DAFTAR HARGA SATUAN DASAR PERALATAN NO. JENIS ALAT SATUAN 1 Tandem Rooler 6 s/d 8 ton (5 jam/ hari) jam 100,000.00 2 Sewa Mesin Las Listrik 18 PK (8 jam/ hari) jam 35,000.00 3 bh/ hari 150,000.00 4 Water Tank 3000 - 4500 Liter unit/ hari 95,000.00 5 Pengaduk Beton (Beton Molen) unit/ jam 30,000.00 6 Sepeda motor unit/ hari 90,000.00 7 Truk / Pick Up unit/ hari 125,000.00 8 Rool Meter 50 Meter bh 55,000.00 9 Gergaji Listrik bh 35,000.00 10 Water Pass Alumunium bh 45,000.00 Bandung, 05 Juni 2012 Estimator, Riezqi Badruzaman & Teguh Firmansyah HARGA SATUAN (Rp.) Teodolith setara Top Con (Digital) DT 205
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
DAFTAR HARGA SATUAN DASAR PERALATAN
NO. JENIS ALAT SATUAN
1 Tandem Rooler 6 s/d 8 ton (5 jam/ hari) jam 100,000.00
2 Sewa Mesin Las Listrik 18 PK (8 jam/ hari) jam 35,000.00
3 bh/ hari 150,000.00
4 Water Tank 3000 - 4500 Liter unit/ hari 95,000.00
5 Pengaduk Beton (Beton Molen) unit/ jam 30,000.00
6 Sepeda motor unit/ hari 90,000.00
7 Truk / Pick Up unit/ hari 125,000.00
8 Rool Meter 50 Meter bh 55,000.00
9 Gergaji Listrik bh 35,000.00
10 Water Pass Alumunium bh 45,000.00
Bandung, 05 Juni 2012 Estimator,
Riezqi Badruzaman & Teguh Firmansyah
HARGA SATUAN (Rp.)
Teodolith setara Top Con (Digital) DT 205
DAFTAR HARGA SATUAN UPAH KERJA
NO. JENIS PEKERJA BANGUNAN SATUAN WAKTU
1 Pekerja 35,000.00 1 ORANG/ HR/ 8 JAM
2 Pekerja Setengah Terampil 30,000.00 1 ORANG/ HR/ 8 JAM
3 Pekerja Terampil 50,000.00 1 ORANG/ HR/ 8 JAM
4 Tukang Gali 40,000.00 1 ORANG/ HR/ 8 JAM
5 Tukang Batu Setengah Terampil 35,000.00 1 ORANG/ HR/ 8 JAM
6 Tukang Batu Terampil 45,000.00 1 ORANG/ HR/ 8 JAM
1 Tukang Kayu Setengah Terampil 35,500.00 1 ORANG/ HR/ 8 JAM
2 Tukang Kayu Terampil 40,000.00 1 ORANG/ HR/ 8 JAM
1 Gravel 1/2 Dia 20 cm m' 19,000 2 Gravel 1/2 Dia 30 cm m' 23,000 3 Buis beton dia 20 cm bh 34,000 4 Buis beton dia 30 cm bh 41,000 5 Bio tank bh 1,200,000 6 Ground Tank Full shet bh 1,950,000 7 Tutup Plat bordes + Engsel bh 235,000
1 Bambu Diameter 5 s/d 7 cm btg 6,000 2 Bambu Diameter 7 s/d 10 cm btg 9,000 3 Bambu Gombong m2 21,000 4 Dolken 5 s.d 7 m2 27,000 5 Dolken 7 s.d 10 m2 81,000 6 Kayu Balok Borneo 6/12, 8/12, 8/15 * m2 4,600,000 7 Kayu Balok Borneo Super m2 4,600,000 8 Kayu Balok Damar Laut 6/12, 8/12, 8/15* m2 8,800,000 9 Kayu Balok Kamper Banjar 6/12, 8/12, 8/15* m2 6,300,000
10 Kayu Balok Kamper Medan ( Kruing ) m2 8,800,000 11 Kayu Balok Kamper Medan 6/12, 8/12, 8/15* m2 9,200,000 12 Kayu Balok Kamper Samarinda m2 10,100,000 13 Kayu Balok Rasamala* m2 4,000,000
1 Kayu Jati Jabar Tua Lepas Mata dari Ø 80 CM ke atas m2 8,100,000 2 Kayu Jati Jateng Tua Lepas Mata dari Ø 80 CM ke atas bh 16,000,000 3 Kayu Jati Jatim Lepas Mata dari Ø 80 CM ke atas bh 16,000,000 4 Kayu Kamper Singkil /Kapur ( Kamper Samarinda Kls II ) bh 9,200,000 5 Kayu Kaso 5/7, 5/10 Borneo* bh 4,000,000 6 Kayu Kaso 5/7, 5/10 Kamper Banjar* Zak 6,300,000 7 Kayu Kaso 5/7, 5/10 Kamper Medan* Zak 8,100,000 8 Kayu Balok Kayu Gunung Klas II 6/12, 8/12, 8/15* m3 2,400,000 9 Kayu Kaso 5/7, 5/10 Kayu Gunung Klas II* m3 2,400,000
10 Kayu Balok /Kayu Gunung Klas III ( Albasia )* m3 1,400,000 11 Kayu Papan bekisting t 2 cm kayu Albasia m3 1,400,000 12 Kayu Papan Kayu Lokal Kls II m3 2,400,000 13 List Profil kayu lokal kls II 5 cm m' 7,000 14 List Profil kayu Kamper 7 cm m' 43,000 15 List Profil gypsum 7 cm m' 70,000 16 Gypsun 120 x 240 cm , t = 9 mm ex DN lbr 72,000 17 Fornika ukuran 120x240 cm Lbr 86,000 18 Jabar Wood 4 mm Lbr 82,000 19 Melamin 4 mm 120 x 240 Lbr 79,000 20 Multiplek 6 mm 120 x 240 Lbr 93,000 21 Multiplek 9 mm 120 x 240 Lbr 139,000 22 Multiplek 12 mm 120 x 240 Lbr 173,000 23 Multiplek 18 mm 120 x 240 Lbr 226,000
D. BAHAN KAYU BERIKUT BAHAN JADINYA
1 2 3 424 Plywood 4 mm 120 x 240 Lbr 58,000 25 Plywood 9mm 120 x 240 Lbr 127,000 26 Plywood 18 mm 120 x 240 Lbr 192,000 27 Teakwood 3 mm 120 x 240 Lbr 93,000 28 Teakwood 3 mm Uk/ Pintu Lbr 161,000 29 Teakwood 4 mm 120 x 240 Lbr 135,000 30 Teakwood 4 mm Uk/ Pintu Lbr 111,000 31 Triplek 3 mm lbr 50,000 32 Ijuk kg 8,000 33 Plastik Cor m2 15,500
1 2 3 4E. BAHAN PENUTUP RANGKA PLAFOND
1 Eternit 1x1 M2 bh 5,700 2 Eternit 1x1 M2 peti 57,000 3 Asbes semen 1x1 M2 bh 26,000 4 Plat Kalsiboard (1.2x2.4)m tebal 4 mm lbr 45,000 5 Cornis Zak 85,000 6 Kumpon Kg 4,200 7 Plester @ roll 20 m Rol 75,000
F. BAHAN FINISHING : LABURAN, PENGISIAN DAN ALATNYA1 Ampelas Lbr 1,700 1 Gall 78,000 2 Kg 15,000 3 Kg 14,400 4 Kg 115,000 5 Kg 90,000 6 Dempul Kayu Kg 15,000 7 Dempul plastik Kg 27,500 1 Kuas 3 " bh 9,000 2 Kuas 4 " bh 12,100 1 Plamir Cat Kg 14,000 2 Plamir Tembok Kg 24,000 3 Rol cat Tembok Bh 12,000 4 Spirtus Ltr 14,000 1 Tiner A Ltr 8,400 2 Ltr 19,300 1 Lem kayu (fox) 0 12,600 2 Water Profing Emulision Kg 66,000 3 Finishing melamic dop/ gloss ls 15,000
G. BAHAN KACA1 Kaca Polos 2 mm m2 30,000 2 Kaca Polos 3 mm m2 48,000 3 Kaca Polos 5 mm m2 58,000 4 Kaca Rayban 5 mm m2 70,000 5 Kaca cermin 5 mm bh 55,000 6 Karet Kaca m1 65,000
H. BAHAN PAKU DAN MUR-BAUT1 Baut /Mur Kg 14,500 2 Beugel Kuda-kuda Kg 30,200 3 Dak Angker Kg 5,700 4 Kg 16,000 5 Paku Beton 2 cm s/d 5 cm bh 500 6 Rangka atap baja ringan m2 160,000
I. BAHAN SANITER1 Bak fibreglass Bh 220,000 2 bh 157,000 3 Closet Jongkok Porselin Warna bh 175,000 4 TOTO CW 420J/SW 420JP 2 tanki Warna Putih (full shet) bh 850,000 5 CLOSET JONGKOK set CE7 bh 199,300 6 Kran Tembok 3/4 " bh 18,000 7 Kran Leher angsa 1/2 " TOTO bh 85,000
1 2 3 48 Stop Kran Tembok 1/2 " setara TOTO bh 30,000 9 Stop Kran Tembok 3/4 " setara TOTO bh 60,000 1 Kitchen Zink Stailess Non Standar franke ( 1 Lobang ) Set 225,000 2 Kitchen Zink Stailess Non Standar franke ( 2 Lobang ) Set 350,000 3 Set 351,000 4 Set 465,000 5 Seal tape Set 2,000 6 Pompa air 125 watt Unit 453,000 7 Pompa air 250 watt otomatic Unit 1,262,000 8 Pintu Fiber KM/WC Set 285,000 1 Water Drain + Assessoris set 115,000 2 Sumur Gali Ls 1,500,000 3 Instalasi Pompa + Stop kontak Ls 150,000 4 Foot Valve Dia 1" bh 25,000 5 Water Level Kontrol Unit 135,000 6 Water level kontrol NYM 2 X 2.5 MM2 ttk 125,000 7 Fitting accessories ls 98,000 8 Shower (tanpa tiang) bh 85,000 9 Shower Tube bh 120,000
10 Jetwasher bh 150,000 11 Waterheater 250 watt Unit 2,000,000 12 Kompor gas (MODENA Freestanding Cooker Type FC 7300) Unit 2,950,000 13 Penghisap asap (MODENA slim ExsausetHoodType SX 9002) Unit 1,850,000 14 Instalasi AS+Stop Kontak AC+AC LG 0,5 PK+ saluran pembuang air set 3,000,000
Wastafel setara merk INA ( lengkap )Wastafel setara merk TOTO
Atap Plastik 80 x 180 ( Gelombang )
1 2 3 41 Box Presto 8 group Unit 75,000 2 MCB induk 10 A bh 55,000 3 MCB induk 6 A bh 45,000 4 Otomatis Radar pompair + Pelampung 0 57,500 5 Soket Antena bh 18,000 6 Soket Telepon bh 17,000 7 BP Telepon 1 Line Ls 1,000,000 8 BP Listrik 3600 VA Ls 3,500,000 9 UJL Listrik 3600 VA Ls 2,000,000
10 Kabel NYY 2x2,5mm m 10,000 11 Kabel NYY 3x2,5mm m 11,500 12 Kabel NYY 3x6,5mm m 30,000 13 Kabel NYY 3x10mm m 45,000 14 Solatif kabel roll 5,500 15 T - Dus bh 5,500 16 Inbow - dus bh 7,500 17 Kabel telephone m1 7,000 18 Kabel TV m1 6,500 19 Kabel Tuvur 3x6 m m1 11,000 20 Kabel Tuvur 3x2,5 m m1 9,000 21 Kabel tembaga bc 5 m1 4,500 22 Fiting lampu Down Ligt exs Artolite RD 150 m1 20,000 23 Fiting Lampu Bundar exs Artolite B 79923 m1 21,500 24 Fitting Lampu gantung exs artolite HLG CF BG C3 m1 22,000 25 Fitting Lampu exs Artolite RD 3HALOGEN REFF m1 25,000 26 Fiting Lampu Taman exs Artolite GL PILAR DAIKO KOTAK m1 30,000 27 Fiting Lampu Tempel Kolom exs Artolite WL DAICO m1 32,000 28 Fiting Lampu exs Artolite RD 21- 1 HALLOGEN m1 35,000 29 Lampu Down Ligt exs Philips cool dayligt 20 W TORNADO m1 45,000 30 Lampu Bundar exs Philips cool daylight CIRCLEuntuk dalam ruangan m1 34,000 31 Lampu gantung exs philips Incandescent E 27 25 W m1 40,000 32 Lampu exs QR-CBC51 GU 5.3 20 W m1 42,000 33 Lampu Taman exs philips Essential E 27 - 18 W m1 30,000 34 Lampu Tempel Kolom exs philips Essential E 27 8 W m1 28,000 35 Lampu exs QR-CBC 51 GU 5.3 20 W m1 35,000
L. BAHAN ALAT PENGGANTUNG KUNCI1 bh 9,600 2 bh 13,500 3 bh 9,600 4 bh 13,500 5 Engsel Casement Anderberg 24 " Bh 12,000 6 Engsel Angin Bh 9,600 7 Grendel 15 cm bh 20,700 8 Grendel 5 cm bh 4,000 9 Hak Angin Biasa bh 9,000
1 m2 /Dus 52,500 2 Keramik 40 x 40 ROMAN Warna m2 /Dus 54,000 3 bh 38,000 4 Keramik 30 x 30 KW I DN Warna KW 1 bh 42,000 5 Keramik 30 x 30 KW I DN POLOS KW II bh 50,000 6 Keramik 30 x 30 ROMAN Vivaldi Garnet m2 /Dus 48,900 7 Keramik 30 x 30 ROMAN Strata Black m2 /Dus 50,000 8 Keramik 30 x 30 ROMAN Colonial Sabia m2 /Dus 45,000 9 Keramik 33 x 33 ROMAN Columbus Beige m2 /Dus 46,000
10 Keramik 25 x 33 ROMAN Aquila Crema m2 /Dus 45,000 11 Keramik 25 x 33 ROMAN Aquila Bruno m2 /Dus 42,000 12 bh 39,000 13 Keramik 20 x 20 KW I DN Warna bh 44,000 14 Keramik 20 x 20 KW I DN Warna anti slip bh 47,000 15 Keramik 20 x 20 ROMAN Troy Bruno m2 /Dus 52,000 16 Keramik 20 x 20 ROMAN Giada Beige m2 /Dus 51,500 17 Keramik 20 x 20 ROMAN Venere Crème m2 /Dus 50,000 18 bh 41,000 19 Keramik 20 x 25 KW I DN Warna bh 47,000 20 Keramik 20 x 25 ROMAN Canossa Dark m2 /Dus 48,000 21 Keramik 20 x 25 ROMAN Canossa Beige m2 /Dus 48,000 22 Keramik 10 x 40 ROMAN m1 /Dus 24,000 23 Keramik 10 x 30 ROMAN Vivaldi Garnet m1 /Dus 24,000 24 Keramik 10 x 30 ROMAN Strata Black m1 /Dus 24,000 25 Keramik 10 x 30 ROMAN colonial sabia m1 /Dus 23,500 26 Keramik 7 x 25 ROMAN Tulip Aquila Crema Listello m1 /Dus 30,000 27 Keramik 7 x 25 ROMAN Tulip Aquila Crema Listello bh 7,500 28 Keramik 6 x 20 ROMAN Marigold Marmara Beige m1 /Dus 22,500 29 Keramik 6 x 20 ROMAN Marigold Marmara Beige bh 4,500 30 Keramik 6 x 20 Light new zhutilani beige mulia bh 9,600 31 Step nosing 30 cm Bh 3,750 32 Border Keramik 20 cm Bh 2,500
N. HARGA BBM1 Premium Ltr 4,500 2 Minyak Solar Ltr 4,300 1 Minyak Bakar Ltr 7,500 2 Pelumas Bekisting Ltr 12,600 3 Olie SAE (Mesran, Pertamina) Ltr 19,000
Bandung, 05 Juni 2012 Estimator,
Riezqi BadruzamanTeguh Firmansyah
Keramik 40 x 40 ROMAN ( polos)
Keramik 30 x 30 KW I DN Putih ( polos) KW 1
Keramik 20 x 20 KW I DN Putih ( polos)
Keramik 20 x 25 KW I DN ( Polos )
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF. SAT.
1 2 3 4 5 6 = (3 x 5) A1 1 M2 PEK. PEMBERSIHAN LOKASI