CH-5325 Leibstadt | Telefon +41(0)56 267 71 11 | www.kkl.chKernkraftwerk Leibstadt AG
Michael LichtinghagenChemistry and Radiation Protection Dept.Section ChemistryNPP Leibstadt (KKL)
BWR VIPMitigation Committee Meeting Strategy Group 2016San Antonio, Texas
Date (Month-Year) Instructions Current Cycle to Date Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16
Plant Enter in Column C KKLCycle Enter in Column C 32Beginning of Cycle Enter in Column C Sep-15Month of Cycle Calculated 9 1 2 3 4 5 6 7 8 9
Update Each Time
HWC Availability, %Enter in current month and Column C for Cycle to Date 96.5 66.0 88.7 96.11 100 100 100 100 100 100
ECP
Enter number of functioning ECP probes in current month. 1 1 1 1 1 1 1 1 1 1
Enter date of last benchmark test in current month. n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a.Have any significant plant changes occurred since last benchmark test? Enter yes or no in current month. no no no no no no no no no no
Availability of 2 Secondary Parameters, %
Enter in current month and Column C for Cycle to Date 100.0 100 100 100 100 100 100 100 100 100
Secondary Parameters Used (List)
Enter in current month and Column C.
OLNC Application Plant Response; RW:
H2/O2 Conc; FW: H2/O2 Conc
OLNC Application Plant Response; RW:
H2/O2 Conc; FW: H2/O2 Conc
OLNC Application Plant Response; RW:
H2/O2 Conc; FW: H2/O2 Conc
OLNC Application Plant Response; RW:
H2/O2 Conc; FW: H2/O2 Conc
OLNC Application Plant Response; RW:
H2/O2 Conc; FW: H2/O2 Conc
OLNC Application Plant Response; RW:
H2/O2 Conc; FW: H2/O2 Conc
OLNC Application Plant Response; RW:
H2/O2 Conc; FW: H2/O2 Conc
OLNC Application Plant Response; RW:
H2/O2 Conc; FW: H2/O2 Conc
OLNC Application Plant Response; RW:
H2/O2 Conc; FW: H2/O2 Conc
OLNC Application Plant Response; RW:
H2/O2 Conc; FW: H2/O2 Conc
OLNC Catalyst Injected
If per vendor recommendation, enter yes in current month; otherwise enter no in current month. yes yes yes yes yes yes yes yes yes yes
OLNC Last Applied Enter in current month 01.05.2016 Jul 15 Jul 15 Jul 15 Dez 15 Dez 15 Feb 16 Feb 16 Apr 16 Mai 16
MMS Availability, %
Enter in current month and Column C for Cycle to Date. Enter n/a if measuring deposition on artifacts or if ECP measurement is not in MMS. 100.0 100 100 100 100 100 100 100 100 100
Mitigation PI Calculated green red red green green green green green green green
Comments Enter in current monthOil leakage on turbo
set H2 leakage Generator
Number of unplanned HWC Trips
Optional; enter in current month. Cycle to Date total is calculated. 0 0 0 0 0 0 0 0 0 0
Number of planned HWC Trips
Optional; enter in current month. Cycle to Date total is calculated. 2 1 1 0 0 0 0 0 0 0