ERCOT Update to ROS NERC TPL-001-004 Sept 4, 2014
2

ERCOT Update to ROS NERC TPL-001-004 Sept 4, 2014

Dec 31, 2015

Download

Documents

Kelly Bryant

ERCOT Update to ROS NERC TPL-001-004 Sept 4, 2014. NERC TPL-001-004 implementation Jan 1, 2015. NERC TPL changes impacting Transmission Planners and Planning Coordinator (ERCOT) Implementation date Jan 1, 2015 - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ERCOT Update to ROS NERC TPL-001-004 Sept 4, 2014

ERCOT Update to ROSNERC TPL-001-004

Sept 4, 2014

Page 2: ERCOT Update to ROS NERC TPL-001-004 Sept 4, 2014

2

• NERC TPL changes impacting Transmission Planners and Planning Coordinator (ERCOT)

– Implementation date Jan 1, 2015– In general the changes modify Planning Models, Steady-State Planning Analysis,

Dynamic Planning Analysis, as well as introducing Short-Circuit Analysis, extended Outage impacts, and Spare equipment analysis

• Numerous meetings conducted over the summer among TP’s and ERCOT to determine scope, interaction, and impacts of the NERC requirements

• Consensus that most of the modeling and analysis changes should be made with modifications to existing guidelines for the SSWG, DWG, and SPWG

– Agreement that most modeling and analysis are already being performed and only incremental revisions are needed

– Some revisions will need to be promoted to a higher stakeholder level and included in Planning Guide revision

• As the Planning Coordinator, ERCOT requests support of ROS to work with the individual working groups on the necessary coordination of guide revisions to achieve readiness in the November 2014 timeframe.

– ERCOT will provide monthly updates of progress and issues to ROS though the end of the year.

NERC TPL-001-004 implementation Jan 1, 2015