Erda Estates PUD Concept Summary and Recommendation Public Body: Tooele County Planning Commission Meeting Date: November 20, 2019 Parcel ID: 05-049-0-0038 Current Zone: RR-5 Property Address: Unaddressed Parcel Request: Conditional Use Approval for the proposed Erda Estates PUD Concept Unincorporated: Erda Planners: Jeff Miller Planning Commission Recommendation: Tabled on November 6 th , not yet received for November 20 th Planning Staff Recommendation: Conditions of Approval Applicant Name: Matt Donaldson PROJECT DESCRIPTION Matt Donaldson is requesting conditional use approval for the proposed Erda Estates Planned Unit Development (PUD) concept on a parcel in Erda which contains a total of approximately 156.47 acres. The main portion of the property is envisioned to be comprised of 227 residential lots of varying sizes. At the west end of the property, the developer has planned 100 residential units for senior citizens. These residential units would be built as multi-unit structures (similar to a typical townhouse style). Along the south end of the property are lots of approximately 1 acre in size, which have been placed in this area to act as a buffer between these residential uses and the residential uses on 5 acre lots to the south. At the west end of the property, there are three large open space areas which have been envisioned to be “agricultural preservation parcels” on approximately 14 acres. Each of these “agricultural preservation parcels” includes an adjoining “farm lot”, which is intended to have the appearance of being the main residence for the agricultural areas. Each of the homes on these “farm lots” will be restricted to farm/ranch house designs. Along SR-36, there are 12.98 acres reserved for commercial uses with a frontage road that will provide a stub street which could be extended further south in the future. The Tooele County Transportation Plan supports the incorporation of a frontage road along both sides of SR-36, as development moves forward within the County. PUD-CUP 2019-03 Planning and Zoning 47 S. Main Street Room 208 Tooele, UT 84074 Phone: (435) 843-3160 Fax: (435) 843-3252 http://www.co.tooele.ut.us/Building/planning.htm
23

Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

Oct 05, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

Erda Estates PUD Concept Summary and Recommendation

Public Body: Tooele County Planning Commission Meeting Date: November 20, 2019 Parcel ID: 05-049-0-0038 Current Zone: RR-5 Property Address: Unaddressed Parcel Request: Conditional Use Approval for the proposed Erda Estates PUD Concept Unincorporated: Erda Planners: Jeff Miller Planning Commission Recommendation: Tabled on November 6th, not yet received for November 20th Planning Staff Recommendation: Conditions of Approval Applicant Name: Matt Donaldson

PROJECT DESCRIPTION

Matt Donaldson is requesting conditional use approval for the proposed Erda Estates Planned Unit Development (PUD) concept on a parcel in Erda which contains a total of approximately 156.47 acres. The main portion of the property is envisioned to be comprised of 227 residential lots of varying sizes. At the west end of the property, the developer has planned 100 residential units for senior citizens. These residential units would be built as multi-unit structures (similar to a typical townhouse style). Along the south end of the property are lots of

approximately 1 acre in size, which have been placed in this area to act as a buffer between these residential uses and the residential uses on 5 acre lots to the south. At the west end of the property, there are three large open space areas which have been envisioned to be “agricultural preservation parcels” on approximately 14 acres. Each of these “agricultural preservation parcels” includes an adjoining “farm lot”, which is intended to have the appearance of being the main residence for the agricultural areas. Each of the homes on these “farm lots” will be restricted to farm/ranch house designs. Along SR-36, there are 12.98 acres reserved for commercial uses with a frontage road that will provide a stub street which could be extended further south in the future. The Tooele County Transportation Plan supports the incorporation of a frontage road along both sides of SR-36, as development moves forward within the County.

PUD-CUP 2019-03

Planning and Zoning 47 S. Main Street ∙ Room 208 ∙ Tooele, UT 84074 Phone: (435) 843-3160 ∙ Fax: (435) 843-3252 http://www.co.tooele.ut.us/Building/planning.htm

Page 2: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

Request: Conditional Use Approval for the proposed Erda Estates PUD Concept File #: PUD-CUP 2019-03

Planned Unit Development Summary Page 2 of 3

SITE & VICINITY DESCRIPTION (see attached map)

The subject property (currently undeveloped) is located near the intersection of Erda Way and SR-36 and is immediately south of the subject property being proposed as a planned unit development (PUD-CUP 2019-02). There are large areas of undeveloped parcels in the RR-5 immediately north. There is a narrow strip of commercial land in the C-H (Commercial Highway) zone at the southwest corner of Erda Way and SR-36. There is also a narrow strip of commercial land directly east across SR-36 in the C-G (Commercial General) zone. There are rural residential uses in the RR-5 zone to the south and the RR-1 zone to the immediate west.

GENERAL PLAN CONSIDERATIONS

According to the Future Land Use Map of the Tooele County General Plan Update 2016, the subject property is located within an anticipated “center”. This “center” is anticipated to consist of mixed uses (commercial uses and residential densities between 10-15 units per acres) near the intersection of Erda Way and SR-36, and an area of “Density Residential”, which allows for approximately two to eight single-family residential units per acre. The proposed density of 2.10 units per acre is appropriate for envisioned growth in this area according to the general plan.

ISSUES OF CONCERN/PROPOSED MITIGATION

As development moves forward within the unincorporated areas of Tooele County, an issue of concern that has been identified is that the Tooele County Health Department has made it known that standard septic systems will not be allowed going forward on parcels smaller than 5 acres in size, due to increased nitrate groundwater contamination. Typically, this would be a significant issue of concern with a large-scale development, however the applicant has informed planning staff that they are proposing to mitigate this concern with the installation of water and sewer infrastructure on the subject property during the subsequent subdivision and development stages.

NEIGHBORHOOD RESPONSE

A public hearing was held with the Tooele County Planning Commission on November 6, 2019. When the hearing was held, there were a large number of people in attendance. Most of the comments were in opposition to the proposed PUD with concerns about water, traffic, density, whether or not the current PUD ordinance should be applicable, impacts on traffic, concerns about zoning, etc. *Please see the attached e-mail correspondence that has been received regarding this item.

PLANNING COMMISSION RESPONSE

When this item was heard by the Tooele County Planning Commission on November 6th, 2019 they made a motion to table the item, so that the planning commission would have additional time to review the materials that were presented and the public comments that were received.

PLANNING STAFF ANALYSIS

Staff has reviewed the requested PUD and has found that the subject property Is located in an area envisioned to be a “center” within the community, which could accommodate an alternative housing type for senior citizens within the community. These senior housing residences would not be in immediate proximity to any existing single-family residences in the community.

Page 3: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

Request: Conditional Use Approval for the proposed Erda Estates PUD Concept File #: PUD-CUP 2019-03

Planned Unit Development Summary Page 3 of 3

The requested PUD is cohesive with the surrounding uses in the immediate vicinity, the Tooele County General Plan Update 2016, and the current PUD ordinance in the Tooele County Land Use Ordinance. The envisioned PUD will also be compatible with the Tooele County Active Transportation Implementation Plan. Although not a required element of the concept plan stage for the PUD, the applicant has provided planning staff with a traffic study for the area. This traffic study had analyzed both the property contained within this PUD application, and PUD-CUP 2019-02, which is located immediately to the north. The overall residential density for both PUD applications is below the estimated 500 residential units, which were analyzed with the traffic study. As development moves forward in the community, it is important to find a delicate balance between changes within the built environment and the surrounding agricultural/rural uses. The proposed “agricultural preservation parcels” seeks to preserve a portion of the existing rural character in the area. All open space areas and trails within the development must be owned and managed by an HOA or similar entity. The agricultural parcels must be actively used for agricultural purposes. Staff is proposing that this requirement is made as a condition of approval. More details are needed during the preliminary and final plan submittals regarding the overall design of the proposed trail system, including surface materials, etc.

PLANNING STAFF RECOMMENDATION

Planning Staff recommends that the Tooele County Planning Commission analyzes the information found in this report before reaching a decision on the proposed Planned Unit Development. If a motion is made to approve the proposed concept for the PUD, Planning Staff recommends the following conditions of approval:

• When the applicant submits an application for the preliminary and final plan stages for the PUD, additional information is provided regarding the planned water and sewer utilities, as well as additional details regarding any landscaping and trail elements within the PUD.

• All open space areas and trails within the development must be owned and managed by an HOA or similar entity. The agricultural parcels must be actively used for agricultural purposes. \

• The homes located on the “farm lots” must be designed as farm/ranch house style homes in an effort to contribute to the rural feel of the “agricultural preservation parcels.”

Page 4: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

P

UD-C

UP

2019

-03:

Pro

pose

d Er

da E

stat

es P

lann

ed U

nit D

evel

opm

ent (

PUD

)

Una

ddre

ssed

Par

cel:

(Par

cel I

D: 0

5-04

9-0-

0038

)

RR-1

Subj

ect

Prop

erty

RR-5

RR-5

RR-5

RR-5

RR-5

RR-5

RR-5

RR-5

RR

-5

RR-1

RR-1

RR-1

RR-1

RR-1

Tooe

le C

ity

Tooe

le C

ity

C-G

C-H

Page 5: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

COCHRANE LANE

STATE ROAD 36

CIMM

ARRO

N W

AY

AGRI

CULT

URAL

PAR

CEL

C

AGRI

CULT

URAL

PAR

CEL

B

AGRI

CULT

URAL

PAR

CEL

A

LOT

28LO

T 4LO

T 5LO

T 6LO

T 7LO

T 8LO

T 9LO

T10

LOT

11LO

T12

LOT

13LO

T14

LOT

15LO

T16

LOT

17LO

T18

LOT

19LO

T20

LOT 21

LOT

22LO

T23

LOT

24LO

T25

LOT

26LO

T27

LOT

132

LOT

133

LOT

134

LOT

135

LOT

29

LOT

35LO

T34

LOT

33LO

T32 LO

T31 LO

T30

LOT

80LO

T88

LOT

97

LOT

83 LOT

82 LOT 81

LOT 91 LOT

90 LOT

89

LOT

99 LOT

98LOT

100

LOT

84LO

T92

LOT

101

LOT

78 LOT

79

LOT

86 LOT

87

LOT

95 LOT

96

PARK

LOT

85LO

T93

LOT

94LO

T10

2

LOT

67 LOT

68LO

T69LO

T66

LOT

65 LOT

70

LOT

64 LOT

71

LOT

63 LOT

72LO

T73LO

T62

LOT 61 LOT

74

LOT

60 LOT

75

LOT

59 LOT

76LO

T77LO

T58

LOT

36LO

T37

LOT

38

LOT

129

LOT

142

LOT

145

LOT

138

LOT

136

LOT

137

LOT

140

LOT

139

LOT

141

LOT

131

LOT

130

LOT

127

LOT

146

LOT

128

LOT

143

LOT

144

LOT

119

LOT

124

LOT

122

LOT

121

LOT

123

LOT

120

LOT

126

LOT

117

LOT

125

LOT

118

LOT

104

LOT

115

LOT

108

LOT

113

LOT

106

LOT

114

LOT

105

LOT

116

LOT

103

FARM

LOT

2

FARM

LOT

3

FARM

LOT

1

LOT

157

LOT

158

LOT

167

LOT

166

LOT

165

LOT

164

LOT

163

LOT

162

LOT

161

LOT

160

LOT

159

LOT

147

LOT

148

LOT

149

LOT

150

LOT

151

LOT

152

LOT

153

LOT

154

LOT

155

LOT

156

LOT

180

LOT

169

LOT

175

LOT

172

LOT

168

LOT

181

LOT

179

LOT

178

LOT

174

LOT

173

LOT

177

LOT

170

LOT

176

LOT

171

LOT

193

LOT

183

LOT

188

LOT

195

LOT

182

LOT

184

LOT

196

LOT

185

LOT

194

LOT

189

LOT

191

LOT

186

LOT

192

LOT

187

LOT

197

LOT

190

LOT

40

LOT

39

LOT

57LO

T 41LO

T42

LOT

43LO

T44

LOT

45LO

T46

LOT

47LO

T48

LOT

49LO

T50

LOT

51LO

T52

LOT

53LO

T54

LOT

55LO

T56

LOT

198

LOT

199

LOT

200

LOT

201

LOT

202

LOT

203

LOT

211

LOT

210

LOT

209

LOT

208

LOT

207

LOT

206

LOT

205

LOT

204

LOT

212

LOT

226

LOT

225

LOT

227

LOT

224

LOT

223

LOT

222

LOT

221

LOT

220

LOT

219

LOT

218

LOT

217

LOT

216

LOT

215

LOT

214

LOT

213

PARK

RETI

REME

NTRE

TIRE

MENT

RETI

REME

NT

LOT

111

LOT

107

LOT

112

LOT

109

LOT

110

CHEC

KED

BYDR

AWN

BY

PROJ

ECT

NUMB

ER

FOR:

PROJ

ECT

MANA

GER

PRIN

T DA

TE

PHON

E:

CONTACT:

TO

OE

LE

169 N

. Main

Stre

et, U

nit 1

Tooe

le, U

T. 84

074

Phon

e: 43

5.843

.3590

SA

LT

L

AK

E C

IT

Y

Phon

e: 80

1.255

.0529

LA

YT

ON

Phon

e: 80

1.547

.1100

CE

DA

R C

IT

Y

Phon

e: 43

5.865

.1453

RIC

HF

IE

LD

Phon

e: 43

5.896

.2983

WW

W.E

NS

IG

NE

NG

.C

OM

E N

S

I G

N

THE

STAN

DARD

IN E

NGIN

EERI

NG

T189

5A

1 of 4

ERDA ESTATES P.U.D.

ERDA WAYERDA, UTAH

CONC

EPT

IRON

WOO

D RE

AL E

STAT

E LL

C.13

92 P

ASS

CANY

ON R

OAD

ERDA

, UTA

H 84

074

JOE

WHI

TE43

5-83

0-36

42

J.CLE

GG

J. CL

EGG

R. F

ISH

HORI

ZONT

AL G

RAPH

IC SC

ALE

0

( IN

FEET

)HO

RZ: 1

inch

=

ft.

200

200

100

200

400

APPR

OVED

THI

S

D

AY O

F

, 20

,

BY T

HE

TOOE

LE C

OUNT

Y PLA

NNIN

G CO

MMISS

ION

TOOE

LE C

OUNT

Y PL

ANNI

NG C

OMMI

SSIO

N.

CHAI

R, TO

OELE

COU

NTY

PLAN

NING

COM

MISS

ION

AREA

CAL

CULA

TION

S TA

BLE

DESC

RIPT

ION

AREA

PRO

POSE

DAR

EA P

ROPO

SED

PERC

ENTA

GE P

ROPO

SED

(227

) 12,0

00 S

Q. F

T.RE

SIDE

NTIA

L LOT

S3,5

01,14

9 sq f

t.80

.375 a

cres

51.41

%

(3) 1

4,520

SQ.

FT.

FARM

LOTS

43,56

0 sq.

ft.1.0

00 ac

res

0.64%

(2) 2

82,89

0 SQ.

FT.

RESI

DENT

IAL L

OTS

565,7

80 sq

. ft.

12.98

9 acre

s8.3

1%

(100

) RES

IDEN

TIAL

RETI

REME

NT U

NITS

764,5

61 sq

. ft.

17.55

2 acre

s11

.23%

AGRI

CULT

URAL

PAR

CELS

609,8

40 sq

. ft.

14.00

0 acre

s8.9

6%

PARK

S48

,000 s

q. ft.

1.102

acre

s0.7

0%

ARTE

RIAL

ROA

DS1,2

76,81

6 sq.

ft.29

.312 a

cres

18.75

%

TOTA

L SIT

E6,8

09,70

6 sq.

ft.15

6.329

acre

s10

0.00%

Page 6: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

STATE ROAD 36

20.0'

TRA

ILEA

SEME

NT

20.0'

TRA

ILEA

SEME

NT

LOT

3812

,392 s

q.ft.

0.284

acre

s

LOT

8012

,004 s

q.ft.

0.276

acre

s

LOT

8812

,004 s

q.ft.

0.276

acre

s

LOT

9712

,004 s

q.ft.

0.276

acre

s

LOT

6712

,000 s

q.ft.

0.275

acre

s

LOT

6812

,000 s

q.ft.

0.275

acre

s

LOT

6912

,000 s

q.ft.

0.275

acre

s

LOT

6612

,000 s

q.ft.

0.275

acre

s

LOT

6512

,000 s

q.ft.

0.275

acre

s

LOT

7012

,000 s

q.ft.

0.275

acre

s

LOT

6412

,000 s

q.ft.

0.275

acre

s

LOT

7112

,000 s

q.ft.

0.275

acre

s

LOT

6312

,000 s

q.ft.

0.275

acre

s

LOT

7212

,000 s

q.ft.

0.275

acre

s

LOT

7312

,000 s

q.ft.

0.275

acre

s

LOT

6212

,000 s

q.ft.

0.275

acre

s

LOT

6112

,000 s

q.ft.

0.275

acre

s

LOT

7412

,000 s

q.ft.

0.275

acre

s

LOT

6012

,000 s

q.ft.

0.275

acre

s

LOT

7512

,000 s

q.ft.

0.275

acre

s

LOT

5912

,000 s

q.ft.

0.275

acre

s

LOT

7612

,000 s

q.ft.

0.275

acre

s

LOT

7712

,000 s

q.ft.

0.275

acre

s

LOT

5812

,000 s

q.ft.

0.275

acre

s

LOT

8412

,000 s

q.ft.

0.275

acre

s

LOT

9212

,000 s

q.ft.

0.275

acre

s

LOT

101

12,00

0 sq.f

t.0.2

75 ac

res

24,00

0 sq.f

t.0.5

51 ac

res

PARK

LOT

8512

,000 s

q.ft.

0.275

acre

s

LOT

9312

,000 s

q.ft.

0.275

acre

s

LOT

9412

,000 s

q.ft.

0.275

acre

s

LOT

102

12,00

0 sq.f

t.0.2

75 ac

res

LOT

8312

,004 s

q.ft.

0.276

acre

s

LOT

8212

,004 s

q.ft.

0.276

acre

s

LOT

8112

,004 s

q.ft.

0.276

acre

s

LOT

7812

,004 s

q.ft.

0.276

acre

s

LOT

7912

,004 s

q.ft.

0.276

acre

s

LOT

2843

,501 s

q.ft.

0.999

acre

s

LOT

132

12,00

0 sq.f

t.0.2

75 ac

res

LOT

133

12,00

0 sq.f

t.0.2

75 ac

res

LOT

134

12,00

0 sq.f

t.0.2

75 ac

res

LOT

2912

,725 s

q.ft.

0.292

acre

sLOT

3519

,452 s

q.ft.

0.447

acre

s

LOT

3415

,494 s

q.ft.

0.356

acre

s

LOT

3312

,725 s

q.ft.

0.292

acre

s

LOT

3212

,725 s

q.ft.

0.292

acre

s

LOT

3112

,725 s

q.ft.

0.292

acre

s

LOT

3012

,725 s

q.ft.

0.292

acre

s

LOT

9112

,004 s

q.ft.

0.276

acre

s

LOT

9012

,004 s

q.ft.

0.276

acre

s

LOT

8912

,004 s

q.ft.

0.276

acre

s

LOT

9912

,004 s

q.ft.

0.276

acre

s

LOT

9812

,004 s

q.ft.

0.276

acre

s

LOT

100

12,00

4 sq.f

t.0.2

76 ac

res

LOT

8612

,004 s

q.ft.

0.276

acre

s

LOT

8712

,004 s

q.ft.

0.276

acre

s

LOT

9512

,004 s

q.ft.

0.276

acre

s

LOT

9612

,004 s

q.ft.

0.276

acre

s

LOT

3612

,438 s

q.ft.

0.286

acre

s

LOT

3712

,436 s

q.ft.

0.285

acre

s

LOT

1632

,670 s

q.ft.

0.750

acre

s

LOT

1743

,497 s

q.ft.

0.999

acre

s

LOT

1843

,497 s

q.ft.

0.999

acre

s

LOT

1943

,497 s

q.ft.

0.999

acre

s

LOT

2032

,670 s

q.ft.

0.750

acre

s

LOT

2132

,670 s

q.ft.

0.750

acre

s

LOT

2243

,497 s

q.ft.

0.999

acre

s

LOT

2343

,497 s

q.ft.

0.999

acre

s

LOT

2443

,497 s

q.ft.

0.999

acre

s

LOT

2532

,670 s

q.ft.

0.750

acre

s

LOT

2632

,670 s

q.ft.

0.750

acre

s

LOT

2743

,501 s

q.ft.

0.999

acre

s

20.0'

TRA

ILEA

SEME

NT

20.0'

TRA

ILEA

SEME

NT

20.0'

TRA

ILEA

SEME

NT

20.0'

TRA

ILEA

SEME

NT

LOT

129

13,50

0 sq.f

t.0.3

10 ac

res

LOT

131

13,50

0 sq.f

t.0.3

10 ac

res

LOT

130

13,50

0 sq.f

t.0.3

10 ac

res

LOT

127

18,00

0 sq.f

t.0.4

13 ac

res

LOT

146

17,97

2 sq.f

t.0.4

13 ac

res

LOT

128

13,50

0 sq.f

t.0.3

10 ac

res

LOT

143

20,59

1 sq.f

t.0.4

73 ac

res

LOT

145

14,94

3 sq.f

t.0.3

43 ac

res

LOT

144

20,59

1 sq.f

t.0.4

73 ac

res

LOT

119

13,50

0 sq.f

t.0.3

10 ac

res

LOT

124

13,50

0 sq.f

t.0.3

10 ac

res

LOT

122

13,50

0 sq.f

t.0.3

10 ac

res

LOT

121

13,50

0 sq.f

t.0.3

10 ac

res

LOT

123

13,50

0 sq.f

t.0.3

10 ac

res

LOT

120

13,50

0 sq.f

t.0.3

10 ac

res

LOT

126

18,00

0 sq.f

t.0.4

13 ac

res

LOT

117

18,00

0 sq.f

t.0.4

13 ac

res

LOT

125

13,50

0 sq.f

t.0.3

10 ac

res

LOT

118

13,50

0 sq.f

t.0.3

10 ac

res

LOT

104

14,63

7 sq.f

t.0.3

36 ac

res

LOT

115

14,63

7 sq.f

t.0.3

36 ac

res

LOT

108

12,68

8 sq.f

t.0.2

91 ac

res

LOT

113

14,63

7 sq.f

t.0.3

36 ac

res

LOT

106

14,63

7 sq.f

t.0.3

36 ac

res

LOT

114

14,63

7 sq.f

t.0.3

36 ac

res

LOT

105

14,63

7 sq.f

t.0.3

36 ac

res

LOT

116

14,63

7 sq.f

t.0.3

36 ac

res

LOT

103

14,63

7 sq.f

t.0.3

36 ac

res

20.0'

TRA

ILEA

SEME

NT

4 of 4

1

4 of 4

1

4 of 4

1

4 of 4

2

4 o

f 4

2

LOT

5716

,436 s

q.ft.

0.377

acre

s

LOT

111

13,63

0 sq.f

t.0.3

13 ac

res

LOT

107

12,68

8 sq.f

t.0.2

91 ac

res

LOT

112

12,69

2 sq.f

t.0.2

91 ac

res

LOT

109

12,68

8 sq.f

t.0.2

91 ac

res

LOT

110

15,68

7 sq.f

t.0.3

60 ac

res

LOT

157

12,06

5 sq.f

t.0.2

77 ac

res

LOT

158

12,06

5 sq.f

t.0.2

77 ac

res

LOT

165

12,06

5 sq.f

t.0.2

77 ac

res

LOT

164

12,06

5 sq.f

t.0.2

77 ac

res

LOT

163

12,06

5 sq.f

t.0.2

77 ac

res

LOT

162

12,06

5 sq.f

t.0.2

77 ac

res

LOT

161

12,06

5 sq.f

t.0.2

77 ac

res

LOT

160

12,06

5 sq.f

t.0.2

77 ac

res

LOT

159

12,06

5 sq.f

t.0.2

77 ac

res

LOT

150

12,06

5 sq.f

t.0.2

77 ac

res

LOT

151

12,06

5 sq.f

t.0.2

77 ac

res

LOT

152

12,06

5 sq.f

t.0.2

77 ac

res

LOT

153

12,06

5 sq.f

t.0.2

77 ac

res

LOT

154

12,06

5 sq.f

t.0.2

77 ac

res

LOT

155

12,06

5 sq.f

t.0.2

77 ac

res

LOT

156

12,06

5 sq.f

t.0.2

77 ac

res

LOT

198

12,00

0 sq.f

t.0.2

75 ac

res

LOT

199

12,00

0 sq.f

t.0.2

75 ac

res

LOT

200

12,00

0 sq.f

t.0.2

75 ac

res

LOT

201

12,00

0 sq.f

t.0.2

75 ac

res

LOT

202

12,00

0 sq.f

t.0.2

75 ac

res

LOT

203

12,27

6 sq.f

t.0.2

82 ac

res

LOT

205

12,27

6 sq.f

t.0.2

82 ac

res

LOT

204

12,27

6 sq.f

t.0.2

82 ac

res

LOT

4028

2,890

sq.ft.

6.494

acre

s

LOT

3928

2,890

sq.ft.

6.494

acre

s

LOT

5716

,436 s

q.ft.

0.377

acre

s

LOT

4112

,000 s

q.ft.

0.275

acre

s

LOT

4212

,000 s

q.ft.

0.275

acre

s

LOT

4312

,000 s

q.ft.

0.275

acre

s

LOT

4412

,000 s

q.ft.

0.275

acre

s

LOT

4512

,000 s

q.ft.

0.275

acre

s

LOT

4612

,000 s

q.ft.

0.275

acre

s

LOT

4712

,000 s

q.ft.

0.275

acre

s

LOT

4812

,000 s

q.ft.

0.275

acre

s

LOT

4912

,000 s

q.ft.

0.275

acre

s

LOT

5012

,000 s

q.ft.

0.275

acre

s

LOT

5112

,000 s

q.ft.

0.275

acre

s

LOT

5212

,000 s

q.ft.

0.275

acre

s

LOT

5312

,000 s

q.ft.

0.275

acre

s

LOT

5412

,000 s

q.ft.

0.275

acre

s

LOT

5512

,000 s

q.ft.

0.275

acre

s

LOT

5612

,000 s

q.ft.

0.275

acre

s

CHEC

KED

BYDR

AWN

BY

PROJ

ECT

NUMB

ER

FOR:

PROJ

ECT

MANA

GER

PRIN

T DA

TE

PHON

E:

CONTACT:

TO

OE

LE

169 N

. Main

Stre

et, U

nit 1

Tooe

le, U

T. 84

074

Phon

e: 43

5.843

.3590

SA

LT

L

AK

E C

IT

Y

Phon

e: 80

1.255

.0529

LA

YT

ON

Phon

e: 80

1.547

.1100

CE

DA

R C

IT

Y

Phon

e: 43

5.865

.1453

RIC

HF

IE

LD

Phon

e: 43

5.896

.2983

WW

W.E

NS

IG

NE

NG

.C

OM

E N

S

I G

N

THE

STAN

DARD

IN E

NGIN

EERI

NG

T189

5A

2 of 4

ERDA ESTATES P.U.D.

ERDA WAYERDA, UTAH

CONC

EPT

IRON

WOO

D RE

AL E

STAT

E LL

C.13

92 P

ASS

CANY

ON R

OAD

ERDA

, UTA

H 84

074

JOE

WHI

TE43

5-83

0-36

42

J.CLE

GG

J. CL

EGG

R. F

ISH

HORI

ZONT

AL G

RAPH

IC SC

ALE

0

( IN

FEET

)HO

RZ: 1

inch

=

ft.

100

100

5010

020

0

APPR

OVED

THI

S

D

AY O

F

, 20

,

BY T

HE

TOOE

LE C

OUNT

Y PLA

NNIN

G CO

MMISS

ION

TOOE

LE C

OUNT

Y PL

ANNI

NG C

OMMI

SSIO

N.

CHAI

R, TO

OELE

COU

NTY

PLAN

NING

COM

MISS

ION

SEE DRAWING 3 of 3SEE DRAWING 3 of 3

AREA

CAL

CULA

TION

S TA

BLE

DESC

RIPT

ION

AREA

PRO

POSE

DAR

EA P

ROPO

SED

PERC

ENTA

GE P

ROPO

SED

(227

) 12,0

00 S

Q. F

T.RE

SIDE

NTIA

L LOT

S3,5

01,14

9 sq f

t.80

.375 a

cres

51.41

%

(3) 1

4,520

SQ.

FT.

FARM

LOTS

43,56

0 sq.

ft.1.0

00 ac

res

0.64%

(2) 2

82,89

0 SQ.

FT.

RESI

DENT

IAL L

OTS

565,7

80 sq

. ft.

12.98

9 acre

s8.3

1%

(100

) RES

IDEN

TIAL

RETI

REME

NT U

NITS

764,5

61 sq

. ft.

17.55

2 acre

s11

.23%

AGRI

CULT

URAL

PAR

CELS

609,8

40 sq

. ft.

14.00

0 acre

s8.9

6%

PARK

S48

,000 s

q. ft.

1.102

acre

s0.7

0%

ARTE

RIAL

ROA

DS1,2

76,81

6 sq.

ft.29

.312 a

cres

18.75

%

TOTA

L SIT

E6,8

09,70

6 sq.

ft.15

6.329

acre

s10

0.00%

Page 7: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

COCHRANE LANE

LOT

135

12,00

0 sq.f

t.0.2

75 ac

res

LOT

443

,497 s

q.ft.

0.999

acre

s

LOT

543

,497 s

q.ft.

0.999

acre

s

LOT

643

,497 s

q.ft.

0.999

acre

s

LOT

732

,670 s

q.ft.

0.750

acre

s

LOT

832

,670 s

q.ft.

0.750

acre

s

LOT

943

,497 s

q.ft.

0.999

acre

s

LOT

1043

,497 s

q.ft.

0.999

acre

s

LOT

1132

,670 s

q.ft.

0.750

acre

s

LOT

1243

,497 s

q.ft.

0.999

acre

s

LOT

1343

,497 s

q.ft.

0.999

acre

s

LOT

1443

,497 s

q.ft.

0.999

acre

s

LOT

1532

,670 s

q.ft.

0.750

acre

s

20.0'

TRA

ILEA

SEME

NT

20.0'

TRA

ILEA

SEME

NT

117,9

41 sq

.ft.2.7

08 ac

res

AGRI

CULT

URAL

PAR

CEL

C

394,6

46 sq

.ft.9.0

60 ac

res

AGRI

CULT

URAL

PAR

CEL

B

97,25

4 sq.f

t.2.2

33 ac

res

AGRI

CULT

URAL

PAR

CEL

A

LOT

138

13,50

0 sq.f

t.0.3

10 ac

res

LOT

142

14,94

3 sq.f

t.0.3

43 ac

res

LOT

136

13,50

0 sq.f

t.0.3

10 ac

res

LOT

137

13,50

0 sq.f

t.0.3

10 ac

res

LOT

140

18,00

0 sq.f

t.0.4

13 ac

res

LOT

139

13,50

0 sq.f

t.0.3

10 ac

res

LOT

141

17,97

2 sq.f

t.0.4

13 ac

res

4 of 4

1

4 of 4

2

4 of 4

2

(TO

BE O

WNE

D AN

D MA

INTA

INED

BY

THE

HOA

OR O

THER

CON

SERV

ATIO

N EN

TITY

)

(TO

BE O

WNE

D AN

D MA

INTA

INED

BY

THE

HOA

OR O

THER

CON

SERV

ATIO

N EN

TITY

)

(TO

BE O

WNE

D AN

D MA

INTA

INED

BY

THE

HOA

OR O

THER

CON

SERV

ATIO

N EN

TITY

)

FARM

LOT

214

,520 s

q.ft.

0.333

acre

s

FARM

LOT

314

,520 s

q.ft.

0.333

acre

s

FARM

LOT

114

,520 s

q.ft.

0.333

acre

s

LOT

167

12,06

5 sq.f

t.0.2

77 ac

res

LOT

166

12,06

5 sq.f

t.0.2

77 ac

res

LOT

147

12,06

5 sq.f

t.0.2

77 ac

res

LOT

148

12,06

5 sq.f

t.0.2

77 ac

res

LOT

149

12,06

5 sq.f

t.0.2

77 ac

res

LOT

226

14,13

3 sq.f

t.0.3

24 ac

res

LOT

225

12,33

9 sq.f

t.0.2

83 ac

res

LOT

227

15,68

0 sq.f

t.0.3

60 ac

res

LOT

180

12,00

0 sq.f

t.0.2

75 ac

res

LOT

169

12,00

0 sq.f

t.0.2

75 ac

res

LOT

175

12,00

0 sq.f

t.0.2

75 ac

res

LOT

172

12,00

0 sq.f

t.0.2

75 ac

res

LOT

168

12,00

0 sq.f

t.0.2

75 ac

res

LOT

181

12,00

0 sq.f

t.0.2

75 ac

res

24,00

0 sq.f

t.0.5

51 ac

res

PARK

LOT

179

12,00

0 sq.f

t.0.2

75 ac

res

LOT

178

12,00

0 sq.f

t.0.2

75 ac

res

LOT

174

12,00

0 sq.f

t.0.2

75 ac

res

LOT

173

12,00

0 sq.f

t.0.2

75 ac

res

LOT

177

12,00

0 sq.f

t.0.2

75 ac

res

LOT

170

12,00

0 sq.f

t.0.2

75 ac

res

LOT

176

12,00

0 sq.f

t.0.2

75 ac

res

LOT

171

12,00

0 sq.f

t.0.2

75 ac

res

LOT

193

12,00

0 sq.f

t.0.2

75 ac

res

LOT

183

12,00

0 sq.f

t.0.2

75 ac

res

LOT

188

12,00

0 sq.f

t.0.2

75 ac

res

LOT

195

12,00

0 sq.f

t.0.2

75 ac

res

LOT

182

12,00

0 sq.f

t.0.2

75 ac

res

LOT

184

12,00

0 sq.f

t.0.2

75 ac

res

LOT

196

12,00

0 sq.f

t.0.2

75 ac

res

LOT

185

12,00

0 sq.f

t.0.2

75 ac

res

LOT

194

12,00

0 sq.f

t.0.2

75 ac

res

LOT

189

12,00

0 sq.f

t.0.2

75 ac

res

LOT

191

12,00

0 sq.f

t.0.2

75 ac

res

LOT

186

12,00

0 sq.f

t.0.2

75 ac

res

LOT

192

12,00

0 sq.f

t.0.2

75 ac

res

LOT

187

12,00

0 sq.f

t.0.2

75 ac

res

LOT

212

12,35

7 sq.f

t.0.2

84 ac

res

LOT

190

12,00

0 sq.f

t.0.2

75 ac

res

LOT

197

12,00

0 sq.f

t.0.2

75 ac

res

LOT

224

12,35

7 sq.f

t.0.2

84 ac

res

LOT

223

12,35

7 sq.f

t.0.2

84 ac

res

LOT

222

12,35

7 sq.f

t.0.2

84 ac

res

LOT

221

12,35

7 sq.f

t.0.2

84 ac

res

LOT

220

12,35

7 sq.f

t.0.2

84 ac

res

LOT

219

12,35

7 sq.f

t.0.2

84 ac

res

LOT

218

12,35

7 sq.f

t.0.2

84 ac

res

LOT

217

12,35

7 sq.f

t.0.2

84 ac

res

LOT

216

12,35

7 sq.f

t.0.2

84 ac

res

LOT

215

12,35

7 sq.f

t.0.2

84 ac

res

LOT

214

12,35

7 sq.f

t.0.2

84 ac

res

LOT

213

12,35

7 sq.f

t.0.2

84 ac

res

LOT

211

12,27

6 sq.f

t.0.2

82 ac

res

LOT

210

12,27

6 sq.f

t.0.2

82 ac

res

LOT

209

12,27

6 sq.f

t.0.2

82 ac

res

LOT

208

12,27

6 sq.f

t.0.2

82 ac

res

LOT

207

12,27

6 sq.f

t.0.2

82 ac

res

LOT

206

12,27

6 sq.f

t.0.2

82 ac

res

146,2

45 sq

.ft.3.3

57 ac

res

RETI

REME

NT

308,6

93 sq

.ft.7.0

87 ac

res

RETI

REME

NT30

9,623

sq.ft.

7.108

acre

s

RETI

REME

NT

CHEC

KED

BYDR

AWN

BY

PROJ

ECT

NUMB

ER

FOR:

PROJ

ECT

MANA

GER

PRIN

T DA

TE

PHON

E:

CONTACT:

TO

OE

LE

169 N

. Main

Stre

et, U

nit 1

Tooe

le, U

T. 84

074

Phon

e: 43

5.843

.3590

SA

LT

L

AK

E C

IT

Y

Phon

e: 80

1.255

.0529

LA

YT

ON

Phon

e: 80

1.547

.1100

CE

DA

R C

IT

Y

Phon

e: 43

5.865

.1453

RIC

HF

IE

LD

Phon

e: 43

5.896

.2983

WW

W.E

NS

IG

NE

NG

.C

OM

E N

S

I G

N

THE

STAN

DARD

IN E

NGIN

EERI

NG

T189

5A

3 of 4

ERDA ESTATES P.U.D.

ERDA WAYERDA, UTAH

CONC

EPT

IRON

WOO

D RE

AL E

STAT

E LL

C.13

92 P

ASS

CANY

ON R

OAD

ERDA

, UTA

H 84

074

JOE

WHI

TE43

5-83

0-36

42

J.CLE

GG

J. CL

EGG

R. F

ISH

HORI

ZONT

AL G

RAPH

IC SC

ALE

0

( IN

FEET

)HO

RZ: 1

inch

=

ft.

100

100

5010

020

0

APPR

OVED

THI

S

D

AY O

F

, 20

,

BY T

HE

TOOE

LE C

OUNT

Y PLA

NNIN

G CO

MMISS

ION

TOOE

LE C

OUNT

Y PL

ANNI

NG C

OMMI

SSIO

N.

CHAI

R, TO

OELE

COU

NTY

PLAN

NING

COM

MISS

ION

SEE DRAWING 2 of 3SEE DRAWING 2 of 3

AREA

CAL

CULA

TION

S TA

BLE

DESC

RIPT

ION

AREA

PRO

POSE

DAR

EA P

ROPO

SED

PERC

ENTA

GE P

ROPO

SED

(227

) 12,0

00 S

Q. F

T.RE

SIDE

NTIA

L LOT

S3,5

01,14

9 sq f

t.80

.375 a

cres

51.41

%

(3) 1

4,520

SQ.

FT.

FARM

LOTS

43,56

0 sq.

ft.1.0

00 ac

res

0.64%

(2) 2

82,89

0 SQ.

FT.

RESI

DENT

IAL L

OTS

565,7

80 sq

. ft.

12.98

9 acre

s8.3

1%

(100

) RES

IDEN

TIAL

RETI

REME

NT U

NITS

764,5

61 sq

. ft.

17.55

2 acre

s11

.23%

AGRI

CULT

URAL

PAR

CELS

609,8

40 sq

. ft.

14.00

0 acre

s8.9

6%

PARK

S48

,000 s

q. ft.

1.102

acre

s0.7

0%

ARTE

RIAL

ROA

DS1,2

76,81

6 sq.

ft.29

.312 a

cres

18.75

%

TOTA

L SIT

E6,8

09,70

6 sq.

ft.15

6.329

acre

s10

0.00%

Page 8: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

30'-0

"

2'-6"

3'-6"

PARK

STR

IP18

'-0"

NATU

RAL

GRAD

E

C L

P L

5'-0"

CON

CRET

ESI

DEW

ALK

2% S

LOPE

SCAL

E:1

NONE

ROAD

CRO

SS S

ECTI

ON W

/ CON

CRET

E TR

AIL

2% S

LOPE

1'-0"

18'-0

"2'-

6"9'-

6" P

ARK

STRI

PW

/ TRE

ES8'-

0" C

ONCR

ETE

TRAI

L12

'-0"

30'-0

"20

'-0" T

RAIL

EASE

MENT

30'-0

"

2'-6"

3'-6"

PARK

STR

IP18

'-0"

NATU

RAL

GRAD

E

C LP L

5'-0"

CON

CRET

ESI

DEW

ALK

2% S

LOPE

SCAL

E:2

NONE

ROAD

CRO

SS S

ECTI

ON W

/ ASP

HALT

TRA

IL

2% S

LOPE

1'-0"

18'-0

"

P L

2% S

LOPE

2% S

LOPE

2% S

LOPE

2% S

LOPE

2'-0"

4'-6"

1'-0"

4'-6"

2'-0"

8'-0"

ASP

HALT

TRA

IL10

'-0" L

ANDS

CAPE

DAR

EA W

/ TRE

ES

60'-0

"

1'-6"

30'-0

"20

'-0" T

RAIL

EASE

MENT

CHEC

KED

BYDR

AWN

BY

PROJ

ECT

NUMB

ER

FOR:

PROJ

ECT

MANA

GER

PRIN

T DA

TE

PHON

E:

CONTACT:

TO

OE

LE

169 N

. Main

Stre

et, U

nit 1

Tooe

le, U

T. 84

074

Phon

e: 43

5.843

.3590

SA

LT

L

AK

E C

IT

Y

Phon

e: 80

1.255

.0529

LA

YT

ON

Phon

e: 80

1.547

.1100

CE

DA

R C

IT

Y

Phon

e: 43

5.865

.1453

RIC

HF

IE

LD

Phon

e: 43

5.896

.2983

WW

W.E

NS

IG

NE

NG

.C

OM

E N

S

I G

N

THE

STAN

DARD

IN E

NGIN

EERI

NG

T189

5A

4 of 4

ERDA ESTATES P.U.D.

ERDA WAYERDA, UTAH

CONC

EPTU

ALCR

OSS

SECT

IONS

IRON

WOO

D RE

AL E

STAT

E LL

C.13

92 P

ASS

CANY

ON R

OAD

ERDA

, UTA

H 84

074

JOE

WHI

TE43

5-83

0-36

42

J.CLE

GG

J. CL

EGG

R. F

ISH

Page 9: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

P.O. Box 521651 Salt Lake City, UT 84152 (801) 949-0348 fax (801) 582-6252

[email protected]

1

October 32018

TRANSPORTATION ENGINEERING RE: Tealby Village – Erda, UT Tealby Village is a proposed 500 single family home development with 5 acres or 50,000 sf of commercial office space located on the southwest corner of Erda Way and SR 36 in Erda, UT. The site extends to Cochrane Lane and is proposing four access points for the residential development and one business access for the proposed professional office. Figure One shows the proposed area and Figure Two shows an initial site plan.

Figure One: Site Locations

Page 10: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

P.O. Box 521651 Salt Lake City, UT 84152 (801) 949-0348 fax (801) 582-6252

[email protected]

2

Figure Two: Site Plan

Based on the ITE Trip Generation Manual, 10th Edition, the projected traffic for the site is based on land use and square footages. Applying these values generates 466 AM peak trips, 618 PM peak trips and 5,530 daily trips. Land Use Trip Generation Projections

According to Traffic on Utah Highways, Erda Way carries approximately 3,500 trips a day. The proposed development represents a substantial increase in traffic relative to the current level however, the capacity of the roadway is approximately 15,000 ADT. Therefore, once this development is built, Erda Way is projected to carry an estimated 9,000 ADT. This would be operating at 60% of the roadway capacity which still represents a Level of Service A. The surrounding roadway infrastructure has available capacity to accommodate the traffic generated by the site.  Please contact me with any questions. Sincerely, A-Trans Engineering

Joseph Perrin, PhD, PE, PTOE Principal

Page 11: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

November 5, 2019 To: Tooele County Planning Commissioners Subject: Statement against of PUD-CUP 2019-02 & PUD-CUP 2019-03 Dear: Tooele County Planning Commission I would like to voice my concerns regarding the upcoming Commissions review of PUD-CUP 2019-02 & PUD-CUP 2019-03 agenda items for NOV 6th 2019Tooele County Planning Commission Meeting. First I would like to address the initial request for rezones which were granted by the Planning Commission in 2018. After the Commission’s approval the public then began a referendum, and submitted the required signatures. During the counting process the Developer (Joe White) withdrew his applications. The Planning Commission had already granted the rezone for these parcels. The Tooele County Commissioners then announced that they were allowing the withdrawal and returning the zoning to the original zoning. This was clearly not in compliance with Chapter 3-11. 3 - 11. Restriction on applications after decision of rezone application. A final determination regarding an application to amend the zoning map shall preclude the filing of another application to amend the zoning map to reclassify the same parcel of property, or any portion thereof to the same zone classification within one year of the date of the final decision unless the county planning commission finds that there has been a substantial change in the circumstances or sufficient new evidence to merit consideration of a second application within the one-year time period. (Ord 2005-22, 9/13/05) The last decision on the these parcel properties was December of last year. There has not been a substantial change in the circumstances or sufficient new evidence to merit consideration of a second application within the one-year time period. These next applications from Mr. White are for a PUD under Chapter 9 which are the subject of this statement. The request for the PUD’s with the County Planning Department was rushed since at this time there was going to be a quote “Time Out” on PUD applications while chapter 9 was rewritten to correct errors. Mr. White hurried to make the application under the old Chapter 9 since the determination of the Planning Commission would be an administrative decision. The problem with this hurried effort to avoid the new chapter 9 was that the procedures that are spelled out were not followed (9.4) Pre-Application Conference. I attended the Planning Commission meeting on Sept 4, 2019 for PUD-CUP 2019-01 and spoke regarding this lack of compliance to Chapter 9 for that request and also mentioned these applications at that time. I stated to the Board that the defined listed requirements of Chapter 9-4 had not been completed. I would have thought at that time that the Board would have asked the Planning Staff if that was true, but they did not.

Page 12: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

Page 2 Statement against PUD-CUP 2019-02 & PUD-CUP 2019-03 The discussion moved on and the County Attorney Mr. Broadhead suggested to the Board that if PUD-CUP 2019-01 was granted it should be subject to a request for rezone to make it more in line with the upcoming rewrite of Chapter 9. I thought this was a strange positon for the County Legal Department to take. When Mr. Jeff Miller was taking about the PUD—CUP 2019-01 Development he addressed my concern with since he had work so much with Mr. White and Mr. Butterfield on the previous requests he decided it was not necessary to have the 9-4 Pre-Application Conference requirement satisfied. I would assume that the same reasoning has been placed on these two applications. I see nowhere in Chapter 9 that allows Mr. Miller to skip steps in the application process, thus the Planning recommendations are flawed and not complete. I also notice that the Notice of the Planning Commission addenda published in the Transport Bulletin Oct 31st makes references as “Joe White: is the applicant on both PUD’s, however the name on the application for PUD-CUP-2019-03 for the meeting on Nov 6th has been changed to a Matt Donaldson. All the Drawings submitted to the County by Ensign are all under Joe Whites name, the traffic study is also co-mingled, between the two applications with different applicants. If Mr. Matt Donaldson is going to be the applicant then he should apply under the New Chapter 9 ordinance. The traffic study is a vain attempt to gloss over the real problem. Erda Way will not be able to accommodate the volume of traffic entering and exiting these developments so close to the Highway 36 intersection. The study makes no mention of the future traffic that will be coming from the New Temple, or if Skywalk was to be completed or the new Medical center on the Northeast counter of Highway 36 and Erda Way. The most important thing left out of this study is the drop off and pick up of students from the Excelsior Academy, where presently the parents have to park on the shoulder of the road and wait before make a left into the school’s pick up area. There are no crosswalks or school zone signage how many students do we sacrifice. I feel that Mr. White and Mr. Donaldson are complicit in their attempt to circumvent the rewrite of Chapter 9. They too should have had knowledge of the existing requirements of the Chapter 9. Planning Commission is not enforcing or questioning the accuracy of the application when information is presented to them, why have a Board? Staff have errored in completing the application in compliance with Chapter 9.4. We the people need to know that the Tooele County Ordinance’s as written are being followed completely and inaccurate and incomplete workmanship will not be tolerated or approved. Thank You, Douglas Buss

Page 13: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

1

Jeffrey C. Miller

From:Sent: Friday, November 8, 2019 10:47 AMTo: Jeffrey C. MillerSubject: Planning Commission processes

Mr. Miller,

After attending the November 6th Planning and Zoning meeting I would like to ask a few questions and make a few suggestions.

1. These documents attached to the agenda requests-what is the time frame to publish them? And do you update theinformation? The "Neighborhood Response" doesn't seem to reflect accurate information and I don't see them beingcorrected to show the emails and public comments your office has received. It looks like these particular requests (PUD-CUP 2019-02 and PUD-CUP 2019-03)were posted the same day as the meeting. So there is not ample time forconcerned citizens to get their responses into your office for publication before the meeting.

2. These notices that are required to be sent to surrounding property owners are not being received by said owners. Thisis evident from the Nov. 6th meeting. Which property owners are actually notified of rezone requests?

3. The time available for public concerns at these meetings should be increased to 5 minutes. I also feel that if it wereQuestions and Concerns, it would be more helpful. It is the "Questions" that we all have that we NEVER getanswered. That is what makes these meetings so frustrating. We attend hoping that our questions will be answered, andleave the meetings more frustrated and angry. Why can't this be added to the agenda?

4. My final suggestion is to PLEASE instruct the P&Z members on the use of the microphones. The mumbling is just notacceptable. If they can't speak at a level for the room to hear them, then they need to TURN ON their microphones.

Thank you, Donna Phillips Lake Point

Page 14: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

1

Jeffrey C. Miller

From:Sent: Thursday, November 7, 2019 8:33 AMTo: Jeffrey C. MillerSubject: Good Morning Jeff

I am sorry you had to take so much abuse last night.  I wanted to tell you some of the things people from West Erda told me. 

Your notification letter looked more like a flyer.  Most of the people don't know how to navigate the county website to get the information.  When they actually could identify where the development was going, by us posting pictures on our Facebook Page, they were outraged.  The letter seemed like the county is telling them they have to have "evidence" and that "opinions" don't matter.  I had lengthy discussions all day yesterday with residents about that statement and the wording. What is evidence? You have to show the developers have criminal intent to push this through? It didn't translate to them and you make it sound like their concerns aren't valid concerns. 

   We pay a lot of taxes out here.  All of us have received increases and we get little in return.  I can't even get the county to clean up the polygamist's relatives next door on the corner.  It's a trash dump with motorhomes, old boats, a tent sideways, a home and whatever else that has been in construction for 3 years.  It is frustrating and then we have to be dissed by the county because we are standing up to bringing more trouble to our little Erda Township, regarding overcrowding, traffic and most likely crime. It's proven that people crammed together in developments have trouble with depression, neighbors etc.... We don't want that here.  

     We also want the ordinances existing to be enforced before we start creating more government over reach into our animals.  It's like the county is punishing everyone for one incident, like when the teacher makes the whole class stay after because one kid won't fess up to stealing. 

  I agree the animal ordinances need to be re‐done, but you might do better if you called a working meeting including a committee of 5 residents who actually own cows, sheep etc... and include them in your working meetings.  No one is going to write in their suggestions and it might show good will to the citizens that their contributions could be useful in making the final decision. Just a thought. 

   Here is my suggestion and you can take it or leave it.  1. When you send out those notices. Send a map and description of exactly where the development is

going in.  Label the streets. I did this with the referendums and it was helpful for people to make an educated decision to sign or not sign. 

2. Put a date on your notice, so people know how many days they have to reply.3. Personalize it. Include their name and address in the top left hand corner.

         I worked in Business Management in Los Angeles, managing a bookkeeping staff. We managed actors, producers, writers and all their personal assets and bills, from mortgages to car insurance. I worked with all types of personalities and I could talk a stressed out actor off a ledge by being genuine and making them always feel I had their best interests at the top of my list.  Making people feel like they matter would alleviate a lot of what you got last night.  I don't think you deserved it, but the public doesn't understand when they get an inflamed notice with no date, no personalization and almost felt threatened to speak up last night.  

Page 15: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

2

   We're all hoping for better days and to be able to work together,    Diane Christensen 

Page 16: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

1

Jeffrey C. Miller

From:Sent: Wednesday, November 13, 2019 11:06 AMTo: Jeffrey C. MillerCc:Subject: Planning Commission Request for State Codes from Allison Kipp's Comments at the Last Planning

Commission MeetingAttachments: Utah Code Section 17-27a-508 Reason for Refusal of Land Use Application.pdf; Code 17-27a-205

Notice of Public Hearings and Public Meetings on Adoption or Modification of Land Use Regulation.pdf; Chapter 9-4 Pre-Application Conference.pdf; Legal Definition of Spot Zoning.pdf; Chapter 2-2(240) Definition of Spot Zone.pdf; Chapter 3-11 Text.pdf; TC Final General Plan - Need to Adress Development and Growth - places constraints on limited resources - especially water.pdf; Kunz West Erda Rezone.pdf; Erda Estates Notification.jpg

Mr. Miller,

The Planning Commission requested the various codes that I quoted while speaking against both PUD-CUP 2019-02 and PUD-CUP 2019-03 last week. I attach the codes I quoted for their reference. Below the asterisked line is a summary of my arguments against each PUD-CUP that evening.

I also attach for the Planning Commission’s review the Planning Staff’s recommendations for the Kunz West Erda Rezone Request. The inconsistency with the surrounding RR-5 properties both in lot size and in use (agricultural) and spot zoning were brought up in the Planning Staff’s report. The Planning Staff clearly does not treat each application that it receives with uniformity and in accordance with the Land Use Ordinance. I suspect the approval of the two prior rezone applications and the PUD’s for these properties are a case of who you know and how well do you know them. I suggest that the Planning Commission should reconsider the recommendations of the Planning Staff and do their own research for these applications.

In closing, I respectfully request that the Planning Commission either (1) deny both PUD-CUP 2019-02 and PUD-CUP 2019-03, or (2) accept both PUD-CUP 2019-02 and PUD-CUP 2019-03 with the condition that the Applicants amend the PUD applications to include only 5-acre lots to be consistent with the Land Use Ordinance, the existing zoning, the surrounding zoning, and in accordance with the surrounding property owners’ requests to deny.

Please confirm receipt by return e-mail.

Best regards, Allison Kipp

*************************************************************************************************************************************************************************************************************************************************************************

Notices to the Adjacent Property Owners

PUD-3 – Applicant name wrong on notice sent to property owners. The notices to the property owners were deficient – did not address letter to owner, did not identify where the property was located, the notice looked like a brochure.

Page 17: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

2

Citizen Input and Background of Applications

Referendums were filed to allow the citizens to determine if the properties should be rezoned and had 3,400 signatures. Once Mr. White found out that there were enough valid signatures, the County Ordinances Rezoning these parcels were withdrawn at a Special County Commission Meeting on December 27, 2018, at 1:00 p.m. As the County was placing a moratorium on new PUD applications until the deficient Chapter 9 was amended, Mr. White submitted these PUD applications after the meeting and before the beginning of 2019.

Applications Should Have Been Refused for Being Incomplete

Pre-application conferences were not held for these applications as required by Land Use Ordinance Chapter 9–4:

“Prior to submitting a planned unit development application, an applicant shall participate in a pre-application conference with the zoning administrator, county planner, county engineer, sheriff’s department, fire district, and the health department. A member of the planning commission and a member of the county commission shall be invited to attend the preapplication conference. Representatives of other county departments and decision making bodies may also be present, where appropriate.”

Spot Zoning

The Planning Staff’s recommendations in favor of these Applications is spot zoning as they are not consistent with the County’s zoning ordinances. See Land Use Ordinance Chapter 2-2(240) and https://legal-dictionary.thefreedictionary.com/Spot+Zoning.

“(240) Spot zone “means a zoning amendment which singles out a relatively small parcel for a use classification totally different from that of the surrounding area, for the benefit of the owner of such property, which is invalid because it is not in accordance with the general plan.”

“The granting to a particular parcel of land a classification concerning its use that differs from the classification of other land in the immediate area. Spot zoning is invalid because it amounts to an arbitrary, capricious, and unreasonable treatment of a limited area within a particular district and is, therefore, a deviation from the comprehensive plan.”

A conditional use recommendation by the Planning Staff does not negate other aspects of our County’s zoning ordinances. While a review of a conditional use should be an individualized consideration, it must also be consistent with the terms of our county’s overall zoning plan.

Applicants Prohibited from Filing These Applications

Additionally, even if the Applicants had attended pre-application conferences, they were prohibited from filing these applications for one year. A final determination was made by the Planning Commission when these properties were rezoned and ordinances were issued; therefore the Applicants are prohibited from submitting applications for a one-year period. The fact that the Applicants requested withdrawal of the approved County ordinances is irrelevant. See Land Use Ordinance Chapter 3-11.

“A final determination regarding an application to amend the zoning map shall preclude the filing of another application to amend the zoning map to reclassify the same parcel of property, or any portion thereof to the same zone classification within one year of the

Page 18: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

3

date of the final decision unless the county planning commission finds that there has been a substantial change in the circumstances or sufficient new evidence to merit consideration of a second application within the one-year time period. (Ord 2005-22, 9/13/05)”

The PUD’s are not consistent with the surrounding uses in the vicinity as the Planning Staff stated in their recommendations.

Citizen’s Rights and Objections to the Applications

The citizens do not want the property rezoned. Utah State Code states that a land use application shall be approved unless “the land use authority, on the record, formally finds that a compelling, countervailing public interest would be jeopardized by approving the application and specifies the compelling, countervailing public interest in writing.” See Utah State Code 17-27a-508.

Additionally, the General Plan provides for citizen input for development in Erda. There is “little to no potential for change without agreement from property owners.” – See Tooele County General Plan - Constraints of Land Available for Development by Zone – Section 4, p. 2-13

Contrary to what was stated in the Planning Staff’s recommendations, there is no “delicate balance between changes within the built environment and the surrounding agricultural and rural uses.”

Lots can be sold as five acres – septic systems allowed for the existing zoning.

Lack of Water in Erda

Water is a scarce and a limited resource in Erda and the development will only cause more harm to the water table. According to the General Plan, there is a “lack of water in Erda” and the “need to address development and growth is imminent, as it places constraints on limited resources in Tooele Valley, especially water.” These are just two of the areas in the General Plan that discuss the limited water available in the Tooele Valley. See Tooele County General Plan, p. 1-1 and p. 2-4.

Lack of Infrastructure and Traffic

Erda does not have adequate infrastructure for these developments. Schools are already overcrowded (School Bond Referendum) and we do not have adequate police personnel. Additionally, there is already too much traffic on Highway 36 and Erda Way (a single lane, narrow road).

Finally, I advised the Planning Commissioners that any change to land use requires notices to be sent to everyone in an area:

Utah State Code 17-27a-205. Notice of public hearings and public meetings on adoption or modification of land use regulation. A County “shall send a courtesy notice to each owner of private real property whose property is located entirely or partially within the proposed zoning map enactment or amendment at least 10 days before the scheduled day of the public hearing.” There are other requirements for the notice as well that can be found within that section of the Utah State Code.

Page 19: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

TOOELE COUNTY LAND USE ORDINANCE – CHAPTER 9 Page 2

Multiple Residential District, RM-7 ....................................................... 5 Acre Multiple Residential District, RM-15 ...................................................... 5 Acres Multiple Residential District, RM-30 ...................................................... 5 Acres Neighborhood Commercial District, C-N ..................................................... 20,000 Square Feet Shopping Commercial District, C-S .................................................. 1 Acre Highway Commercial District, C-H ...................................................... 1 Acre General Commercial District, C-G .......................................................... 1 Acre Manufacturing and Distribution, M-G ...................................................... 1 Acre General Industrial District, M-G .............................................................. 1 Acre Hazardous Industrial district, MG-H ............................................................ 1 Acre

9-4 PRE-APPLICATION CONFERENCE.(1) Prior to submitting a planned unit

development application, an applicant shall participate in a pre-application conference with the zoning administrator, county planner, county engineer, sheriff’s department, fire district, and the health department. A member of the planning commission and a member of the county commission shall be invited to attend the pre-application conference. Representatives of other county departments and decision making bodies may also be present, where appropriate.

(2) The purpose of the pre-applicationconference is to enable the applicant to present the concept of the proposed planned unit development and to discuss the procedures and standards for the planned unit development approval. The conference is intended to facilitate the filing and consideration of a complete application. No representation made by the zoning administrator, county planner, county engineer, sheriff’s department, fire district, the health department, the county commission, the planning commission or the representatives of any county departments or other decision making bodies during such conference shall be binding upon the county with respect to the application subsequently submitted.

(3) The zoning administrator shall schedulethe pre-application conference within 14 calendar days after receiving the request from the applicant. At the time of the request for the pre-application conference, the applicant shall include a narrative summary of the proposal and a description of adjacent land uses and neighborhood characteristics.

9-5 DEVELOPMENT PLAN APPROVALSTEPS. The development plan approval process requires three approval steps: a Concept Plan, Preliminary Plan approval and a Final Plan approval.

9-6 CONCEPT PLAN.(1) The concept plan is intended to provide

the applicant an opportunity to submit and obtain review of a plan showing the basic character and

scope of the proposed planned unit development without incurring undue cost. At the election of the applicant, the concept plan may be submitted to the planning commission for its review, and decision following a public hearing.

(2) An application for submittal of a conceptplan shall include schematic drawings at a scale of not smaller than 100 feet to the inch, of the proposed development concept, showing buildings located within 85 feet of the site exclusive of intervening streets and alleys, the general location of vehicular and pedestrian circulation and parking; public and private open space; and residential, commercial, industrial and other land uses, as applicable, and a tabulation of the following information:

(a) total number of dwelling unitsand rooming units proposed, by type of structure and number of bedrooms;

(b) total square feet of building floorarea proposed for commercial uses, recreation and accessory uses and industrial uses, by general type of use;

(c) proposed number of off-streetparking and loading spaces for each proposed type of land use;

(d) total land area, expressed insquare feet and as a percent of the total development area, proposed to be devoted to residential uses, by type of structure; commercial uses; industrial uses; other land uses; public and private open space; streets, sidewalks, trails and paths; and off-street parking and loading area; and

(e) total project density or intensityof use.

(3) The applicant shall submit an applicationfor planning commission consideration, 14 calendar days prior to the next planning commission meeting. Upon receipt of an application, the zoning administrator shall forward the concept plan application accompanied by staff recommendations to the planning commission seven days prior to the next scheduled planning commission meeting.

(4) Upon review, the planning commissionshall approve the concept plan, approve the concept plan subject to modifications or conditions, or disapprove the concept plan.

From Allision Kipp

alli
Highlight
Page 20: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

Utah Code

Page 1

Effective 5/9/201717-27a-205 Notice of public hearings and public meetings on adoption or modification ofland use regulation.(1) Each county shall give:

(a) notice of the date, time, and place of the first public hearing to consider the adoption ormodification of a land use regulation; and

(b) notice of each public meeting on the subject.(2) Each notice of a public hearing under Subsection (1)(a) shall be:

(a) mailed to each affected entity at least 10 calendar days before the public hearing;(b) posted:

(i) in at least three public locations within the county; or(ii) on the county's official website; and

(c)(i) published:

(A) in a newspaper of general circulation in the area at least 10 calendar days before thepublic hearing; and

(B) on the Utah Public Notice Website created in Section 63F-1-701, at least 10 calendardays before the public hearing; or

(ii) mailed at least 10 days before the public hearing to:(A) each property owner whose land is directly affected by the land use ordinance change;

and(B) each adjacent property owner within the parameters specified by county ordinance.

(3) Each notice of a public meeting under Subsection (1)(b) shall be at least 24 hours before thehearing and shall be posted:

(a) in at least three public locations within the county; or(b) on the county's official website.

(4)(a) A county shall send a courtesy notice to each owner of private real property whose property is

located entirely or partially within the proposed zoning map enactment or amendment at least10 days before the scheduled day of the public hearing.

(b) The notice shall:(i) identify with specificity each owner of record of real property that will be affected by the

proposed zoning map or map amendments;(ii) state the current zone in which the real property is located;(iii) state the proposed new zone for the real property;(iv) provide information regarding or a reference to the proposed regulations, prohibitions, and

permitted uses that the property will be subject to if the zoning map or map amendment isadopted;

(v) state that the owner of real property may no later than 10 days after the day of the firstpublic hearing file a written objection to the inclusion of the owner's property in the proposedzoning map or map amendment;

(vi) state the address where the property owner should file the protest;(vii) notify the property owner that each written objection filed with the county will be provided to

the county legislative body; and(viii) state the location, date, and time of the public hearing described in Section 17-27a-502.

(c) If a county mails notice to a property owner in accordance with Subsection (2)(c)(ii) for apublic hearing on a zoning map or map amendment, the notice required in this Subsection

From Allison Kipp

alli
Highlight
alli
Highlight
alli
Highlight
Page 21: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

Utah Code

Page 2

(4) may be included in or part of the notice described in Subsection (2)(c)(ii) rather than sentseparately.

Amended by Chapter 84, 2017 General Session

Page 22: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

Utah Code

Page 1

Effective 5/14/201917-27a-508 Applicant's entitlement to land use application approval -- Application relatingto land in a high priority transportation corridor -- County's requirements and limitations --Vesting upon submission of development plan and schedule.(1)

(a)(i) An applicant who has submitted a complete land use application, including the payment of

all application fees, is entitled to substantive review of the application under the land useregulations:

(A) in effect on the date that the application is complete; and(B) applicable to the application or to the information shown on the submitted application.

(ii) An applicant is entitled to approval of a land use application if the application conformsto the requirements of the applicable land use regulations, land use decisions, anddevelopment standards in effect when the applicant submits a complete application andpays all application fees, unless:

(A) the land use authority, on the record, formally finds that a compelling, countervailing publicinterest would be jeopardized by approving the application and specifies the compelling,countervailing public interest in writing; or

(B) in the manner provided by local ordinance and before the applicant submits theapplication, the county formally initiates proceedings to amend the county's land useregulations in a manner that would prohibit approval of the application as submitted.

(b) The county shall process an application without regard to proceedings the county initiated toamend the county's ordinances as described in Subsection (1)(a)(ii)(B) if:

(i) 180 days have passed since the county initiated the proceedings; and(ii) the proceedings have not resulted in an enactment that prohibits approval of the application

as submitted.(c) A land use application is considered submitted and complete when the applicant provides the

application in a form that complies with the requirements of applicable ordinances and paysall applicable fees.

(d) The continuing validity of an approval of a land use application is conditioned upon theapplicant proceeding after approval to implement the approval with reasonable diligence.

(e) A county may not impose on an applicant who has submitted a complete application arequirement that is not expressed:

(i) in this chapter;(ii) in a county ordinance; or(iii) in a county specification for public improvements applicable to a subdivision or development

that is in effect on the date that the applicant submits an application.(f) A county may not impose on a holder of an issued land use permit or a final, unexpired

subdivision plat a requirement that is not expressed:(i) in a land use permit;(ii) on the subdivision plat;(iii) in a document on which the land use permit or subdivision plat is based;(iv) in the written record evidencing approval of the land use permit or subdivision plat;(v) in this chapter; or(vi) in a county ordinance.

(g) Except as provided in Subsection (1)(h), a county may not withhold issuance of a certificateof occupancy or acceptance of subdivision improvements because of an applicant's failure tocomply with a requirement that is not expressed:

From Allison Kipp

alli
Highlight
alli
Highlight
Page 23: Erda Estates PUD Concept Summary and Recommendation · Erda Estates PUD Concept . Summary and Recommendation . Public Body: Tooele County Planning Commission Meeting Date: November

Utah Code

Page 2

(i) in the building permit or subdivision plat, documents on which the building permit orsubdivision plat is based, or the written record evidencing approval of the building permit orsubdivision plat; or

(ii) in this chapter or the county's ordinances.(h) A county may not unreasonably withhold issuance of a certificate of occupancy where an

applicant has met all requirements essential for the public health, public safety, and generalwelfare of the occupants, in accordance with this chapter, unless:

(i) the applicant and the county have agreed in a written document to the withholding of acertificate of occupancy; or

(ii) the applicant has not provided a financial assurance for required and uncompletedlandscaping or infrastructure improvements in accordance with an applicable ordinance thatthe legislative body adopts under this chapter.

(2) A county is bound by the terms and standards of applicable land use regulations and shallcomply with mandatory provisions of those regulations.

(3) A county may not, as a condition of land use application approval, require a person filing a landuse application to obtain documentation regarding a school district's willingness, capacity, orability to serve the development proposed in the land use application.

(4) Upon a specified public agency's submission of a development plan and schedule as requiredin Subsection 17-27a-305(8) that complies with the requirements of that subsection, thespecified public agency vests in the county's applicable land use maps, zoning map, hookupfees, impact fees, other applicable development fees, and land use regulations in effect on thedate of submission.

(5)(a) If sponsors of a referendum timely challenge a project in accordance with Subsection

20A-7-601(5)(a), the project's affected owner may rescind the project's land use approval bydelivering a written notice:

(i) to the local clerk as defined in Section 20A-7-101; and(ii) no later than seven days after the day on which a petition for a referendum is determined

sufficient under Section 20A-7-607(5).(b) Upon delivery of a written notice described in Subsection (5)(a) the following are rescinded

and are of no further force or effect:(i) the relevant land use approval; and(ii) any land use regulation enacted specifically in relation to the land use approval.

Amended by Chapter 384, 2019 General SessionAmended by Chapter 384, 2019 General Session, (Coordination Clause)