ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014
28

ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

Jan 04, 2016

Download

Documents

Gervase Lucas
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

ERS Update Plus

Revisions to Proposed Changes for ERS Time Periods

Presented to: Demand Side Working GroupNovember 5, 2014

Page 2: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

2

Emergency Response Service (ERS) Trends

Page 3: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

3

Revisions to Proposed Changes

for ERS Time Periods

Page 4: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

4

• Align ERS time periods with the seasonal and hourly changes in the risk of entering into an EEA– Winter Peaks, currently winter peak hours (less than 2% of the

annual hours) requires to contract for all NBHs for both the Oct-Jan and Feb-May standard contract terms (≈43% of the annual hours)

• Optimize the allocation of ERS expenditure dollars

Purpose of Proposed Changes

Page 5: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

5

Summary of Discussions

February and the August DSWG Meetings – ERCOT introduced two options, one changed both SCT and Time Periods, the other only Time Periods.

– A common concern from DSWG was that both options would introduce unnecessary confusion during the Standard Contract Terms and put providers at risk during deployments

– DSWG requested that ERCOT develop a third option that would keep the time period definitions consistent across Standard Contract Terms

August DSWG – 3rd Option presented with a request that variations for the Business Hours 3 be considered.

Options 3, 4, 5 and 6 now up for consideration

Page 6: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

6

Option 3, 4 and 5

Features:

1. Modify time periods within each SCT to enable better alignment with the risk of ERS deployments

2. New time period that targets morning winter peak hours before the existing Business Hours 1 Time Period and extending evening Business Hours to 10 p.m.

3. Time Periods would be consistent across all SCTs

4. No change to the SCTs

1.ERCOT recommends implementation at the beginning of the 2016 ERS Budget year (initiate for the Feb-May 2016 SCT)

2.Changes would only require a 90 day notice and modifications to the Technical Requirements & Scope of Work document

3.Would NOT require PUC Rule change, NPRR, or redefinition of the ERS budget year

Page 7: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

7

Option 3 details

Time Period Name Time Period Hours

Business Hours 0Hours Ending 0600 – 0800 (5:00:00a.m. to 8:00:00a.m.)Monday through Friday except ERCOT Holidays

Business Hours 1Hours Ending 0900 - 1300 (8:00:00a.m. to 1:00:00p.m.)Monday through Friday except ERCOT Holidays.

Business Hours 2Hours Ending 1400 - 1600 (1:00:00p.m. to 4:00:00p.m.)Monday through Friday except ERCOT Holidays.

Business Hours 3Hours Ending 1700 - 2200 (4:00:00p.m. to 10:00:00p.m.) Monday through Friday except ERCOT Holidays.

Non-Business Hours All other hours

Page 8: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

8

Option 4 details

Time Period Name Time Period Hours

Business Hours 0Hours Ending 0600 – 0800 (5:00:00a.m. to 8:00:00a.m.)Monday through Friday except ERCOT Holidays

Business Hours 1Hours Ending 0900 - 1300 (8:00:00a.m. to 1:00:00p.m.)Monday through Friday except ERCOT Holidays.

Business Hours 2Hours Ending 1400 - 1900 (1:00:00p.m. to 7:00:00p.m.)Monday through Friday except ERCOT Holidays.

Business Hours 3Hours Ending 2000 - 2200 (7:00:00p.m. to 10:00:00p.m.) Monday through Friday except ERCOT Holidays.

Non-Business Hours All other hours

Page 9: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

9

Option 5 details

Time Period Name Time Period Hours

Business Hours 0Hours Ending 0600 – 0800 (5:00:00a.m. to 8:00:00a.m.)Monday through Friday except ERCOT Holidays

Business Hours 1Hours Ending 0900 - 1300 (8:00:00a.m. to 1:00:00p.m.)Monday through Friday except ERCOT Holidays.

Business Hours 2Hours Ending 1400 - 1600 (1:00:00p.m. to 4:00:00p.m.)Monday through Friday except ERCOT Holidays.

Business Hours 3Hours Ending 1700 - 2000 (4:00:00p.m. to 8:00:00p.m.) Monday through Friday except ERCOT Holidays.

Business Hours 4Hours Ending 2100 - 2200 (8:00:00p.m. to 10:00:00p.m.) Monday through Friday except ERCOT Holidays.

Non-Business Hours All other hours

Page 10: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

10

Option 6 details

Time Period Name Time Period Hours

Business Hours 0Hours Ending 0600 – 0800 (5:00:00a.m. to 8:00:00a.m.)Monday through Friday except ERCOT Holidays

Business Hours 1Hours Ending 0900 - 1300 (8:00:00a.m. to 1:00:00p.m.)Monday through Friday except ERCOT Holidays.

Business Hours 2Hours Ending 1400 - 1600 (1:00:00p.m. to 4:00:00p.m.)Monday through Friday except ERCOT Holidays.

Business Hours 3Hours Ending 1700 - 1900 (4:00:00p.m. to 7:00:00p.m.) Monday through Friday except ERCOT Holidays.

Business Hours 4Hours Ending 2000 - 2200 (7:00:00p.m. to 10:00:00p.m.) Monday through Friday except ERCOT Holidays.

Non-Business Hours All other hours

Page 11: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

11

Page 12: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

12

Page 13: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

13

Page 14: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

14

Page 15: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

15

Page 16: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

16

Page 17: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

17

Page 18: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

18

Page 19: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

19

Page 20: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

20

Page 21: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

21

Page 22: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

22

Page 23: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

23

Page 24: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

24

Page 25: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

25

Page 26: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

26

Implementation of NPRR491/634 (Reporting of Demand Response)

• ERCOT shall post on the MIS Public Area by the fifth Business Day after the start of a calendar month a report of the MW of Demand response that is participating in the past month in:– ERS

• ERS Load

• ERS Gen

• Gen offsetting Load

– Load Resource providing A/S– Any Pilot Project

• Data will be aggregated according to 2003 ERCOT Congestion Management Zone

• On an annual basis, ERCOT shall work with Market Participants to produce a report summarizing Demand response programs, and MWs enrolled in Demand response in the ERCOT Region.

Page 27: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

27

Name Plate Rating for Generators

Protocols Section 3.10.7.2.1 Reporting of Demand Response

To the extent that a participating generator is not registered with ERCOT, information about the nameplate rating of the generator and the maximum deliverable to the ERCOT Transmission Grid or to serve native load shall be collected through the ERS contracting process.

The ERS Submission form was updated during the Oct14Jan15 SCT to include a column titled Generator Name Plate Rating (MW). For Oct14Jan15 we did not require the column to be filled in since the protocol section referenced above was still gray boxed.

For the FebMay15 SCT if the column is not filled in you will receive an error book.

Page 28: ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.

28

Questions