TOPIC BUILDING CONSTRUCTION 05/28/2022 RaZdaN RohIt 1
04/12/2023 RaZdaN RohIt 1
TOPIC
BUILDING CONSTRUCTION
04/12/2023 RaZdaN RohIt 2
04/12/2023 RaZdaN RohIt 3
TYPES OF CONSTRUCTIONS PROJECTS
• Residential building construction• Industrial construction• Commercial building construction• Heavy civil construction
04/12/2023 RaZdaN RohIt 4
04/12/2023 RaZdaN RohIt 5
CONSTRUCTION PROCESS(PROJECT TEAM)
The design usually consists ofdrawings and specification , usually prepared by a design team including
• Surveyors, • Civil engineers, • Cost engineers (or quantity surveyor), • Mechanical engineers,• Electrical engineers, • Structural engineers,• Fire protection engineers,• Planning consultant, • Architectural consultants, and • Archaeological consultants.
04/12/2023 RaZdaN RohIt 6
CONTENTS
• PLANNING• ESTIMATING AND COSTING • SELECTION OF SITE • SOIL INVETIGATION • EXCAVATION• LEVELLING • FOUNDATION • LAYOUT• SHUTTRING(FRAME WORK)• REINFORCEMENT• CEMENT CONCRETE
• BRICK WORK• SANATIRY FITTING• WIRING OF
ELECTRICITY• DOORS AND WINDOWS• PLASTERING • FLOORING• WHITEWASH• RELIEF TO CUSTOMERS
04/12/2023 RaZdaN RohIt 7
• Objectives of purposes• Preliminary investigation • Method of site exploration • Depth and spacing of trial pits and
borings• Choice of method • Recording of data
SOIL INVESTIGATIONS
The study of complete soil investigation can be grouped under the following :-
04/12/2023 RaZdaN RohIt 8
TO OBTAIN INFORMATION ABOUT THE SOIL CONDITIONS BELOW THE SURFACE, SOME FORM OF SUBSURFACE EXPLORATION IS REQUIRED. METHODS OF OBSERVING THE SOILS BELOW THE SURFACE, OBTAINING SAMPLES, AND DETERMINING PHYSICAL PROPERTIES OF THE SOILS AND ROCKS INCLUDE TEST PITS, TRENCHING (PARTICULARLY FOR LOCATING FAULTS AND SLIDE PLANES, BORING, AND IN SITU TESTS.
Geotechnical investigation
04/12/2023 RaZdaN RohIt 9
Soil investigation methods
As general guide the most suitable methods in terms of investigation depth are:
• Foundation up to3.000d-trial pits• Foundation up to 30.000d- boring• Foundation over 30.000d- deep doring an in-
siu examination from tunnels and/or deep pits
04/12/2023 RaZdaN RohIt 10
Soil samplers Soil samples are taken using a variety of samplers; some provide only
disturbed samples, while others can provide relatively undisturbed samples
• Shovels• Trial pits• Augur (hand/machine)• Split-spoon / SPT Sampler• Modified California Sampler
04/12/2023 RaZdaN RohIt 11
Shovel
Trial pits
Hand Augur boring
Machine augur
samplers
04/12/2023 RaZdaN RohIt 12
Soil tests
In-situ test • standard penetration testa) dynamic Cone penetrometeb) cone penetration test
Laboratory test• Grain size• Moisture content• Specific gravity• Liquid limit• Plastic limit• Shrinkage limit• Compaction• Direct Shear• Permeability• California bearing ratio• Direct shear test• Hydrometer• Proctor compaction test• Sieve analysis• Triaxial shear test
04/12/2023 13
FOUNDAT
IONS
• Nature of foundation • Nature and amount of suprimosed loads • Nature and extent of difficulties (presence
of boulders or many things )• Availability of expertise and equipment
RaZdaN RohIt
04/12/2023 RaZdaN RohIt 14
Foundation before cement concrete but with in reinforcement detail
04/12/2023 RaZdaN RohIt 15
Raft
foun
datio
n
04/12/2023 RaZdaN RohIt 16
Stepped footing foundation (shallow foundation )
04/12/2023 RaZdaN RohIt 17
FORM WORK(SHUTTERING)
As fresh concrete is in a plastic state when it is placed for construction purposes, so it becomes necessary to provide some temporary structure to continue and support the concrete fill it gain sufficient strength too self supporting. This is temporary structure is known as form work.
04/12/2023 RaZdaN RohIt 18Type
s of f
ound
ation
Shallow foundation (D≤B)• Wall footing • Isolated or pad• Combined• Inverted• Continuous or strip• Strap or cantilever• Raft foundation
Deep foundation (D≥B)• Pile foundation • Pier foundation • Well foundation
04/12/2023 RaZdaN RohIt 19
Types of form work(preliminary structures)
• Steel form • Moving form • Climbing form
04/12/2023 RaZdaN RohIt 20
Form work
Braces PlanksCleatswedges
04/12/2023 RaZdaN RohIt 21
Masonary construction walls and lintels
Masonary • Brick • Stone• Cement concrete• Glass block masonary• Composite masonary
Walls • Load bearing• Partition wall• Cavity wall• Faced wall• Party wall(separating)• Dwarf• Parapet• Monolithic• Retainig wall• Column • Pier• Buttress
04/12/2023 RaZdaN RohIt 22
TERMS IN MASONARY• COURSE • BED• FACE• HEARTING• SIDE• JOINT• HEADER• STREACHER• BOND• SPALLS(CHIP)• CLOSER• BAT
• FROG• PLINTH• PLINTH COURSE• SILL• LINTELS• JAMBS• REVEALS• CORNICE• BLOCKING COURSE• COPING• QUEION CLOSER• KING CLOSER
04/12/2023 RaZdaN RohIt 23
04/12/2023 RaZdaN RohIt 24
FLOORS AND FLOORS FINISHING
• BRICKS• CONCRETE HOLLOW BLOCKS • STONES• WOODEN BLOCK• CONCRETE
MATERIAL ARE USED FOR GROUND FLOORS CONSTRUCTION
04/12/2023 RaZdaN RohIt 25
FLOOR FINISHES OR COVERING
• MUD OR MURAM• BRICKS • CONCRETE• TERRAZZO• TILES• LINOLEUM• MAGANESITE• MARBLE• STONES• WOOD OR TIMBER
• MOSAIC• ASPHALT• RUBBER• CORKE• GRASS• PLASTIC OR P.V.C
04/12/2023 RaZdaN RohIt 26
METHOD OF FLOORING
• ?????• ????• ???• ??• ?
04/12/2023 RaZdaN RohIt 27
Bar binding schedules.no Detail of
reinforcement
figure No of bars Length(m) Total length(m)
Cross sectional area
Weight/m Total weight
1. 8mm@300c/c 10 2355 10*2355 π/4*d2
04/12/2023 RaZdaN RohIt 28
04/12/2023 RaZdaN RohIt 29
04/12/2023 RaZdaN RohIt 30
04/12/2023 RaZdaN RohIt 31
04/12/2023 RaZdaN RohIt 32
04/12/2023 RaZdaN RohIt 33
04/12/2023 RaZdaN RohIt 34