Top Banner
EnviTec Biogas BIOGAS FROM POME AND EFB Eng. Marcello Barbato Regional Business Development - SEA
30

EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

Jun 01, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

Textfeld für Hinweise

EnviTec Biogas

BIOGAS FROM POME AND EFB

Eng. Marcello Barbato – Regional Business Development - SEA

Page 2: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

EnviTec Biogas AG – Company Profile

2

• EnviTec Biogas covers the entire value chain for the production of biogas

• Market leader in Europe

• Foundation of company in 2002 with 20 employees

• Since July 2007 listed on the Frankfurt Stock Exchange

• Headquarter and Administration in Lohne, Lower-Saxony

• Sales and Project Execution in Saerbeck, Northrhine-Westfalia

• 148,8 Mio. Euro Turnover in 2013

• Thereof abroad 45,1 Mio. Euro in 2013

• 350 employees worldwide

As of 2014-07-02

Page 3: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

EnviTec Biogas AG – Company Profile

3

Daughter companies & strategic cooperations in 14 countries

Page 4: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

EnviTec Biogas AG – Company Profile

4

Plants in Operation (as of 2013-12-31)

0.6

Page 5: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

EnviTec Biogas AG – Company Profile

5

Integrated Business Model

EnviTec Biogas AG

Construction Service Own Operating EnviTec Energy

• Biological Service

• Technical Service

• 24-Hour-Hotline

• Insurance

• Planning

• Permission

• Realization

• Commissioning

• Repowering

• Direct Marketing of

Electricity

• Purchase and Sale

of Biomethane

• Green Heat from

Biomethane CHP

• Operation and Own

Investments

• Plant Management

• Purchase of Raw

Material

• Logistic

Page 6: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

Biogas – an allrounder

6

• Process of energy generation

Preparation and pre-treatment

of feedstock

• Feedstock blending

• Crushing

• Separation of

contaminants before

inserting into the

fermenter

Page 7: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

7

EFB Pre-Treatment

Dissolver

• Multi-feed capable

• More gas out of less substrate

• More gas in less time due to shorter retention

time in

the fermenter

• Less agitator power needed due to better

consistence

• Separation of stones and external bodies

(bottom hopper)

• EnviTec Biogas Protected

Know-How

Page 8: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

8

EFB: Pre-Treatment with the EnviTec Circle Dissolver

± 500m3 of Biogas / ton of Org. DM Thanks to the Dissolver Technology

DM: 50-60 %

Page 9: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

Biogas – an allrounder

9

• Process of energy generation

Preparation and pre-treatment

of feedstock

• Recirculation from

digester

Page 10: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

Biogas – an allrounder

10

• Process of energy generation

Preparation and pre-treatment of feedstock

• Feedstock blending

• Crushing

• Separation of contaminants before inserting into

the fermenter

• Recirculation from digester

Biogas production through fermentation (system

tank)

• Wet fermentation, mesophilic process

• Fully blended system

Fermented residue storage

• Usage of fermented slurry as fertilizer

Biogas utilization

• Electricity and heat generation

• Gas upgrading

Preparation and pre-treatment

of feedstock

• Recirculation from

digester

Page 11: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

Biogas – an allrounder

11

• Process of energy generation

Preparation and pre-treatment of feedstock

• Feedstock blending

• Crushing

• Separation of contaminants before inserting into

the fermenter

• Recirculation from digester

Biogas production through fermentation (system

tank)

• Wet fermentation, mesophilic process

• Fully blended system

Fermented residue storage

• Usage of fermented slurry as fertilizer

Biogas utilization

• Electricity and heat generation

• Gas upgrading

Biogas production through

fermentation (system tank)

• Wet fermentation,

mesophilic process

• Fully blended system

Page 12: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

Biogas – an allrounder

12

• Process of energy generation

Fermented residue storage

• Usage of fermented

slurry as fertilizer

Page 13: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

Biogas – an allrounder

13

• Process of energy generation

Biogas utilization

• Electricity and heat

generation

Page 14: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

Biogas – an allrounder

14

• Process of energy generation

Biogas utilization

• Gas upgrading

Page 15: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

Biogas – an allrounder

15

• Process of energy generation

Biogas utilization

• Gas upgrading

Page 16: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

EnviThan – BIOGAS UPGRADE TO BIOMETHANE

16

Functionality of a Membrane

The gases have different penetration rates

Control variable: partial pressure ratio

Page 17: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

EnviThan – BIOGAS UPGRADE TO BIOMETHANE

17

Schematic structure

biogas-production

cooling

H2S-removal

compression cooling

condensation filtration

3-stage

Gas-separation

RTO*

biomethane injection

3 Stufen Konzept

* Regenerative thermal oxidizer

Page 18: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

HISTORY CASE

18

Gas Upgrading

Location: Köckte (Germany)

Capacity: 1,7 MWel

In operation since: September 2013

Input material: Pig and cow slurry, corn

Features:

• Production of 350 Nm³ biomethane

• 192 kWel CHP

Page 19: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

DATA

19

•100,000 ton/year FFB

•65% POME: 65,000 ton/year

•23% EFB: 23,000 ton/year

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

jan feb mar apr may june july aug sept oct nov dec

ton

Biomass seasonality

POME

EFB

Page 20: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

CNG (BIOMETHANE) PRODUCTION

20

POME: 36 Nm3biogas/ton

EFB: 208 Nm3biogas/ton

4,136,290 Nm3 CNG/year

7,143,852 Nm3biogas/year

Page 21: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

MONTHLY PRODUCTION OF CNG (BIOMETHANE)

21

-

100

200

300

400

500

600

700

jan feb mar apr may june july aug sept oct nov dec

EnviThan

m3/h

Page 22: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

BIOGAS PLANT

22

Page 23: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

BUSINESS OPPORTUNITY

23

•MAX POTENTIAL 5,500,000 Nm3 CNG/year

•ADDITIONAL 1,300,000 Nm3 CNG/year

-

200

400

600

800

jan mar may july sept nov

EnviThan

m3/h

PURCHASE 12,000 ton/year EFB

Page 24: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

References

24

Waste to energy plants

Location: Kishiwada (Osaka, Japan)

Capacity: 249 kWel

In operation since: March 2015

Input material: Waste from food

Features / Special characteristics

• Complete container solution

• Power to the public grid

• Heat utilization by the adjacent factory

Page 25: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

HISTORY CASE

25

Industrial Plants

Location: Penkun (Germany)

Capacity: 40 x 500 kWel

In operation since:

November 2007

Input material: renewable raw

material

Features:

• Synergy effect due to modular

design

• Optimization of logistic process

Page 26: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

HISTORY CASE

Agricultural Biogas Plants

Page 27: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

Location: Udine (Italy)

Capacity: 330kWel

In operation since: August 2011

Input material: Broilers manure, cow

slurry, corn waste

Features:

The heating produced by the plant is

used to warm up the chicken farm.

Reduction of ammonia content in the

residue.

HISTORY CASE

Agricultural Biogas Plants

Page 28: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

Location: Cremona (Italy)

Capacity: 250kWel

In operation since: 10-2010

Input material: Pig slurry

Features: The heating

produced by the plant is used to

warm up the pig farm.

HISTORY CASE

Agricultural Biogas Plants

Page 29: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

HISTORY CASE

29

Waste to Energy Plants

Location: Ribeauvillé (France)

Capacity: 1,4 MWel

In operation since: January 2012

Input material: Waste from

supermarkets, pig slurry

Features:

• Hygienization

• Biogas boiler

• Heat transport to swimming pool

of casino

• Heating of residential building

Page 30: EnviTec Biogas BIOGAS FROM POME AND EFB KL Day 1 PDF/15.00 Asia Pa… · EnviTec Biogas AG – Company Profile 2 •EnviTec Biogas covers the entire value chain for the production

53

148

38

208

208

208

116

169

87

165

197

142

211

226

199

30

Thank you

MARCELLO BARBATO

Regional Business Development - SEA

1603-B West Tower - Philippine Stock Exchange Center

Exchange Road, Ortigas Center, Pasig City

M: +63 915 259 7371

Skype: lumasa48

[email protected]