ERP PROCESS

Page 2: Erp process (training)

Empowering Store with ERP

We wish to announce the global access ofERP and it’s usability at store. The ERP willnow available at store. This will help infacilitation of tasks, which are now timetaking. The ERP will empower store to the getactual status of stock available, materialissued and material reconciliation.

Page 3: Erp process (training)

ERP PROCESS COVERAGE

Page 4: Erp process (training)

A. PUNCHING ITEMS

1. GRN2. MIN3. MRN4. MTN

B. HELP DESK

1. STORE HELP DESK 2. ERP HELP DESK

C. ESCALATION

Page 5: Erp process (training)

ERP LOGIN PROCESS

Page 6: Erp process (training)

HOW TO LOGIN• First open your Internet Browser like Google

Chrome or Mozilla Firefox etc.

• Then type WWW.SIPSERP.COM in your address bar and press ENTER.

Page 7: Erp process (training)

• You get the LOGIN page, here enter your USER NAME & PASSWORD. Then press LOGIN button as shown above.

Page 8: Erp process (training)

• Then you prompted to this page. Here enter COMPANY & YEAR (Financial year) in which you want to work & press OK otherwise press CANCEL button.

Page 9: Erp process (training)

• You get over to this page showing the Menu list from which you can choose different items according to your need. You just roll over the mouse over the menu, as showing in the slide.

Page 10: Erp process (training)

PUNCHING IN ERP

Page 11: Erp process (training)

GRN (GOODS RECEIPT NOTE)

Page 12: Erp process (training)

A. DOCUMENTS REQUIRED FOR PUNCHING GRN

• Purchase order (PO)

• Invoice copy

• MRA

• Packing list of material

• LR copy

• Weight slip

Sample copy of each is given below:-

Page 13: Erp process (training)

Purchase order (PO)

Page 14: Erp process (training)

Invoice copy

Page 15: Erp process (training)

MRA

Page 16: Erp process (training)

Packing list of material

Page 17: Erp process (training)

LR copy

Page 18: Erp process (training)

Weight slip

Page 19: Erp process (training)

GRN PUNCHING PROCESS

• Click on Inventory Management > Goods Receipt Note.

Page 20: Erp process (training)

• Then you prompted to this page where you have to choose the Action (e.g New, Alter, View, Delete, Print etc) from drop down menu & press GO.

Page 21: Erp process (training)

• You get to this page where you have to fill the various fields like GRN Date, Vendor, P.O no., Location, Store other information required & given in MRA (Material Receipt Acknowledgment Note).

Page 22: Erp process (training)

• After filling all the required fields, then click on SHOW PO ITEMS & select items from PO which you want to link with GRN.

• Then just close the P.O. Items window.

Page 23: Erp process (training)

• Now it’s shows the items added by you as above. Next step is to add the Quantity, for this you have to click EDIT button

Page 24: Erp process (training)

• Enter the Quantity given in MRA e.g Invoice/ChallanQty, Received Qty, Surplus Qty, Rejected Qty etc & click UPDATE or CANCEL.

• Next step is to save the GRN by clicking on SAVE button. System generate GRN with unique & system GRN no. or press CANCEL button for cancelling.

Page 25: Erp process (training)

Print GRN• You can search your GRN with GRN No. or other

fields given e.g Vendor name by using filters and choose Print and click GO button to print the GRN.

Page 26: Erp process (training)

• MRN Print out

Page 27: Erp process (training)

QUESTIONER

S.No. QUESTIONER WHAT TO DO STATUS TAT

1 PO not Punched Contact coordinator Wait for PO3 working

Days

2 PO not Tracked Contact coordinator Wait for approvalSame Day

3PO in parked

modeContact coordinator Contact coordinator 3 Days

Page 28: Erp process (training)

MATERIAL ISSUE NOTE(MIN)

Page 29: Erp process (training)

MIN is punched in ERP when goods are issued to contractors on demand basis.

A. DOCUMENTS REQUIRED FOR PUNCHING MIN

• MIN physical copy with signature of all the concerned persons e.g P.M/APM, Store Incharge, contractor etc.

• Work order of contractor

• Material list with their ERP codes

Page 30: Erp process (training)

MIN COPY

Page 31: Erp process (training)

MIN PUNCHING PROCESS• Click on Inventory Management > Material

Issue Note

Page 32: Erp process (training)

• Now choose the NEW from Action drop down list & click GO.

Page 33: Erp process (training)

• Now fill all required field like Issue Date, Project, Contractor, Work Order No. , Location, Store etc.

Page 34: Erp process (training)

• Next step is to add items, click on ADD NEW ITEMS & enter all the fields. Then click INSERT or CANCEL. Repeat the process to add more items

• Click SAVE for punching MIN or click CLOSE for canceling.

Page 35: Erp process (training)

Print MIN• Select the MIN by clicking on Check box you

want to print or use filters, then select the Print option from drop down menu and click on ‘Go’

Page 36: Erp process (training)

• MIN Print out

Page 37: Erp process (training)

QUESTIONER

S.No. QUESTIONER WHAT TO DO STATUS TAT

1 W/O not PunchedContact

coordinator/CMGWait for W/O

3 working Days

2 W/O not TrackedContact

coordinator/CMGWait for approval

from HOSame day

3 Items RM codes Contact coordinatorWait for approval

from HOSame day

Page 38: Erp process (training)

MATERIAL RETURN NOTE(MRN)

Page 39: Erp process (training)

MRN is punched in ERP when goods are returned by contractors back to the store.

A. DOCUMENTS REQUIRED FOR PUNCHING MRN

• MBN physical copy with signature of all the concerned persons e.g P.M/APM, Store Incharge, contractor etc.

• Material list with their ERP codes

Page 40: Erp process (training)

MATERIAL BACK NOTE COPY (MBN)

Page 41: Erp process (training)

MRN PUNCHING PROCESS

• First click on Inventory Management> Material Return Note.

Page 42: Erp process (training)

• Now fill all required field like Return Note Date, Contractor, Work Order No. , Location, Store etc.

• Click SHOW ISSUED ITEMS, it shows only those items which are issued to the contractor.

Page 43: Erp process (training)

• Now choose only those items from list which have been returned by the contactors. After choosing items just close the item window.

Page 44: Erp process (training)

• Click on EDIT for altering the quantity & click update• Then click SAVE for punching & CLOSE to cancel.

Page 45: Erp process (training)

Print MRN

• Select the MRN by clicking on Check box you want to print or use filters, then select the Print option from drop down menu and click on ‘Go’

Page 46: Erp process (training)

• MRN Print out

Page 47: Erp process (training)

QUESTIONER

S.No. QUESTIONER WHAT TO DO STATUS TAT

1 W/O not PunchedContact

coordinator/CMGWait for W/O

3 working Days

2 W/O not TrackedContact

coordinator/CMGWait for approval

from HOSame day

3 Items RM codes Contact coordinatorWait for approval

from HOSame day

Page 48: Erp process (training)

MATERIAL TRANSFER NOTE(MTN)

Page 49: Erp process (training)

Material transfer note is used when material is transfer from one store to another store i.einter-store transfer.

A. DOCUMENTS REQUIRED FOR PUNCHING MTN

• STN physical copy with signature of all the concerned persons e.g P.M/APM, Store Incharge, contractor etc.

• Material list with their ERP codes

Page 50: Erp process (training)

STOCK TRANSFER NOTE COPY

Page 51: Erp process (training)

MTN PUNCHING PROCESS• First click on Inventory Management > Material

Transfer Note.

• Choose NEW as action & hit GO.

Page 52: Erp process (training)

• Select Transfer Date, Location, Store, Remarks etc.

• After entering the details click on Add New item button for adding of items to be transferred. The screen shown below will be pop-up

Page 53: Erp process (training)

• Fill fields like ITEM, QTY, RATE, AMOUNT• Click on ‘Insert’ button to add the items to be transferred or press Cancel. For adding multiple items repeat the steps. After adding the items. Click on ‘Save’ Button to save the MTN or click Close to discard. The new MTN no. will be generated.

Page 54: Erp process (training)

Print MTN• Select the MTN by clicking on Check box you

want to print or use filters, then select the Print option from drop down menu and click on ‘Go’

Page 55: Erp process (training)

• MTN Print out

Page 56: Erp process (training)

QUESTIONERS.No. QUESTIONER WHAT TO DO STATUS TAT

1 Items RM codes Contact coordinatorWait for approval

from HOSame day

2Material Transfer from one store to

another

Only Stock Out entry should be punched in

ERP

Inform coordinator & Wait for

approval from HOSame day

Page 57: Erp process (training)

MATERIAL CONSUMPTION NOTE

Page 58: Erp process (training)

Material consumption note you punch the material actually consumed by contractor.

A. DOCUMENTS REQUIRED FOR PUNCHING MCN

• Contractors reconciliation sheet copy with signature of all the concerned persons e.gP.M/APM, Store Incharge, contractor etc.

• Material list with their ERP codes

Page 59: Erp process (training)

MCN PUNCHING PROCESS• Click on Inventory Management > Material

Consumption Note.

• Choose NEW as action & click GO.

Page 60: Erp process (training)

• Enter the details as required in above screen. After that click on SHOW ISSUED ITEMS button for adding of items.

Page 61: Erp process (training)

• The screen shown below will be pop-up. Now Choose the items you needed to alter.

Page 62: Erp process (training)

• Below screen will be pop-up.

• Click on EDIT for altering the quantity or click Delete to remove the item & click update or Cancel to discard.• Then click SAVE for punching & CLOSE to cancel. • The new Material consumption no. will be generated.

Page 63: Erp process (training)

Print Material consumption note• Select the MCN by clicking on Check box you

want to print or use filters, then select the Print option from drop down menu and click on ‘Go’

Page 64: Erp process (training)

• MCN Print out

Page 65: Erp process (training)

QUESTIONER

S.No. QUESTIONER WHAT TO DO STATUS TAT

1 W/O not PunchedContact

coordinator/CMGWait for W/O

3 working Days

2 W/O not TrackedContact

coordinator/CMGWait for approval

from HOSame day

3 Items RM codes Contact coordinatorWait for approval

from HOSame day

Page 66: Erp process (training)

HELP DESK

Page 67: Erp process (training)

Stores Haryana MP NDPL

& CG

HP & PB Railway

Contact

Person

Mr. Hitesh Mr. Shri

Bhagwan

Mr. Ravi

Bhandari

Mr.

Manoj

Mr.

Sandeep

Contact

No.

STORE HELP DESK

Page 68: Erp process (training)

ERP HELP DESK

ERP SupportEmail:- [email protected]

Mr. Gautam(IT Deptt.)Email:- [email protected]

Mr. Atul Jeffrey(ERP Head)Email:- [email protected]

Page 69: Erp process (training)

ESCALATION

Page 70: Erp process (training)

STORESHaryana MP CG & NDPL HP & PB Railway

LEVEL 1Mr. Hitesh

Mr. ShriBhagwan

Mr. Ravi Bhandari

Mr. Manoj Mr. Sandeep

LEVEL 2 Mr. Pardeep

Miss Pooja

LEVEL 3Mr. Amardeep Singh

LEVEL 4Mr. Atul Jeffrey

LEVEL 5Sheetal Madam