ESIA SUMMARY ESTABLISHMENT OF 5,600 TPD CLINKER CAPACITY GREENFIELD CEMENT PROJECT AND OPERATION OF CAPTIVE MINES NEAR DERBA VILLAGE, OROMIYA REGIONAL STATE, FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA ETHIOPIA OPSM FEBRUARY 2008 Plant site
ESIA SUMMARY
ESTABLISHMENT OF 5,600 TPD CLINKER CAPACITY GREENFIELD CEMENT PROJECT AND OPERATION OF CAPTIVE MINES
NEAR DERBA VILLAGE, OROMIYA REGIONAL STATE,
FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA
ETHIOPIA
OPSM
FEBRUARY 2008
Plant site
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
1
ESIA SUMMARY
1. INTRODUCTION
MIDROC HOLDING (Al-Muwakaba For Industrial Development and Overseas Commerce) is a large company having many business interests in Ethiopia, Saudi Arabia and other countries.
DERBA MIDROC CEMENT PLC is proposing to establish a green field cement plant of capacity 5,600 tonnes per day (tpd) of clinker (cement capacity of 7000 tpd) based on Derba limestone deposit in Ethiopia.
This ESIA Summary outlines the Summary of the Environmental and Social Impact Assessment (ESIA), the Environmental and Social Management Plan (ESMP) and the Resettlement Action Plan (RAP) formulated for the proposed project, which includes the cement plant, captive raw material mines, proposed roads from the plant to the mines and from Derba village to the plant, belt conveyor from mines to plant, water pipeline and the power transmission lines.
2. PROJECT DESCRIPTION
The cement plant is proposed to be located about 8 km from Derba village in Sululta Wereda in Shoa Zone of Oromiya Regional State. The proposed mining area is located within the Aanda Weizero Peasant Association in Sululta Wereda, Shoa Zone of Oromiya Regional State and is about 7 km (crow fly distance) from the plant site.
The Derba Cement plant site is about 70 km from Addis Ababa the capital of Ethiopia. The coordinates and elevations of the plant and mining areas are given below. The project location is shown in the map below.
Coordinates : Latitude : 09027’28” to 09
028’25”’N : Longitude : 38
034’31” to 38
035’23” E
Elevation of Plant site : 2380 m to 2420 m above Mean Sea Level (MSL)
Elevation of Mining area : 1550 m to 1650 m above MSL
Ordinary Portland Cement (OPC) and Portland Pozzolana Cement (PPC) will be manufactured at the DMC Plant. Both the cements shall meet the requirements of Ethiopian National Standard No. EN-197.
Plant L ti
Mining Area
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
2
OPC shall be produced as per CEM-I - 42.5 grade and shall contain 95% clinker and 5% gypsum. PPC shall be produced as per CEM-II - 32.5 grade and shall contain 67% clinker, 28% pumice and 5% gypsum. The annual cement capacity of the plant shall be 2.46 million tonnes per annum.
Cement consumption in Ethiopia during the period 1997-2007 has grown well, with a Cumulative Annual Growth Rate (CAGR) of around 10% per annum (pa). In the last 5 years, the growth rate was around 16.1% pa.
The cement consumption for the year 2006-07 is estimated to be around 2.05 million tonnes. The demand supply gap for cement has been estimated as given below.
Year Demand (million tonnes) Supply (million tonnes) Gap (million tonnes) 2007 2.05 1.75 0.30 2008 2.66 2.01 0.65 2009 3.38 2.82 0.56 2010 4.19 3.50 0.69
The proposed plant capacity is primarily based on market considerations and the availability of raw materials. The proposed location enjoys the twin advantage of proximity to raw material sources as well as market offered by the Addis Ababa, which is the capital and largest city of Ethiopia. Addis Ababa is also an important trade center of East Africa.
DMC is expected to command a market share of around 37% in its 1st year of operation, which will increase to 41% in its 4th year of operation. The plant will achieve 100% capacity utilization in its 4th year of operations.
The raw material and fuel requirements for the proposed plant are to be met from different sources as given below.
Sn Material Source Locality Distance from plant (km) Remarks
Raw materials 1 Limestone &
Marl Mugher 6.5 The crusher, located in the mine, would
be connected to the plant by a 7 km long belt conveyor.
2 Clay Mulu Seyo 18 Considered as a corrective. 3 Sand Mugher 15 Considered as a corrective. 4 Basalt Near Gimbichu 10 Considered as a corrective. 5 Gypsum Mugher 15 Considered as an additive 6 Pumice Dera Ararate/ Nazerat 125 Considered as an additive
Fuel 1 HFO Middle East - 2 Imported coal South Africa -
Transport by sea up to Djibouti port, land transport 925 km
The limestone deposit at present is accessible by about 12 km foot track from Derba Cement plant site, which is situated at a distance of 70 km from Addis Ababa. The deposit is surrounded by Mugher river and its tributaries. Due to the natural topography of the area, the limestone deposit lies in the valley (1550-1650 m above MSL) whereas the flat area where the plant is proposed to be located is at an altitude of 2380-2420 m above MSL. There is a sharp fall in elevation of approximately 800 to 850 m between the plant and the mining areas.
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
3
The best available technology, which is the dry process, shall be used for manufacture of cement. Cement manufacturing consists of raw meal grinding, blending, calcining to form clinker and cement grinding. In short, limestone and other materials containing calcium, silica, aluminium and iron oxides are crushed and milled into a raw meal. This raw meal is blended and is then heated in the pre-heater to initiate the dissociation of carbonate to calcium oxide and carbon dioxide. The meal then proceeds to the kiln for heating and reaction between calcium oxide and other elements to form calcium silicates and aluminates at a temperature up to 1450oC. The products leave the kiln as a nodular material called clinker. The clinker is inter-ground with gypsum and other additives like pumice to a fine product called cement. The adjacent Figure shows the cement manufacturing process from raw material quarrying to the bagging of the cement.
The manpower requirement for operation of the proposed plant is estimated as 474.
UTILITIES
The maximum power demand for the proposed plant is estimated at about 45 MVA. The power demand will be meet from the national grid. The main feeder line passes near Chancho, where a sub-station will be constructed and a power line drawn over 20 km. Water supply will be met from ground water sources. Borewells will be located near Mulo Seya village around 16 km away and pipelines will be laid up to the plant. The total requirement of water for the project including drinking and sanitation is around 2,000 m3/day. A Sewage Treatment Plant (STP) to treat sewage effluent will be installed. The STP will cater to the plant and colony both and will have a capacity of 300 m3/ day.
A residential colony to provide accommodation for plant personnel will be built. The Colony will have facilities like a health centre, school, shopping complex, recreation centre, guesthouse, gymnasium, sports playgrounds, etc.
3. POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK
The ESIA study for the proposed Cement project has been carried out within the framework of local, national and international environmental regulations. The legislative framework applicable to the proposed project is governed by the Federal Democratic Republic of Ethiopia (FDRE), Africa Development Bank (AfDB), International Finance Corporation (IFC), European Investment Bank (EIB) and the Development Bank of Ethiopia (DBE).
3.1 REGULATORY FRAMEWORK OF FDRE
Ethiopia adopted its Constitution in 1995, which provides the basic and comprehensive principles and guidelines for environmental protection, and management in the country.
The FDRE consists of the Federal State and Regional States. Proclamations 33/ 1992, 41/ 1993 and 4/ 1995 define the duties and responsibilities of the Regional States which include planning, directing and developing social and economic development programs as well as protection of natural resources.
The Environment Protection Authority (EPA) has established an Environmental Impact Assessment system for Ethiopia including the preparation of Procedural and Sectoral Guidelines as a prerequisite for the approval of new development activities and projects. The EIA Process as applicable to development projects is detailed in the ‘Environmental Impact Assessment Procedural Guidelines Series 1’ of November 2003. As per Schedule I of the Guidelines, both cement plants as well as mining projects have significant environmental impacts, and, therefore, require a full EIA/ EA study.
The Derba Cement plant will be responsible for implementing environmental management plans at its facilities in coordination with the Federal EPA and the Regional EPA for Oromiya Region. The
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
4
environmental performance of the project will be monitored on a regular basis through DMC’s own set up and through external/ third party audits.
3.2 IFC/ WORLD BANK GUIDELINES
The proposed cement project falls under Category A as per IFC Performance Standards and its procedures for project appraisals. The WB and IFC provide detailed guidelines for the EA process. As of April 30, 2007, new versions of the World Bank Group Environmental, Health and Safety Guidelines (EHS) are in use. The EHS Guidelines also include sector specific:
EHS Guidelines for Cement and Lime Manufacturing EHS Guidelines for Construction Material Extraction
In addition, IFC’s eight Performance Standards, viz., Social and Environmental Assessment and Management System; Labour and Working Conditions; Pollution Prevention and Abatement; Community Health, Safety and Security; Land Acquisition and Involuntary Resettlement; Biodiversity Conservation and Sustainable Natural resource Management; Indigenous People; and Cultural Heritage, will be adhered to throughout the operation of the project.
3.3 AFRICAN DEVELOPMENT BANK GUIDELINES
As per the Environmental and Social Assessment Procedures of AfDB, the proposed cement project including its associated raw material mining operations and utility connections is classified as Category 1. The projects assigned to Category 1 require a full ESIA, including the preparation of an ESIA report and ESMP.
4. DESCRIPTION OF THE PROJECT ENVIRONMENT
In order to assess the baseline environmental status in the study area around the proposed project area, a primary and secondary data collection programme has been undertaken during the period July-Aug 07. The environmental components studied include:
Physical/ chemical components: Physiography, Geology, Geomorphology, Hydrometeorology, Hydrogeology, Surface and Ground water resources, Climatology, Meteorology, Ambient Air Quality, Noise Levels, and Soil quality.
Land use, archeology and cultural heritage Biological environment: Flora and Fauna Socio-economic components: Demography, education system, agricultural system and livestock,
transportation networks and other infrastructure like water supply, public services, health status and medical facilities.
4.1 TOPOGRAPHY & DRAINAGE
Topography of the project area and of the surroundings consists of plains, mountains and valleys. The drainage of the project area is governed by the catchments of Blue Nile River, particularly Mugher river, which is one of the tributaries of the Blue Nile. Mugher river flows west of the proposed plant site in a deeply incised valley, which is at an elevation about 800 m lower than the plant area.
4.2 CLIMATE
The climate of the area is characterized by two distinct seasonal weather patterns; the wet season extending from June to September, contributing about 70% of the annual rainfall, and the dry season which covers the period from October to May. The minimum and maximum temperature in the area vary from 9oC to 23.5oC. The average relative humidity during the year is 62%. The mean annual rainfall in the area is about 1158 mm.
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
5
4.3 HYDROLOGY
A detailed hydro-geological study has been carried out in the area. The groundwater recharge of the study area of 10 km radius around the plant and mining sites is estimated at 25 mio m3/ year. The total existing abstraction in the area is 5.1 mio m3/ year, which is only 20% of the available groundwater resources. The net available ground water in the area is 19.9 mio m3/ year. Thus it is safe to extract water from the area to meet DMC’s total water requirement of 0.73 mio m3/ year (∼2000 m3/ day).
4.4 WATER QUALITY
Surface water samples from three (3) rivers, three (3) springs and a river confluence and ground water samples from six borewells in the area have been analysed for their physico-chemical properties. All samples are within the stipulated WHO/ Ethiopian Standards.
4.5 AMBIENT AIR QUALITY
The ambient air quality has been monitored at site and at various locations within the study area during the period August-September 2007. The average total particulate matter in the area varied from 42.5 –118.8 µg/ m3, PM10 varied from 13.3-54.4 µg/ m3, SOx varied from 19.5-24.4 µg/ m3 and NOx varied from 6.3 –9.5 µg/ m3 at the monitoring stations located at Plant site, mines, Derba & Lilo villages. All values are within the draft Ethiopian AAQ standards.
4.6 NOISE LEVELS
The noise levels were monitored at four locations within the study area during August-September 2007. The average daytime and night time noise levels have both been recorded as 42 dB(A) and are well within the IFC and draft Ethiopian standards.
4.7 ECOLOGY
4.7.1 Flora
The vegetation composition, abundance, cover, and other relevant ecological information of the areas has been conducted. The study has covered both the core area, i.e., the plant and mining sites, as well as the buffer area, i.e., an area of 10 km radius around the plant and mining sites.
The area is rich in species composition though the abundance and distribution is highly influenced by anthropogenic factors such as crop cultivation, grazing, charcoal production and wood cutting for domestic uses. A total of 241 floral species belonging to 79 families have been recorded in the buffer zone. Most of these species are indigenous while a few others are exotic or naturalized. A total of 23 cultivated plant species and 60 medicinal plants were recorded in the buffer area. The plant species encountered include 15 endemic species of which 5 are highly endangered and 10 are of least concern as per Ethiopian statutes.
4.7.2 Fauna
Few fauna were observed in the core and buffer zones, as the area is highly impacted by deforestation and wildlife hunting. The fauna recorded in the buffer area include monkeys, baboons, hyenas, jackals, bush pig, serval, etc. There are no faunal species recorded from the Muger valley area that can be categorized as endangered, threatened or vulnerable. The species encountered are common forms that are observed in other parts of Ethiopia.
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
6
4.8 CULTURAL, HISTORICAL & ARCHAEOLOGICAL FEATURES
No visible archaeological remains, which have scientific, cultural, public, economic, ethnic and historic significances, have been observed in the area. The risk value of both the plant and the mining sites is very low, where no significant observable archaeological evidence is found. The sites have no archaeological importance. However, a Chance Find protocol will nevertheless be prepared to cover any unexpected finds.
4.9 SOCIO-ECONOMIC SCENARIO OF THE AREA
A detailed socio-economic survey has been carried out in the 10 km area around the project site. The poverty profile of the area is given below.
4.9.1 Income/ Consumption Dimension of Poverty Consumption/ Expenditure
The results of the household survey carried out for the project area comprising of plant and mining areas reveal that the per capita consumption/ expenditure of the household and the population in the project area is estimated to be Birr 9214.37 and Birr 1722.77 respectively. According to the 2002 Development and Poverty Profile of Ethiopia the real per capita consumption expenditure of North and West Shoa zone, the area where the project is located, amounts to Birr 1087.2. The higher figure arrived at during the primary survey may partly be attributed to the time gap and current prices used in the calculation of the data.
In accordance with the 2002 Development and Poverty Profile of Ethiopia, the proportion of people in absolute poverty is about 31.7% in North and West Shoa Zones. This is by far better than the National and Oromiya Region absolute poverty figures of 39.9% and 44.2% respectively.
As indicated by the survey a significant portion of the expenditure incurred by people in the area is incurred on food. Food on average accounts for 56.4% of the household budget. Within the non-food category, clothing and house maintenance account for greater share of total expenditure (10.5 and 8.7%). Medical care and education budget contribute 4% and 0.8 % of the total household budget respectively.
Income
The major source of employment and income in the project area is mixed farming, i.e. crop production and livestock. Apart from the heads of the households who are often the breadwinners of the family, other family members also contribute to family income through employment in farming and off-farm activities.
The most important part of the income accounting to over 88.5% originates from agricultural and related activities mainly from the production of cereals and vegetables, perennial crops, domestic animals and its products, agro-forestry products and renting of farming lands. The remaining activities, i.e., trading, employment, handicrafts and others bring in the remaining income of the people. On the bases of the survey result, the annual per capita income of the households and population is computed to be Birr 10,287.62 and Birr 1923.4 respectively.
4.9.2 Non-Income/ Consumption Dimension of Poverty
Demography
The Plant and Mining sites are located close to Becho Dibdibe and Gimbichu villages within Becho Kidane Mehret and Handa Weizero Peasant Associations (PAs) respectively. The demographic details of the three PAs, viz., Becho Kidane Mehret (Plant area), Handa Weizero (Mining area) and Derba Gulele Beresa (the closest habitation of Derba) are given below:
Population Number of Households Sn PA Male Female Total Male Female Total
Avg. Family
Size
Population Density
(persons/sq km) 1 Becho Kidane Mehret 804 872 1676 269 18 287 5.8 31.59 2 Handa Weizero 891 1611 2502 514 235 749 3.3 33.62 3 Derba Gulele Beresa 1825 2065 3890 1161 107 1268 3.1 147.46
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
7
Female headed households are few. The average population density is 70.9 persons/ sq km, which is, more than the national average of 50 persons/ km2.
Females constitute 51.3% of the total population. Out of the total surveyed household heads (244) only 12.3% were female-headed households. The average family size in the project area is about 5.3. This is classified as a large family size, which usually indicates the characteristics of a poor family.
Residents of the project area are predominantly followers of the Orthodox Christian Religion (98.4%). The population of the project affected area is almost entirely of the Oromo ethnic group (97.5%) and Oromiffa is the major language spoken in the area. The Local Consultation is therefore carried out verbally and in Oromiffa language. The remaining 2.5% of the total households belong to Amhara ethnic group. None of the Project Affected Persons belong to ethnic minority groups.
Education
According to findings of the socio-economic survey, the overall literacy rate in the project area is very low. 81.5% of the surveyed household heads are illiterate whereas the remaining 18.5% are literate. Of this, less than a quarter of the household heads had formal education of which the majority was only till primary level.
Literacy rates are also disproportionate between sexes. While 88.5% of females are illiterate, the figure is 69.8% for males. Literacy rates are consistently higher for men than women throughout all levels of education.
Of the total household heads in the project area, 3.5%, 4.0%, 7.6%, and 1.5% and 1.5% have attained Lower Primary (1-4), Primary (5-8), and Secondary (9-10), Technical school and above grade 10 level education respectively.
Farm Assets
The main source of livelihood in the project area is agriculture. Therefore, land ownership in the project area becomes an important determinant of welfare. The major crops of the area are teff, barley, maize, sorghum, chickpeas, wheat, etc. Trees grown include banana, orange, mango, coffee, chat and eucalyptus tree is the dominant tree species. The area is mainly cultivated by means of traditional rainfed subsistence farming.
According to the survey results, average landholding of the surveyed household is found to be 2.8 ha. The majority, nearly 90.9% of the surveyed households own more than 2 ha of land. In general the size of individual land holding of the farmers in the study area is better than the average holdings on Regional and country levels. Thus farmers in the study area are likely to have better welfare status.
5. PROJECT ALTERNATIVES
Prior to arriving at a decision regarding establishment of a greenfield cement plant at Derba, different project alternatives were examined and reviewed. The options considered were:
No project option Establishment of a new cement plant close to the quarry for production of cement.
Three possible plant locations have been considered.
Option 1 (Mugher, in the valley): This option would entail minimal transportation for limestone. However, other materials like pumice, coal, clay, which are available at a higher altitude, will have to be brought down to the valley. There is no road at present linking the heights to the valley area. Thus, a new 14 km long road shall have to be built. In addition transportation of cement also shall be difficult. Moreover, contiguous adequate flat land to the tune of 125 ha for location of plant is not available in the valley, and dispersion of kiln emissions will be difficult considering the elevation difference between the valley and the plateau.
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
8
Option 2 (Derba): This village has a good road connection. However, locating the plant close to habitation of Derba village is not advisable since it may lead to detrimental impacts on the local population.
Option 3 (8 km from Derba): The plant site can be connected to the mining area by a 7 km long conveyor. The flat area available is suitable for locating the plant with a residential complex. The site is also far from Derba village.
Thus Option 3 i.e. location of plant about 8 km from Derba has been selected to allow for minimal site disturbance and to avoid a site close to habitation.
The proposed new project works out to be economically viable, socially beneficial and environment friendly. The existence of abundant raw materials for cement production close to the proposed plant site, and the area being far away from habitation are the factors in favour of the selection of the proposed location at Derba.
6. POTENTIAL IMPACTS & MITIGATION MEASURES
The Operation phase of the proposed cement plant mainly comprises of the following activities:
Excavation of limestone from the captive mines Transportation of crushed limestone from mines to plant site Transportation of other correctives/ additives to the plant site Preparation of raw meal by adding correctives to limestone Clinkerisation of raw meal Cooling and heat recovery Blending & grinding of clinker by adding additives Packing & Despatch
The details of main activities and actions to be undertaken and their impacts during operation phase of plant and mines are summarized below. Similar summaries have been prepared for the construction stage and plant closure stage.
Sn Component Activities Potential Impacts 1 Transportation of
raw materials and products
Increase in traffic movement Washing and maintenance of
vehicles
Disturbance to community & its safety Contribution of dust and gaseous pollutants like
SO2, NOx, CO, VOC to ambient air quality Contribution to ambient noise level Disposal of solid waste & waste water
2 Operation of plant / mines
Mines Drilling Blasting Loading & transportation Operation of mining
machinery Plant
Crushing of limestone/ other raw materials
Preparation of raw meal Clinkerisation of raw meal Cooling and heat recovery Blending & grinding of
clinker Packing & Dispatch
Air emissions from operations are Dust, NOx, SO2, GHG and unburnt hydrocarbons.
Generation of noise and vibrations from blasting Waste water generation from:
o Water treatment plant o Domestic usages in plant
Solid waste from wastewater treatment plant as dry sludge, waste lubricating oil from machinery and municipal waste from domestic usages
Accidental spillage of oil, if any.
3 Socio-economic Acquisition of land Payment of taxes and royalty Direct and indirect
Loss of agricultural land Loss of grazing area Employment to locals
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
9
Sn Component Activities Potential Impacts employment
Development of infrastructure like roads, medical, transportation, etc
Implementation of Welfare schemes
Demand of local products and agricultural products
Development of green belt
Business opportunities to locals Increase in per capita income Increase in literacy rate Change in living standard Regional development Saving of foreign exchange
6.1 QUALITATIVE IMPACT ASSESSMENT
The details of criteria adopted for impact assessment are as follows:
Impact Rating Criteria Beneficial Positive Nature of impact
Adverse Negative Short term Impacts shall be confined to a stipulated time Duration of impact Long term Impacts shall continue till the end of plant life Negligible <10% Low 10-40% Medium 40-60% High 60-80%
Likelihood of occurrence
Very high 80-100% Minor Noticeable impacts only Localized Noticed by adjacent locality & may have direct impacts Major Have direct sustainable impacts
Significance of impact
Massive Ability to change the system Low Has practically no impact Medium Has impact in local area
Potential impact level
High Has impact in region
The qualitative impacts of the proposed project during construction and operation phases are summarized here
Impact Rating Particulars Nature Duration Likelihood Severity Potential
Construction Phase Land Use Adverse Long term Medium Localized High Air Quality Adverse Short term Medium Localized Medium Noise level Adverse Short term Medium Localized Medium Water Resources Adverse Short term Medium Localized Medium Waste Water Adverse Short term Medium Localized Medium Soil & Solid Waste Adverse Short term Medium Localized Medium Ecology Adverse Short term Medium Localized Medium Socio-economic & employment Beneficial Short term Medium Localized High
Impact Rating Particulars Nature Duration Likelihood Severity Potential
Operation Phase Green House Gas Emission Adverse Long term High Regional Medium Air Quality Adverse Long term Medium Localized Medium Noise level Adverse Long term Medium Localized Medium Traffic movement Adverse Long term High Localized Medium
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
10
Impact Rating Particulars Nature Duration Likelihood Severity Potential
Water Resources Adverse Long term Medium Localized Medium Waste Water Adverse Long term Medium Localized Low Solid Waste Adverse Long term Medium Localized Low Ecology Adverse Long term Medium Localized Low Loss of agricultural/ grazing land Adverse Long term High Localized High Employment & Economic growth Beneficial Long term High Regional High Socio-economic Measures Beneficial Long term High Localized High
6.2 MITIGATION MEASURES
The mitigation measures for the identified impacts are described below.
Sn Potential Impact
Main Source of Risk Mitigation Measures
1 Natural Resources
Depletion of Limestone reserves and other corrective materials and additives
Availability of raw materials shall be estimated properly Regular review of raw mix to get consistent quality of products Continuous attempt to control wastages during transportation, storage
and handling of raw materials Mining plan shall be prepared to optimize the mining methodology
and ensure the implementation of a progressive reclamation plan to replant in areas where limestone has been excavated
Regular monitoring of availability of stocks and consumption of raw materials, dispatch of products and loss of material
2 Air Emissions A Emission
from mines o Drilling o Blasting o Loading and
unloading o Crusher o Transportation o Wind erosion o Traffic movement
Dust emissions from crusher will be controlled by bag filter. All dumps will be suitably vegetated. A speed limit shall be defined for the trucks/ dumpers moving within
the mining area. Dust suppression systems (water spraying) shall be adopted at faces/
sites before and after blasting and while loading Dust generated due to blast hole drilling shall be suppressed by using
water injecting system of dust collectors in the drills. Use of sharp drill bits for drilling holes and drills with water flushing
systems (wet drilling) to reduce dust generation, Use of sharp teeth for shovels to reduce dust generation, Regular water spraying shall be carried out on haulage roads by water
sprinklers during transportation of raw materials. All vehicles and their exhausts would be well maintained and regularly
tested for emission concentration. Dust masks shall be provided to workers engaged at dust generation
points like drills, loading, unloading points, etc. Extensive plantation shall be carried out in and around the mining area Use of good quality explosives having proper oxygen balance with
regular monitoring.
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
11
Sn Potential Impact
Main Source of Risk Mitigation Measures
B Air emissions from stacks
Air Emissions o Crusher o Raw Mill o Coal Mill o Kiln o Clinker Cooler o Cement Mill o Packing Plant o DG sets o Traffic movement
Ensure maximum efficiency of combustion in kiln and emergency DG sets
Suitably designed ESPs/ Bag filters will limit the dust concentration to 25 mg/ Nm3 in all emissions
In the event of failure of any pollution control equipment, automatic tripping in the control system will be provided
For ESP operations, any disturbance in the power supply to electrode will switch the whole unit off
Efficiency of each air pollution control equipment will be ensured to more than 99%
SO2 and NOx emissions will be within the norms of 400 mg/ Nm3 and 600 mg/ Nm3 respectively as specified by IFC.
A well-designed burner system, will limit the core flame temperature to ensure a low value of NOx
Impact of CO emission will be negligible in view of the firing technique of keeping a positive oxygen balance.
Regular preventive maintenance of pollution control equipment All vehicles and their exhausts will be well maintained and regularly
tested for emission concentration. Continuous dust monitor will be installed on all point emissions Continuous SO2 and NOx monitor will be installed on main stack
C Fugitive Emissions
Storage and Conveying/ transportation of raw materials and products
Leakages from machinery and pipes
Jet Pulse bag filters shall be provided at all dry material conveying and transfer points
Drop distances shall be minimized by the use of adjustable conveyors Dust suppression system by water sprinkler at dump hopper of raw
materials Regular dust suppression with water sprinkler on the haul roads Plant roads & approach roads shall be made of bitumen/ concrete &
mechanical vacuum cleaner shall be used for cleaning of dust on internal roads
Open areas within the plant premises/ along boundaries of the plant premises shall be covered under green belt
Raw Materials/ products shall be fully covered during transportation to/ from the site by road.
D Green house Gas Emissions
All stacks Traffic
movement
The proposal to manufacture blended cement shall reduce clinker requirement in cement, thereby reducing GHG emissions.
The state-of-the-art-technology of 5 stage preheater shall lead to increased energy efficiency thereby reducing GHG emissions.
3 Noise Emissions
Operation of noise generating equipment like compressors, pumps, DG sets, etc.
Maintenance Traffic movement
Procurement of
drill, loaders and dumpers and other equipment with noise proof system in operator's cabin
Cumulative noise level at walkways and work areas shall be <85 dB (A) and no worker shall be exposed to a noise level >85 dB(A) without hearing protection
Noise level at the boundary of plant/ mines shall be <70 dB(A) Blasting operations shall be carried out only during the day time using
milliseconds detonators and cord relay so as to avoid high noise intensity
Regular maintenance of noise generating equipment Provision of silencers shall be made wherever possible. Necessary enclosures will also be provided on the working
platforms/areas for local protection in high noise level areas Proper lubrication & housekeeping to avoid excessive noise The operators will be provided with necessary safety and protection
equipment such as ear plugs, ear muffs etc. Provision of plantation in and around the plant premises
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
12
Sn Potential Impact
Main Source of Risk
Mitigation Measures
4 Ground Vibration/ Fly Rocks
Drilling Blasting
Careful planning, checking, execution & monitoring of each blast Blast holes shall always be initiated by short delay detonators rather
than adopting instantaneous detonation. Short delay in blasting of successive blast holes effectively reduces the vibration problem.
Free faces shall be sufficiently cleared of any loose material before blasting and burden.
Multi row blasting shall be followed. Use of ANFO, which has low velocity of detonation, shall also reduce
the vibration problem. 5 Ground Water
Resources Make up water
for cooling Dust
suppression Domestic
Continuous attempt shall be made to optimize/reduce the use of water Water harvesting shall be carried out to the maximum extent possible Regular monitoring of ground water table
6 Waste Water Domestic RO Rejects
STP with tertiary treatment shall be provided and no waste water shall be discharged from the plant premises
Treated effluent shall be used for dust suppression and plantation/ greenbelt development
Rejects from RO of STP shall be sprayed on raw material stockpiles and coal stored in yard.
Construction of suitably designed drains all along the roads and boundary of the plant premises
Appropriate storm water and runoff control systems shall be provided to minimize the quantities of suspended material carried off site
7 Solid waste (hazardous & non-hazardous)
Maintenance and Operation of integrated plant
Storage and handling of fuel
Accidental spillage
Whenever possible, use of non-hazardous instead of hazardous materials.
All hazardous (ignitable, reactive, flammable, corrosive, and toxic) materials shall be stored in clearly labeled containers or vessels
All hazardous wastes, process residues, solvents, oils, and sludges shall be properly disposed of
Recycle or reclaim materials where possible If recycling or reclamation is not practical, wastes shall be disposed of
in an environmentally acceptable manner and in compliance with local laws and regulations.
Careful garbage transportation to dumping site and disinfections of transport vehicles body
Fire prevention systems and secondary containment shall be provided for storage facilities, to prevent fires or the release of hazardous materials to the environment
8 Spill Manage-ment
Maintenance and Operation
Storage and handling of fuel
Accidental spillage
Impervious liners in place for fuel, lubricants and chemicals storage area.
Effective bunds capable of containing 110% of the volume within and enclosing all potentially contaminating materials to be used for fuel and lubricants storage area
Oil drip pans shall be used wherever there is significant potential for leakage including, but not limited to;
o Electric generator engine o Compressors, pumps or other motors o Maintenance areas o Fuel transfer areas
9 Occupational Health & Safety
All Operations Provision of PPE like ear muffs, helmets, boots, dust masks, etc. to employees
Safe procedure for storage and handling the explosives shall be developed
Adequate training shall be provided to the staff Regular medical check up of workers
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
13
6.3 SOCIO-ECONOMIC DEVELOPMENT PLAN
DMC will actively contribute to improve the socio-economic conditions of the area. The details of the Socio-economic Development Plan are given below:
6.3.1 Community Development Fund
DMC is committing an annual contribution of Birr 250,000 per year for establishing a revolving fund to support/ supplement the efforts to help finance small scale businesses for the local communities. A Committee comprising of officials from Sululta Wereda, PAs, and DMC will oversee the implementation of the fund. DMC shall continue the contribution till the cumulative contribution reaches Birr 2.5 million.
6.3.2 Employment and Business Opportunities
Preference is being/ will be given in employment to able-bodied locals whose land has been permanently acquired for the project. Currently 70 local labour have been employed at the project. As the construction progresses, the local labour proposed to be employed shall be around 400. The Community Development Fund which will be established by DMC will help the interested locals in setting up small businesses like transportation, auto workshops, eateries, and other small shops which shall come up to cater to the cement plant and the “transport sector” visiting the plant.
6.3.3 Road Development
Major road building and upgradation is proposed by DMC in the area. Road from the Plant to mines will for the first time link the valley to Derba and further. The proposed bridge over Mugher river will provide an access to the villages in the vicinity of the quarry and beyond. The road from Chancho to Derba, which is presently a gravel road, will be converted to a tarred black-topped road in stages which will provide a better connectivity. There are presently four old, narrow bridges over small streams on the way from Chancho to plant site. New bridges will be constructed alongside these bridges thereby providing much improved infrastructure in the area. A new, tarred road will be constructed from Derba to the plant site.
6.3.4 Health Facilities
A Health Centre staffed by a Doctor, a Nurse, Laboratory technician, pharmacist and other supporting staff will be set up within the plant which will serve the employees of DMC.
DMC plans to extend health facilities for the local community by establishing a Clinic for inhabitants around the plant site. The ownership and administration of the Clinic shall be with the Regional Government. The estimated cost of the Clinic, which will be allocated by DMC in its budget, is:
Establishment Cost : Birr 300,000
Health facility Cost : Birr 200,000
Total : Birr 500,000
DMC is willing to support the upgradation and upkeep of the established Centre by providing the Centre up to Birr 10,000 per month aimed at supplementing the running expenses, manpower expenses, etc. In addition to the above, professional assistance to organize and run the Centre will be provided by DMC health professionals.
The health facility at quarry site will also be established to the same standards as the plant facility. The cost of health facility, which will be borne by DMC, is estimated as Birr 200,000. However, the administration and management of the health facilities will remain with the concerned office of the Regional Government. A financial assistance of Birr 10,000 per month will be given for meeting the running expenses of the Health Centre. DMC health professionals will extend close cooperation and help in periodic health surveys and during occurrence of any accidents, calamities, etc. Diseases of high concern during the construction phase due to labour mobility are sexually transmitted diseases (STDs) such as HIV/ AIDS. DMC propose the following measures:
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
14
Undertaking health awareness and education initiatives by imparting information and counseling to influence individual behaviour as well as promote individual protection, and protect others from infection.
Training health workers in disease treatment DMC shall ensure ready access to medical treatment, confidentiality and appropriate care, particularly
with respect to migrant workers A number of measures are proposed to reduce the impact of vector-borne diseases like malaria in the workers and the local communities. Sanitation in and around the project area will be improved to eliminate breeding habitats. Use of repellants, clothing, netting, etc. will be promoted. DMC will make efforts to provide appropriate drugs to workers and collaborate with public health officials to help eradicate disease reservoirs. It is proposed to monitor and treat the migrating population to prevent disease spread and also educate project personnel and area residents on risks, prevention, and available treatment. Education
DMC commits to build new or expand the existing elementary school at the plant and quarry sites and hand over the same to the concerned Government office for managing them. DMC is allocating in its budget for expanding and upgrading the educational facilities at Derba town and quarry. The estimated costs are:
Cost of additional classrooms at plant site and quarry : Birr 500,000
Cost of facilities like desks, laboratory equipment, etc. : Birr 250,000
Total : Birr 750,000
A Regional Vocational Training Center is proposed to be established by Sululta Wereda at Chancho. DMC will contribute about Birr 224,000 for the establishment of Vocational (Health Extension Workers and Farmers’ Training) Centre.
Water Supply
DMC will help in improving the water supply in the area. As observed during the socio-economic baseline survey, almost all villages rely on dirty, unpotable stream water for their water requirement. This has lead to prevalence of water borne diseases.
Water supply access will be extended to a total of seven villages around the plant and mining sites. These villages are Adero, Abale, Becho Kidanemehrat, Debedebe, Muger, Anda Wezero and Anda Botero. The amount of water, which shall be made available, is estimated to be 83,560 litres per day (assuming consumption of 20 l/ day) in the form of one water point per village. The water points shall be run by a Water Committee, which shall be established comprising of members of the community. The community will be expected to generate a small amount of revenue from the sale of water, so as to cover at least the maintenance cost of the system.
Communication
With the establishment of the plant, DMC will set up modern communication facilities like telephones, internet, etc. in the area, which will also be available to the local population.
Electricity
DMC will extend to 2MW electric power line for the community along the Derba-plant road and around the plant site to facilitate personal connections for the community. However, the cost of individual connections and bills based on the consumption will be borne by the individuals.
6.4 AUDITS AND MONITORING
Environmental monitoring and audits will be undertaken during & after the construction and development phase and during operation phase to check that the environmental management measures are being satisfactorily implemented and that they are delivering the appropriate level of environmental performance. A summary of the proposed monitoring plan is given below.
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
15
Impact Monitoring method
Parameters Location Frequency
PM/ PM10, NOx, SOx Pyro-processing stacks Continuous PM/ PM10 Cement grinding and clinker
cooler stacks Continuous
PM/ PM10, CO2, Temperature, Oxygen level, combustion efficiency
Combustion sources Biannually
Air quality Measurement/ sampling
Ambient PM/ PM10, NOx and SOx
Selected receptor villages, colony, plant premises
Quarterly
Mines, Crusher, Raw mill, Cement Mill
Biannually Noise Measurement Leq (dB(A))
Four (4) sites around Plant site Biannually and upon complaints
Surface and ground water
Sampling Temperature, pH, Oil content, Suspended solids, COD
Ground water wells, installed grease traps, oil/ water separators, sedimentation tanks
Quarterly
Moisture content, pH, salinity, Nitrogen, Phosphate, Chloride, Potassium, Sodium
Annual Soil Sampling
Heavy metal content (mercury, lead, chromium, copper, nickel, zinc and cadmium)
Agricultural plots near project site
Every three years
Solid Waste Audits, photographic documentation, and interviews
Generation, storage, recycling, transport and disposal
Plant premises Quarterly
Biodiversity Visual inspection and photographic documentation
General condition of the floral cover
Plant, mines and landscaped areas Annual
Metering Water and energy consumption Plant and mines Continuously Resource use Audit Raw material consumption Plant and mines Continuously
Health and Safety
Health and safety surveys
Proper use of PPE, presence of safety signs, first aid kit, fire fighting devices, Injury/ illness records. Accident statistics recording in accordance with ILO standards, including recording of Lost-Day-Accidents per Million-man hours (LDA/MMH)
Plant, road linking plant to Derba Continuously
Field questionnaire Local population Plant and surrounding areas Annually Socio-economic Interviews Employment records Plant Continuously Operations monitoring
Visual inspection and documentation
Production rate, gas flow rates, counter readings, pressure valves, temperatures, abnormal readings, overloads, stoppages
All facilities and major equipment at Plant and Mines
Daily
The Federal EPA has no capacity for monitoring or environmental auditing. DMC will have a dedicated Environmental Management Cell within the plant to oversee environmental management of its operations. Like the EPA, the Government institutions like Wereda level offices at Chancho and PAs do not have the capacity to undertake or assist in implementing social development schemes in the area on behalf of DMC. Thus the Environmental Management Cell will have a strong Social set up to take care of the social development plans in the surrounding area. A Grievance Cell will also be established to address the complaints/ grievances of the local communities.
7. PUBLIC CONSULTATION
Public consultation plays a key role in enabling the public to participate in the planning of project that affects the people directly. The project is proposed to be located within Oromiya Regional State of the country. There are five Weredas located within and around the project. There are twenty eight (28) Kebeles or Peasant Associations that are organized under the Weredas consisting of a number of settlement villages. The Kebele Peasant Association (PA) is the lowest governmental administrative unit of the rural area.
The consultative participants from administrative and community levels total to 1,247 consisting of 40 Wereda officials, 28 Kebele Peasant Associations council members, 223 community members consulted through community discussions and 956 individual household heads consulted privately.
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
16
The major issues identified and the suggestions proposed during the Public Consultation include:
Contain smoke, dust, noise, hazardous discharge and minimize environmental pollution; Extend health services to the local residents by constructing hospital or health center; Create awareness among the people to combat the spread of HIV/AIDS and other STDs and provide
treatment for patients; Provide appropriate compensation for the People to be evicted from their land. In addition, project
should seek ways and means of restoring their livelihood; Create awareness among the people to benefit from project related activities such as trading, etc.; Develop infrastructure, school, electricity, telecommunications, hospital and the like for the
community; Jointly seek remedial measures to regulate the unemployment rate in the project area; Assist the creation and operation of small and micro institutions; Launch reforestation program near the project site and the quarry; Community level discussion should continue to jointly identify and recommend corrective measures
for the potential problems.
8. RESETTLEMENT PLAN
The Cement project comprises of the following sections, which necessitate acquisition of land:
Plant area Mining area Road from Derba to plant site Road from Plant to Mines Road from Chancho to Derba Right of way for disturbances caused by power line, water pipeline and conveyor belt
As per the statutes of FDRE, DMC is required to pay lease rent for the land for the project, which is acquired by the Oromiya Regional Government. DMC is paying the Compensation for acquisition of this land, which is on account payment for the lease rent. The acquisition of the total plant area (125 ha), road from Derba to plant (4.83 ha), road from Chancho to plant (8.2 ha), land for water supply (4.35 ha) is already complete. Land acquisition for conveyor belt, mining area, power transmission line and road from plant to mines is under progress.
A total compensation of Birr 13,330,736.80 has been paid to 354 landowners who have lost part of their landholdings and 74 house owners who have lost their houses. The details of the compensation paid are summarized below:
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
17
Land owners who have lost total land
Landowners who have lost part of their land
Land owners who have lost houses Purpose Site/ Village
Nos. Total area (ha)
Compen-sation paid
(Birr)
Nos. Total area (ha)
Compen-sation paid
(Birr)
Nos. Total area (ha)
Compen-sation paid
(Birr)
Total Compen-
sation paid (Birr)
Whether acquisition
completed or in progress
Plant site Becho Kidanemeheret - - - 94 125.104 4,466,034.36 4,466,034.36 Completed Road from Derba to Plant
Derba Gulele Berisa PA
- - - 37 4.83 349,143.60 349,143.60 Completed
Due to Quarry site Becho Kidanemeheret - - - 4 0.75 41,607.00 41,607.00 Completed Road from Plant to Mines
Ada Gimbichu - - - 116 139.70 5,186,497.10 74 1,229,898.50 6,416,395.60 In progress Becho Kidanemeheret 88 23.07 1,305,187.60
1,305,187.60 Completed
Road from Chancho to Plant site Derba Gulele Berisa PA 50 7.86 479,931.80
479,931.80 Completed
Becho K.meheret (Dibdebe) 2 0.34 18,722.00
18,722.00 Completed
Road for Water supply Lilo-Chebeka 4 2.50 33,819.60 33,819.60 Completed
Amara Sefer 12 1.85 12,595.35 12,595.35 Completed Conveyor Belt/Right of way In progress Mining Area
Anda Wiezero 32 6.21 201,200.70 201,200.70 In progress Anda Wiezero 9 0.83 6,099.19 6,099.19 In progress Power Transmission Line In progess Total 354 187.942 12,100,838.30 1,229,898.50 13,330,736.80 13,330,736.80
ESIA Summary: Greenfield Derba Cement Project: DMC, Ethiopia
18
9. CONCLUSIONS
The proposed cement project will impact on the physical, natural and socio-economic environments at Derba. The plant and mining operations will result in permanent changes in the land use of the area. Agricultural and grazing land will be converted to industrial and mining. However, the soil quality of the area will remain unchanged.
Air emissions from the plant will be highly controlled and the installation of state of the art pollution equipment will limit the dust and gaseous pollutants levels much below the norms specified by the IFC to ensure a continued good air quality in the area.
The proposed plant and mines will not affect the hydrology of the region. The drainage pattern will not be affected and the quality of the water will also not be affected by the mining operations. The vegetation in the mining area may be disturbed, causing a loss of crops, fruit trees and natural vegetation. However, the flora and fauna existing in the area are of common species. Mitigation measures including a rehabilitation and management program and a green belt/ afforestation plan will reduce the overall ecological impacts and in the long term improve the forest cover to the benefit of the fauna diversity.
Employment resulting from plant and mining operations and associated services and improved infrastructure and facilities in the area will be the main socio-economic benefits for the affected community. The acquisition of land in the plant and mining area and the access roads and the resettlement of people living in these areas are the major negative impacts of the project. The implementation of the resettlement action plan will mitigate these impacts in terms of compensation and improvement of livelihood of the affected families.