ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD School of bioprocess engineering Unimap CONVERSION & REACTOR SIZING (part 2)
49

ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

May 30, 2018

Download

Documents

dangtu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

ERT 208

REACTION ENGINEERING

MISMISURAYA MEOR AHMAD School of bioprocess engineering

Unimap

CONVERSION & REACTOR SIZING (part 2)

Page 2: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

REACTORS IN

SERIES

Page 3: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

objectives DEFINE conversion and REWRITE all the balance equation in term of conversion EVALUATE the size of CSTR & PFR based on conversion, DETERMINE the reactor volume necessary to achieved a specified conversion, COMPARE CSTRs & PFRs and overall conversion for reactor arranged in series. IDENTIFY the best arrangement of reactors in series.

Page 4: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

• Reactors are connected in series so that the

exit stream of one reactor is the feed stream for another reactor.

• Therefore, conversion is defined in terms

of location at a point downstream rather than with respect to any single reactor.

Page 5: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

• So that Conversion, X is the total number of

moles of A that have reacted up to that point per

mole of A fed to the first reactor.

• For reactors in series,

Page 6: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

• But, the definition of conversion can only be used when the feed stream only enters the first reactor in the series &

no side streams either fed or withdrawn.

• The molar flow rate of A at point i = moles of A

fed to the first reactor minus all moles of A

reacted up to point i.

Page 7: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

• For example:

• X1 at point i=1 is the conversion achieved in the PFR.

• X2 at point i=2 is the total conversion achieved at this point in PFR and CSTR.

• X3 at point i=3 is the total conversion achieved by all three reactors (PFR, CSTR & PFR).

Page 8: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Consider 3 different schemes of reactors in series:

1) Two CSTRs

2) Two PFRs

3) Combination of PFRs & CSTRs

Page 9: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

1) CSTR in series (2 CSTRs)

• Consider 2 CSTRs in series:

Page 10: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

So that

The rate of disappearance of A is –rA1 at conversion X1.

A mole balance on reactor 1 gives:

The molar flow rate of A at points 1 is:

Equation 1

Equation 2

# Combining Equation 1 & 2 then rearrange,

Page 11: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

So that

The rate of disappearance of A, –rA2 is evaluated at the

conversion of the exit stream of reactor 2, X2.

A mole balance on reactor 2 gives:

The molar flow rate of A at points 2 is:

Equation 3

Equation 4

# Combining Equation 2, 3 & 4 then rearrange,

Used (X2–X1) to calculate V2 at X2.

Page 12: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

From experiment (Temp. 500 K (440 °F), total pressure=830 kPa (8.2 atm) & pure A used as reactant.

Used previous data:

X 0.0 0.1 0.2 0.4 0.6 0.7 0.8

-rA 0.45 0.37 0.30 0.195 0.113 0.079 0.05

For the 2 CSTR in series, 40% conversion is achieved

in the first reactor. What is the volume of each of the two reactors necessary to achieve 80% overall conversion of the entering species A?

Example 2.5 (Comparing Volumes for CSTRs in Series)

Page 13: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Answer Used previous data & calculated:

1st method

Page 14: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

2nd method Shade the area for Levenspiel Plot

Page 15: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

• For CSTRs in series, the rate –rA1 is evaluated at X1 = 0.4 and rate –rA2 is evaluated at X2 = 0.8.

Notice The sum of 2 CSTRs reactor volume in series (4020 dm3) < the volume of one CSTR (6400 dm3) to achieve the same conversion, 80%.

• The total volume for 2 reactors in series:

By comparison, the volume necessary to achieve 80% conversion in one CSTR (Example 2.2):

Page 16: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Model a large number of CSTRs in series = a PFR

Conclusion We can model a PFR with a large number of CSTRs in series. This concept of using many CSTRs in series to model a PFR will be used to model catalysts decay in Packed Bed Reator/ transient heat effect in PFRs.

We want to compare the Total Volume of all the CSTRs with the volume of one PFR for the same conversion, 80%.

Page 17: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

2) PFRs in series (2 PFRs)

• Consider 2 CSTRs in series:

Page 18: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

The equation for two PFR in series:

Total reactor volume for 2 PFR in series = Reactor volume for one PFR

Page 19: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Use the data below to calculate the reactor volumes V1 and

V2 for PFRs in series (shown below) when the intermediate conversion is 40 % and final conversion is 80 %.The entering molar flow rate is 0.4 mol/s.

Example 2.6 (Sizing PFRs in Series)

Page 20: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Use the simpson’s three point rule:

Answer 1st method

There are 2 method to solve PFR: 1) Use the Simpson’s rule

2) Shade the area for Levenspiel Plot

Page 21: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Note: This volume same with a single PFR to achieve 80 % conversion in Example 2-4

Page 22: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

3) Combinations of CSTRs and PFRs in Series

• Consider the dimerization reaction of propylene into isohexanes.

The Industrial reactors to dimerize propylene into isohexanes (2 CSTRs & one PFR in series)

A schematic of the industrial reactor system

Page 23: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Assume the reaction carried out in this reactor follows ‘ curve given by Table 2-3

The volume of the first two CSTRs in series are (Example 2-5):

1st method

Page 24: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size
Page 25: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

2nd method: (Shade the area for Levenspiel Plot)

Page 26: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Example 2.7

The isomerization of butane was done adiabatically in liquid phase and the data below are obtained.

(An Adiabatic Liquid Phase Isomerization)

Calculate the volume of each reactors for an entering molar flow rate of n-butane of 50 kmol/hr.

Page 27: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Answer

Page 28: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size
Page 29: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Where:

Page 30: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Comparing the CSTR & PFR reactor volumes & reactor sequencing

Based on the graph: (Usually for adiabatic reaction)

1) The area under the curve between X = 0 and X = 0.2 PFR Area > Rectangular Area (CSTR)

2) The area under the curve between X = 0.6 and X = 0.65

Rectangular Area (CSTR) > PFR Area

Page 31: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Which reactor should go first to give the highest overall conversion?

It depends on:

1) the shape of Levenspiel plots (FAO/-rA) versus X

2) The relative reactor sizes

Page 32: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Methods:

Suppose a Levenspiel plot (FAO/-rA) versus X will be given for three reactors volumes in series VCSTR1 = 3 m3, VCSTR2 = 2 m3 & VPFR = 1.2 m3. Then find the highest possible CONVERSION, X

The methods we used to calculate reactor volumes all apply, except the procedure is reversed & a trial-and-error solution is needed to find the exit overall conversion from each reactor.

Page 33: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

The data of the reaction rate as a function of conversion (Experiment)

Know the molar flow rate to the reactor, FAO

Can calculated the reactor volume necessary to achieve a specified conversion

The reaction rate does not depends on CONVERSION only, it also affected by the initial CONCENTRATION of the reactant, the TEMPERATURE & the PRESSURE.

The data obtained in the laboratory (presented in all Example) as –rA as a function of X are useful ONLY in the design of full-scale reactor that are to be operated at the identical conditions as the laboratory experiments (temp., pressure, initial reactant concentration). But such circumstances are seldom encountered & we must revert to the methods to obtain –rA as a function of X (CHAPTER 3).

Page 34: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Some further Defination

Space Time, ד

Is the time necessary to process one reactor volume of fluid based on entrance condition.

The time it takes for fluid to enter the reactor completely.

Dividing reactor volume by the volumetric flow rate entering the reactor.

Also known as the holding time or mean residence time.

Page 35: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

For Example, consider the tubular reactor 20 m long & 0.2 m3 in volume.

If the volumetric flow rate were 0.01 m3/s, so that:

Means that, it would take 20 s for the fluid at point a to move to point b, which corresponds to a space time of 20 s.

Page 36: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Table 2-4 show a range of typical processing time in term of the space time for industrial reactor.

Page 37: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size
Page 38: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Space Velocity, SV

SV as the reciprocal of the space time

The 2 space velocities commonly used in industry are:

1) Liquid-hourly space velocity

2) Gas-hourly space velocity

Page 39: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Example 2.8 (Reactor Space Times & space Velocities)

Answer

Page 40: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Answer

Page 41: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

SUMMARY

Page 42: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size
Page 43: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size
Page 44: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size
Page 45: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Let’s think

Page 46: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Let’s think

Page 47: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Let’s think

Page 48: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Let’s think

Page 49: ERT 208 REACTION ENGINEERINGportal.unimap.edu.my/portal/page/portal30/Lecturer Note… ·  · 2011-10-04ERT 208 REACTION ENGINEERING MISMISURAYA MEOR AHMAD ... EVALUATE the size

Q &A