(PH) 9.1m 7.6m 39 7 OLD WORTHING ROAD 31 15 77 17 7 26 12 24 1 ETL 16 6 26a Path (um) Hotel 17 Kelston House Appletree Cottage 37 11 8 16 MAYFIELD 8 25 2 15 11 Ward Bdy ESS ESS Def 65 12 14 22a THAKEHAM CLOSE 1 7 28 20 Sub 12 The Roundstone Lachine BURWASH CLOSE 51 HAILSHAM CLOSE ROUNDSTONE BY PASS ROAD ARLINGTON CRESCENT 2 Roundstone 22 6 30 7.3m 28a 1 House Heanton El 1 19 Sta Shelter 63PE LP 250PE LP X X X X X X X X X X X X X X X X X X X X X X X X JB110 JB110 JB110 8x110Ø 1x110Ø 8x110Ø 4x110Ø 8x110Ø 8x110Ø 4x110Ø 4x110Ø 4x110Ø 8x110Ø 5x110Ø 1x110Ø 1x110Ø X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X JB110 5x110Ø 1x110Ø 2x110Ø 5x110Ø X X X X X X X X X X X X X X X X 4x110Ø 4x110Ø JB104 JB111 JB106 JB111 5x110Ø 5x110Ø X X CH 1300m CH 1350m CH 1400m CH 1450m CH 1500m CH 1550m CH 1600m JOINT BAY 6 AT CH 1460m. REFER TO DRAWING 831364-SDS-DR-CV-A259-1003 FOR DETAILS PILOT CH 1500m 6" CI WATER MAIN CROSSING. REFER TO DRAWING 831364-SDS-DR-CV-A259-1006 FOR DETAILS 6m CROSSING SURFACE WATER SEWER. RECORDS INDICATE A DEPTH OF 1.2m A A A A A A A A D D CROSS SECTION A-A SCALE 1:20 GL 670 100 75 900 FOR VERGE / CARRIAGEWAY 1050 FOR ARABLE LAND 1175 FOR VERGE / CARRIAGEWAY 1325 FOR ARABLE LAND 450 50 50 BACKFILL USING SELECTED ARISINGS FROM EXCAVATION/ COMPACTED TYPE 1 TO COMPLY WITH HAUC SPEC. 3 x 1000 x 244 x 9mm STOKBORD 2x 200mmØ OD EMTELLE uPVC DUCTS FOR 300mm² Al XLPE 33kV CACLES & 1x 88.9mmØ OD EMTELLE uPVC DUCT FOR 19-PAIR PILOT CABLE CBS SURROUND AS PER ENA TS 97-1 SURFACE REINSTATED TO MATCH EXISTING CONSTRUCTION CROSS SECTION D-D SCALE 1:20 GL 670 100 75 525 800 450 50 50 BACKFILL USING SELECTED ARISINGS FROM EXCAVATION/ COMPACTED TYPE 1 TO COMPLY WITH HAUC SPEC. 2x 900x300x 9mm STEEL PLATES PAINTED WITH A SINGLE COAT OF BITUMASTIC PAINT & 3 x 1000 x 244 x 9mm STOKBORD 2x 200mmØ OD EMTELLE uPVC DUCTS FOR 300mm² Al XLPE 33kV CACLES & 1x 88.9mmØ OD EMTELLE uPVC DUCT FOR 19-PAIR PILOT CABLE CBS SURROUND AS PER ENA TS 97-1 SURFACE REINSTATED TO MATCH EXISTING CONSTRUCTION Project Drawing Title Designed Checked Approved Drawn Signed Date Date Signed Date Signed Date Signed Suitability Scale Code Revision Sheet Drawing Number Status Rev Date Description of Revisions Drawn Chkd Contractor(s) Legend/Notes Appr of PART OF THE KIER GROUP DESIGN SERVICES Alternative Reference A259 BRIDGE ROAD S. ORR J.MOK - 1:500 831364-SDS-DR-CV-A259-1001 07 19.03.21 19.03.21 - PSC DESIGN STAGE 33kV CABLE ROUTE DIVERSION M.STOCKDALE 19.03.21 P01 S.ORR 19.03.21 P01 19.03.21 FIRST ISSUE SO JM MS 1. ALL DIMENSIONS IN mm UNLESS STATED OTHERWISE. 2. DO NOT SCALE FROM THIS DRAWING. 3. THE CONTRACTOR MUST UNDERTAKE A SERVICES SEARCH IN THE VICINITY OF THE WORKS BOTH VISUALLY AND USING APPROVED CAT EQUIPMENT. 4. ALL SURFACE REINSTATEMENT TO BE IN LINE WITH LANDOWNER / LOCAL AUTHORITY REQUIREMENTS. 5. MINIMUM CABLE BENDING RADII & CABLE MAXIMUM PULLING TENSIONS TO BE OBSERVED AT ALL TIMES. SUFFICIENT LABOUR & EQUIPMENT TO INSTALL CABLE WITHOUT CAUSING DAMAGE TO IT OR OTHER SERVICES SHALL BE USED AT ALL TIMES. 6. CABLES MAY BE INSTALLED WITH MINOR HEIGHT CHANGES IN ORDER TO ACCOMMODATE THE EXISTING UNDERGROUND SERVICES. HOWEVER, THIS MUST BE KEPT TO A MINIMUM. 7. ALL STAFF & SUB-CONTRACTORS TO CARRY AN UKPN STREET WORKS POLICY & UKPN EXCAVATION & CABLE INSTALLATION MANUAL. 8. INSPECT CABLE DRUMS & CABLE FOR DAMAGE BEFORE INSTALLATION. 9. CABLE TO BE PULLED FROM TOP OF DRUM TO AVOID DAMAGE TO CABLE. 10. CABLES TO BE PULLED AS SPECIFIED IN APPENDIX B OF ENATS 09-02. 11. INSTALL CABLE WHEN AMBIENT AIR TEMPERATURE IS ABOVE 0°C FOR AT LEAST 24 HOURS. 12. GS6 GOALPOSTS ARE REQUIRED WHEN CROSSING EXISTING OVERHEAD LINES. APPROPRIATE GS6 SETUP IN ACCORDANCE WITH HSE "AVOIDING DANGER FROM OVERHEAD POWER LINES GUIDANCE NOTE GS6 (FOURTH EDITION)" IS REQUIRED. 13. ALL LP GAS, LV, 11kV, BT & COMS CABLES ARE ASSUMED TO BE INSTALLED AT DEPTHS AS PER NJUG GUIDELINES KEY Proposed 300mm 2 AL 33kV Cable Proposed 19-Pair Pilot Cable Proposed 33kV Joint Bay Proposed Cable Pulling Chamber 33kV Cable - Bi-Directional Pull Pilot Cable- Bi-Directional Pull 33kV Cable Reverse Pull Only BT Cable LP Gas MP Gas IP Gas 33kV Cable 11kV Cable LV Cable Foul Water Surface Water Water GS6 Goalposts 06 - CABLE ROUTE DRAWING DISTANCE BETWEEN JOINTS CABLE SECTION LENGTH (m) JB2 - JB3 20 JB3 - JB4 319 480 33kV JOINT BAY REFERENCE COORDINATES X (EASTING): Y (NORTHING): JB1 506605.491 102923.923 JB2 506494.800 102964.685 JB3 ANGMERING SUBSTATION (JB1) - JB2 161 506497.125 102984.254 JB4 JB5 JB6 JB7 JB4 - JB5 JB5- JB6 JB6 - JB7 480 340 506638.157 103181.067 507116.949 103200.895 507596.364 103208.425 507916.782 103177.648