200 West Kensinger Drive, Suite 400 Cranberry Township, PA 16066 (724) 779-4777 Fax (724) 779-4711 www.hrg-inc.com SEPTEMBER 15, 2016 DRAFT WATER SOURCE AND TREATMENT EVALUATION STUDY FOR TOBY WATER SYSTEM WATER ALLOCATION PERMIT NO. 96120 PWS ID NO. 6240008 FOX TOWNSHIP, ELK COUNTY, PENNSYLVANIA HRG Project No. 001693.0435
28

EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

Aug 03, 2018

Download

Documents

lehuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

200 West Kensinger Drive, Suite 400

Cranberry Township, PA 16066

(724) 779-4777

Fax (724) 779-4711

www.hrg-inc.com

SEPTEMBER 15, 2016

DRAFT

WATER SOURCE AND TREATMENT

EVALUATION STUDY

FOR

TOBY WATER SYSTEM

WATER ALLOCATION PERMIT NO. 96120

PWS ID NO. 6240008

FOX TOWNSHIP, ELK COUNTY, PENNSYLVANIA

HRG Project No. 001693.0435

Page 2: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

WATER SOURCE AND TREATMENT EVALUATION STUDY

FOR

TOBY WATER SYSTEM

FOX TOWNSHIP

ELK COUNTY, PENNSYLVANIA

PREPARED FOR:

FOX TOWNSHIP

P.O. BOX 184

KERSEY, PENNSYLVANIA 15846

PREPARED BY:

HERBERT, ROWLAND & GRUBIC, INC.

200 WEST KENSINGER DRIVE, SUITE 400

CRANBERRY TOWNSHIP, PENNSYLVANIA 16066

(724) 779-4777

______________________________

Chad E. Hanley, P.E.

Page 3: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

FOX TOWNSHIP, TOBY WATER SYSTEM

WATER SOURCE AND TREATMENT EVALUATION STUDY

TABLE OF CONTENTS

Subject Page

WATER SOURCE AND TREATMENT EVALUATION STUDY

INTRODUCTION ----------------------------------------------------------------------------------------------------- 1

SECTION 1- EXISTING FACILITIES OVERVIEW --------------------------------------------------------- 2

SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY -------------------------------------- 3

SECTION 3- RESERVOIR UPGRADES ------------------------------------------------------------------------ 4

SECTION 4- TREATMENT PLANT UPGRADES------------------------------------------------------------ 5

SECTION 5- INTERCONNECTION WITH ST. MARYS AWA ------------------------------------------- 5

APPENDICES

Appendix A: SYSTEM LOCATION MAP

Appendix B: DRAINAGE MAP

Appendix C: SOIL REPORT

Appendix D: RESERVOIR PRELIMINARY LAYOUT EXHIBITS

Appendix E: PRELIMINARY COST ESTIMATE AND PROJECT IMPLEMENTATION SCHEDULE

Appendix F: LAYOUT OF PRELIMINARY TREATMENT PLANT DESIGN

Page 4: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

FOX TOWNSHIP, TOBY WATER SYSTEM

WATER SOURCE AND TREATMENT EVALUATION STUDY 1

WATER SOURCE AND TREATMENT EVALUATION STUDY

FOR

FOX TOWNSHIP

TOBY WATER SYSTEM

INTRODUCTION

Fox Township (Township) owns and operates the Toby Water System (System), which serves an estimated

population of 511 residents in Fox Township, Elk County, Pennsylvania. The water treatment plant (WTP)

was constructed in 1994 as the first Pennsylvania water treatment plant to employ membrane filtration for

drinking water treatment. The WTP’s raw water source is the Lost Run Reservoir (reservoir). Up until the

WTP ceased operation in December 2014 following a failed filter plant performance test, the system

required labor-intensive operation to maintain the aging equipment’s functionality. Since the WTP has

been shut down, the Township has been purchasing bulk water from the St. Marys Area Water Authority

under an emergency permit issued on December 17, 2014. The permit allowed for the continuous use of

and upgrade to the interconnection with the St. Marys Area Water Authority. The interconnection is still

currently in use and consists of a 2” metered connection.

A previous study prepared by Nittany Engineering & Associates, LLC examined other potential sources of

water and in general the only two feasible options to the Township are the St. Marys AWA interconnect or

an expansion to the existing Lost Run Reservoir and upgrade to the WTP. The Township has engaged

HRG, to perform a planning level study to determine the required upgrades to the existing reservoir and

WTP and provide cost estimates for those improvements.

It is also understood that the Pennsylvania Department of Environmental Protection (PADEP) is currently

drafting a Consent Order and Agreement (COA) that will likely include requirements for a study such as

this to be completed and therefore the Township is in a good position with advancing the completion of this

work. However, modifications or additions to this study may be required depending on the requirements

of the COA.

Page 5: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

FOX TOWNSHIP, TOBY WATER SYSTEM

WATER SOURCE AND TREATMENT EVALUATION STUDY 2

SECTION 1- EXISTING FACILITIES OVERVIEW

The current operational design of the WTP is as follows: Raw water from the reservoir enters the WTP and

passes through a series of three (3) bag filters (Shelco, Model BFS-2C-2) and a sand/grit separator

(LAKOS). The pre-filtered water then enters a raw water storage tank with an approximate volume of

1,200 gallons. From the raw water tank, water is pumped through one of two membrane filtration process

trains, each containing a feed pump (60-90 psi), a 1-micron cartridge filter (Harmsco, Hurricane Model

HUR 170 HP) and spiral membrane filtration unit (GE Osmonics, Model JX4040F1052). Each membrane

unit contains seven (7) filter modules. After passing through the membrane units, the water is conveyed to

a 1,200-gallon filtered water tank where it is dosed with sodium hypochlorite for disinfection and sodium

silicate for corrosion control. The finished water is then pumped out of the filtered water tank to one of

four 20,000-galon Finished Water Storage Tanks. Locations of the reservoir, WTP and finished water

storage tanks are shown in Appendix A.

The Lost Run Reservoir is located on Sawmill Road in Fox Township. Based on an analysis of the USGS

topographic contours, the reservoir has a drainage area of approximately 475 acres (0.74 square miles) and

is predominantly fed by Tributary 50397 to Sawmill Run (Tributary), formerly known as Lost Run. See

Appendix B for a map of the drainage area. In November of 2012, Fox Township was granted a Water

Allocation Permit from the PADEP to allow a maximum withdrawal of 40,000 gallons per day (gpd) from

the reservoir. That permit does not require a conservation release from the reservoir. The reservoir was

originally built with an approximate capacity of 1.5 million gallons. Due to sediment build up, the current

storage volume is estimated at 670,000 gallons (per PADEP Filter Plant Performance Evaluation dated

November 17-19, 2014).

According to the DEP Public Drinking Water Reporting System, before the interconnection agreement with

St Marys Area Water Authority was set forth, the WTP served a population of approximately 511. Utilizing

the DEP PWS Design Manual, Part II, it can be estimated that 75 gallons of water are utilized per day per

capita. Therefore, the WTP should be able to provide, at minimum, 38,325 gpd. Based on the Nittany

Engineering report previously cited: “it is reasonable and prudent to recommend that the source of water

for the Fox Township water system be capable of providing a minimum of 39,900 gpd or 28 gpm.”. For

purposes of this study this amount will be rounded to 40,000 gpd.

Page 6: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

FOX TOWNSHIP, TOBY WATER SYSTEM

WATER SOURCE AND TREATMENT EVALUATION STUDY 3

SECTION 2 – DETERMINATION OF RESERVOIR DESIGN CAPACITY

Conversations with PADEP personnel have indicated that if the reservoir is proposed to be put back in

service a new water allocation permit will be required. Further, it has been indicated that the new permit

will contain a conservation release requirement. Until the permit is completed, submitted and reviewed by

PADEP it can only be estimated what the rate of this conservation release requirement will be. In order to

estimate this release rate, HRG has utilized the Susquehanna River Basin Commission Policy No. 2012-01

Technical Guidance for Low Flow Protection Related to Withdrawal Approvals adopted in 2012. This

guidance document is relied upon by the PADEP to determine the release rates to protect watersheds during

low flow periods. The estimated passby flow (conservation release) requirement presented in this study was

determined in accordance with the referenced Commission Policy.

It is important to note that the tributary’s designated use according to the PADEP eMAPPA application is

High Quality-Cold Water Fishes (HQ-CWF). It is also designated as a Total Maximum Daily Load

(TMDL) stream and is considered impaired due to Atmospheric Deposition. Therefore, the DEP may

require additional passby flow protection.

The tributary meets Aquatic Resource Class (ARC) 1 because the drainage area is less than 10 square miles.

The percent exceedance flow specified for ARC 1 is 70 percent (%) of the 7-Day 10-Year Low Flow rate

(Q7-10). According to Pennsylvania StreamStats, the Q7-10 for the drainage area is 0.039 cubic feet per

second. This equates to 25,205 gallons per day (gpd). Therefore, the estimated required passby rate is

17,643 gpd when factoring in the 70% requirement.

In periods of drought, it has been observed that nearly zero water flows into the reservoir. During severe

drought years, this can occur for periods as long as sixty to ninety days. Therefore, in order to ensure that

the WTP has a source of water and that the conservation release requirement can be met, a significant

volume of water must be stored. To determine this maximum required storage volume, the following has

been assumed:

1. Required water for treatment is 40,000 gallons per day; because this is a max day usage, it has been

further assumed that this quantity is inclusive of required membrane backwash water.

2. The drought period utilized in sizing the reservoir is 90 days, to ensure that the reservoir is equipped

to provide water in the event of a 90-day drought.

3. Provide the conservation release of 18,000 gpd.

4. Provide 10% of unusable capacity so that the intake is not drawing from the bottom of the reservoir.

5. Evaporation quantity has been negated at this point in the study, however will need to be evaluated

in the preliminary design stage. Estimates of this quantity indicate this could be as much as 3

million gallons depending on the surface area of the reservoir.

6. Leakage has been negated at this point and it is assumed that an impermeable liner will be installed.

With consideration of the above assumptions, the reservoir storage capacity is estimated at 5.8 million

gallons.

Appendix D shows a draft plan and section of what a reservoir of this size would look like compared to the

existing reservoir.

This is nearly 4 times the original design capacity of 1.5 million gallons and approximately 8.5 times the

existing usable capacity of 670,000 gallons.

Page 7: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

FOX TOWNSHIP, TOBY WATER SYSTEM

WATER SOURCE AND TREATMENT EVALUATION STUDY 4

SECTION 3 – RESERVOIR UPGRADES

To maintain low flow rates and provide water in the event of a drought, the reservoir would need to expand

in volume approximately 4,250,000 gallons. 830,000 gallons of sediment build up in the existing reservoir

will need to be removed as well. According to NRCS Custom Soil Report for Cameron and Elk Counties,

Pennsylvania, there is a possibility of shallow depth to bedrock specifically on the northern side of the

reservoir. See Appendix C for full Soil Report. Due to the possibility of shallow bedrock, the proposed

reservoir will likely need a berm (dam) to be built up rather than excavated down and will be lined with a

geomembrane containment liner. To minimize bedrock disturbance, the surface area of reservoir will also

increase by an estimated 60,000 square feet graded from the bottom of the basin to the top of the bank at a

1:3 slope.

A dam will be constructed along the northwestern bank that will rise 3 feet above the high water level.

Rather than a traditional dam spillway, a square overflow structure (approximately 10 foot by 10 foot) will

be constructed adjacent to a new intake structure. The outfall pipe from the overflow structure is assumed

to be a 48-inch pipe with an energy dissipater at the discharge to the existing stream. The intake structure

will be approximately 5 foot by 5 foot and installed adjacent to the overflow structure. The intake itself

will have multiple valved ports at increasing depths so the clearest water can be drawn to the WTP at

varying depths of reservoir level. Both the overflow and intake structure will be accessible by a cat walk

that connects to the raised, earthen berm/dam. The existing reservoir currently has approximately 4,100

cubic yards of accumulated silt that will be removed during construction of the new reservoir. Future

removal of significant sedimentation accumulation would be achieved by vacuum dredging that won’t

damage the liner. Discharge of sedimentation to the tributary is restricted by the PADEP.

Based on preliminary information it appears the reservoir and dam size in conjunction with the drainage

area will require a major dam permit which can be an intensive effort. According to the Pennsylvania Code

Chapter 105, 105.3.a.1, dams that meet one or more of the following are regulated:

- Drainage area > 100 acres

- Greatest depth of water at upstream toe > 15 feet

- Maximum Impoundment > 50 acre-feet

Because the Lost Run Reservoir drainage area is greater than 100 acres, construction of the dam will likely

require a Major Dam Permit Submission.

In addition to the Chapter 105 Dam Permit, the PADEP will also require a National Pollution Discharge

Elimination Permit (NPDES) for construction, Water Allocation, and a Public Water Supply permit before

the start of construction. It is possible that there will be additional permitting requirements associated with

this project. However, the extent of permitting required to complete this project will remain unclear until

further along in the design process. The amount of time required to obtain all permits necessary for the

construction of this project is estimated at nine months. See Appendix F for the Project Implementation

Schedule.

A floating decanter with a weir will be used to ensure the required conservation release will be met under

all reservoir water level conditions. This decanter will be permitted to rise and fall with water level but will

remain adjacent to the outlet structure for continuous access. Design of the decanter will ensure that debris

and algae are precluded from clogging the weir but it will also be accessible from the platform for periodic

Page 8: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

FOX TOWNSHIP, TOBY WATER SYSTEM

WATER SOURCE AND TREATMENT EVALUATION STUDY 5

maintenance and cleaning. The floating decanter will discharge the conservation release to the overflow

structure.

It is likely that an emergency spillway will not be necessary in the design of this reservoir because the

outfall structure will be designed to control the 100-year storm event. The proposed reservoir will not pose

a major threat to the downstream environment due to the size of the reservoir and the low height of the dam.

Estimated costs for the reservoir improvements are located in Appendix E.

SECTION 4-TREATMENT PLANT UPGRADES

The WTP upgrades are based on the 2009 Water Feasibility study completed by HRG. Adding pretreatment

to a membrane system that is 22 years old is not considered a viable option anymore. Based off the study

and the age of the existing water treatment plant the replacing the existing membrane filtration system with

a low pressure membrane system would be the best alternative.

In addition, algae growth in the reservoir in the summer months is a problem. The new reservoir would be

designed for greater depths and modifying the design of the intake to the water plant will help with algae

clogging the membranes but will not eliminate the problem. To further reduce the algae issue, the

installation of ultrasonic transducers or solar powered mixers in the reservoir will help reduce the amount

of algae blooms in the summer months. The WTP would also include a hydrogen peroxide chemical feed

system to help prevent fouling of the membranes due to iron and manganese. Pretreatment filtering and

settling will also be examined.

Treatment of the backwash water from the membranes may also be required. HRG continues to investigate

this with PADEP to determine the discharge limits that will be imposed.

The existing WTP building will be expanded and rehabilitated. An approximate 12 foot extension to the

building is proposed with a new loading dock to provide improved access to the treatment unit area and

space for chemical storage. New electrical equipment and general building rehabilitation is also anticipated.

According to a preliminary, budget proposal for the package treatment plant provided by Evoqua Water

Technologies, LLC, and Artesian of Pioneer Water Treatment Systems, the cost of the proposed treatment

system is estimated at $350,000. The proposed 2 skid system includes two 40,000 gpd units. See Appendix

F for a suggested layout with an elevation view drawing provided by Evoqua Water Technologies, LLC.

The total cost for the WTP upgrades is estimated at $1.38 million

SECTION 5- INTERCONNECTION WITH ST. MARYS AREA WATER AUTHORITY

An emergency permit was issued on December 17, 2014 for the use of an upgraded interconnection with

the Saint Marys Area Water Authority (St. Marys). This interconnection has been in use since the permit

was issued. The interconnection consists of a 2” meter, 2” piping and associated valving. The

interconnection is manually operated to fill the existing 80,000 gallon storage tanks and/or to supply water

to the Fox Township distribution system on an as-needed basis.

Page 9: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

The Water System Feasibility Study/Report by Nittany Engineering & Associates, LLC completed in

February of 2016 analyzed the possibility of a long-term interconnection with St. Marys. The report

disregards long-term utilization of the existing interconnection due to the need to manually open and close

the valves at the interconnect to affect turnover within the 80,000 gallon storage tanks.

For the interconnection to become a permanent solution, upgrades to the existing system will need to be

made. The extent of these upgrades and associated costs are currently unknown but it can safely be

anticipated that a permanent interconnection with St. Marys will be a lower cost alternative and therefore

other factors concerning the system should be considered.

In general, if the interconnect is to be utilized long-term, there are few concerns that need to be addressed

by either St. Marys Water Authority, the Township or both:

- Study the effects of water age on the Township’s system including turnover within

the storage tanks and the effect of Disinfection By-Products (DBP).

- Constructing more robust interconnection with larger diameter pipe and automated

valves.

- In-depth study of St. Marys system and the long term capital improvements that

should be made in that system to support demand. This may include watermain

replacement or additional, expanded storage and re-chlorination facilities.

- Other issues that may arise during investigation and preparation of these studies.

Page 10: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

APPENDIX A

SYSTEM LOCATION MAP

Page 11: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal
Page 12: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

APPENDIX B

DRAINAGE MAP

Page 13: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal
Page 14: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

APPENDIX C

SOIL REPORT

Page 15: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

SOIL REPORT NOT

INCLUDED

Page 16: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

APPENDIX D

RESERVOIR PRELIMINARY DESIGN EXHIBITS

Page 17: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal
Page 18: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal
Page 19: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

APPENDIX E

PRELIMINARY COST ESTIMATE AND PROJECT

IMPLEMENTATION SCHEDULE

Page 20: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

200 WEST KENSINGER DRIVE

SUITE 400

CRANBERRY TOWNSHIP, PA 16066

ITEM NO. DESCRIPTION EST QTY UNIT UNIT COST TOTAL COST

1 NEW MEMBRANE FILTRATION 1 LS 350,000.00$ 350,000.00$

2 H2O2 OXIDATION SYSTEM 1 LS 3,500.00$ 3,500.00$

3 ULTRASONIC ALGEA CONTROL 3 EA 8,500.00$ 25,500.00$

4 MISC EQUIPMENT AND CONTROLS 1 LS 75,000.00$ 75,000.00$

5 BUILDING EXTENTION 1 LS 50,000.00$ 50,000.00$

6 MISC BUILDING REHAB 2 LS 30,000.00$ 60,000.00$

7 PIPING AND ELECTRICAL 1 LS 80,000.00$ 80,000.00$

8 LOADING DOCK 1 LS 25,000.00$ 25,000.00$

9 BACKWASH TREATMENT 1 LS 80,000.00$ 80,000.00$

10 DEMO 1 LS 40,000.00$ 40,000.00$

SUBTOTAL 789,000.00$

INSTALLATION 25% 197,250.00$

SUBTOTAL 986,250.00$

CONTINGENCY 20% 197,250.00$

ESTIMATE CONSTRUCTION COST 1,183,500.00$

DESIGN 95,000.00$

PERMITTING 30,000.00$

PILOT TESTING/LABORATORY 45,000.00$

LEGAL AND ADMINISTRATION 3,000.00$

CONSTRUCTION PHASE SERVICES 10% 118,400.00$

TOTAL 1,380,000.00$

TREATMENT PLANT COST ESTIMATE

Page 21: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

200 WEST KENSINGER DRIVE

SUITE 400

CRANBERRY TOWNSHIP, PA 16066

ITEM NO. DESCRIPTION EST QTY UNIT UNIT COST TOTAL COST

1 EXCAVATION OF RESERVOIR* 35,000 CY 8.00$ 280,000.00$

2 EXCAVATION FOR BYPASS 40 HRS 300.00$ 12,000.00$

3 GEOMEMBRANE LINER 130000 SQ FT 2.50$ 325,000.00$

4 SOLARBEE MIXER 1 EA 60,000.00$ 60,000.00$

5 RIP RAP OUTLET PROTECTION** 300 TON 125.00$ 37,500.00$

6 FENCE 300 FT 50.00$ 15,000.00$

SUBTOTAL 729,500.00$

CONTINGENCY 20% 145,900.00$

TOTAL 875,400.00$

DESIGN 125,000.00$

PERMITTING 60,000.00$

GEOTECHNICAL 60,000.00$

BIOLOGICAL ALGEA TESTING 2,000.00$

LEGAL AND ADMINISTRATION 5,000.00$

CONSTRUCTION PHASE SERVICES 10% 59,500.00$

TOTAL 1,190,000.00$

ITEM NO. DESCRIPTION EST QTY UNIT UNIT COST TOTAL COST

1 EXCAVATION OF RESERVOIR* 35,000 CY 18.00$ 630,000.00$

2 EXCAVATION FOR BYPASS 30 HRS 500.00$ 15,000.00$

3 GEOMEMBRANE LINER 130000 SQ FT 2.50$ 325,000.00$

4 SOLARBEE MIXER 1 EA 60,000.00$ 60,000.00$

5 RIP RAP OUTLET PROTECTION** 300 TONS 125.00$ 37,500.00$

6 FENCE 300 FT 50.00$ 15,000.00$

SUBTOTAL 1,082,500.00$

CONTINGENCY 20% 216,500.00$

TOTAL 1,299,000.00$

DESIGN 125,000.00$

PERMITTING 60,000.00$

BIOLOGICAL ALGEA TESTING 2,000.00$

GEOTECHNICAL 60,000.00$

LEGAL AND ADMINISTRATION 5,000.00$

CONSTRUCTION PHASE SERVICES 10% 129,900.00$

TOTAL 1,680,000.00$

***RESERVOIR SIZED FOR 90 DAYS OF DROUGHT

RESERVOIR COST ESTIMATE

**RIPRAP ASSUME 500 LINEAR FEET, 4 FEET WIDE BY 2 FEET DEEP

*DOES NOT INCLUDE ROCK EXCAVATION

WORK COMPLETED BY LOCAL WORK FORCE

WORK COMPLETED BY CONTRACTOR

Page 22: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

200 WEST KENSINGER DRIVE

SUITE 400

CRANBERRY TOWNSHIP, PA 16066

DESCRIPTION EST QTY UNIT UNIT COST TOTAL COST

CONCRETE 65 CY 1,500.00$ 97,500.00$

48 INCH PIPE COST 100 FT 150.00$ 15,000.00$

6 INCH PIPE 200 FT 50.00$ 10,000.00$

CATWALK AND GRATING 1 LS 10,000.00$ 10,000.00$

VALVES/ MISC 1 LS 15,000.00$ 15,000.00$

FLOATING DECANTER 1 LS 75,000.00$ 75,000.00$

RIP RAP ENERGY DISSIPATER 1 LS 50,000.00$ 50,000.00$

EARTH DAM 1 LS 350,000.00$ 350,000.00$

SUB TOTAL 622,500.00$

CONTINGENCY 15 % 93,375.00$

TOTAL 715,875.00$

ENGINEERING 40,000.00$

LEGAL AND ADMINISTRATION 4,000.00$

CONSTRUCTION PHASE SERVICES 10 % 71,600.00$

TOTAL 760,000.00$

OUTFALL COST ESTIMATE

Page 23: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

200 WEST KENSINGER DRIVE

SUITE 400

CRANBERRY TOWNSHIP, PA 16066

LOCAL FORCES CONTRACTOR

1,380,000.00$ 1,380,000.00$

1,190,000.00$ 1,680,000.00$

760,000.00$ 760,000.00$

3,330,000.00$ 3,820,000.00$

TOTAL COST COMPARISON

TREATMENT COST

RESERVOIR COST

DAM AND OUTFALL COST

TOTAL

Page 24: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

Toby Water System Evaluation

Task Name Duration Start Date Finish Date

Design

Water Treatment Plant Design 245 Days 1-Jan-17 1-Sep-17

Reservoir Design 245 Days 1-Jan-17 1-Sep-17

Geotechnical Investigation 60 Days 1-Mar-17 29-Apr-17

Permitting

Chapter 105 Dam Permit 180 Days 1-Jun-17 7-Dec-17

NPDES Submission 60 Days 1-Aug-17 1-Oct-17

Water Quality Management Permit 180 Days 1-Jun-17 7-Dec-17

Water Allocation Permit 180 Days 1-Jun-17 7-Dec-17

Public Water Supply Permit 180 Days 1-Jun-17 7-Dec-17

Address Review Comments 30 Days 7-Dec-17 6-Jan-18

Obtain Permits 30 Days 6-Jan-18 6-Feb-18

Bidding

Advertise for Bids 30 Days 20-Mar-18 17-Apr-18

Review and Award Construction Contracts 60 Days 17-Apr-18 17-Jun-18

Construction

Construction of Treatment Plant 365 Days 16-Aug-18 16-Aug-19

Construction of Reservoir 275 Days 16-Aug-18 15-May-19

Start-up of Water Treatment Plant 30 Days 16-Aug-19 16-Sep-19Time to Fill Reservoir* 90 Days 15-May-19 13-Aug-19

Project Implementation Schedule

*Time to fill reservoir will vary depending on rainfall accumulation and frequency.

Page 25: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

APPENDIX F

LAYOUT OF PRELIMINARY TREATMENT PLANT DESIGN

Page 26: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

PRELIMINARYNOT FOR CONSTRUCTION

COMPRESSORSAIR RECEIVERS

STRAINERS

CIP TANK

NEUTRALIZATION TANKCHEMICAL DRUMS

CONTROL PANELS

XPsr UNIT

DATE

STATUS

DATE

DRAWN

CHECKED

SCALE:

DATE TITLE

PROJECT DRAWING SHEET

APPROVED

U.S.A. ECRDESCRIPTION DATE DWN CHKD APVD

GENERAL ARRANGEMENT

MEMCOR 1 X 12XP

MEMCOR STANDARD

OF

6/2/2011

6/2/2011

U.S.A.55 TECHNOLOGY DRIVE, SUITE 201LOWELL,MA 01851-5203

1-800-636-2674 (1-800-MEMCOR4)

U.K.OUTRAMS WHARF.LITTLE EATON,DERBY. ENGLAND, DE21 5ELTEL +44 (0) 1332 387300

ALL DIMENSIONS

IMPERIAL

DO NOT SCALE

AUSTRALIA1 MEMTEC PARKWAY,SOUTH WINDSOR.NSW 2756

TEL +61 (0) 2 4577 6800

CLIENT6/2/2011

U.K./AUS 9200770552-GANONE 1 2 A920077

SML

SJT

PRELIMINARY ISSUE6/2/11 SML SJT SJT

SJT

C:\Vault 2008\Prospects\XP Plant Layouts\1 x 12XPsr\9200770552-GA.idw

A

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

A A

B B

C C

D D

Page 27: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

PRELIMINARYNOT FOR CONSTRUCTION

1'-6"

5'-2"

11'-2"

4'-2"5'-9"

3'-0"

4'-3"

2'-1

0"

10'-0

"

5'-2

"4'

-1"

9'-1

"

1'-6

"

8'-0

"

23'-0

"

1'-0

"

6'-1

"

28'-0"

3'-8

"

4'-3

"

7'-2

"

3'-2

" 5'-0

"6'-6

"7'-5

"

DATE

STATUS

DATE

DRAWN

CHECKED

SCALE:

DATE TITLE

PROJECT DRAWING SHEET

APPROVED

U.S.A. ECRDESCRIPTION DATE DWN CHKD APVD

GENERAL ARRANGEMENT

MEMCOR 1 X 12XP

MEMCOR STANDARD

OF

6/2/2011

6/2/2011

U.S.A.55 TECHNOLOGY DRIVE, SUITE 201LOWELL,

MA 01851-52031-800-636-2674 (1-800-MEMCOR4)

U.K.OUTRAMS WHARF.LITTLE EATON,DERBY. ENGLAND, DE21 5EL

TEL +44 (0) 1332 387300

ALL DIMENSIONSIMPERIAL

DO NOT SCALE

AUSTRALIA1 MEMTEC PARKWAY,SOUTH WINDSOR.

NSW 2756TEL +61 (0) 2 4577 6800

CLIENT6/2/2011

U.K./AUS 9200770552-GANONE 2 2 A920077

SML

SJT

PRELIMINARY ISSUE6/2/11 SML SJT SJT

SJT

C:\Vault 2008\Prospects\XP Plant Layouts\1 x 12XPsr\9200770552-GA.idw

A

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

A A

B B

C C

D D

Page 28: EROSION AND SEDIMENTATION CONTROL PLANfoxtownship.com/Water system Study HRG.pdf · SECTION 2- DETERMINING RESERVOIR DESIGN CAPACITY ... SOIL REPORT Appendix D: RESERVOIR ... removal

PRELIMINARYNOT FOR CONSTRUCTION

1'-6"

5'-2"

11'-2"

4'-2"5'-9"

3'-0"

4'-3"

2'-1

0"

10'-0

"

5'-2

"9'

-1"

1'-6

"

8'-0

"

23'-0

"

1'-0

"

6'-1

"

33'-3"

DATE

STATUS

DATE

DRAWN

CHECKED

SCALE:

DATE TITLE

PROJECT DRAWING SHEET

APPROVED

U.S.A. ECRDESCRIPTION DATE DWN CHKD APVD

GENERAL ARRANGEMENT

MEMCOR 1 X 12XP

MEMCOR STANDARD

OF

6/2/2011

6/2/2011

U.S.A.55 TECHNOLOGY DRIVE, SUITE 201LOWELL,MA 01851-52031-800-636-2674 (1-800-MEMCOR4)

U.K.OUTRAMS WHARF.

LITTLE EATON,DERBY. ENGLAND, DE21 5ELTEL +44 (0) 1332 387300

ALL DIMENSIONSIMPERIAL

DO NOT SCALE

AUSTRALIA1 MEMTEC PARKWAY,SOUTH WINDSOR.NSW 2756TEL +61 (0) 2 4577 6800

CLIENT6/2/2011

U.K./AUS 9200770552-GANONE 2 2 A920077

SML

SJT

PRELIMINARY ISSUE6/2/11 SML SJT SJT

SJT

C:\Vault 2008\Prospects\XP Plant Layouts\1 x 12XPsr\9200770552-GA.idw

A

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

A A

B B

C C

D D

3'-0"