© 2 0 1 5 – H e r v é B a r o n
The actors
Impossibled’afficherl’image.
The
COMPANY“Client”
The EPC
Contractor
The suppliers
The sub-contractors
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
3/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Conceptual evaluation
+ Pre-Project
By COMPANY
Basic Engineering
By ENGINEERING
Project Execution
by EPC CONTRACTOR
Sanction
Sanction
The phases
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
4/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Design Procurement Manufacturing Shipping
InstallationConstruction &
erectionInspection & tests Hand-over
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
5/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
The multiple sides of a Project
H um anR e s o ur c e s M an a g em
en t
Project Control
PROJECT
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
6/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Engineering Sub-Contractor
(India)
Detail Engineering (part)
Shipyard (Korea)
Hull Engineering & Fabrication
Shipyards (Singapore &
Malaysia)
Topsides Fabrication & Integration
Home office (Paris)•Project management
•Detail Engineering (part)
•Procurement
Satellite office
Detail Engineering (part)
Fabrication yard (Nigeria):Fabrication (part)
Offshore (Nigeria):Installation, commissioning, start-up
The multiple sites of a Project
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
7/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Project
Engineering Procurement Construction
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
8/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Project
Engineering Procurement Construction
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
9/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Process facilities:
Feedstock and products flow
Feedstock composition
Battery limit conditions
Equipment Spare
Performance:
Products specifications
Energy efficiency, emissions
Utilities:
Electric power supply
Other utilities
Systems:
Process control
Fire/gas alarm
Public address, LAN, PABX
Infrastructure:
Administrative and technical
buildings
Control room
Access road
Site fencing, gates, check point
Design criteria:
% of over design
Environment data:
Min/max temperature
Rain/snow fall
Wind
Geological conditions
Applicable codes and standards:
International standards
Local rules
0
5
10
15
20
25
30
35
40
45
50
-85 -80 -75 -70 -65 -60 -55
P r e s s
u r e
( b a r )
The facilities design basis
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
10/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
EngineeringDocuments for Purchase:
bill of quantity & specification
Documents for Construction:
Construction drawings &
specifications
Design basis:
- Functional
requirements
- Client
specifications
- Design codes
Engineering
in the Project
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
11/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Project
Engineering
Instruments&Control Layout& Piping Process Electrical Equipment Civil Safety
Procurement Construction
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
12/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Project
Engineering
Instruments&Control Layout& Piping Process Electrical Equipment Civil Safety
Procurement Construction
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
13/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Process simulations
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
14/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Heat & Material
balance
Thermodynamic
calculations
Process Flow
Diagram (PFD)
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
15/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Equipment list
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
16/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Equipment
duty
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
17/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
18/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Process Flow Diagram (PFD)
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
19/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Piping & Instrumentation Diagram (P&ID)
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
20/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
21/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Process control
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
22/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Emergency shut down
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
23/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Emergency relief
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
24/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Operating manual
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
25/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Project
Engineering
Instruments&
Control
Layout
& Piping Process Electrical Equipment Civil Safety
Procurement Construction
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
26/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Rotating machinery
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
27/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
28/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Heat exchangers
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
29/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Packages,
Fired Equipment
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
30/206
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
31/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Material Requisition
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
32/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
33/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Project
Engineering
Instruments&
Control
Layout
& Piping Process Electrical Equipment Civil Safety
Procurement Construction
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
34/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
HERVE Fi fi hti
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
35/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Fire fighting
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
36/206
HERVE
Fi & G d t ti l t
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
37/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Fire & Gas detection layout
HERVE Environmental Impact Assessment
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
38/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Environmental Impact Assessment
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
39/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
Project
Engineering
Instruments&
Control
Layout
& Piping Process Electrical Equipment Civil Safety
Procurement Construction
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
40/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
41/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
42/206
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
43/206
HERVE
BARON
© 2 0 1 5 – H e r v é B a r o n
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
44/206
R
BARON
© 2 0 1 5 – H e r v é B a r o n
Equipment supporting
structures
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
45/206
BARON
© 2 0 1 5 – H e r v é B a r o n
Piping supporting
structures (pipe-racks)
HERVESt t l d i
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
46/206
BARON
© 2 0 1 5 – H e r v é B a r o n
Structural design
HERVE Structural design
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
47/206
BARON
© 2 0 1 5 – H e r v é B a r o n
Structural design
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
48/206
BARON
© 2 0 1 5 – H e r v é B a r o n
Structural
drawings
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
49/206
BARON
© 2 0 1 5 – H e r v é B a r o n
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
50/206
BARON
© 2 0 1 5 – H e r v é B a r o n
Architectural drawings
Equipment layout
drawing
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
51/206
BARON
© 2 0 1 5 – H e r v é B a r o n
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
52/206
BARON
© 2 0 1 5 – H e r v é B a r o n
Project
Engineering
Instruments&
Control
Layout
& Piping Process Electrical Equipment Civil Safety
Procurement Construction
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
53/206
BARON
© 2 0 1 5 – H e r v é B a r o n
HERVE
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
54/206
BARON
© 2 0 1 5 – H e r v é B a r o n
Layout/
principles
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
55/206
HERVE
O l l l
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
56/206
BARON
© 2 0 1 5 – H e r v é B a r o n
General Plot Plan
HERVE
BARON
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
57/206
BARON
© 2 0 1 5 – H e r v é B a r o n
Piping Layoutdrawing
HERVE
BARON3D modelling
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
58/206
BARON
© 2 0 1 5 – H e r v é B a r o n
3D modelling
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
59/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
60/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
61/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
62/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
63/206
HERVE
BARON
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
64/206
BARON
© 2 0 1 5 – H e r v é B a r o n
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
65/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
66/206
HERVE
BARONIsometric drawing
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
67/206
BARON
© 2 0 1 5 – H e r v é B a r o n
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
68/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
69/206
HERVE
BARON
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
70/206
BARON
© 2 0 1 5 – H e r v é B a r o n
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
71/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
72/206
HERVE
BARONMaterial Selection
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
73/206
© 2 0 1 5 – H e r v é B a r o n
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
74/206
HERVE
BARON Material Specification
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
75/206
© 2 0 1 5 – H e r v é B a r o n
Material Specification
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
76/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
77/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
78/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
79/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
80/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
81/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
82/206
HERVE
BARON
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
83/206
© 2 0 1 5 – H e r v é B a r o n
Building detail drawing/Telecom and PAGA layout
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
84/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
85/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
86/206
HERVE
BARON
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
87/206
© 2 0 1 5 – H e r v é B a r o n
Electrical consumers list
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
88/206
HERVE
BARONElectrical distribution
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
89/206
© 2 0 1 5 – H e r v é B a r o n
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
90/206
HERVE
BARON
G t
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
91/206
© 2 0 1 5 – H e r v é B a r o n
Generators
Switchgear
Transformer
Equipment
specification
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
92/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
93/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
94/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
95/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
96/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
97/206
HERVE
BARON
Engineering work sequence
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
98/206
© 2 0 1 5 – H e r v é B a r o n
Extract from the book: ”The Oil & Gas Engineering
Guide”, Hervé Baron, Editions Technip, 2015, page 209
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
99/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
100/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
101/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
102/206
HERVE
BARON
Interested and wanting to know more on Engineering?
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
103/206
© 2 0 1 5 – H e r v é B a r o n
A unique synthesis for
the busy Projectprofessional
270 pages
300 illustrations
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
104/206
HERVE
BARON
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
105/206
© 2 0 1 5 – H e r v é B a r o n
Project
Engineering Procurement Construction
HERVE
BARON Procurement
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
106/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARON Procurement / Steps
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
107/206
© 2 0 1 5 – H e r v é B a r o n
Inquiry (Call for Tender)
Short listing
Bid analysis
Clarifications
Negotiations
Purchase Order
Expediting
Inspection
Delivery
Warranty Period
HERVE
BARON Procurement / Supplier selection criteria
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
108/206
© 2 0 1 5 – H e r v é B a r o n
Technical Compliance
Price
Qualification of supplier
Schedule
Load of workshop
References
References with final Client
Financial situation
Annual turn-over
Internal feed-back
HERVE
BARON Procurement
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
109/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARON Expediting
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
110/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARON Expediting
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
111/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARON Inspection
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
112/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARON Inspection
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
113/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARONShipping
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
114/206
© 2 0 1 5 – H e r v é B a r o n
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
115/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
116/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
117/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
118/206
HERVE
BARONPipeline
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
119/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARONPipeline
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
120/206
© 2 0 1 5 – H e r v é B a r o n
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
121/206
HERVE
BARONBuildings
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
122/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARONCivil Works
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
123/206
© 2 0 1 5 – H e r v é B a r o n
Admixtures
Sand
Aggregate
Cement
HERVE
BARONCivil Works
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
124/206
© 2 0 1 5 – H e r v é B a r o n
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
125/206
HERVE
BARONCivil Works
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
126/206
© 2 0 1 5 – H e r v é B a r o n
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
127/206
HERVE
BARONCivil Works
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
128/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARONPre-fabrication
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
129/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARONErection
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
130/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARONUnderground networks
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
131/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARONPlant erection
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
132/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARONSteel structure erection
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
133/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARONEquipment installation
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
134/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARONEquipment installation
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
135/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARONPiping Pre-fabrication
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
136/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARONPiping erection
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
137/206
© 2 0 1 5 – H e r v é B a r o n
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
138/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
139/206
HERVE
BARONElectrical equipment connection
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
140/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARONCable pulling
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
141/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARONArrangement of Technical rooms
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
142/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON
Cable connections
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
143/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON
Other Systems Field Equipment Installation
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
144/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON
Control room consoles installation
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
145/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON
Testing
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
146/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON
Handover System
Commissioning
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
147/206
© 2 0 1 5 – H e r v é B a r o n
Sub-System
Junction
Box
Instrument
Loop
Instrument
Cable
Mech Equip
Document Folder
Elect EquipCircuit
Instrument
Tag
HERVEBARON The multiple sides of a Project
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
148/206
© 2 0 1 5 – H e r v é B a r o n
H um anR e s o ur c e s M an a g em en t
Project Control
PROJECT
HERVEBARON Project Organisation
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
149/206
© 2 0 1 5 – H e r v é B a r o n
Project
Manager
Engineering
Manager
Project
Engineers
Discipline
Engineers
Process
Civil
Instrumentation
Electrical
Equipment
Procurement
Manager
Purchasers Expediters Inspectors
Site Manager
Construction
Manager
Construction
Superintendent
Construction
supervisor
Construction
superintendent
Constructionsupervisor
Project Control
Manager
Contract
Manager
Scheduling
ManagerCost Control
HERVEBARON Project procedures
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
150/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON
Project temporary facilities
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
151/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON
Project temporary facilities
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
152/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON
Project temporary facilities
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
153/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON
Project temporary facilities
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
154/206
© 2 0 1 5 – H e r v é B a r o n
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
155/206
HERVEBARON
Construction Procedures
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
156/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
157/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON
Quality Control
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
158/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON Quality Control
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
159/206
© 2 0 1 5 – H e r v é B a r o n
Slump
SamplingTemperature
HERVEBARON Quality Control
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
160/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON Cost Control
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
161/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON Insurance
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
162/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON Contracts
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
163/206
© 2 0 1 5 – H e r v é B a r o n
P.O.
Sub
P.O.
P.O.
Main Contract
Purchase
Orders
Sub-Contracts
EPC
Sub
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
164/206
HERVEBARON Contracts
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
165/206
© 2 0 1 5 – H e r v é B a r o n
E P C
HERVEBARON Contracts
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
166/206
© 2 0 1 5 – H e r v é B a r o n∑ + x%
HERVEBARON Construction contracts
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
167/206
© 2 0 1 5 – H e r v é B a r o n
Civil
HERVEBARON Construction contracts
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
168/206
© 2 0 1 5 – H e r v é B a r o n
Mechanical
HERVEBARON Construction contracts
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
169/206
© 2 0 1 5 – H e r v é B a r o n
E&I
HERVEBARON Construction contracts
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
170/206
© 2 0 1 5 – H e r v é B a r o n
GeneralContractor
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
171/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
172/206
HERVEBARON Quality Assurance (QA)
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
173/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON Quality Assurance (QA)
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
174/206
© 2 0 1 5 – H e r v é B a r o n
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
175/206
HERVEBARON
Document code
1 Installation drawings
2 Detail drawings
Document Control
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
176/206
© 2 0 1 5 – H e r v é B a r o n
Discipline code
A Instrumentation & Control
C Civil engineering
E Electrical
G Project general documents
J MechanicalK Safety
M Piping & Layout
P Processes
S Steel Structures
V Vessels – Heat exchangers
W Materials – Welding
g
3 Diagrams
4 Lists – Bill of Quantities
5 Isometrics
6 Calculation notes
7 Specifications
8 Data sheets
9 Requisitions
HERVEBARON Document Control
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
177/206
© 2 0 1 5 – H e r v é B a r o n
HERVEBARON Document Control
Client
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
178/206
© 2 0 1 5 – H e r v é B a r o n
Engineering
Documents
submitted
to client
Approval/Comments
Vendors
Documents
submissionComments
HERVEBARON Electronic Document Management System
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
179/206
© 2 0 1 5 – H e r v é B a r o n
Intranet /
Internet
Intranet /
Internet
Breakdown
structures
Projects
Interfaces
Reports
Satellite
Engineering
Center
Center 1 Sr.
Mgmt Center 2 Sr.
Mgmt
Construction
Site
Electronic Document
Management System
Engineering
documents
Vendor
documents
Correspondence
etc.
HERVE
BARON Interface Management
http://../IFP-Training/My%20Documents/perso/ptont/Local%20Settings/ERP/janus/Janus_Login.htmhttp://../IFP-Training/My%20Documents/perso/ptont/Local%20Settings/ERP/janus/Janus_Login.htmhttp://images.google.com/imgres?imgurl=www.enterasys.com/products/items/INTERFACES/INTERFACES.jpg&imgrefurl=http://www.enterasys.com/products/items/INTERFACES/&h=145&w=150&prev=/images?q=interfaces&svnum=10&hl=en&lr=&ie=UTF-8&oe=UTF-8http://images.google.com/imgres?imgurl=web.mit.edu/evolving/img/proj/infrastructure/bigphoto.jpg&imgrefurl=http://web.mit.edu/evolving/projects/infrastructure/&h=274&w=348&prev=/images?q=projects&start=40&svnum=10&hl=en&lr=&ie=UTF-8&ohttp://www.shawpipe.com/images/box1.gifhttp://../IFP-Training/My%20Documents/perso/ptont/Local%20Settings/ERP/janus/Janus_Login.htm
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
180/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARON
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
PLANT START-UP
PIPING PRE-FABRICATION & INSTALLATION X X X X X X X X X X
PIPING MATERIAL & DRAWINGS AT SITE
PROJECT SCHEDULE
MONTH
4
5
Scheduling
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
181/206
© 2 0 1 5 – H e r v é B a r o n
PIPING MATERIAL MANUFACTURING & SHIPPING X X X X X X
PURCHASE OF PIPING MATERIAL
TECHNICAL & COMMERCIAL CLARIFICATIONS X XCALL FOR TENDER FOR PIPING MATERIAL
PREPARE PIPING MATERIAL TAKE-OFF X
PIPING ROUTING STUDIES X X X
PIPING & INSTRUMENTATION DIAGRAMS (PIDs)
1
1
2 3
3
2
4 5
5
HERVE
BARON Critical path of an Oil & Gas Project
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
182/206
© 2 0 1 5 – H e r v é B a r o n
Extract from the book: ”The Oil & Gas Engineering Guide”, Hervé Baron, Editions Technip, 2015, page 225
HERVE
BARON Progress Monitoring
How would you measure
?
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
183/206
© 2 0 1 5 – H e r v é B a r o n
progress?
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
184/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
185/206
HERVE
BARON Progress Monitoring
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
186/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARON IT
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
187/206
© 2 0 1 5 – H e r v é B a r o n
15 years ago: 2D
Today: 3D
Tomorrow:
3D & data
http://../Documents%20and%20Settings/hbaron/My%20Documents/perso/teaching/Engineering/Training/IFP-Training/Information%20Management/3D%20model.wmv
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
188/206
HERVE
BARON Safety
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
189/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARON Safety
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
190/206
© 2 0 1 5 – H e r v é B a r o n
Guard Rail System with ToeBoards
Cross Bracing
Planking
Runner
Bearer
Longitudinal Brace
Post
Sill
HERVE
BARON Safety
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
191/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARON Human resources / career path
Graduate Engineer 25 years old
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
192/206
© 2 0 1 5 – H e r v é B a r o n
3-5 yrs
5 yrs
Graduate Engineer, 25 years old
5-7 yrs
40-45 yrs oldProject Manager
Engineering Manager/
Deputy Project Manager
Project Engineer
Process Engineer
Note: the career pattern shown here is a very fast track one to the PM
position... One would enjoy oneself just as well taking more time!
HERVE
BARON The Oil & Gas Engineering Guide2nd edition
Do you want to know more... Much more?
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
193/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARON The Oil & Gas Engineering Guide - 2
nd
editionTable of Contents
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
194/206
© 2 0 1 5 – H e r v é B a r o n
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
195/206
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
196/206
HERVE
BARON
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
197/206
© 2 0 1 5 – H e r v é B a r o n
Design activities are
explained, e.g., Plant
Equipment layout
HERVE
BARON
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
198/206
© 2 0 1 5 – H e r v é B a r o n
Complex activities, such asQRA, are explained
through a practical
example.
HERVE
BARON
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
199/206
© 2 0 1 5 – H e r v é B a r o n
A sample of all common
Engineering documents is
included
HERVE
BARON
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
200/206
© 2 0 1 5 – H e r v é B a r o n
Difference between
Engineering and Shop
drawings
HERVE
BARON
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
201/206
© 2 0 1 5 – H e r v é B a r o n
Understand the main
technical aspects, e.g.,
DCS vs ESD
HERVE
BARON The Oil & Gas Engineering Guide - 2
nd
editionTable of Contents
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
202/206
© 2 0 1 5 – H e r v é B a r o n
The overall process
HERVE
BARON The Oil & Gas Engineering Guide - 2
nd
editionTable of Contents
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
203/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARON The Oil & Gas Engineering Guide - 2
nd
editionTable of Contents
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
204/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARON
The Oil & Gas Engineering Guide - 2nd edition
Table of Contents
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
205/206
© 2 0 1 5 – H e r v é B a r o n
HERVE
BARON
The Oil & Gas Engineering Guide
2nd edition
Order direct from the publisher:
8/20/2019 epcprojectexecutionorientationcourse-130317031040-phpapp01
206/206
http://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.html
http://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.htmlhttp://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.htmlhttp://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.htmlhttp://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.htmlhttp://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.htmlhttp://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.html