesResearch Challenges
• Research Challenges are related to Research Challenges are related to A-WARE components:A-WARE components:Workflow management of TSS invocationsUser focused workflow orchestrationOne-stop, fire-and-(almost) forget, ‘dropping-
off and rendezvous point’ a repository to store workflows;a workflow design application;TSS service for gLite.
INSERT PROJECT ACRONYM HERE BY EDITING THE MASTER SLIDE (VIEW / MASTER / SLIDE MASTER)
ETSI Grid – Sophia Antipolis – 2005/05/24
StandardisationStandardisation (requirements & use of)(requirements & use of)
• Standardisation GoalsStandardisation Goals::Main goal is to influence standards proposing
exemplar implementations
• Pertinent/required Standards:Pertinent/required Standards:WSRF / OGSA Suitable Workflow standard (WS-BPEL?)Job/service submission & control interfaces (ESI?)Grid objects representation (GridML?)Portlet standards (JSR168, WSRP?)
INSERT PROJECT ACRONYM HERE BY EDITING THE MASTER SLIDE (VIEW / MASTER / SLIDE MASTER)
ETSI Grid – Sophia Antipolis – 2005/05/24
StandardisationStandardisation (approach)(approach)
collaborate with other European projects to coordinate the standards activities
focus project work within standards organisations
GGF WGs: project partners’ representative participation
ETSI collaboration?