Estimation of resources (personnel, material, space) needed for PACMAN. Summary ( kCHF ). CERN, 17/06/2013, HMD, SR, AC, MM, NCL, MW, AG. Summary of M to P ressources (FTE). WP1 Metrology & Alignment. Estimation of resources (personnel, material , space ) needed for PACMAN. ESR1.1. - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
2014 2015 2016 2017 SUM
ESR1.1 30 150 150 5 335
ESR1.2 250 50 50 0 350
ESR1.3 30 150 30 0 210
ESR2.1 50 50 30 0 130
ESR2.2 40 70 40 0 150
ESR3.1 25 150 25 5 205
ESR3.2 30 70 20 5 125
ESR3.3 30 70 20 5 125 (TBC)
ESR4.1 90 50 50 20 210
ESR4.2 10 30 20 5 65
Sum 585 840 435 45 1905
Ressources 250 250 250 30 780
TOTAL 2685 kCHF
Estimation of resources (personnel, material, space) needed for PACMAN
Summary (kCHF)
CERN, 17/06/2013, HMD, SR, AC, MM, NCL, MW, AG
Summary of M to P ressources (FTE)
Estimation of resources (personnel, material, space) needed for PACMAN WP1 Metrology & Alignment
ESR1.1 01/01/2014 - 31/12/2016
Year Material (kCHF)
Comments Additional personnel
2014 30
Tests and caracterization of new sensors and linear encoders, new materaials (mumetal) for thin plates of the head
Modifications as required on mechanics and electronics
Manfred Wendt
Modification on the initial stretched wire setup as required for integration to the final assembly.
Manfred Wendt
Expenses for software tools, hardware drivers, etc.
CTF3 Cavity BPM Installation
ESR4.1
MW, 21/05/2013
cavity BPM
step motor controlledtranslation stages
beam tube with bellows(to be fitted with a stretched wire)
Space requirements for PACMAN
To improve team efficiency and make the project a real success:
• ESRs offices located at the same place (and not near their supervisors, except during the 6 first months – 1 year), e.g. 5 offices for 2 persons. Even «Algecos» could be ok.
• At least 3 laboratory rooms (~4m x 4m) nearby (or one large laboratory room), hosting the following test benches:• Magnetic measurements• RF measurements• Assembly / final mock-up• Micrometric alignment test setup • Nano-positioning• Seismic sensors
• Requirements for the labs:• Thermally stable ~ 20±2 °C• Low level vibration and ground motion (potential sites can be easily
checked by the CLIC Stabilization Team)• Duration (2014-2017)