1 Environmental Risks of Condensate Releases - Leviathan Offshore Gas Project, Israel Independent Expert Opinion July 15, 2018 Professor Richard Steiner Oasis Earth, Anchorage, Alaska USA www.oasis-earth.com; [email protected] Contents: Page 1. Executive Summary – Findings 2 2. Introduction 10 3. Leviathan Project Summary 12 4. Condensate – General Characteristics 13 5. Leviathan Oil Spill Models 18 5.1 Drilling 19 5.2 Production/Seabed Pipelines 21 5.3 Leviathan Production Platform (LPP) 21 5.4 Ecological Impacts 22 6. Risk Assessment 24 7. Mitigation – Spill Prevention 25 7.1 Well design and control 26 7.2 Redaction 29 7.3 2011 Leviathan 2 Blowout 30 7.4 Blowout Preventers 31 7.5 Blowout Response Plan 32 7.6 Pipeline Integrity Management 33 7.7 Pipeline Leak Detection 35 7.8 Additional spill prevention measures 37 8. Selected Project Design - Platform vs. FPSO or FLNG 39 9. Condensate Spill Response 44 9.1 Oil Spill Contingency Plan (OSCP) 45 9.2 Mechanical Recovery 46 9.3 Dispersants 46 9.4 In-situ burning 48 9.5 Additional considerations 48 9.5 Vapor Emissions Above Condensate Releases 49 9.6 Spill tracking and monitoring 51 10. Marine Discharge 51 11.1 Produced Water 51 11.2 Norway and U.S. Marine Discharge Regulations 53 11.3 Emissions Monitoring and Reporting 54 11. Financial Liability 54 12. CO2 Emissions 55
73

Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

Jun 06, 2019

Download

Documents

vothien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

1

EnvironmentalRisksofCondensateReleases-LeviathanOffshoreGasProject,IsraelIndependentExpertOpinion July15,2018 ProfessorRichardSteiner OasisEarth,Anchorage,AlaskaUSAwww.oasis-earth.com;[email protected]: Page 1. ExecutiveSummary–Findings 22. Introduction 103. LeviathanProjectSummary 124. Condensate–GeneralCharacteristics 135. LeviathanOilSpillModels 18 5.1 Drilling 19 5.2 Production/SeabedPipelines 21 5.3 LeviathanProductionPlatform(LPP) 21 5.4 EcologicalImpacts 226. RiskAssessment 24 7. Mitigation–SpillPrevention 25 7.1 Welldesignandcontrol 26 7.2 Redaction 29 7.3 2011Leviathan2Blowout 30 7.4 BlowoutPreventers 31 7.5 BlowoutResponsePlan 32 7.6 PipelineIntegrityManagement 33 7.7 PipelineLeakDetection 35 7.8 Additionalspillpreventionmeasures 378. SelectedProjectDesign-Platformvs.FPSOorFLNG 399. CondensateSpillResponse 44 9.1 OilSpillContingencyPlan(OSCP) 45 9.2 MechanicalRecovery 46 9.3 Dispersants 46 9.4 In-situburning 48 9.5 Additionalconsiderations 48 9.5 VaporEmissionsAboveCondensateReleases 49 9.6 Spilltrackingandmonitoring 51 10. MarineDischarge 51 11.1 ProducedWater 51 11.2 NorwayandU.S.MarineDischargeRegulations 53 11.3 EmissionsMonitoringandReporting 54 11. FinancialLiability 5412. CO2Emissions 55

Page 2: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

2

13. SecurityRisk 5614. StakeholderEngagement 60 14.1IsraelOffshoreCitizens’AdvisoryCouncil 61 15. GovernmentRevenue-IsraelPermanentFund 6216. Conclusion 6317. References 63 i. Appendix1AuthorBiography 66ii. Appendix2HydrocarbonInfluenceontheMarineEnvironment 681. ExecutiveSummary-Findings Background

1. ItisevidentthatLeviathanproponents(industryandgovernment)havededicatedanimpressiveamountoftime,effort,andfinancialresourcesinplanninganddevelopmentoftheprojecttodate.Therevieweddocumentspresentathoroughbackgroundofthebaselineregionalenvironment,abasicdescriptionoftheproject,andreasonableassessmentofsomeoftheexpectedconstructionandoperationalimpacts.

2. ItisnotedthattheLeviathandevelopmentisconsiderablyadvancedat

present,withseveralwellshavingbeendrilledandcompleted.ThusthecommentsbelowmayhavebeenmoreusefultoprojectplannersandtheGovernmentofIsraelifprovidedearlierintheprocess.Nevertheless,thecommentsandconcernsoutlinedinthisreportremainrelevantforallaspectsoftheproject.Evenatthisstageofprojectdevelopment,itishopedthatthisreportmayhelpimprovetheenvironmentalsafetyoftheproject.

3. Thedocumentsreviewedareinsufficientuponwhichtoconcludethatthe

Leviathanprojectmeetsitssafetydeclarationsandobjectivesandbestindustrypractice.Significantly,documentsunderstatetherisksandimpactsoftheLeviathanprojectfromapotentialcatastrophicfailureofanyoftheseveralsystems-criticalprojectcomponents,andoverstateresponsecapabilities.Thedocumentsfailtoaccountforthemanywaysinwhichacomplexsystemsuchasadeepwatergasprojectcanfail,causingalowprobability/highconsequenceeventsuchasamajorgas/condensatewellblowoutorpipelinerelease.Inthepost-DeepwaterHorizonunderstandingofdeepwaterdrillingrisks,thisisunacceptable.Whileimpactsfromconstructionandnormaloperationoftheprojectmaybemoderateaspredicted,impactsofmajorfailurescouldbecatastrophic.Thesecatastrophicriskshavenotbeenadequatelyassessed.

4. TheLeviathandocumentsreviewedarepoorlyintegrated,redundant,often

inconsistent,containsignificanterrors(e.g.unitsofmeasurement),containsignificantgapsinessentialinformation,andoftenmakevagueandgeneralassertionslackingdetail.Thispoororganizationofdocumentsmakesit

Page 3: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

3

difficultforthepublictoassimilateprojectinformationandreasonablyevaluateenvironmentalimpactsandrisksoftheproject.

5. ThecurrentstatusofLeviathandevelopmentandpermittingremainsunclear

totheauthor.Theprojectschedulereportedinthe2016DrillingEIAstatesthatoffshorewelldrillingandcompletionwouldbeunderwayatthistime.Yet,thereismuchdetailonthisandotheraspectsoftheprojectthatwereunavailabletotheauthor,includinganyApplicationsforPermitstoDrill(APD).Thispresentedasignificanthandicaptoacomprehensivereviewoftheproject.

SpillModeling

6. Condensateisalight,volatile,andacutelytoxicpetroleumhydrocarbonmixturethatbehavesverydifferentlythanheaviercrudeoilwhenreleasedintothemarineenvironment.Condensatereleasesgenerallydonotformdefinablesurfaceslicks(asdocrudeoils),andthuscondensatespillsarenotamenabletotraditionalspillresponsemethodologies.Whilenotaspersistentascrudeoilwhenreleasedintotheenvironment,condensatescanpersistforwellover6monthsoncereleased.Inaddition,weatheredcondensateisknowntobeevenmoreacutelytoxicthanfreshcondensate,downtoconcentrationsaslowas0.04ppm(40ppb).

7. ThecondensatespillmodelsconductedforLeviathan(OSCARandMEDSLIK)

arerobustanduseful,butfailtomodeltrueWorstCaseDischargesfromeachprojectcomponent,ignorewatercolumnentrainment,understatepotentialimpacts,andoverstateresponsecapabilitytomitigatesuchimpacts.

8. FortheDrillingphase,MEDSLIKmodeledawellheadcondensatereleaseof

857m3(5,827bbls)/dayx30days(thisdatawasredacted,butretrievable),foratotalreleaseof25,110m3,orabout175,000barrels(bbls).Giventhehistoryofdeepwaterpetroleumblowouts,thisisclearlynotaWorstCaseDischarge.Theprojectshouldmodelablowoutatthisratecontinuingforatleasttwicethislengthoftime(60days),foranapproximatecondensatereleasevolumeof350,000bbls.

9. Bycomparison,thefailedMacondooil/gaswelldrilledbytheDeepwater

Horizonin2010intheU.S.GulfofMexico,atcomparabledepthandpressuretoLeviathan,releasedanaverageof62,000bbls/dayofoilover87days,foratotaloilreleaseof4.9millionbbls(oilequivalent).Andthe2009Montaraoil/gasplatformblowoutoffnorthwestAustralia(inonly76mwaterdepth)continuedfor74days.Accordingly,the30-daywellblowoutperiodmodeledforLeviathanisinsufficient,andshouldbeincreasedtoatleast60days.

10. FortheProduction(seabedpipeline)phase,themodeledWorstCase

Dischargewasapprox.1,220bbls–1,320(194m3)bblscondensate,based

Page 4: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

4

onthereleaseoftotalpipelineinventory,plus5minutesresponsetimetoshut-inthepipeline.ThisrepresentsanunderestimateofpotentialWorstCaseDischargevolume,andshouldberevisedupward.Thisunderestimatederivesfromtheassumptionthatapipelinefailurewillbeimmediatelydetectedandshut-inwithproperfunctioningoftheSurfaceControlledSubSurfaceValve(SCSSV)systemfromtheLeviathanProductionPlatform.However,thereisnodiscussionofacontingencyforthefailureinthissurface-controlledsystem(e.g.severedumbilicalconnection,fire/explosionontheLPP,etc.),whichcouldleadtoamuchlargerreleaseofgasandcondensatefromseabedpipelines.

11. ForthenearshoreLeviathanProductionPlatform(LPP),theOSCARmodel

assumesareleaseofonly1,000bblscondensate,whileOSCARalsomodelsaverysmallcondensaterelease(fromadroppedobject),ofonly15.9bblsofcondensateand75tonsofgas.MEDSLIKalsomodeleda100,000bblscondensatereleasefromaFloatingStorageandOffloading(FSO)tanker/facility(NOP37/HGuidelines),whichwasnotselectedforthefinalLeviathandesign.Atminimum,areleaseoftheentirestoragecapacityofapprox.5,000bblsofcondensatefromtheLPPshouldbemodeled.Bothmodelsassumeapprox.40%-50%evaporationofcondensate,withtheremainingbalancedispersinginthemarineenvironmentand/orbeachingonshorelines.BothmodelspredictsubstantialshorelinecontaminationfromaWorstCaseDischargecondensatereleaseattheLPP.

12. Surprisingly,theLeviathandocumentsdonotdiscussindetailthepotential

large-scalereleaseofnaturalgasfromfailureofsubseainfrastructure,itspotentialfate,orecologicalimpacts.Inadditiontoreleasing350,000bblsofcondensate,aWorstCaseDischargefromafaileddeepwaterwellcouldalsoreleaseperhaps100,000tonsofnaturalgasintothedeepoceanecosystemoffIsrael.Naturalgas(99%methane)isknowntobetoxictomarineorganisms,particularlyatwarmerwatertemperatures(andhighermetabolicratesinorganisms)foundoffthecoastofIsrael.Thelackofdetailedevaluationofalargegasreleaseisasignificantgapintheenvironmentalassessmentoftheproject.

13. Regardingecologicalimpactsofcondensatereleases,thedocumentsassert

that:“NoHighriskimpactswereidentifiedintheevaluationfromroutineactivitiesoraccidentalevents.”Thisisnotsupportable.Ifasmodeled,175,000bblsofcondensateisreleasedfromaLeviathandeepwaterwellfailure,spreadsover395,000km2ofcoastalocean,resultsinwaterhydrocarbonconcentrationsinexcessof300ppm,persistsformonths,andcontaminates388kmofshorelinesfromEgypttoSyriawithover88,000barrelsoftoxicweatheredcondensate;thenclearlytheecologicalimpactswouldbe“high”,not“moderate”aspredictedbytheEIAs.IfaWorstCaseDischargeoftwicethismuchorlargeroccurs,thenimpactswouldbecorrespondinglygreater.

Page 5: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

5

14. TheEIAsdonotsufficientlydiscussthepotentialforlong-termecological

impactsfromamajoroffshoregas/condensaterelease. Mitigation/SpillPrevention

15. Mitigation/spillpreventionispoorlydevelopedinthedocuments.Asthisisthemostcriticalaspectofenvironmentalriskreduction,thisneedsconsiderablymoretechnicaldetail.Forinstance,thedocumentsdonotpresentaclearplanforpreventingwellblowoutsorseabedpipelinefailure,robustwelldesignandcontrol,pipelinedesign,pipelineIntegrityManagement(IM)program,pipelineLeakDetection,personneltraining,thirdpartyservices,managementofchange,near-casualtyreportingandinvestigation,riskassessment,subcontractormanagement,andequipmentmaintenanceandsurveillance.AlthoughseveraldeepwatergaswellshavebeensuccessfullydrilledoffIsraelinrecentyearswithnoreportedmajorhydrocarbonrelease,anyofthenextwellsdrilledcouldfailcatastrophically.Priortothe2010DeepwaterHorizonoil/gasblowoutintheU.S.GulfofMexico,hundredsofdeepwaterwellshadbeendrilled,mostwithnowell-controlincident.TheLeviathandocumentsprojectatroublingsenseofcomplacencyaboutthisveryrealrisk.

16. Riskisinherentinalloffshoreoilandgasprojects,andcannotbereducedto

zero.ButasevensimplefailuresincomplexindustrialsystemssuchasLeviathancanleadtocatastrophicconsequencesfortheenvironmentandpublicsafety,thegovernmentmustrequirethatthehighestriskreductionstandardsareemployedfortheproject.ButasLeviathancommitsonlytoariskreductionstandardofAsLowAsReasonablyPracticable(ALARP),thisisprimafacieevidencethattheprojectmaynotalwaysemployBestAvailableTechniquesandTechnology(BAT),suchasininstanceswhereBATisjudgedtoocostlyorotherwisenot“reasonablypracticable.”Asexample,ProducedWaterReinjection(PWRI)iswidelyrecognizedasBAT,butwasdeclinedforLeviathanduetocost.TheLeviathanprojectmustberequiredtocommittoBATatalltimes,regardlessofcost,andemployariskreductionstandardofAsFarAsPossible(AFAP),asisbestindustrypractice,andisrequiredintheE.U.offshoredrillingrule.

17. Aconsiderableamountofsystems-criticalinformation(asreferencedabove)

issimplyredactedfromdocuments.Thisishighlyunusual,andforaprojectwithsuchpotentialconsequenceandpublicinterest,isunacceptable.

18. The2011Leviathan2blowoutismentionedbrieflyintheDrillingEIA,but

insufficientdetailisprovided.Asaresultofthislossofwellcontrolincident,thedrillrigdisconnectedfromthewell,andformationwaters/brineflowedfromthefailedwellfromMay2011–Sept.2012(16months)beforebeingplugged.Thisisanunacceptableresponsetoawellcontrolincident,and

Page 6: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

6

callsintoquestiontheveracityofmanyofthewellcontrolassertionsmadeinthedocuments.Benthicimpactsfromthisincidentreportedlycontinuedforatleastfive(5)years.ItisnotknownwhetherthisfailurewaswidelyandaccuratelyreportedtotheIsraelipublic,government,orlenders,butclearlyitshouldhavebeeninvestigatedindetail,andtransparentlyreported.

19. TheprojectdoesnotpresentaCriticalOperationsandCurtailmentPlan

(COCP),BlowoutPreventionandResponsePlan,drillingmudandcementformulations,andsafetysystems(e.g.gasalarms)ondrillingrigstobeused(whichhadyettobeidentifiedinthedocumentsreviewed).

20. WhileNoblecommitstomeetU.S.andglobalbestpracticestandards,the

documentsdonotitemizetheinternationalstandardsandregulationsthecompanycommitstomeet,whichshouldincludespecificreferencetoallthoseoftheU.S.BureauofSafetyandEnvironmentalEnforcement(BSEE),AmericanPetroleumInstitute(API),AmericanSocietyofMechanicalEngineers(AMSE),AmericanNationalStandardsInstitute(ANSI),OfficeofPipelineSafety,TransportationSecurityAdministration,andtheEuropeanUnion’sDirective2013/30/EUonSafetyofOffshoreOilandGasOperations.

21. Documentsdonotidentifywell-controlcontractorsthatwouldbecalled

upontointerveneinalossofwellcontrol.

22. Documentsdonotdetailareliefwellcontingencyplan,wherebyareliefwellwouldbedrilledfromanotherrigtointersectandbottom-killawellblowout.

23. DocumentsdonotprovideadequatedetailregardingtheSurfaceControlled

SubSurfaceValves(SCSSVs),andcontingenciesforfailureofconnectionwithsurfacecontrolsystems.

24. PipelineIntegrityManagementandLeakDetectionSystemsareinadequately

detailedinthedocuments.PetroleumcompaniesoperatinginIsraelmustberequiredtocomplywithinternationalbestpracticestandards,includingthoseoftheAmericanPetroleumInstitute(API),andtheAmericanSocietyofMechanicalEngineers(ASME).UnderU.S.regulation,aHighConsequenceArea(HCA)forpipelineoperationisdefinedasanyareawithsignificanthumanpopulation,navigablewaterways,oranenvironmentunusuallysensitivetospills.ItisrecommendedherethattheIsraeloffshoreandonshoreregionsbeconsideredaHighConsequenceArea(HCA),requiringthehighestBATstandardsforallpetroleuminfrastructure,includingwellandpipelinedesignfeatures,pipewallthickness,pipespacing,corrosionprotection,inspection,maintenance,etc.

25. TheGovernmentofIsraelshouldcommissionacomprehensivethird-party

IntegrityManagement(IM)assessmentofallexistingandplannedgasandcondensateinfrastructureinIsrael,offshoreandonshore;anditshould

Page 7: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

7

requirearigorous,continuousIMprogramforallpetroleuminfrastructure.ThisIMassessmentshouldbeconductedonallplannedoffshoregasdevelopment,includingLeviathan,AphroditeBlock12,Dalit,KarishandTanin,DanielEastandWest;andexistingdevelopmentsincludingTamar,Mari-BandNoa,HaderaDeepwaterLNGterminal,ShimshonGasField,andAphrodite/Ishai.Aswell,allonshorepetroleuminfrastructureshouldsubmittosuchacomprehensiveIMassessment.

26. ThefrequencyofunderwaterRemotelyOperatedVehicle(ROV)surveyson

seabedinfrastructureshouldbeincreasedfromannually,ascurrentlyplanned,toatleastmonthly.

27. ItisnotclearthatfireandexplosionriskontheLeviathanProduction

PlatformhasbeenadequatelyassessedandmitigatedviaFrontEndEngineeringDesign(FEED).Explosion/fireontheLPPisasignificantriskthatcouldresultincatastrophicconsequencesforhumansafetyandthenearshoreenvironment.Thismustbefurtherclarified.

Platformvs.FPSOorFLNG

28. TheoveralldesignselectedforLeviathaneliminatedoptionsforoffshoreFloatingProduction,Storage,andOffloading(FPSO),orFloatingLiquefiedNaturalGas(FLNG),inuseelsewhereintheworld,withoutadequateconsideration.AnFLNGfacility125kmoffshore,shippingLNGviashuttletankers,wouldeliminatemostnearshorerisksandimpactsinherentinthecurrentprojectdesign,whichincorporateshundredsofkmofseabedpipelinesandaplatform10kmoffshore.AndanFPSO,also125kmoffshore,evenwithseabedpipelinestransportinggastoshore,wouldalsoeliminatethesubstantialrisksposedbythenearshoreplatform.Inevaluatingalldesignoptionsfortheproject(includinganentirelyoffshoreoption),thedocumentsclaim:“Therewerenosignificantenvironmentaldifferentiatorsorshowstoppersidentifiedacrossalloftheviableoptions.”Thisiscategoricallyincorrect,astheoffshoreFPSOorFLNGoptionwouldsignificantlyreduceoreliminaterisksandimpactstothecontinentalshelfenvironmentandcoastalpublicsafety.Accordingly,thecurrentprojectshouldbesuspendedandtheFLNGorFPSOoptionreconsideredandadopted.

29. RegardingtherelativeenvironmentalbenefitofFLNGvs.onshore/near

shoreprocessing(ascurrentlyplannedinLeviathan),RoyalDutchShellstatedwithregardtoitsPreludeFLNGprojectoffthecoastofAustralia: “FLNGtechnologyofferscountriesamoreenvironmentally-sensitive waytodevelopnaturalgasresources.Preludewillhaveamuchsmaller environmentalfootprintthanland-basedLNGplants,whichrequire majorinfrastructureworks.Italsoeliminatestheneedforlongpipelines toland.”

Page 8: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

8

30. And,Energean’s2017KarishandTaninFieldDevelopmentPlanconcludesthatanFPSOoptionoffersseveraladvantagesovertheonshore/nearshoreprocessingoption,including:anFPSOminimizesworknecessaryinthefield,quickerdevelopmenttime,capitalexpenditureconsiderations,increasedopportunitiestoexport,tie-backofmultiple3rdpartyfields,reducedtechnicalrisk(e.g.hydrateformationinseabedpipelines),enhancedproductrecoveryfromfield,easeofabandonmentafterfieldisexhausted,andsignificantlyreducedenvironmentalfootprint.Evenwithseabedpipelinestransportingdrygastoshore,anFPSOisclearlyasaferoptionforthenearshoreandcoastalenvironment.NobleshouldexploreleasinganFPSOforinitialLeviathandevelopment,totie-intotheseabedpipelineinfrastructuretransportinggastoshoreandintotheINGLsystem.

31. Regardingrelativesecurityrisksofaplatformvs.FPSO/FLNGfacility,a

formerNobleEnergyofficialstatedasfollowstoa2011TelAvivconference: “Planningaterroristattackonanunprotectedoilplatformisassimple ascharteringboats,trainingdivers,andprovidingthemwiththe explosivesrequired.Optionstoreduceriskandmaximizeflexibility couldincludeusingafloatingplatformcapableofprocessinggasinto LNG.Allsecurityeffortswouldbeconcentratedatthedrilling platformandFLNGfacility,therebyreducingother,greaterrisksin naturalgasproductionandtransportation.”

SpillResponse

32. TheLeviathandocumentsoverstatethecapabilitytorespondto(contain/recover)anoffshorecondensaterelease.Itisgenerallyacceptedintheinternationalspillresponsecommunitythatthereexistsnocontainment/recoverymethodologythatwouldbeeffectiveforoffshorecondensate(ornaturalgas)releases.TheTechnicalLeadforOilSpillResponseLimited(OSRL)intheUK,whichisNoble’sTierIIIresponsecontractor,admittedthedifficultyinrespondingtocondensatespillsinareplytotheauthoronthissubject,stating:“Youarecorrectthatinthemajorityofcasesofgasorcondensatereleasesthenit’ssimplyamatterof‘Monitor&Evaluate’withnodirectintervention.”Theassumptionthatallgasandcondensatewillquicklyfloattotheseasurfaceisalsoincorrect,assomemayremainentrainedinmid-layerwatermasses(asinDeepwaterHorizon).

33. Chemicaldispersantsarenotknowntobeeffectiveinmostcondensate

releasescenarios,yettheLeviathanOilSpillContingencyPlan(OSCP)reliesondispersantapplicationasaprimaryresponsetool.Further,currentIsraelidispersantrestrictionsprohibitdispersantuseinwaterdepthslessthan20mdeep,orwithin1nauticalmileofsensitivecoastalhabitats.Thisrequirementneedstoberevisedtoprohibitdispersantuseinwaterslessthan200mdeep,orwithin10milesofshore.Theoperatorshouldberequiredtoconductlaboratorytestsoftheeffectivenessofdispersantson

Page 9: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

9

Leviathancondensate,anduntileffectivenesscanbedemonstrated,dispersantsshouldnotbeapprovedforuseonLeviathancondensatespills.

34. TheLeviathanOCSPhasinsufficientdiscussionoftransboundaryspill

responsearrangements(e.g.withLebanon,Egypt,Cyprus);in-situburningandignitionrisk;andwildliferesponseinaspill.

35. TheOCSPcontainsinadequatediscussionoftechnologiesavailableforspill

trackingandmonitoring,includingremotesensingtechnologiesandtrackingsubsurfacecontaminantplumes,anddoesnotadequatelyconsiderdispersionandsafetyissuesregardingvaporemissionsaboveacondensaterelease.

36. Thereisnodiscussionofpre-planningforconductinganenvironmental

damageassessment(NaturalResourceDamageAssessment,orNRDA)scienceprogramintheeventofamajorreleaseofgasorcondensate.

OtherSignificantIssues

37. Thereisnodiscussionofsecuringadequatefinancialliabilitycoveragefortheproject,includingenvironmentaldamageandunlimitedliabilityforgrossnegligence.Israelisapartytoseveraloftheinternationaloilpollutionliabilityregimes,butthesealoneareinsufficient.Israelshouldconsideradditionalliabilityrequirementstomotivateresponsiblecorporatebehavior.

38. IfthecurrentdesignmovesforwardwiththeLeviathanProductionPlatform

(LPP)10kmoffshore,theprojectshouldberequiredtouseeitherProducedWaterReinjection(PWRI)asBAT,ortobuildadischargepipelinefromtheLPPoffshoretoatleast500mdepth(about10kmfurtheroffshore),fromwhichtodischargeproducedwaterfurtherfromshoreandbeneaththephoticzone/thermocline,reducingimpacttothecontinentalshelfecosystem.

39. Theprojectestimateofabout19milliontonsCO2emissionsoverthe30+

yearlifetimeoftheprojectconstitutesadramaticunderestimate.Ifthetotaltheamountofnaturalgasprojectedtobeproduced(22Tcf)fromtheprojectisconsidered,totalCO2emissionsresultingfromtheprojectwouldexceed1.2billiontons.TheGovernmentofIsraelshouldestablishacarbontaxofatleast$60/tonCO2e(comparabletoNorway)onallcarbonemissions.

40. Securityriskoftheproject,particularlyfortheLPPandonshore

infrastructure,isnotsufficientlyconsidered.SecurityriskalonearguesagainsttheLPPoption,infavoroftheFLNGoption125kmoffshore.

41. TheStakeholderEngagementPlan(SEP)reliesonconventionalpassive

engagement,whichisineffective.AstheGovernmentofIsraelisbothfinancialbeneficiaryandregulatoroftheproject,ithasconflictofinterestin

Page 10: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

10

providingeffectiveoversightonitsown.Tocorrectthis,theprojectshouldberequiredtoestablishwell-funded,representativeIsraelOffshoreCitizens’AdvisoryCouncil,toauthenticallyempowerallstakeholdersinworkingwithindustryandgovernmenttoprovideoversightoftheproject.

42. TheIsraeligovernmentshouldestablishasufficienttaxandroyaltyregime

forrevenuefromitsfinitehydrocarbonresources,collectingatleast50%ofgrossrevenues,andestablishingapetroleumsavingsfundwithatleast50%ofannualgovernmentrevenuedepositedasanIsraelPermanentFund.SomegovernmenthydrocarbonrevenuesshouldbededicatedtosubsidizingarenewableenergytransitioninIsrael.

Giventheabovesubstantiveconcerns,itismyrespectfulrecommendationthattheGovernmentofIsraelsuspendpermittingfortheLeviathanproject,pendingsatisfactoryresolutionofallissuesraisedherein.Inparticular,theLeviathanprojectshouldberedesignedtoeliminatethenearshoreLeviathanProductionPlatform(LPP)andextensiveseabedpipelineinfrastructure,optinginsteadforeitheranFLNGfacilityoffshoreatthegas/condensatefield125kmoffshore,anduseofshuttletankerstodeliverLNGandcondensatetoIsraelandothermarkets;oralternatively,anFPSOattheoffshoregas/condensatefield,transportingcondensateviashuttletankersanddrygasviaseabedpipelinetoshore.WhileFPSOorFLNGoptionswouldposedifferentrisksthatmustbeaddressed,onbalanceeitherwoulddramaticallyreducenearshorerisksandimpactsoftheproject.

Clearly,themostenvironmentallyresponsibleoptionforLeviathandevelopmentisforNobletodesignandconstructanFLNGfacility.Alternatively,inordertoavoidconstructiondelays,thecompanyshouldconsiderleasinganFPSOforinitialdevelopment,andtie-intoitsseabedgaspipelinesystem(inconstruction)totransportgastoshoreandtheINGLsystem,andcondensateviatanker.NobleshouldofferitsnewlyconstructedLPPforsaletoanotheroffshoregasprojectelsewhere.

Inaddition,manysystems-criticaltechnicaldetailsarenotreported,redacted,ornotadequatelydetailedintheLeviathandocuments.Allofthismustberemediedbeforetheprojectproceeds.2. IntroductionThisIndependentExpertOpinionwascommissionedbyGuardiansoftheCoastalPlain,Citizen’sCoalitionAgainstCondensate;HomelandGuards;andZalulEnvironmentalAssociation;non-governmentalorganizationsinIsrael.ThegroupsrequestedindependenttechnicalreviewofseveralspecificaspectsoftheLeviathanOffshoreGasProjectnowindevelopmentofftheIsraelicoast,specificallyfocusingontheenvironmentalrisksofacondensatereleasefromtheproject.Theauthor

Page 11: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

11

confirmsthatneitherGuardiansoftheCoastalPlain,HomelandGuards,Zalul,oranyothergroup-government,industryorcivilsociety-assertedanyeditorialcontroloverthisindependentopinion.Thisreviewwaslimitedtothedocumentstranslatedandprovidedtotheauthor,andcompletedwithoutconductingasitevisittoIsrael.Documentsprovidedforreviewincludedthefollowing:

• SupplementalLenderInformationPackage(2016);• DrillingEIA:EnvironmentalImpactReportforProduction,Drilling,

ProductionTests,andCompletion–LeviathanField(2016);• DrillLeviathanEIAAmendment(2017);• ProductionEIA:EnvironmentalImpactAssessmentforInstallation,

OperationandMaintenanceofpipelinesandSubmarineSystemsforLeviathanFieldDevelopment;

• LeviathanProductionPlatform(LPP)EIA:TAMA37HNOP(NationalOutlinePlan),EIAOffshoreSection;

• OnshoreEIA:TAMA37HEIANOP,OnshoreSection;• RelevantAppendices6.1,6.4,6.9toaboveEIAs;• LPPEMMP:EnvironmentalManagementandMonitoringProgram

(EMMP)Civil2andMechanic1;• MarineEMMPNo.1,Appendix6.1• OPICInformationSummaryforthePublic;• LayoutandPlanningofNGInfrastructureinIsraelfromOffshoretoLand

(IsraelMOE);• RatioOilExplorationPartnershipPresentation(2014);• NobleEnergyMediterraneanLtd.(NEML)OilSpillContingencyPlan(Jan.

2018);• NOP37/HOffshoreProcessingScheme(PDI)FacilitiesDescription&

QuantificationofEmissionsandDischarges;• Leviathan4–EnvironmentalMonitoringProgramPost-DrillSurvey

(2013);• EnvironmentalImpactReportforProductionDrilling,ProductionTests,

andCompletion–LeviathanField(2016).Asofthiswriting,thecurrentstatusofprojectdevelopmentandpermittingremainsuncleartotheauthor.Theprojectschedulelistedinthe2016DrillingEIAstatesthatoffshorewelldrillingandcompletionwouldbeunderwayatthistime.TheauthorwasrecentlyinformedthatconstructionoftheLPPhasbeencompletedinHoustonTexas(USA),andtheplatformisnowawaitingtow-outtotheselectedsiteoffshoreIsrael.Aswell,apparentlyseveralofthewellshavebeendrilledandcompleted.Yet,thereismuchdetailonthisunavailabletotheauthor,suchasdetailedApplicationsforPermittoDrill(APDs).Thisinformationgappresentedasignificanthandicaptoacomprehensivereviewoftheproject.

Page 12: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

12

TheLeviathandocumentsreviewedarepoorlyintegrated,redundant,inconsistent,andcontainseveralerrors(e.g.units),makingitdifficultforthepublictoeasilyaccessthemostsignificantinformationabouttheproject.The2016SupplementalLenderInformationPackage,orothersummarydocument,shouldhavemethodicallysynthesizedandclarifiedallrisksandmitigationfortheproject,inparticularWorstCaseDischargecondensate/gasreleasesoffshore,butfailedtodoso.

Finally,whilethisreviewfocusesonthefailuresandinsufficienciesoftheLeviathandocuments,itisofferedrespectfully,andinthesincerehopethatitwillassistIsraelicivilsociety,theGovernmentofIsrael,thecompanies,andpotentiallendersbetterunderstandtherisksinvolvedintheproject,thepotentialeffectivenessofproposedriskmitigationmeasures,andcontributetoinformeddecisions.ThisreviewisofferedinrecognitionofIsrael’slaudablegoalofsecuringenergyindependence.Theauthor’sprofessionalexperienceinenvironmentalaspectsofoffshoreenergydevelopmentandoilspillsissummarizedinAppendixI.Theauthorlooksforwardtoworkingwiththepublic,government,andoperatorstomakeLeviathanassafeaspossible.3. LeviathanProjectSummaryTheLeviathanOffshoreGasprojectplanstodevelopadeepwaterhydrocarbonreservoirintheeasternMediterraneanSea125kmoffthenorthcoastofIsrael.OwnershipoftheLeviathangasfieldincludesNobleEnergyMediterraneanLimited(39.66%),RatioOilExploration(1992)LimitedPartnership(15%),DelekDrillingLimitedPartnership(22.67%),andAvnerOilExploration–LimitedPartnership(22.67%).NoblewillbetheoperatorofLeviathan.TheLeviathanprojectisoneofseveraloffshoregasprojectsoperatingorindevelopmentoffIsrael,includingTamar,Mari-BandNoa,HaderaDeepwaterLNGterminal,ShimshonGasField,Aphrodite/Ishai,AphroditeBlock12,Dalit,KarishandTanin,andDanielEastandWest.TheLeviathanprojectenvisionsproducinganestimated22trillioncubicfeet(Tcf)ofnaturalgas,39.4millionbarrels(bbls)ofcondensate,andpotentiallyseveralhundredmillionbblsofcrudeoil(beneaththegas/condensatereservoir).Thegas/condensatereservoirliesabout5,170mbeneaththeseabed,inwaterdepthsfrom1,540m–1,800m(totalmeasureddepthfromseasurfacetoreservoirofabout7,000m).Reservoirformationpressureisexpectedtobeapproximately590bar(8,557psi)withatemperatureof140°C,approachingconditionsofHighPressure/HighTemperature(HP/HT)reservoirs,thusrequiringstringentsafetymeasures.TheLeviathandevelopmentplancallsforeightinitialwells(6newand2sidetrackoffexistingtwowells,Leviathan3and4)andupto29totalwellsoverprojectlifeof30+years.TheinitialproductionwellswillbedrilledbytwoDynamically

Page 13: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

13

Positioned(DP)rigs,eithersemi-submersibleordrillship,andareexpectedtotakeatotalof556daystocomplete.Naturalgasandcondensateproductionwillflowtogetherfromtheeight(8)initialhigh-ratedeepwaterwellheads,through14”diameterinfieldflowlinestoaseabedInfieldGatheringManifoldin1,629mdepth,about10kminshorefromthewellheads.Thisseabedgatheringmanifoldwillbeconnectedbytwo(2)18”pipelines(totheDomesticSupplyModule),andone(1)20”pipeline(totheRegionalExportModule)transiting117kmtothenearshoreprocessingplatform,theLeviathanProductionPlatform(LPP)onthecontinentalshelfat87mwaterdepth,about10kmoffthecoastatDor.Two(2)6”MonoEthyleneGlycol(MEG)pipelineswillcarryMEGfromtheplatformtothedeepwaterwellheadsforcontinuoushydrate(ice-likemethanecrystals)inhibition(twoareusedforredundancyinthisproduction-criticalcomponent).ThesubseaproductionsystemwillbecontrolledfromtheLPP,viaanopenloop,multiplexedelectrohydraulicsystemconnectedthroughasingle4”umbilicallinerunningfromtheLPPtotheinfieldcontrolSubseaDistributionUnit(SDU),fromwherecontrolwillextendbyadditionalumbilicalstoremotelyoperatedvalvesatthewells.Leviathanproductionratesareexpectedtobeginat1.2billioncubicfeet(MMMscf)/dayofnaturalgas,andbetween2,500-7,630barrelsperday(bpd)ofcondensate,toexistingmarketsinIsrael,Jordan,andthePalestinianAuthority,andexpandto2.1MMMscf/dayofgaswhenadditionalmarketsmature.TheprojectalsoenvisionsthepossibilityofconnectingtheLeviathanwellstotheAphroditeBlock12gasfieldnowindevelopmentintheEEZofCyprus,about45kmtothewest,forexporttoCyprus.Afterdewatering,separation,andcondensatestabilizationattheLPP,recoverednaturalgaswillflowthrougha32”seabedpipeline,andcondensatethrougha6”seabedpipeline,toanonshorecoastalvalvestationatDor,fromwheregaswillentertheIsraelNaturalGasLine(INGL)pipelinesystem,andcondensatewillalsotransportviatheINGLandviapipelinethroughHagittorefineriesatHaifa.Alltogether,theprojectisexpectedtoinclude352.5kmofsubseaproductionpipelines,235kmofMEGsupplylines,and117.5kmofelectrohydraulicumbilicalsforsurfacecontrol(electricalandhydraulic)ofsubseaproductioninfrastructure.4. Condensate-GeneralCharacteristicsCondensates,alsocalledNaturalGasCondensates(NGCs),areacomplexmixtureofhydrocarbons(pentaneandhigherhomologues)associatedwithmanynaturalgasreservoirs.1Whileunderpressureinthegeologicreservoir,theyaregenerallyinagaseousstate.Ascondensatesareproducedalongwithnaturalgasfromthereservoirandpressuredrops,theycondenseintoaliquidphase.Thiscondensation

Page 14: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

14

generallyoccursduringproductionatthewellhead,gasprocessingplants,oringaspipelines.NGCsconsistofhydrocarbonssuchasalkanes,isoalkanes,cycloalkanes,andaromaticswithintherangeofC2–C30,mainlyfallingbetweenC5andC15(includinglowboilingpointnaphthas,suchasgasoline).Condensatesarealsoreferredtoasnaturalgasliquids(NGLs).Bycomparison,naturalgasiscomprisedlargely(99%)ofmethanegas,andcrudeoilmuchheavierfluidhydrocarbons,againdifferingbetweenreservoirsandevenatdifferentlocationswithinreservoirs.NGCsmaycontainover100differenthydrocarbons,includingbenzene,toluene,ethylene,xylene(BTEX),andpolycyclicaromatichydrocarbons(PAHs).Somearesimilartolightcrudeoilsabsentheavierasphaltenes.2Condensatesexhibithighvariabilitybetweendifferentreservoirs.APIGravityisaninversemeasureofpetroleumdensityrelativetowater--thegreatertheAPIGravity,thelessdensetheliquid.PetroleumliquidswithAPIGravitylessthan10areheavierthanseawaterandsink.PetroleumisgenerallyclassifiedastoAPIGravityasfollows:HeavyoilAPI0-20;MediumoilAPI20-40;LightoilAPI35-55;condensateAPI50-85;andLNG/CNGAPI80-90.APIGravitymeasuresforLeviathancondensatearereportedat43.2,althoughAPIGravityof34.2isusedforsomeLeviathanspillmodels.Thisisheavierthanmostcondensate.CondensatesdiscussedintheCanadaScreeningAssessmentrangedfromAPI39.9(SpecificGravity0.83)toAPI78.1(SpecificGravity0.67);viscosityrangedfrom0.41cP(centipoise–dynamicviscosity)to2.7cP;andwatersolubilityrangedfrominsolubleto74.7mg/L.3CondensateswithAPI39.9weighapproximately824kg/m3;whilethoseofAPI78.1weigh660kg/m3.Condensatescontainbetween0.15%-3.6%ofthecarcinogenbenzene,averagingabout1%,andexhibitvaryingdegreesofsolubilityandviscosity.4CompositionofLeviathancondensateisexpectedtobepredominantlyC13–C19(24.46%),Octanes(10.26%),C30+(10.07%),C11(9.93%),Heptanes(8.25%),n-Nonane(7.59%),andn-Decane(7.01%).5Condensatesaregenerallyhighlyvolatileandmoderately(andvariably)solubleinwater.TheBTEXcomponentcontributesmostofthesolubilityofcondensates,withbenzenebeinghighlysoluble(upto1,790mg/L).Solubilityofthecomplexcondensatemixtureisoftendifferentthanitisfortheindividualcomponentsalone,thusthereisasynergisticeffectonsolubility.6Condensatesareusedfordilutingheavycrudeoil,andrefineryfeedstockforgasoline,jetfuel,andotherindustrialuses.Worldproductionisnowapproximatelynine(9)millionbbls/day(bpd),andincreasingbyabout3%/yr.Whilemostcondensatespillsatseaaresmall,from1–70bbls,therehavebeenatleasttwoverylargecondensatespillsatsea:

Page 15: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

15

1.1980,JuanAntonioLavellejacollidedwithabreakwaterintheport ofArzew,Algeria,spillingareported28,000tonsofcondensate.

2.2018SanchicondensatetankerdisasterintheEastSeaoffChina (ship-to-shipcollisionandsinkingwithallhands),releasingitsentire cargoofapprox..113,000tonsofIraniancondensate–thelargestcondensate releaseinthehistoricrecord.

Unfortunately,neitheroftheselargemarinecondensatespillswassubjectedtocomprehensiveenvironmentaldamageassessment.Condensateislight,volatile,andacutelytoxic(inconcentrationslessthan1ppm).Condensatebehavesverydifferentlythancrudeoilwhenspilled,asitisnotknowntoformdistinctandvisiblesurfaceslicksaswithcrudeoilspills.Whiletheimpactontheseasurfacemaybeless,theimpactofthedissolvedorentrainedfractioninthesubsurfacewatercolumnecosystemmaybeacuteandserious.Thedissolvedanddispersedhydrocarbonplumewouldbesubmergedandnotvisibleattheseasurface.Ifthecondensateignites,muchofthehydrocarbonwilldisperseatmosphericallyasburnedparticulatesinthesmokeplume,butburnresiduemayalsosettleontheseasurfaceandpotentiallylenditselftocontainmentandrecovery.Thedissolvedorentrainedfractionofthecondensatereleasedwouldformanacutelytoxic,three-dimensionalplumethatdispersesanddiluteswithwatercurrents.Althoughtheyaregenerallylesspersistentthanheaviercrudeoilspills,condensatehydrocarbonscanpersistformonths(dependingonwater/airtemperature,dispersionrate,biodegradation,etc.).Whenreleasedattheseasurface,mostcondensatewillvolatilize(evaporateintoagaseousphasetotheatmosphere),andtheremainderwilldissolveinseawater,emulsify(generallyintounstableemulsions),adheretosuspendedparticulates,biodegrade,weather,anddispersewithwatercurrents.Thewater-solublefraction(WSF)ofcondensateissimilartolightcrudeoils,withlightpolycyclicaromatichydrocarbons(PAHs)dominant.7Mostscientificinformationonthefateandeffectsofcondensatespillsderivesfromsmallsurfacereleases.However,whencondensateisreleasedbeneaththeseasurface(suchasfromafailureintheLeviathandeepwateroffshoreproductioninfrastructure),ahigherpercentageofthecondensatewilldissolveasitdriftstowardtheseasurface.Thisisparticularlytrueifthereleaseoccursfromthedeepwaterwellheadsandpipelinesat1600-1800mdepth.SomecondensatereleasedatdepthsinvolvedintheLeviathanprojectmayevenentrainindeepwatermasses,suchasthehighersalinityLevantineIntermediateWaterbelow200m,orMediterraneanDeepWaterbelow800m,andremaininthesewatersforsometime.

Page 16: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

16

Indeepwaterreleases,whilelargedroplets(upto5mmdiameter)willrisewithinhourstotheseasurface,smalldroplets(to0.5mm)willrisemoreslowly,takinguptoadaytosurface.8AsreportedbySINTEFfordeepwater(below1000m)releases:

“Finedroplets(below100microns)maystayinthewaterforweeksoreven month(s)beforetheyeventuallyreachthesurface.However,factorslike verticalturbulencemixinginthewatercolumn,densitystratificationand crossflowswillcontributetokeepsuchfinesmalldropletssubmergedfor evenprolongedperiods(Johansenetal.,2003).”

Thisdynamicispreciselywhatoccurredwithmuchofthe400,000tonsofmethaneandsmalloildropletsreleasedalongwithoilfromthe2010DeepwaterHorizonblowoutintheU.S.GulfofMexico.9Mostofthishugevolumeofmethanedidnot,aspreviouslyexpected,reachtheseasurfaceandatmosphere,butinsteadremainedentrainedinlargesubsurfaceplumesdriftingwithmid-watercurrents.Thesesubsurfacemethaneplumesremainedintactinthewatercolumnformonths,leadingtosignificantenhancementinmethanotrophicbacterialproduction,oxygendepletion,andwasultimatelytakenupbyplanktoninmidwaterdepths.SuchaphysicaldynamicispossibleforadeepwaterLeviathanrelease,butwasnotconsideredintheEIAdocuments.Thereislittleavailableresearchregardingtheeffectofwaterpressureatthesedepthsoncondensatereleasebehavior,dissolution,orecologicaleffects.ThisrepresentsasignificantgapinpredictingecologicaleffectsofamajordeepwatercondensatereleasefromLeviathan.Regardless,itisevidentthatadeepwaterreleaseofcondensatefromtheLeviathanprojectwouldbeexpectedtocausefargreaterimpactonthepelagic(watercolumn)ecosystemthanwouldareleaseattheseasurface.Duetoitsvolatility,thepersistenceofsignificantcondensateontheseasurfaceisexpectedtobeshortterm,fromdaystoweeks.However,studieshaveshownthatspilledgasoline(acomponentof,andsurrogatefor,condensate)canhaveahalf-lifeofupto6monthsinwater.10Somecomponents,includingtheheavieraromatics,alkanes,andPAHs,haveshownhalf-livesexceeding6monthsinwaterandmorethanayearinsediments.Theseheavier,lipophiliccomponentsarealsopronetobioaccumulation.And,weatheredcondensateontheseasurfaceandshorelinewilldegrademoreslowly.Environmentalimpactsofcondensatespillscanincludelethalandsub-lethalinjuryacrossallcomponentsofamarineecosystem,includingplankton,fish,benthicinvertebrates,seabirds,andmarinemammals.Condensateisabsorbedintomarineorganismsthroughingestion,respiration,anddirectcontact(e.g.throughgilltissuesoffish).Acutetoxicityisreportedinsomemarinespeciesexposedtoconcentrationsofweatheredcondensateaslowas0.03mg/L(0.04ppm,or40ppb).11Thisisconsideredahightoxicity.Similartoxicityresultsarereportedforheavycondensatesaswell.Withsuchtoxicity,monitoringmustachievehigh

Page 17: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

17

sensitivityandanalyticprecision,yetnoanalyticdetailswereprovidedinLeviathandocuments.Water-solublefractionsofcondensatehavebeenshowntobetoxictocorallarvae,leadingtoincreasedmortality,reproductiveinjury,delayedmetamorphosis,andreducedgrowth.12Theseresultssuggestsignificantrisktoearlylifestagesoforganisms(e.g.fishlarvae,plankton,etc.)inthepelagicecosystem.Subsurfacecondensatereleases,wherevolatilizationisgreatlyreduced,wouldbeexpectedtoexertfargreatertoxicityonmarineorganismsthansurfacereleases.Ofparticularinteresthereisthatinmoststudies,weatheredcondensate(over48hours)exertedfargreatertoxicitythanfreshcondensate.13Inadditiontotheknowncarcinogenbenzeneincondensate,othercomponentsoftoxicologicalconcernincluden-hexane(neurotoxicity),toluene(ototoxicity),ethylbenzene(possiblycarcinogenic),xyleneandn-pentane.Epidemiologicalstudiesinpetroleumworkershavereportedincreasesinincidenceandmortalityfromleukemia,skincancer,kidneycancer,andlungcancerinpetroleumworkers.14Aone-dayexposuretocondensate-contaminatedsurfacewateronaranchinCalifornialedtothedeathsof30sheepovera21-dayperiod,duetoaspirationpneumonia,myocardialnecrosis,renaldamage,andmeningealedema.15Onecanbroadlyextrapolatesuchacutetoxicityifmarinemammalsandbirdsaredirectlyexposedtohighconcentrationsofcondensate.Beyondtheseacutelytoxiceffectstomarineorganisms,ecologicalimpactscanlastconsiderablylongerthantheenvironmentalpersistencetimeofcondensate.Thishasbeenproveninoilspills,suchasecologicalimpactsfromthe1989ExxonValdezoilspillpersistingtoday,almost30yearslater.16Ifamajorcondensatereleaseimpactsreproductioninlong-livedmarineanimals,forinstancemarinemammals,effectscanpersistforseveralgenerations.Itispossiblethatimpactstogeneticallydistinctpopulationsoflong-livedmarineanimals(e.g.whales),withlimitedsizeandrange,canbepermanent.ThishasbeenreportedinonekillerwhalepopulationinAlaska(AT1),thatwasheavilyimpactedbytheExxonValdezspill,andisnowexpectedtogoextinctduetothelossofallreproductivefemalesfromthesmallpopulationinthespill.17TheEnvironmentCanadasynthesissummarizescondensate(NaturalGasCondensate)ecotoxicityasfollows: “Basedontheavailableinformation,NGCscontaincomponentsthatmay persistinairandundergolong-rangeatmospherictransport.Theyalso containcomponentsthatmaypersistinsoil,waterand/orsedimentforlong periodsoftime,thusincreasingthedurationofexposuretoorganisms.NGCs arealsoexpectedtocontaincomponentsthatarehighlybioaccumulative. Studiessuggestthatmostcomponentswillnotlikelybiomagnifyinfood webs;however,thereissomeindicationthatalkylatedPAHsmight.”18

Page 18: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

18

Thus,condensatereleasesareconsideredasignificantenvironmentalrisk.5. LeviathanOilSpillModelsTwoindependentoilspillmodelingapproacheswereusedfortheLeviathanproject:1.OSCAR(OilSpillContingencyandResponse),developedbytheNorwegianNavalResearchInstitute(SINTEF),andconductedfortheLeviathanprojectbyGenesis.2.MEDSLIK,developedbytheOceanographicInstituteofCyprus,tailoredtoMediterraneanSeaconditions,conductedfortheLeviathanprojectbyDr.SteveBrennerofBarIlanUniversity.Bothmodelsappearrobustanduseful.However,theinputspillvolumesthatweremodeledshouldberevisedsignificantlyupwardforaWorstCaseDischarge(seebelow).Duetotheorganizationofthedocumentsandanalyses,itisdifficulttosummarizeandevaluatethevariousworstcasedischargeestimates.Aswell,severalunitsindocumentsareincorrect,confusingm3forbbls(e.g.condensatestorageontheLPP),oroiledshorelinemeasurementsofm3/kmform3.The2016SupplementalLenderInformationPackage(SLIP)shouldhavemethodicallysynthesized,corrected,andclarifiedallofthespillmodelingresultsfromallprojectdocuments,butfailedtodoso.Thismakesitextremelydifficultforthepublictounderstandthepotentialspillvolumesfromtheproject.Thefollowingstatement,fromtheLPPEMMP,isincorrectandmisleading(emphasisadded): “Itisimportanttoemphasizethatthedatainthetablesbelowrepresents themostextremescenarios,anddoesnottakeintoaccounttheexpected interventionoftheCompanyanditscontractorsinordertomitigatethe damage.Inpractice,theimplementationoftheCompany’semergencyplan willallowthetakingofavarietyofactionsinordertodealwiththespill, whichwillenableasignificantmitigationofitseffect.Inviewofthe platform'sproximitytothecoastline,thedepthofthewaterandtheexisting naturalreservesinthearea,mostofthespillagecollectionactivitieswill concernmechanicalmeasuresandpreparationsforthemitigationofthe damagetothecoastline,ShoreLineCleanupandAssessmentTechnique (SCAT),dependingonthecoasttype,sensitivelanduse,etc.” First,modeledspillvolumesdonotrepresent“mostextremescenarios”(seebelow).Next,theclaimthatspillresponse“willenableasignificantmitigationofitseffects,”isalsonotsupportable.Thementionof“mechanicalmeasures”forcondensateresponseisnotrealistic(seeOSCPsectionbelow).APIGravityforLeviathancondensateisreportedat43.2,althoughAPIGravityof34.2isusedforsomeLeviathanspillmodels.Thisissignificantlyheavierthancondensate,more

Page 19: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

19

appropriateformediumcrudeoils,andthususeofthisAPIgravitymayhaveskewedspilldispersionmodels.Thisshouldbeevaluated.Andthespillmodelsdonotadequatelyaccountformidwaterentrainmentofsmall(lessthan100micron)condensatedropletsfromdeepwaterinfrastructure,oradherenceofcondensatestosedimentinnearshoreandshorelineoilingsituations.5.1 DrillingTheMEDSLIKmodelassumesatotalcondensatereleaseof857m3x30days=25,110m3,with37%evaporatinginfirst2days,leaving15,819m3ontheseasurface.Thistotalreleasewouldbeapproximately170,748bbls(whichcanberoundedto170,000bbls).Themodelpredictsthatattheendof30days,44%ofthisoffshorecondensatespillwillhaveevaporated,leaving56%(95,619bbls)inthemarineenvironment.Itmustbenotedthat,whilethemodeleddieselspillvolumewasreported(8,415.3m3),themodeledvolumecondensatespillwasredactedfromtheDrillingEIA.However,thedatawasretrievable,andtheredactedcondensatereleasevolumewassetat857m3(5,827bbls)/dayx30days.Itishighlyunusualandunacceptabletoredactthismodeledreleasevolume,andraisesanumberofveryseriousconcernsregardingthetransparencyoftheproject(seeredactiondiscussionbelow).Assuminganaveragesurfaceslickthicknessof1micron–0.04micron,areaofsurfacecontaminationisestimatedfrom15,819km2to395,475km2.Ataconversionfactorof6.8bbls/m3,themodeled25,110m3releasewouldtotal170,748bbls.However,inAppendixNoftheDrillingEIA,themodeledcondensateblowoutrateisreportedtobe5,264bbls/dayx30days,totaling157,920bbls.Thereasonforthediscrepancyisunclear,butlikelyduetoaconversiondifference(fromm3tobbl).Regardless,thesetotalreleasevolumesarerelativelyclosetooneanother.ItissimilarlyunclearwhyslightlydifferentAPIgravitymeasureswereusedinvariousmodels.TheMEDSLIKmodelisrigorousandusefulinprovidingageneralunderstandingofexpectedfateforalargecondensaterelease.However,twosignificantissueswiththemodelare:

1.Themodeledvolumedischarge(857m3x30days=25,710m3)isclearly notaWorstCaseDischarge(WCD)scenario;and

2.Theassumptionthat:“Theslickisassumedtobepositivelybuoyantand risesinstantaneouslytothesurfacewhereitfloatsandisdispersedbythe currentsandthewinds,”isnotnecessarilyavalidassumption.

Itisunclearhowthe857m3/day(5,827bbls)andthe30-daytotalreleaseperiodwereselectedforthemodelingexercise.Bycomparison,theflowratefromthe

Page 20: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

20

DeepwaterHorizonblowoutintheUSGulfofMexico(fromtheMacondoreservoiratcomparabledepthandpressureasLeviathan)averaged62,000barrelsperday(bpd)over87days,foratotalreleaseofestimatedat4.9millionbbls,withsurfacecontaminationultimatelycovering180,000km2.The2009MontaraoilandgasplatformblowoutinnorthwestAustraliacontinuedfromAug.21–Nov.3,atotalof74days,atanestimatedrateof2,000bpd,foratotalreleaseof4,500m3–34,000m3(30,600bbls–231,200bbls).AndthePointThomsongas/condensatefieldonAlaska’sNorthSlopemodeleda27,000bpdx15dayscondensatespill,foratotalreleaseof405,000bbls.19Total’sElgingasandcondensateblowoutintheScottishNorthSeaisanotherexampleofahightemperature/highpressuregasblowoutthatcontinuedlongerthan30days.TheElginwellblewoutduringplugandabandonmentproceduresonMar.25,2012,releasing7millioncf/dayofmethaneintotheNorthSeaforover7weeks,untilmudandcementpumpingintoareliefwellwascompletedMay16,2012.20Theblowoutwasattributedtocorrosionofthewellcasing.Giventherelativesimilaritiesinreservoirdepthandpressure,Leviathanmodelsshouldassumethataworsecasedischarge(WCD)condensatereleasefromoneofLeviathan’sdeepwaterwellscouldcontinueforaslongas,andbeaslargeas,anyoftheseblowouts.Infact,giventhereported2011blowoutoftheexploratoryLeviathan2wellwhiledrilling,whichcontinuedfor16monthsuntilplugged,acorrespondinglylongertimeperiodforawellheadblowoutshouldbemodeled.Ataminimum,atleasttwicethereleaseperiod(60days)shouldbemodeledforaLeviathanblowout.Aswell,itmustbenotedthat16monthstoregaincontrolofafailedwellisanunacceptablelengthoftime,andthiscallsintoquestiontheeffectivenessofNobleandDelek’swellcontrolcapabilities.

Astothefateofcondensatereleasedfromadeepwaterwell,somecouldbecomeentrainedindeepormid-levelwatermasses(e.g.underthethermoclineorbelow200m)forsometimepost-release.Indeed,elsewhereinthediscussionitispredictedthatasubstantialamount-e.g.14%-wouldremaindispersed(verticallymixed)inthewatercolumn.Onthemodeledreleaseof170,000bbls,thatwouldbe23,800bbls.OnalargerWCDreleaseof350,000bbls,thiswouldbe47,600bblsofcondensateremaininginthewatercolumn.

Andthestatement:“Ingeneralthemainconcernistheamountandlocationoftheoilthatwillpotentiallyreachthecoast,”betraysanunreasonable(yetconventional)shorelineoilingbiasinsuchoilspillimpactassessments.Infact,fromanecologicalstandpoint,thegreatestconcernfromalargeoffshorecondensatereleaseisfortheoffshorepelagicecosystem,nottheshoreline.TheEasternMediterraneancontinentalshelfecosystemisauniqueandfragilebiologicalsystemthatcouldbeseriouslyimpactedbysuchamajorpollutionevent.

TheMEDSLIKmodelprojectsthat15.8%oftheoffshoresurfacecontaminationfromtheDrillingcondensatespillwillreachshore,contaminating388kmofshoreline,

Page 21: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

21

withupto941bbls/kmofshoreline,fromtheshoresofEgypttoSyria.Butagainadiscrepancyisthatinoneplacethemodelprojects2,000m3onshore,yetTable4-8intheDrillingEIAprojects13,000m3onshore.[Note:Table4-8actuallystates13,000m3/kmtoreachshore,whichseemstobeanerrorinunits].Importantly,theMEDSLIKmodelforthedrillingcondensatereleaseprojectsonly44%ofthecondensatebeingevaporatedattheendof30days.Thus,56%wouldremaininthemarineenvironmentforaconsiderablylongerperiod.Andgiventhediscussionaboveregardingreportsthatweatheredcondensateisfarmoretoxicthanfreshcondensate,thisrepresentsasignificantgapintheeffectsanalysis.Givenalloftheabovepoints,itisrecommendedherethattheprojectmodela350,000bblcondensatereleaseduringLeviathanoffshoredrilling,twicethatincurrentmodels.

5.2 Production(subseapipeline,wellheadstoLPP)FortheProduction(seabedpipeline)phase,themodeledWorstCaseDischargewasapproximately1,220bbls–1,320(194m3)bbls,basedontotalpipelineinventory+5minutestoshut-inthepipeline.ThisrepresentsasignificantunderestimateofpotentialWorstCaseDischargevolume,andshouldberevisedupward.Thisunderestimatederivesfromtheassumptionthatafailedpipelinewillbedetectedandpromptlyshut-inwithproperfunctioningoftheSurfaceControlledSubSurfaceValve(SCSSV)systemfromtheLeviathanProductionPlatform.Upondetection,operatorswouldclosetheInfieldGatheringManifold(IGM),relevantsubsurfaceisolationvalves(SSIV),andthetopsidesafetyvalvesattherisertie-inpoint.Thescenarioassumescompletepipelineisolationin2minutesor5minutes.Thisignoresotherpipelinefailurescenarios,includingafailureindetectionsensorsystemsorlostconnectivitywithinthesystem.Allofsuchisarealpossibilitythatmustbeevaluatedandmitigated.Again,themodeledscenarioassumesthegaswillallrisetothesurfaceandevaporatetotheatmosphere.“…thegaswilleventuallyleavethewatercolumnandentertheatmosphere”(p.16D).ButasintheDeepwaterHorizonrelease,thismaynotbethecase.Smalldropletsofcondensate/gasmixture(lessthan100microns)canremaininthewatercolumnforweeksormonths.ThespillscenariomodeledfortheProductionphasedramaticallyunderstatesthepotentialreleaseofgasand/orcondensatefromacatastrophicseabedpipelinefailure.

5.3 LeviathanProductionPlatform(LPP)DifferentdischargescenariosareusedbythetwomodelsforcondensatespillsfromtheLPP.TheOSCARmodelusesa1,000bblspill,andMEDSLIKusesa100,000bblspillfromapotentialFSO(FloatingStorageandOffloading)tanker/facilityassociatedwithaplatform(NOP37/H–Guidelines).However,theWorstCase

Page 22: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

22

DischargefromacondensatetankfailureontheLPPwouldbefivetimeslargerthanthe1,000bblsmodeled.InaMay5,2018letter,MoEPstatedasfollows: “Thetotalamountofcondensateexpectedtobestoredintheplatformand pipelinestotheshorewillnotexceed5300barrels(850m3).”21Thus,althoughtheFSOcondensatestorageoptionwasnotselectedinthefinalLPPdesign,thelossof5300bblsofcondensatefromatankfailureontheLPPrepresentsaWorstCaseDischargeandshouldbemodeled.Elsewhere,OSCARmodelsaverysmallcondensaterelease,only15.9bblsand75tonsofgas(ChapterD,p14).Thisisbasedonatotalreleasetimeofonly3minutes,includingonly2minutestoactivatethesubsurfaceisolationvalve(SSIV)closingthesystem.ThesolescenarioconsideredwasadroppedobjectfromtheLPPrupturingasegmentdownstreamoftheSSIVs(subsurfaceisolationvalves),whichwouldclose“uponpositivedetectionofalossofcontainment,”andisolatethepipeline.Bothmodelsassumesignificant(50%)evaporationwithin24hours,andbothestimatesignificantshorelinecontaminationbetweenAtlitandHaifa.Inthevariousscenarios,condensatecontaminationisprojectedtoreachshorefrom18hourstoseveraldaysafterrelease.ShorelinecondensateinOSCARmodelfromLPPmaximumis32tons,whichisreportedtobe24%ofthespill.OSCARprojectswatercolumnhydrocarbonconcentrationsbetween300ppm-400ppm,whichgiventoxicityreportscitedinabovesections,isconsideredacutelytoxictomarineorganisms.5.4 EcologicalImpacts

Regardingecologicalimpactsexpectedfromcondensatespills,agoodsummary(althoughgeneral)isfoundinSection4.8.6intheTAMAoffshoreEIA.ThissummaryisattachedinApp.1(verbatim,withoutcitations),inordertomaketheinformationmoreeasilyaccessibletothegeneralpublic.

However,itisclearthatthestatementinthedocumentsthat:“NoHighriskimpactswereidentifiedintheevaluationfromroutineactivitiesoraccidentalevents,”isnotsupportable.

Forinstance,theDrillingEIAstates(p.13,emphasisadded):

“Bothoftheaccidentalspillscenarios(afuelspillandacondensatespillfrom ablowout)wereevaluatedashavingseveralModerateimpacts.Forthefuel spill,potentialimpactsonseabirdsandmigratorybirdsaswellascoastal habitatsandinfrastructurewereratedasModerate.Forthecondensatespill, potentialimpactsonmarinemammals,seaturtles,fishes,seabirdsand migratorybirds,fishingactivitiesandmarinefarming,andcoastalhabitats

Page 23: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

23

andinfrastructurewereratedasModerate.Thecondensatespillhasthe potentialforgreaterconsequencesbecauseoftheextendedtimeperiod(30 days)forthespilleventandthegreatervolumesofoilpotentiallyreaching theshoreline.”

However,if170,000bblsofcondensatearereleasedfromaLeviathandeepwaterwellorpipelinefailure,spreadsover395,000km2ofcoastalocean,resultsinwaterhydrocarbonconcentrationsinexcessof300ppm,persistsformonths,andcontaminates388kmofshorelinesfromEgypttoSyriawithover88,000barrelsoftoxicweatheredcondensate,thenclearlyecologicalimpactswouldbehigh.Inparticularifalargerworst-casereleaseisconsidered,ecologicalimpactsshouldbeconsidered“high.”UnderstatementofpotentialspillimpactsforLeviathanderivesfromtheconventionalindustrytendencytofocusalmostexclusivelyonshorelineimpacts,whileinmanyoftheLeviathanspillscenarios,mostoftheimpactwillbetooffshorepelagicecosystems.Risktable4.9intheDrillingEIA(p.210-211)shouldbeadjustedaccordingly.TheLeviathanenvironmentalimpactassessmentsdonotadequatelydetailthebiologicaluniquenessofthedeep-seaecosystemsoftheLevantSea,whichisdescribedasfollows: “…auniqueanddelicatemarineecosystem,whoserichbiological communitieshostrarespeciesofdeep-seasponges,worms,molluscsand coldwatercorals–someofwhicharethousandsofyearsold.”22

AlthoughtheconventionalviewofthedeepsearegionoftheLevantSeaisofarelativelynon-diverse,simplebioticassemblage,morerecentstudiesreportarichanddiversedeepseafauna,with60speciesoffish,crustaceans,andmollusksnewlyrecordedintheregion,andseveralspeciesnewtoscience.23TheLeviathandocumentsdonotprovidesufficientdetailregardingthisuniquedeepseaecosystem,andinparticularpotentialimpactsoftheproject.Inaddition,thereislittlediscussionoftheimpactsofamajornaturalgas(largelymethane)releaseinthedocuments.Thisisasignificantgapintheassessmentofenvironmentalimpacts.Asreportedinthe2010DeepwaterHorizonwellheadblowout,up40%ofthereleasevolumewasmethane.Thisreleasebehavedinunexpectedways,remainingentrainedinmidwaterpelagicecosystemformonths,leadingtoenhancedmicrobialpopulationsandextensiveanoxicconditionsintheGulf.Thepotentialenvironmentalimpactsofalarge-scalegasreleasefromLeviathanneedtobemoreextensivelyassessedandreportedtothepublic.Naturalgas(methane)isknowntobetoxictomarineorganisms,particularlysoathigherwatertemperaturesoffthecoastofIsrael.Finally,ifextensiveshorelinecontaminationoccursasaresultofalargecondensaterelease,someofthetoxicweatheredcondensatewilladheretobeachsediment(sand,silt,etc.),andsomewillthentransportbackoffshorewithtidalmixingand

Page 24: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

24

nearshorecurrents.Thiswillcontaminatenearshorebenthiccommunities.Thispotentialimpactwasnotdiscussed,andshouldbe.

6. RiskAssessmentSomequantitativeriskassessmentforvariousprojectcomponentsisreportedinthedocuments,butitisunclearthatarigorous,independent,integratedriskassessmenthasbeenconducted.Theindependentriskassessmentshouldmethodicallyandquantitativelyevaluateallrisksandpotentialconsequencesderivingfromtheproject,includingcommon-causefailuresandextraordinary,catastrophiccasualties.Generally,probabilisticriskassessmentsunderstatetheriskofcatastrophicfailure,leadtolessthanBestAvailableTechniques/Technology(BAT)systemsdesign,andpromotedangerouscomplacencyingovernmentandindustry.Inarealsense,iftheriskofacatastrophiceventisnotzero,itshouldbeconsideredtobe100%--thattheeventwillhappen,soonerorlater.AsLeviathanproductionisexpectedtocontinuefor30+years,thechanceforamajorpollutiondisasterissignificant.Thisisthebestframeworkwithwhichtoevaluateandreduceallpossiblerisk.

Evencompetentriskmanagersgenerallydoapoorjobatassessingandmanagingriskincomplexsystems.AnexampleistheNASASpaceShuttleprogramintheU.S.Afterthe1986Challengerdisaster(causedbyaverysimplemalfunctionofthefueltankgasket“O”ring),manytechnicalinquirieswereconducted,andNASAconcludedthatallriskshadbeenidentifiedandremedied,andthenrestartedtheprogram.Then,the2003Columbiadisasteroccurred,causedbyanotherverysimpleproblemthatwasnotanticipatedbytheengineeringanalysesonChallengerandriskassessments(asmallpieceofthegantrybrokeoffduringliftoff,piercedtheforwardedgeofawing,exposingtheareatoexcessiveheatonreentry,andtheshuttleexploded).Thepointhereisthateveninthemosthighlyengineered,sophisticated,complexsystems,wemakelowprobability/highconsequencemistakes.ThepeopleofIsraelshouldexpectandplanforsuchwiththeLeviathandevelopment,andrigorouslyanalyzeandmitigateallsuchrisks.

Leviathanplanningdocumentsdonotsufficientlyenvisionandplanforcatastrophicfailure,whichtheydoonlysuperficially.Tothecontrary,theLeviathandocumentsassumesuccess.Thisattitudeleadstodangerouscomplacencyandlackofvigilance.

Historyisfullofthetragicconsequencesofsuchcomplacencyandarrogance.Forinstance,seekingapprovaltobuildthe800-mileTransAlaska(oil)pipelineandmarineterminalintheearly1970s,politiciansassuredtheAmericanpublicthat“notonedrop”ofoilwouldeverbespilledintocoastalwatersofAlaska,asbestavailabletechnologywouldbeusedtopreventsuch.Butaftersecuringtheright-of-waytobuildthepipeline,thepromiseofbestavailabletechnologywasabandoned.TwelveyearsaftertheopeningoftheAlaskapipelineandterminal,thefullyloadedExxonValdezgroundedonawell-markedreef,spillinghundredsofthousandsof

Page 25: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

25

barrelsoftoxicoilintothepristinecoastalecosystemofPrinceWilliamSound.Theenvironmentalinjurycontinuestothisday.

Just5monthspriortotheDeepwaterHorizondisasterintheU.S.GulfofMexico,representativesoftheU.S.oilindustryandgovernmentregulators,intestimonytoaU.S.SenatehearingregardingtheAugust2009MontaraoffshoreplatformblowoutintheWestTimorSea(NWAustralia),assuredtheU.S.CongressthatoffshoredrillingintheGulfofMexicowasperfectlysafe,andtheregulatoryprocesswassufficienttopreventsuchdisastersintheU.S.

Andjustthreeweeksbeforethe2010DeepwaterHorizondisaster,thenU.S.PresidentBarackObamaopenedlargeareasoftheU.S.OuterContinentalShelf(OCS)tooilandgasdrilling,assuringtheAmericanpublicthat:“Oilrigstodaygenerallydonotcausespills.Theyaretechnologicallyveryadvanced.”

Thisverysamedangerouscomplacency,hubris,andrisktoleranceisevidenttodayinLeviathanplanning.

7. Mitigation-SpillPrevention

Asdiscussedbelow,itmustbehonestlyadmittedbyprojectproponentsandtheGovernmentofIsraelthatthereisnorealisticpossibilityofeffectivelycontainingorrecoveringacondensateornaturalgasreleaseatsea.Oncereleased,theenvironmentaldamagefromnaturalgasand/orcondensatewilloccur,irrespectiveofanyresponseeffort.Thus,mitigationoftheseimpactsmustfocusonpreventionofreleases.

Regardingriskofcatastrophicfailureofprojectcomponentsand/oracatastrophicenvironmentalreleaseofhydrocarbons,riskneedstobemethodicallyassessed.Onthis,thedocumentsreviewedsimplydonotprovideenoughdetailtoconfirmthecompany’ssafetyassurances.Ingeneral,thedocumentsoverstatethepotentialeffectivenessoftheproject’sriskmitigationandresponseplans,anditsclaimsregardingriskmitigationarequalitative,vague,andunsubstantiated.

Forinstance,thedocumentsdonotpresentaclearwellblowoutorpipelinespillpreventionplan-justgeneralassurances-includingleakdetection,welldesignandcontrol,pipelinedesign,personneltraining,thirdpartyservices,managementofchange,near-casualtyreportingandinvestigation,riskassessment,andequipmentmaintenanceandsurveillance.ThereisnodiscussionofanOperationsIntegrityManagementSystem(OIMS).

AlthoughseveraldeepwatergaswellshavebeendrilledsuccessfullyinrecentyearsofftheIsraelcoastwithnomajorreportedhydrocarbonrelease,suchacatastrophicfailurecouldoccuronanyofthewellstobedrilledinthefuture.Itshouldbenotedthatpriortothe2010DeepwaterHorizonblowoutintheU.S.GulfofMexico,hundredsofsuchwellshadbeendrilled,mostwithfewlossofwell-controlincidents.Thelessonhereisthatthepastdoesnotalwaysaccuratelypredictthefutureinthis

Page 26: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

26

regard.TheLeviathandocumentsprojectasenseofcomplacencyabouttheveryrealriskofacatastrophichydrocarbonrelease.

TheDrillingEIAsimplystates:

“Bestindustrypracticewillbeusedduringalldrillingphases.Aftereach newwellisdrilled,itwillbetemporarilyabandonedandsecuredwith multiplebarrierspendingcompletionoperationsbytheseconddrillingrig. TemporaryabandonmentwillbeconductedinaccordancewithMNIEWR guidelines.“

Obviously,thisisinsufficientwithwhichtojudgetherigoroftheproject’ssafetyandspillpreventionsystems(Seebelow).

7.1 Welldesignandcontrol

Theprojectdocumentationneedstorecognize,detail,andconfirmtheprojectwillmeettheincreasedsafetystandardsimposedintheU.S.afterthe2010DeepwaterHorizondisaster.24Inparticular,theprojectdocumentsmustdiscusstheU.S.BureauofSafetyandEnvironmentalEnforcement(BSEE)FinalRule(30CFRPart250)publishedonAugust10,2012:OilandGasandSulphurOperationsontheOuterContinentalShelf–IncreasedSafetyMeasuresforEnergyDevelopmentontheOuterContinentalShelf.ThisoffshoreDrillingSafetyRuleintheU.S.,establishednewcasinginstallationrequirements,newcementingrequirements,requiresindependentthird-partyverificationofblindshearram(BSR)capabilityandsubseaBOPstackcompatibility,requiresnewcasingandcementingintegritytests,establishesnewrequirementsforsubseasecondaryBOPintervention,requiresfunctiontestingforsubseasecondaryBOPintervention,requiresdocumentationforBOPinspectionsandmaintenance,requiresaRegisteredProfessionalEngineertocertifycasingandcementingrequirements,andestablishesnewrequirementsforspecificwellcontroltrainingtoincludedeepwateroperations.

ThedocumentsdonotpresentaCriticalOperationsandCurtailmentPlan(COCP),formovingarigofflocationduringanemergencysituation,asisrequiredintheU.S.TheCOCPneedstodetailspecificproceduresforrespondingtosuchthingsasadverseweather;unavailabilityofequipment,materials,orpersonnel;orwellcontrolissues.TheCOCPneedstoidentifyplannedandunplannedcriticaloperations,suchasdrillingintoazonecapableofflowingoilorgas,coring,pullingoutofthehole,wirelogging,runningcasing,circulating,cementing,attemptingtoretrievelostitemsinthewell,open-holesidetracking,drillingintoalostcirculationzone,remedialwellwork,anchorlinetensioning,refueling,oraccidentalriserdisconnect.TheCOCPmustidentifytheamountoftimeexpectedtosecurethedrillingoperation,includingtime(inhours)necessarytodisconnecttheLowerMarineRiserPackage(LMRP)fromtheBOPandtemporarilyabandonthewell,andtomoveoffthesite.AndtheCOCPmustclearlyestablishadrillingcurtailmentdecisionprocess,aswellastrainingofkeypersonnelinthisprocess.

Page 27: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

27

Again,asnotedabove,theLeviathanplanningdocumentsdonotsufficientlyenvisionandplanforcatastrophicfailure,whichtheydoonlysuperficially.Tothecontrary,thedocumentsassumesuccess.Thisattitudeleadstodangerouscomplacencyandlackofvigilance.

Infact,projectdocumentsconfirmthataninadequateriskreductionstandardwouldbeusedfortheproject.WhiledocumentsrecitetheintentiontoemployBestAvailableTechniquesandTechnology(BAT),alsocalledBestAvailable&SafestTechnology(asrequiredinU.S.regulation),itiscleartheLeviathanprojectdoesnotintendtomeetaBATstandard.Tothecontrary,thedocumentsstatethattheoperatorwillemployariskreductionstandardofAsLowAsReasonablyPracticable(ALARP).AnALARPstandardimpliesthatnotallBestAvailableTechniquesandTechnologyriskreductionmeasureswillbeincorporatedintotheproject,particularlyif,atthediscretionofthecompany,theyaredeemedtoocostly,toodifficult,tootime-consuming,orotherwise“notreasonablypracticable.”Inessence,ALARPisnotBAT/BEP.IfBATisrequired,thenALARPisinsufficient.ThisisaveryimportantpointthattheGovernmentofIsraelneedstoclarify.

GiventhesensitivityofenvironmentalandsocialresourcesinIsrael,theregionshouldclearlybeconsideredaHighConsequenceArea(HCA)forpetroleumdevelopment(asdefinedinAPIstandards),therebyrequiringenhanceddesignandoperationalstandardstoreduceriskwithBATtoAsLowAsPossible(“ALAP”).AHighConsequenceAreaisgenerallyconsideredtoincludeinfrastructurethroughpopulationareas,drinkingwatersources,andhighlysensitiveenvironments.Theseareasofinfrastructurethenreceivegreatersafetydesignstandards.ItisclearthattheseenhanceddesignstandardsareindeedbestAvailableTechnology(BAT),anditisrecommendedherethatsuchBATbeemployedonallcomponentsofLeviathan.Additionally,Directive2013/30/EUonSafetyofOffshoreOilandGasOperationssimilarlyrequiresrisktobereducedtoAsFarAsPossible.25TheLeviathanprojectshouldbeheldtothisstandard.

Thedocumentsomitreferenceto,orcommitmenttocomplywith,importantAmericanPetroleumInstitute(API)Standards,including,butnotlimitedto,thefollowing:APIStandard53:BlowoutPreventionEquipmentSystemsforDrillingWells;APIRecommendedPractice(RP)65Part2:IsolatingPotentialFlowZonesDuringWellConstruction,addressingbestpracticesforcementing;APISpec16A:SpecificationforDrill-ThroughEquipment;APISpec16D:SpecificationforControlSystemsforDrillingWellControlEquipmentandControlSystemsforDiverterEquipment;APISpec17D:SpecificationforSubseaWellheadandChristmasTreeEquipment;APIRP17H;ISO13628-8:RemotelyOperatedVehicle(ROV)InterfacesonSubseaProductionSystems;andAPIRP75:DevelopmentofaSafetyandEnvironmentalManagementProgramforOffshoreOperationsandFacilities.ManyoftheseareincorporatedbyreferenceintotheU.S.offshoreDrillingSafetyRule(BSEE,2012),withwhichNoblecommitstomeet.

Page 28: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

28

AlthoughtheEIAsasserttheprojectwillmeetU.S.BSEEstandards,theydonotcitetheDirective2013/30/EUonSafetyofOffshoreOilandGasOperations.26IftheLeviathanprojectistomeetglobalindustrybestpracticeandBATstandards(whichitshould),itshouldciteandcommittomeettherelevant2013EUOffshoreDrillingDirectiveaswellasallrequirementsoftheU.S.BureauofSafetyandEnvironmentalEnforcement(BSEE),AmericanPetroleumInstitute(API),AmericanSocietyofMechanicalEngineers(AMSE),AmericanNationalStandardsInstitute(ANSI),andotherbestglobalbestpracticestandardsasappropriate. ThedocumentsdonotpresentevidencethatarobustwellintegrityRiskAssessmentforspecificwelldesignshasbeenconducted,orthatsuchwillbeconductedpriortodrilling,asrequiredbyDirective2013/30/EUonSafetyofOffshoreOilandGasOperations.ThewellintegrityRiskAssessmentsshouldfocusparticularattentionontheexpecteddifferencebetweenporepressureandfracturegradientofsurroundingrockstrata.

Thedocumentsdonotprovidesufficientdetailregardingexpectedreservoircharacteristics.Thegeologyoftheproposedwellsitesislargelyredacted.Computersimulationsandhydraulicmodelingcanaccuratelypredictthedownholepressuresthatmaybeencountered.ThedocumentsneedtopresentthepredictedMaximumAnticipatedSurfacePressure(MASP)forthewells,andMaximumAnticipatedWellheadPressures(MAWHP).

Drillingmudengineeringisacriticalelementofasafedrillingprogram,particularlyfordeepwaterwells.Precisecalibrationofmud(weight,viscosity,etc.)mustbeidentifiedthatwillmaintainwellcontrol.Ifthemudweightistoohigh,thesurroundingformationmayfracture,leadingtoalossreturneventandpotentiallyaninfluxofhydrocarbonsintothewell.Ifthemudweightistoolow,thenthewellisinanunderbalancedcondition,alsoconducivetoflowintothewellandawellheadblowout. DrillingmudpropertiesthatarenotreportedfortheproposeddeepwaterLeviathanwellsincludeviscosity,yieldstressandgels,compressibility,gassolubility,stabilitytocontaminantsandaging,weighting,mudformulation,applicationandcontrol,mudadditives(e.g.particlesizeofbaritetobeused),compressibility,andpressure-volume-temperature(PVT)analysis.Thisshouldincludeadiscussionofcontrolofimpurities,suchasclay,carbonate,iron,etc.,thatmaycompromisemudintegrityorfunction.

Thedocumentsomitdetailsforthecementandcementingprocedurestobeused.Thisisasafety-criticalelementthatmustbediscussedindetail.Itiswellknownthatcementingproblems,includingtheannulusbetweencasingsandthesurroundingrockformationandthecementplugsinthewellbore,constituteoneofmostsignificantriskfactorsforblowouts.Particularlyindeepwaterwells,cementformulationandapplicationisanextremelyimportant,safety-criticalaspect.Theprojectmustcite,andcommittocomplywith,enhancedcementingrequirementsinthenewoffshoredrillingsafetyruleintheU.S.

Page 29: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

29

Thedocumentsdonotidentifyarigorousprocessfordecidingandconfirmingcementspecifications,andthetestingprocedureforcementslurryformulation,includingtestingprocedurespriortoapplication.

AnimportantconclusionreachedregardingtheDeepwaterHorizonblowoutwasthat:“Thefailuretoproperlyconductandinterpretthenegative-pressuretestwasamajorcontributingfactortotheblowout.”27Onthis,theLeviathandocumentsdonotdetailthepressureteststhatwillbeperformedpriortomuddisplacementandabandonment.Inparticular,thenegativepressuretestisacriticalproceduretotestintegrityofcementedfinalcasingstringorliner,wheremudisremovedfromthewellbore,replacedwithlessdenseseawater,todetermineifpressureincreasesinwellborethatmightindicateadangerousflowofhydrocarbonsintothewell.Thisprocedureneedstobediscussedindetail.

Thedocumentsdonotdiscussthespecificprocedureandguidelinesthatwillbeusedtomonitorkicks(short-termpressuredhydrocarbonreleases)fromwells.Theyneedtodetailakickmonitoringsystem(e.g.KickAlertStatus),withsuccessivelevelsofalert,andproceduresforrespondingtosuchalerts.Earlydetectionofflowiscritical.ItshouldbenotedthattheinfluxofhydrocarbonsintotheMacondowellontheDeepwaterHorizonwasnotdetecteduntil50minutesafterflowhadstarted,renderingwellcontrolmoredifficult.

Inaddition,bothMeasurementWhileDrilling(MWD)andLoggingWhileDrilling(LWD)toolsintheBottomHoleAssembly(BHA)arediscussed,butnofinaldeterminationhadbeenmadeatthetimeofEIApublication.Itisimportanttodetailhowoperatorswillcollectandanalyzerealtimedrilldata,andthecontingencyplanifwelldatatransmissionislost.

7.2 Redaction

AseriousconcernintheLeviathandocumentsisthatmostofthesystems-criticaldetails,includingthoseforwelldesignandcontrol,aresimplyredacted/withheld.Thisextensiveredactioninsystems-criticalinformationisclearlyunacceptable.

Section4.3.5oftheDrillingEIAgenerallystates:

“Mitigationforaccidentalspillsincludesbothspillpreventionandresponse measures.NobleEnergywillusesafedrillingpracticesduringitsactivitiesin theLeviathanFieldtoreducethelikelihoodofanaccidentalspill.Best industrypracticewillbeusedduringalldrillingphases(e.g.,settingofBOP; cementingofconcretebetweenboreandprotectivepipe).DetailedBOP specificationsareprovidedinSection3.2.5.Thedetailedcasingdesignand testingaredescribedinSection3.2.6.Inaddition,oncethedrillingrigtobe usedhasbeenidentified,NobleEnergyandthedrillingrig’sownerwill engageinacomprehensiveinspectionandtestingoftherig’ssubseaBOP systemtoensurecompliancewiththeU.S.BSEEregulations.Theinspection andtestingwillbewitnessedandcertifiedbyathird-partysurveyor.Noble

Page 30: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

30

EnergyhascommittedtooperatinginIsraelperBSEEregulations,unless supersededbyMNIEWRregulations.”

However,muchofthisinformationiseithernotprovidedorredacted.

RedactedpartsofDrillingEIA,and2017Amendmentincludethefollowing:detailsondrillingmuds;condensatespillmodeltotalreleasevolume;seafloorbathymetryatdrillsites;geologicsetting;seafloormorphology;wellboreschematics;shallowstratigraphyoftheLeviathanfield;geohazards;seismicity;reservoircharacteristics;reservoirgascomposition;CyprusA-2awelldetails;drillingplansandcompletionactivities;casingdesign;wellboreconfigurationandschematics;toxicologicaldata;wellbarrierschematics;wellproductionparameters;dischargechemicals;vesselinformation;BOPcontrol;bariteanalysis;TCCreport;bridgingdocuments;shallowwaterflowcontingency;wellcontrolhandbook;expertopiniononincreasedWBMdischarge;bathymetricmapsatwellsites;etc.Muchofthe2017DrillingEIAAmendmentisredacted.Thisishighlyirregularand,foraprojectwithsuchpotentialconsequenceandpublicinterest,simplyunacceptable.Itisunclearatwhatpoint,oronwhosebehalf,theredactionsoccurred-thecompany,thegovernment,orinsurers(OPIC).Ifthecompanyisresponsible,thentheGovernmentofIsraelhasnowaytodeterminetheveracityofthecompany’ssafetyassertions.Ifthecompanysubmitstheinformationandthegovernmentthenredactsit,thenthepublichasnowaytojudgethesafetyassurances.Regardless,duetosuchextensiveredaction,safetyassurancesbyproponentscannotbeindependentlyconfirmed.Thismustberemedied.Accordingly,Irecommendtheprojectapprovalbesuspendeduntilthisinformationismadepublic,independentlyreviewedbyrelevanttechnicalexperts,andjudgedtobeBestAvailableTechniquesandTechnology(BAT).

7.3 2011Leviathan2Blowout

Regardingdrillingrisk,the2011-2012Leviathan2wellcontroleventisinstructive,butnotadequatelydiscussed.Section1.13(p.114)oftheDrillingEIAreportsasfollows:

“DuringdrillingoftheLeviathan-2wellinMay2011,wellboreintegrity issuesoccurredpriortodrillingofthewell’sreservoirsection.Duetothese issues,thedrillingrigwasremovedfromthewell.Followingcessationof drillingoperations(May2011)andpriortothesuccessfulplugging(plug- and-abandonment)ofthewellinSeptember2012,therewasaflowof formationwaterandsubsurfacesedimentsfromthewell….Findingsfromall post-pluggingsurveysconductedtodate(November2012toJanuary2015) suggestthatthepluggingwaseffective(i.e.,noevidenceofaleak),andthat conditionsaregraduallyapproachingnormalconditions(i.e.,decreaseinsize andsalinityofcalderabrinepool).Ithasbeenrepeatedlyshowninprevious reportsthatallenvironmentalimpactsareminimalandhighlylocalized

Page 31: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

31

within200mofthewellhead,andtheareaisshowingsignsofrecovery.The effectsofwaterandsanddischargesappeartobeminimal,havingno indicatorsoftoxiclevelsofcontaminationfromcompoundsofconcern.”

Althoughthereislittledetailinthisstatement,andnofurtherdetailprovidedonthissignificantfailure,itisevidentthatthewellcontrolandblowoutresponsecontingenciesfailed,andflowfromthefailedwellcontinuedfor16months.Thisisanexceptionallylongtimetocontrolafailedwell,andindicatesafailureinbothwellcontrolandblowoutresponsecapabilityofthecompaniesinvolved.Additionally,asthe2016EIA(5yearslater)reportedthat:“conditionsaregraduallyapproachingnormalconditions,”indicatesthelong-termnatureofenvironmentalimpactfromthiswellblowout.Further,thiswasnotreportedintheSLIP.

7.4 BlowoutPreventers(BOPs)

RegardingtheBlowoutPreventer(BOP)tobeusedindrillingthehighpressure,deepwaterwells,thedocumentsgenerallystate:

“NobleEnergyandtherig’sownerwillengageinacomprehensiveinspection andtestingoftherig’ssubseaBOPsystemtoensurecompliancewiththeU.S. BureauofSafetyandEnvironmentalEnforcement(BSEE)regulations.The inspectionandtestingwillbewitnessedandcertifiedbyathird-party surveyor.”

Giventhe2011failureoftheLeviathan2well,theaboveassertionisquestionable.Andalthoughthestatementisencouraging,itneedsfarmoredetaileddiscussion,includingindependentverification,monitoring,andconfirmation.Forinstance,documentsshoulddiscusstheIndependentVerificationOrganizationthatwillbeusedforallaspectsoftheproject,andtheirtechnicalqualifications.ThedocumentsdonotrecognizetheinherentlimitationsofBlowoutPreventers.ABlowoutPreventer(BOP)isacriticalsafetysystemforsubseawellheadblowoutcontrol,butthedocumentsshouldclearlyrecognizethataBOPisnotafailsafemechanismforsealingawellblowout.NumerousstudieshavedocumentedthelimitedeffectivenessofBOPsinsealingsubseawellblowouts,butnoneofthesearereferenced.28SomeofthesestudiesreportaBOPfailurerateupto45%.Theresidualriskimposedbythisinherentfailurerateshouldbehonestlydiscussed,sothatthepublicandgovernmentdonotdevelopafalsesenseofsecuritybytheinstallationofaBOPontheseabedwellheads.

Further,thedocumentsshouldciteandcommittocomplywithAPIStandard53:BlowoutPreventionEquipmentSystemsforDrillingWells,whichincludesarigoroustestingandmaintenancescheduleforBOPstobeused.29FurtheronBOPs,theyneedtodiscusstheneedforBOPandwellfunctionalarmstoautomaticallydefaulttoclosethewell(activationofBSRs,EDS,generalalarm,etc.),ifspecificalarmstriggerbutarenotaddressedintimelymanner.

Page 32: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

32

BOPactivationmethodsincludeelectricaltransmissioncable,acousticsignal,RemotelyOperatedVehicle(ROV)intervention,a“deadmanswitch”/autoshearfunction,andanEmergencyDisconnectSystem(EDS)onthedrillingrig.YetnoneofthesecriticalBOPactivationsystemsarediscussedindetail.AlloftheseBOPactivationsystemsneedtobeindependentlyinspectedandtestedregularly.

7.5 BlowoutResponsePlan

Thedocumentsdonotpresentarigorouswellcontrolplan,BlowoutContingencyPlan(BOCP),areliefwellplan,andsecuredcontractstoprovidetheseservices.TheBOCPmustdetailalltechnologiestobeused,andverifythattestsinexpectedconditions(atdepth,temperature,andpressuresexpectedattheseabed)havedemonstratedtheeffectivenessofthewellcontrolresponsetechnologies.Theseshouldincludeacontainmentdomeortophatforinitialresponse,adiscussionoftheprosandconsandmethodologiesforattemptingatopkillofablowout,acappingstackspecificallyfittedtotheBOPtobeused,andanadequaterisersystemandsurfacesupportvesselstocollecthydrocarbonsfromablowout.TheBOCPneedstoidentifycommunicationsandlogisticsfordeployingallequipmentandsupportvesselsnecessaryinablowoutresponse.Thisshouldincludewheretheequipmentwillbephysicallylocatedonstandby,andhowquicklyitcouldbedeployedtotheLeviathandrillingsites.

ThemostreliableblowoutcontroloptionisdrillingareliefwellfromanotherDynamicallyPositioned(DP)drillrig/ship,butsuchreliefwellstaketimetocomplete.Areliefwellconsistofdrillingasecondaryboreholenear,ortointersectthefailedwell,pumpingheavymuddowntooverbalancethereservoirpressure,and/orperformabottom-killonthefailedwell.Sixty(60)daysisareasonableminimumestimateofthetimeitwouldtaketocompleteareliefwellattheLeviathanfield.ItshouldbenotedthatittookBPtwelve(12)daysaftertheDeepwaterHorizonexplosionjusttobegindrillingareliefwell,andthereliefwell(atsimilardepthstoLeviathan),wasnotcompleteduntilmorethan4.5months(137days)later.However,over95%ofoffshorewellblowoutsontheUSOCSarestoppedbysurface(wellhead)intervention–muds,capping,BOPs,cement,etc.Butareliefwellshouldbedrilledatthesametimeassurfaceinterventionisattempted,particularlywhenthefailedwellboreisdamaged,blocked,orcannotbeaccessed.

Thedocumentsdonotprovideaspecificplan,ordiscussacontract,forarigtodrillareliefwelltoperformapermanentbottom-killofablowout.Thisneedstoidentifywhatrigwouldbeusedtodrillareliefwell(e.g.,theotherrigengagedinsimultaneousdrillingtheLeviathanfield),itsdisconnectsequenceandresponsetime,andthetimeitmayrequiretodrillthereliefwell.AstherewillbetwoDPrigsonlocationdrillingonanoverlappingscheduleforsomeofthedrillingperiod,onedrillingthewellandonedoingwellcompletions,itisassumedthatinablowoutemergency,thenon-emergencyrigwouldsafelydisconnectfromitswellandbegindrillingthereliefwelladjacenttothefailedwell.Thisneedstobediscussedindetail.Aswell,asdrillingtakesplacefromonevesselwithouttheotheron-siteat

Page 33: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

33

thebeginningofthedrillingschedule,areliefwellcontingencymustbeidentified.

ThedocumentsshouldlistcontractsNoblehasinplacewithwellcontrolfirmstoassistintheinterventionandresolutionofwellcontrolemergencies.Suchservicesinclude,butarenotlimitedto,firefightingequipmentandservices,specialtyblowoutcontrolequipmentandservices,directionaldrillingservices,high-pressurepumpingservices,etc.ProvidersofsuchservicesincludeBoots&CootsInternationalWellControl,CuddWellControl,WildWellControl,SafetyBoss,HalliburtonEnergyServices,AnadrillSchlumberger,BakerHughesINTEQ,DowellSchlumberger,Baroid,andMIDrillingFluids.

7.6 PipelineIntegrityManagement

ThedocumentsfailtoadequatelydetailarigorouspipelineIntegrityManagementprogramforalloffshoreandonshorepipelineinfrastructure.

GaspipelineoperatorsinIsraelmustberequiredtocomplywithinternationalbestpracticestandards,includingthoseoftheAmericanPetroleumInstitute(API),AmericanSocietyofMechanicalEngineers(ASME),BritishStandardCodeofPracticeforPipelines:BSPD8010Part2:SubseaPipelines,andNorwegianOffshoreStandard:DNV-OS-F101:SubmarinePipelineSystems.

UnderU.S.regulation,aHighConsequenceArea(HCA)forpipelineoperationisdefinedasanyareawithhighhumanpopulation,navigablewaterways,oranenvironmentunusuallysensitivetooilspills.ItisrecommendedherethattheIsraeloffshoreandonshoreregionsbeconsideredaHighConsequenceArea(HCA),requiringthehighestpipelinestandardspossible.

Theregulatoryrequirementsforgaspipelinedesign,operation,andmaintenanceintheU.S.(Dec.2003U.S.IntegrityManagementinHighConsequenceAreas-GasTransmissionPipelines),shouldstrictlyapplytoallgasandcondensatepipelinesinIsrael.30TheU.S.pipelineIntegrityManagement(IM)programrequiresthefollowingofpipelineoperators:

• IdentificationofallpipelinesegmentsthatcouldaffectHCAsintheeventofafailure;

• DevelopmentofaBaselineAssessmentPlan;• RiskAssessment,toidentifyallthreatstoeachpipelinesegment;• Remedialactionstoaddressintegrityissuesraisedbytheassessment;• Acontinualprocessofmonitoring,assessmentandevaluationtomaintain

pipelineintegrity;• IdentificationofpreventiveandmitigativemeasurestoprotectHCAs;• Methodstomeasuretheprogram’seffectiveness;• Amanagement-of-changeprocess;

Page 34: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

34

• Aprocessforreviewofintegrityassessmentresultsandinformationanalysisbyapersonqualifiedtoevaluatetheresults.

• AcommunicationplanTheAPI1160standard,publishedinNovember2001,providesguidancetoallAPImembers(includingNobleEnergy)toimplementtheIMprogram,recommendingthatallpipelinesegmentsareevaluatedwithacompany’sIMprogram.Clearly,allofthisshouldapplytogasandcondensatepipelinemanagementinIsrael.ThisstandardrequiresalloperatorstocompleteaBaselineAssessmentPlan,includingthefollowingissues:

• Resultsofthepreviousintegrityassessment,defecttypeandsizethattheassessmentmethodcandetect,anddefectgrowthrate;

• Pipesize,material,manufacturinginformation,coatingtypeandcondition,andseamtype;

• Leakhistory,repairhistory,andcathodicprotectionhistory;• Producttransported;• Operatingstresslevel;• Existingorprojectedactivitiesinthearea;• Localenvironmentalfactorsthatcouldaffectthepipeline(e.g.corrosivityof

soil,subsidence,climatic);• Geo-technicalhazards;and• Physicalsupportofthesegment,suchasbycablesuspensionbridge,etc.

UndertheU.S.IntegrityManagementregime,anoperatormustregularlyassesstheintegrityoftheirpipelinesbyseveralmethods:

• Internalpipeinspectiontoolscapableofdetectingcorrosionanddeformationanomaliesincludingdents,gougesandgrooves(smart‘PipelineInspectionGauges’,or`PIGs');

• Pressuretesting;• Assessingweldseamintegrity,especiallyforElectricResistanceWelded

(ERW)pipelines;• Directassessmentofexternalandinternalcorrosion--ExternalCorrosion

DirectAssessment(ECDA),andInternalCorrosionDirectAssessment(ICDA);• Monitoringofcathodicprotection;• Othertechnologiesthattheoperatordemonstratescanprovideanequivalent

understandingofconditionofthepipeline.Further,U.S.IntegrityManagementlawrequiresthatpipelineoperatorsmust: “…continuallychangetheprogramtoreflectoperatingexperience, conclusionsdrawnfromresultsoftheintegrityassessments,andother

Page 35: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

35

maintenanceandsurveillancedata,andevaluationofconsequencesofa failureonthehighconsequencearea.”Apipelineoperator’sIntegrityManagementevaluationandremediationschedulemustprovideforimmediaterepairconditions.Underthisregime,apipelineoperatormust: “…takepromptactiontoaddressallanomalousconditionsthattheoperator discoversthroughtheintegrityassessmentorinformationanalysis.In addressingallconditions,anoperatormustevaluateallanomalous conditionsandremediatethosethatcouldreduceapipeline’sintegrity.An operatormustbeabletodemonstratetheconditionwillensurethatthe conditionisunlikelytoposeathreattothelong-termintegrityofthe pipeline.”ApipelineoperatormusttakemeasurestopreventandmitigatetheconsequencesofapipelinefailurethatcouldaffectaHighConsequenceArea.Thesemeasuresincludeconductingariskanalysisofthepipelinesegmenttoidentifyadditionalactionstoenhancepublicsafetyorenvironmentalprotection.Suchactionsmayinclude,butarenotlimitedto:

• Implementingdamagepreventionbestpractices,• Bettermonitoringofcathodicprotectionwherecorrosionisaconcern,• Establishingshorterinspectionintervals,and• Providingadditionaltrainingtopersonnelonresponseprocedures,

conductingdrillswithlocalemergencyrespondersandadoptingothermanagementcontrols,etc.

Giventheabove,itisrecommendedthattheGovernmentofIsraelimmediatelycommissionacomprehensivethird-partyIntegrityManagement(IM)assessmentofallpetroleuminfrastructureinIsrael,offshoreandonshore,andrequirearigorousIntegrityManagementprogramonallgasandcondensatepipelines,existingandplanned.ThisIMassessmentshouldbeconductedonallplannedoffshoregasdevelopment,includingLeviathan,AphroditeBlock12,Dalit,KarishandTanin,DanielEastandWest;andexistingdevelopmentsincludingTamar,Mari-BandNoa,HaderaDeepwaterLNGterminal,ShimshonGasField,andAphrodite/Ishai.Aswell,allonshorepetroleuminfrastructureshouldsubmittosuchanIMassessment. 7.7 PipelineLeakDetectionAcriticalcomponentinreducingpipelinerupturesandspillriskisabestavailabletechnology(BAT)leakdetectionsystem.Theleakdetectionsystemshouldincorporatecontinuousmonitoringusingsuchtechnologiesasline-volumeaccounting,flowmeters,pressuretransducers,rarefactionwavemonitoring,real-

Page 36: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

36

timetransientmonitoring,acousticemissions,fiberopticsensing,vaporsensing,andaerialsurveillanceofremotepipelines.Externallybasedmethodstodetectleakingproductoutsidethepipelineandincluderight-of-wayinspectionbypipelinepatrols,ROVsurveysonseabedpipelines,hydrocarbonsensingviafiberopticordielectriccables.Internallybasedmethods,alsoknownasComputationalPipelineMonitoring(CPM),useinstrumentstomonitorinternalpipelineparameters(i.e.,pressure,flow,temperature,etc.),whichareinputsforinferringaproductreleasebymanualorelectroniccomputation.Internationalbestpracticerequireseffectivealarmsystems,andthattheleakdetectionsystemmustbesensitive,accurate,reliable,androbust.ItwasnotpossibletodeterminewhatleakdetectiontechnologiesNobleintendstoemployinitsextensivepipelinesystem.Arobustpipelineleakdetectionsystemshouldincludeasmanyofthefollowingcharacteristics(fromAPICPM1995)aspossible:

• Accurateproductreleasealarming;• Highsensitivitytoproductrelease;• Timelydetectionofproductrelease;• Efficientfieldandcontrolcentersupport;• Minimumsoftwareconfigurationandtuning;• Minimumimpactfromcommunicationoutages;• Accommodatescomplexoperatingconditions;• Configurabletoacomplexpipelinenetwork;• Performsaccurateimbalancecalculationsonflowmeters;• Isredundant;• Possessesdynamicalarmthresholds;• Accommodatesproductblending;• Accountsforheattransfer;• Providesthepipelinesystem’srealtimepressureprofile;• Accommodatesslack-lineandmultiphaseflowconditions;• Accommodatesalltypesofliquids;• Identifiesleaklocation;• Identifiesleakrate;• Accommodatesproductmeasurementandinventorycompensationfor

variouscorrections(i.e.,temperature,pressure,anddensity);and• Accountsforeffectsofdragreducingagent.

FortheLeviathanproject,pipelineleakdetectionistobeachievedbycontinuousmonitoringofarrivalpressuresandflowrates,aProductionManagementSystemtoreceiveandmonitorsubseasensorreadings(continuousmassbalanceonentireproductionsystem),annualROVsurvey,andapipelineintegrityassuranceprogram.Nofurtherdetailsofthissystems-criticalcomponentwereprovided,andthisneeds

Page 37: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

37

considerablymoredetail.Ataminimum,thefrequencyofROVsurveysofseabedinfrastructureshouldbeincreasedtoatleastmonthly,notannuallyasproposed.TheLeviathanDrillingEIAstates(emphasisadded): “Theriskofdamagetothepipelinesduetofactorssuchaslandslides, anchorsinshippinglanesandtrawlerfishingwillbeassessedatall relevantlocationsalongtheroutewillalsobeconsideredinthesafetyrisk assessment.Wheresignificantriskisidentified,preventativemeasureswill betakensuchasburyingthepipelineorprovidingexternalshieldingsuch asconcretecoating,Uraduct®coatingorconcretemattresses.”

Thisassessmentshouldhavebeencompletedandreportedinthesedocuments.Aswell,otherpipelinesafetydesignfactorsshouldbediscussed,includingpipelinewallthicknessandspacing.Asdesigned,seabedpipelinewallthicknesswillbeslightlygreateratfree-spansubseachannelcrossings,butthereisnodetaileddiscussionofadditionalseabedpipelinedesignfeaturestoreducerisksofpipelinefailure.7.8 Additionalspillpreventionmeasures

RegardingtheDynamicallyPositioned(DP)drillingrigstobeused,whichhadnotbeenselectedatthetimeofpublicationofthesedocuments(2016),therearemanysystem-criticaldetailsthatneedtobereportedandconfirmed,includingdetailontheIntegratedAlarmandControlSystem(IACS)onthedrillingrigs,CombustibleGasDetectors(CGDs),electricalgeneratorsafetysystems,firesuppression,andcommandstructureontherig,e.g.,responsibilitiesandrelationshipsbetweenallprojectparticipants,includingtherigowner,thecaptainofthevessels,OffshoreInstallationManager(OIM),andallsubcontractors.

Thedocumentsdonotprovideadiscussionofthecausesorspecificresponsestohistoricworst-caseoffshoreblowouts,whichindicatesalackofconsiderationforhistoriclessonslearned.Thisisalsorequiredinthe2013EUDrillingDirective,andshouldberequiredforLeviathan.

ItisunclearwhetherfireandexplosionriskontheLeviathanProductionPlatformhasbeenadequatelyassessedandmitigatedviaFrontEndEngineeringDesign(FEED).Explosion/fireontheLPPisasignificantriskthatcouldresultincatastrophicconsequencesforhumansafetyandthenearshoreenvironment.Thismustbeclarified.Thedocumentsdonotpresentsufficientdiscussionofallinspectionregimes,andtrainingandqualificationsofpersonnel,orthirdpartyexpertreviewofthedrillingplan.

Thedocumentsdonotidentifyorcommitto,asariskmitigationmeasure,

Page 38: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

38

establishingananonymoussafetyreportingcapability(“whistleblower”provision),incentivesandprotectionsforpersonnelusingsuchasystem,andhoweachsuchreportwillbeinvestigated.ThisisrequiredbyDirective2013/30/EUonSafetyofOffshoreOilandGasOperations.

ThedocumentsdonotpresentacompletecasualtyhistoryforNobleorRatioOil’soffshoredrillingprojects,aswellasforthespecificrigstobeused(whichhaveyettobeidentified).Thisinformationisnecessarytoevaluatethecompany’sassertionsregardingitssafetymanagementsystems. ThedocumentsdonotadequatelydiscussNoble’sSafetyandEnvironmentalManagementSystem(SEMS),asisrequiredinU.S.regulation(30CFR250FederalRegister,Vol.75,No.199,Oct.15,2010).ThisisalsorequiredinDirective2013/30/EUonSafetyofOffshoreOilandGasOperations(EU,2013).Inthisregard,thedocumentsshoulddetailthecompany’ssafetymanagementstructure,technicalexpertise,deepwaterexperience,analyticalmethodologytoassesstheperformanceofallsafetysystemineventofmultiplefailures,anditsoverallsafetyculture.SEMSisagoal-oriented,performancebasedSafetyCaseapproach,ratherthanthetraditionalprescriptiveapproach.Itrequiresoperators,contractors,andservicecompaniestodocumenttheirsafetyapproach;worktogethertoachievesafedrillingoutcomes;formalizeriskmanagementproceduresandresponsibilitiesofallparties;establishclearcommunicationprocedures;establishaManagementofChange(MOC)process;provideanindependentassessmentofwelldesign,drilling,andcompletion;andaproceduretomanageandincorporateevolvingtechnologies.TheU.S.NationalAcademyofEngineeringrecommendsahybridofprescriptiveandperformancebasedmanagementregimes,andthisshouldbediscussed.

Thedocumentsfailtodetailarigoroussubstanceabusepreventionprograminallphasesoftheproject,includingforallsubcontractors.

Regardingwellcompletionandwell-controlmonitoring,theDrillingEIAstates(3.2.7):

“EachwellwillbeequippedwithanSCSSVbelowmudlinetopreventan uncontrolledreleaseofhydrocarbons.Inaddition,eachwellwillbeequipped withadualdownholepressureandtemperaturegaugeforreal-time downholesurveillance,includedwithchemicalinjectionmandrels(CIMs)for mitigationagainstthepotentialriskofscaleorhydrates.”

Yetthereisnomoredetailavailablere:theSCSSVs(Surface-ControlledSubsurfaceSafetyValves)orotherdownholeequipmenttomaintainwellcontrolduringtheoperational/productionphase.ThereisnodiscussionofthepotentialforSCSSVfailureandlossofwellcontrol,orarobustcontingencyplanforsuch.Thisisasystems-criticalissue,andmustbedetailedinthedocuments.Pressuretransmittersindownholeequipment,includingSCSSVsystems,areknowntofailfromavarietyofissuesincludingplugging,leaks,trappedbubbles/gaspocketsin

Page 39: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

39

liquid-filledimpulselines,trappedliquidsingas-filledimpulselines,electrostaticdischarges,temperature-inducedmeasurementerrors,corrosion,andoverpressuresorvacuums.31Allofthesepotentialfailuresmustbeaddressedindetail,yethavenotbeeninthedocumentsreviewed.Ifsubseacontrolsystemslosesurfacecontrolconnectivity(suchasafteranexplosiononLPP,orabreakinthesubseaumbilicalconnection),backupprocedureswouldneedtobeemployedquicklytoceasegasandcondensateproductionandrelease.Thedocumentsdonotidentifyallsubcontractorstobeused,andhowtheywillbemanaged.InadrillingacomplexdeepwaterprospectsuchasLeviathan,itisnecessarytoeffectivelymanageseveraldrillingsubcontractors,servicecompanies,andconsultants,andstaffsimultaneously.Forinstance,indrillingtheMacondowellintheGulfofMexico,BPemployedatleasteight(8)subcontractingcompaniesforvariouscomponentsoftheproject.Therelationshipandcommunicationbetweenallcorporateentitiesinvolvedinacomplexdeepwaterdrillingoperationisasafety-criticalissue.Thedocumentsshouldclarifythisrelationship,whichpersonnelhavestop-workauthority,andhowandwhenthismaybeimposed.

ThedocumentsdonotstipulatethatanIndependentWellControlExpert(IWCE),willbeavailableandreviewthedrillingproceduresatalltimesduringdrilling,aswellasaprocedureforobtainingpeerreviewandsecondopinionsonvarioussafety-criticaldecisionsmadebeforeandduringdrilling.SuchasystemexistsintheU.K.,isrequiredintheU.S.offshoreDrillingSafetyRules(BSEE,2012),andimpliedbythe2013EUDrillingDirective(EU,2013).TheindependentthirdpartyexpertshouldbeaRegisteredProfessionalEngineer,whosequalificationsarepresentedtoandapprovedbygovernment.

8. SelectedProjectDesign–Platformvs.FPSOorFLNGNineconceptualdesignoptionsweregenerallydiscussedintheOffshoreProcessingScheme,Table2.1,NOP37H,asfollow: 1.DirectSubseaTieback–FullProcessingOnshore 2.DirectSubseaTieback-FullProcessingOnshorewithsubseapressure reduction 3.DirectSubseaTieback–FullProcessingOnshorewithsubseapressure reductionoronariserplatforminterritorialwaters 4.ShelfPlatformSubseaTieback–MinimumProcessingOnshore 5.SubseaSeparationandProcessingOnshore 6.ProductiontoMari-BExisting/FuturePlatformsandPartialProcessingin Ashod 7.ShelfPlatformSubseaTieback–MaximumProcessingOffshore 8.ShelfPlatformSubseaTieback–FullProcessingOffshore,connectionto NGTSpipelineoffshoreHadera

Page 40: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

40

9.DeepwaterDevelopment–ProcessingOffshore“ThesenineconceptswerethenevaluatedagainstaseriesofselectioncriteriaandthreewereshortlistedforfurtherevaluationinStage2ofthePlanningProcess”:Cases3,4,and7.Anotheroptionwithminimalonshorefacilitieswasalsoconsidered.

ThedocumentpresentsaninadequateexplanationforwhyCase9“DeepwaterDevelopment–ProcessingOffshore”wasdeclinedasanoption.InitsSept.2014document“RatioOilExploration[1992]”document32,Noble’spartnerRatioOildiscussestheoverallprojectconceptforuseofaFloatingProduction,Storage,andOffloading(FPSO)ship,andaFloatingLiquefiedNaturalGas(FLNG)optionfortheLeviathanproject.

TheNOP37/H–Guidelines(1.6,ChaptersAandB)providesageneraldiscussionofsomeoftheadvantagesanddisadvantagesoftheFPSO/FLNGoption.ThedocumentevaluatesfourdifferentoptionsinCase9:Semi-SubmersibleProductionPlatform,Tension-LegPlatform,FPSO,andFLNG.However,thesealternativesconsideronlyseabedpipelinetransmissionofgas/condensatetoshore,afterinitialstorageandprocessingoffshore--thedocumentdoesnotconsideruseofshuttleLNGtankersorbargestotransportLNGtoshorefacilitiesorexport.

SeveralconstraintstotheoffshoreFPSO/FLNGoptionareraisedinthedocument,sometechnicalandsomefinancial.Technicalissuesincludepotentialcondensation(hydrates)inseabedpipelines,engineeringanddurabilityofflexiblerisersbetweenseabedwellheadsandtheFPSO/FLNG,etc.Forallfouralternatives,cost,timetobuild,andinabilitytosupplygastothelocalsystemarecitedasimpedimentstotheoffshorealternative.Infact,theFLNGoptioncaneasilyprovidegastothelocalgassystemviashuttleLNGtankerorbarge,orFPSOthroughseabedpipelinestransportingdrygastoshore(aswiththeKarishandTaninproject),butthiswasnotthoroughlyevaluated.

TheNOP37/HdocumentincorrectlystatesthatFLNGisan“unproventechnology.”WhilesuchFLNGfacilitiesareindeednewdevelopmentsfordeepwater,offshoregasfields,atleasttwoarenowoperational-oneinMalaysia,PetronasPFLNG133,currentlyoperatingattheKanowitgasfieldoffSarawak,Malaysia;andGolar’sFLNGoffCameroon.34

AdditionalFLNGprojectsarenowindevelopmentoffChina,EquatorialGuinea,andAustralia,andothersarepresentlyinconsideration.Shell’s“PreludeFLNG”facilityforthePreludeandBrowsegasfields200kmoffSouthAustralia(whichisnowonsite)islargestfloatingstructureeverbuilt(488mx74m,displacing600,000tons).35TheseFLNGfacilitiesloadandprocessallproducedgasandcondensateontofloatingfacilitiesoveradeepwateroffshoregasfield,eliminatingtheneedforhundredsofkmofseabedpipelinestoshore,nearshoreplatforms,andotheronshoreinfrastructure.TheFLNGfacilityliquefiesthegas,andthenloadsLNGonto

Page 41: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

41

shuttletankers/bargesfortransporttomarketsonshoreorexport.Assuch,FLNGdrasticallyreducesriskandimpacttocoastalresources.

AsShellstatesregardingitsPreludeFLNGprojectoffAustralia:

“FLNGtechnologyofferscountriesamoreenvironmentally-sensitivewayto developnaturalgasresources.Preludewillhaveamuchsmaller environmentalfootprintthanland-basedLNGplants,whichrequiremajor infrastructureworks.Italsoeliminatestheneedforlongpipelinestoland.”36 AndFPSOs(withgas/oilseparation)havebeenusedsuccessfullyforover25yearsfordeepwateroilandgasfields,andtherearepresentlyover200inuseglobally.SomeFPSOsarenowinuseatwaterdepthsfargreaterthanLeviathan,includingtheBWPioneermoored(viaadisconnectableturret)in2,600mdepthintheU.S.GulfofMexico.37

Further,the2017EnergeanKarishandTaninFieldDevelopmentPlandescribestherelativeadvantageofanFPSOvs.seabedpipeline/onshoredevelopmentoptionasfollows:minimizesworktobeconductedinthefield,quickerdevelopmenttime,capitalexpendituretofirst-gas,increasedopportunitiestoexport,tie-backofmultiple3rdpartyfields,reducedtechnicalrisk(e.g.hydrateformationinextensiveseabedpipelines),additionalproductrecoveryfromfield,significantlyreducedenvironmentalfootprint,andeaseofabandonmentafterfieldisexhausted.38RegardingexperiencewithFPSOtechnology,Energean’s2017assessmentstates:

“Useofafloatingstructureinthevicinityofthefieldisamuchmorecommon approach,onethathasbeenmasteredoverthelast25years.Therearemore than20floatingunitsworldwideinwaterdepthsgreaterthantheKarish field.”39

RegardingenvironmentalfootprintoftheFPSOvs.seabed/onshoreoption,Energean’s2017analysisstatesasfollows(emphasisadded):

“Environmentalfootprint:UsinganFPSOlocated75kmfromtheIsraelcoast shouldresultinthedevelopmenthavingverylowenvironmentalimpacts, substantiallylessthantheotherschemesconsidered.Environmentalimpacts shouldbelowerduringallprojectphases:construction,operationand abandonment.Asnofixedplatformisrequiredandsuctionpileswillbe employedfortheFPSOmooringsystemasmallfleetofmarinevesselswillbe requiredduringconstruction/installation.Thiswillresultinlownoiseand pollutionlevels.TheFPSOschemealsolimitsthepotentialforoilpollution resultingfrompipelineleaks.Hydrocarbonliquidsarenottransportedto shoreandhencetheconsequenceofanyspillageissignificantlyreduced.The FPSOschemealsoallowsreservoirpressureenergytobeemployedmore effectivelyreducingoverallpowerrequirementsandhenceemissionlevels. Importantly,theonshoreandcoastalprojectscopeandhenceenvironmental

Page 42: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

42

impactwillbesmall.Thisiscriticalasnotonlywillitensurethat environmentalimpactsareminimizedbutshouldaidintheobtainmentof permitsandhencesupportafast-trackproject.ThelowestCAPEX(capital expenditure)approachwouldhavebeentotreatallfluidsonshorebutclearly thiswouldhavehadthemostsignificantenvironmentalimpactandhence wasexcluded.”

ToavoidconstructiondelaysforLeviathan,NoblecouldleaseanFPSO,andtie-intoitsseabedpipelinesystemnowinconstructiontotransportgastoshore,andshipcondensateviashuttletankers.Asfarascouldbedetermined,anFPSO/FLNGalternativeforLeviathanwasnotfurtherevaluated.Itisimperativethatbothoftheseoptionsarereconsidered. TheSLIP(p.57)states(emphasisadded):

“NobleEnergyassessedavarietyofdevelopmentandtreatmentoptions(i.e., onshore,offshore,sub-sea),includingaFloatingProductionStorageandOff- Loadingvessel(FPSO)withaPressureReductionMeteringPlatform,which wasoriginallypreferred,andaFixedPlatform...Therewerenosignificant environmentaldifferentiatorsorshowstoppersidentifiedacrossallofthe viableoptions.Afixedproductionplatformwaschosen,primarilyinorderto accelerategassupplytothedomesticmarketthusbringingredundancyto Israel’sgassupplyearlier.”

Thisconclusionisclearlynotsupportable,asthereareindeeddramaticenvironmentaldifferentiatorsbetweenthenearshoreplatformandtheFPSO/FLNGoption.

Itisinarguablethatnearshorerisksandimpactsfromconstructionandoperationoftheproject(noise,light,atmosphericemissions,marinedischarge,visual/aestheticimpacts,socioeconomicimpacts,etc.);risksofnaturalgas,condensate,diesel,MEG,methanolorotherspillstocoastalinhabitantsandecosystems;riskfromfire/explosionontheLPP;andsecurity/terrorismriskpresentedbytheLPPandnearshoreinfrastructure,etc.;wouldallbesignificantlyreducedif,insteadoftheproposedLPP10kmoffshore,theprojectoptedforanFPSO/FLNGfacility125kmoffshoreatthedeepwatergasfield.Accordingly,theselectedLPPoptionshouldbereconsidered,infavorofCase9:“DeepwaterDevelopment–OffshoreProcessing.”

FPSOandFLNG,andLNGtankerswillposedifferentrisks,andtheseshouldbeevaluatedandmitigatedasfaraspossible.Butoverall,theriskfromanFPSOorLNGtankerscarryingLNGfromanoffshoreFLNGfacilitywouldbeconsiderablylowerthanthenearshoreplatformoption.

Fromasecuritystandpointalone,thenearshoreplatformoptionclearlyposesfarmoreriskthananFPSO/FLNGfacility125kmoffshore(seediscussionofthisissue

Page 43: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

43

inSecurityRisk,Section13,below).TheLPPwouldlikelybeconsideredahigh-valuetargetforterroristattack.Additionally,ifhostilitiesweretoeruptonceagainbetween,forinstance,HezbollahinsouthernLebanonandIsrael(asin2006),anearshoregasprocessingplatformclosetotheborder(e.g.,LPP)wouldlikelybehighonanadversary’stargetlist.

AstheGovernmentofIsraelisacutelyaware,Hezbollahnowpossesses130,000–150,000rockets,includingshort,medium,long-rangeandM-600ballisticmissiles(witharangeof300miles),mostlypositionedalongthesouthernLebaneseborder.40WhileanFPSO/FLNGfacility125kmoffshorewouldstillbeinrangeoflong-rangemissiles,itwouldclearlybeatlessriskofthis,andotherthreats,thanwouldtheplatformonly10kmoffshore.Additionally,anFPSO/FLNGfacilityshoulddevelopacontingencyplanintheeventofhostilities,inwhichitwouldclosedownallproductionandmoveoff-site,outofrangeofhostileaction.SucharesponsewouldbeunavailabletothestationaryLPP.

Further,thedocumentsstatethattheactualrationalefordecliningtheoffshoreFLNGalternativeforLeviathaninfavorofmoretraditionaldesign(subseapipelinestoanearshoreprocessingplatform)wasasfollows:

“…inordertoaccelerategassupplytothedomesticmarketthusbringing redundancytoIsrael’sgassupplyearlier.”

Thisstatementconfirmsthatcommercialimperativetoexpeditegasdeliverieswasthemainreasonforselectingtheplatformoption--notminimizingenvironmentalriskorimpact.CostwasraisedasanissueinallfouralternativesoffshorediscussedinNOP37/H.

SourcessuggestthatthetotalcostfortheShell’sPreludefacilitymaybefrom$11billion-$13billion.41However,amortizingthiscostovertheexpected30+yearlifetimeofLeviathan(whichcouldgrossover$100billion),andotherdeepwatergasdevelopmentsintheEasternMediterranean,FLNGbecomescost-effective.

EventhoughtheLeviathanProductionPlatform(LPP)andseabedpipelineoptionhasalreadybeenselectedandareindevelopmentatpresent,astheprojectlifetimeisexpectedtoexceed30years,itisinthelong-terminterestofIsraeltosuspendthecurrentplatformdevelopment,andredesigntheprojectasanoffshoreFPSO/FLNGfacility.Thiswouldeasilystillprovidedomesticenergyneeds,asLNGshuttletankerswouldtransportgasandcondensatetotheHaderadeepwaterLNGbuoy,additionalLNGbuoys,otherportsinIsrael,ordrygasviaseabedpipelinetoshore.Infact,theFPSO/FLNGoptionwouldprovidegreaterlong-termflexibilityfortheprojectinmeetingshiftingmarketsandexportopportunities.

NobleshouldexploreoptionstosellthenewlyconstructedLPPtoanotheroffshoregasprojectelsewhere.

RegardingtheselectedLPPlocation,threesiteswereevaluated,(TAMAoffshoreEIA

Page 44: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

44

p.193),Hadera,HavatzeletHaSharon,andNetanya,allalongthesamegeneraldepthcontour(80m-90m),about10kmoffshore.TheEIAstates:that“thereisnosignificantdifferencebetweenthethreesites,”andselectedHavatzeletHaSharon,withthecaveatthattheystillneededa“detailedsurveyoftheseabed.”However,itisnotedthatoffshoreplatformsgloballycanbelocatedinwaterdepthsto500m,yettheLeviathandocumentsdonotdiscusspotentialforlocatingtheLPPfurtheroffshore,indeeperwater.Thisshouldhavebeenexplored.Essentially,thefurtherfromshoreahydrocarbonplatformorprocessingfacilityis,thebetter.

9. CondensateSpillResponseAsitislight,volatile,andlowviscosity,spilledcondensatewouldbevirtuallyimpossibletocontainandrecoverfromtheseasurfacewithconventionaloilspillmethodologiessuchasboomsandskimmers.Infact,itisgenerallyacceptedintheinternationalspillresponsecommunitythatthereexistsnocontainment/recoverymethodologythatwouldeffectiveforcondensate(ornaturalgas)spillsatsea.InaMay17,2018emailreplytotheauthoronthesubjectofresponsetocondensatereleases,Dr.RobHolland,TechnicalLeadforOilSpillResponseLimited(OSRL)intheUK(theprimaryTierIIIresponsecontractorformostoilandgasoperationsglobally,includingNoble)statedasfollows:

“Youarecorrectthatinthemajorityofcasesofgasorcondensatereleases thenit’ssimplyamatterof‘Monitor&Evaluate’withnodirectintervention. Somecondensateshavehigherwaxcontentthanotherswhichcanposeits ownsetofchallengesoncethefreshcondensatehasweatheredatsea.”42Itisimportanttonotethattherehasneverbeenasuccessfulmechanicalcontainmentandrecoveryoperationinresponsetoalargecondensate(ornaturalgas)releaseinthemarineenvironment.Asfarasisknown,nonehasevenbeenattempted.Theremaybeapossibilityofusingsorbentmaterialsdeployedtoabsorbsmallamountsofspilledcondensatefromsurfaceandsubsurfacewaters(e.g.newlydevelopedpolyurethaneOleoSponge,sorbentboomsandpads,etc.),andperhapsweatheredcondensatemaylenditselftocontainmentandrecovery,buteventhesewouldhaveminimaleffectonlargeoffshorecondensatereleases.Thusforplanningpurposes,itshouldbeassumedthatnoneofanoffshorecondensate(ornaturalgas)releasefromLeviathaninfrastructurewouldberecoveredfromtheenvironment.TheassumptionfoundthroughouttheLeviathandocumentsthatcondensatespillswillbehavesimilarlytooilspillsisunfounded.Further,theassumptionthatchemicaldispersantswouldbeeffectiveonamarinecondensatespillissimilarlyunfounded.Thereisonlyminimalresearchintotheeffectofdispersantsoncondensatespills,withequivocalresults.

Page 45: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

45

Itmayindeedbepossibletocollectweathered,emulsifiedaccretionsonshore,andthatshouldbeexplored.ShorelinecontaminationfromaWorstCaseDischargeofcondensatecouldpersistformonths,ifnotyears.AnOilWeatheringModel(OWM)shouldbeconductedonLeviathan/Tamarcondensateandnaturalgas.InputintothecondensateOWMshouldincludeoil/emulsionfilmthickness,seastate,andseatemperature.9.1 OilSpillContingencyPlan(OSCP)Thedocumentsassertthat:“Inthecaseofaspill,anemergencyplanforthepreventionofseapollutionwillbeexecuted.Theprogramwillinclude,interalia:

• Useofdedicatedequipmenttodealwiththespillevent,atTIER1level;• PeriodicemergencydrillsaccordingtotherequirementsoftheMinistry

ofEnvironmentalProtection;• Operationofalocalcontractortoprovideimmediateresponsetoalocal

spill;• Operationofinternationalcontractorstorespondtoaregionalevent.• TheprogramwillbebasedonthescenariosexaminedinboththeOSCAR

modelandtheMEDSLIKmodel,withrespecttoresponsetimesrequiredtoreducethespreadofthespill,andpreventingitsarrivalatthecoastline.

• TheuseofdispersantswillbecarriedoutinaccordancewiththeMinistry’sinstructions,andsubjecttorestrictionsresultingfromproximitytothecoastlineandmarinereserves(waterdepthgreaterthan20meters,distancefromareservationgreaterthan1mile).”

TheonlyOCSPavailableforreview–Jan.2018“NEMLLeviathanFieldInstallationandConstructionOSCP–Tier4”–doesnotconstituteasufficientoperationalspillresponseplanforallphasesoftheproject,includingdrilling,production,andtheLPP.Theplanappearstofocusmostlyoninshoreresponsescenarios,andeventhatisinadequate.NoShipboardOilPollutionEmergencyPlans(SOPEPs)orEmergencyResponsePlanswereavailableforreview,andthereisnodiscussionofresponseequipmentorcapabilityattheoffshoredrillrigsortheLPP.

CondensatespillresponseassumptionsintheOSCP(5.2)arelistedasfollows:“ThegeneralcharacteristicsoftheproductassociatedwithNEMLoperationsfavorsdispersantoverrecovery.NEML’sstrategywilldependonmanyfactorsthatwillbesituationdependent.Ingeneral,hydrocarbonreleasestrategiesmayincludethefollowing:

• DispersantApplication• MechanicalAgitation

Page 46: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

46

• MechanicalRecovery• ShorelineProtection• ShorelineCleanup/Recover• Rehabilitation

Thegovernmentand/orNobleshouldprovideaMaterialSafetyDataSheet(MSDS)forLeviathancondensate,buttheauthorhasnotbeenprovidedsuch.ThisisastandardrequirementintheU.S.andEuropeforallpotentiallyhazardouschemicalsproduced,transported,orstoredbyindustrialprojects,andisalsorequiredinIsrael.AnMSDSshouldbeprovidedforallhazardoussubstancesinvolvedinLeviathan.

9.2 Mechanicalrecovery

Mechanicalrecoveryofseasurfaceoilspillsconsistsofcontainmentwithboomsandcollectionwithvariouskindsofskimmersorsorbents.

Butagain,itisimportanttounderscorethefactthatspillresponseprofessionalsdonotgenerallyconsidercondensate(ornaturalgas)releasesatseatoberecoverable.Infact,evencontainmentandresponsetolargeoffshorecrudeoilspillsisknowntobegenerallyineffective,withusuallylessthan10%recovered.Asexample,recoveryofDeepwaterHorizoncrudeoilwasonly3%ofthetotalreleasevolume,despitethelargestoilspillresponseeffortinhistory(with47,000responsepersonnel,7,000vessels,costingover$14billion).AndrecoveryrateintheExxonValdezcrudeoilspillwasabout7%.

AsreportedbySINTEF,condensatesreleasedonacalmseasurfacemayspreadandformathinfilm(lessthan0.1mm)ofverylowviscosity,and“theuseoftraditionalmechanicalrecoverysystemsisassumedtohavelowefficiencyonthinoilfilms.”43However,afterweatheringforseveraldays,theremaybesomesolidificationofcondensateallowingcontainmentwithboomsandcollectionwithskimmers.ButthissolidificationmaybeunlikelyathightemperaturesfoundoffIsrael.

Forplanningpurposes,itshouldbeassumedthatacondensateornaturalgasreleaseatseawouldbenon-recoverable.

9.3 DispersantsRegardinguseofchemicaldispersants,thereislittleevidencethatdispersantswouldbeeffectiveonlargeoffshorecondensateornaturalgasreleases.Dispersantsareacombinationofasurfactantandorganicsolventthatlowerstheinterfacialtensionbetweenoilandwater,resultinginemulsificationanddispersionofsurfaceoilintosmallerdroplets,increasingdispersionandbioavailabilitytonaturalhydrocarbondegraders.44Theyareusuallyappliedviaairplane,equippedwithanAerialDispersantDeliverySystempackage(ADDS-pack).Inthe2010MacondoblowoutintheU.S.GulfofMexico,dispersantswerealsoaddedatthedeepwater

Page 47: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

47

wellhead.AcontingencyforwellheaddispersantapplicationshouldalsobedevelopedforLeviathan.Evenwithcrudeoilspills,chemicaldispersantsareknowntobeoflimitedeffectiveness,exertasynergistictoxicity,andtransferofpollutantimpactfromtheseasurfacedownintothewatercolumn.Dispersantsaregenerallyusedonsurfacefilmsgreaterthan0.05mm–0.1mmthick,andtheylosetheireffectivenessasoilsweather.TheyaregenerallymosteffectivewhenappliedataDispersanttoOil(DOR)ratioof1:25.SINTEFreportslaboratoryteststhatdemonstratesomeefficacyinuseofdispersantsonSigyn(fromanoffshorefieldoffsouthernNorway)condensateincalm(summer)conditions.45However,thewindowoftimeandsea/windstatewithinwhichdispersantsmaybeeffectiveisextremelynarrow,thefirstfewdaysatmost.TheSINTEFstudythatreportedeffectivenessofDasicNSandCorexit9500onSigyncondensatefrom67%-100%didnotestablishacontrol,withnodispersantadded,thusthedispersibilityresultsarequestionable.46Muchofthereporteddispersibilitymaysimplyhavederivedfrommechanicalwaveaction,notchemicaldispersion.Fromapracticalresponsestandpoint,itisextremelyunlikelythatlarge-scaledispersantapplicationcouldbemobilizedquicklyenoughtobeeffectiveonamajoroffshorecondensaterelease.Afteronlyaoneortwodays,residualcondensateontheseasurfacewouldlikelybetooweatheredtobedispersible.Andassurfaceapplicationofdispersantstransferstoxichydrocarboncontaminationfromtheseasurfacedownintothewatercolumn,theiruseshouldbeavoidedovershallowwaters.Israelidispersantuserestrictionscurrentlypermitdispersantuseinwaterdepthsgreaterthan20moroutside1nauticalmileofsensitivecoastalhabitats,andtheserulesneedtoberevised.Itisrecommendedherethatdispersantusebeprohibitedinwaterdepthslessthan200m,and/orwithin10milesofshore.Ifusedonacondensaterelease,dispersantswouldincreasetheexposureofpelagicorganismstothewater-solubleanddispersedfractionofcondensate,therebyincreasingimpactinthiscomponentofthemarineecosystem.Thiswasnotaddressedinthedocuments,butmustbeconsidered.TheLeviathandocumentsrepeattheclaimthat:“Expeditedresponsefromouroilspillresponsecontractorandapprovalfortheuseofdispersantuseisvitaltosuccessfullymitigatingthisevent.”Asdiscussedabove,theuseofchemicaldispersantsinresponsetoanoffshorecondensate(ornaturalgas)releasehasnotbeendemonstratedtobegenerallyeffective.Indeed,eveninresponsetocrudeoilspillsthewindowforpotentialeffectiveuseofdispersantsisverynarrow,andgenerallyonlyeffectiveonfresh(un-weathered)oil(1-2daysout),andonlywithmoderatewave/windmixing,withwindsbetween10-20knots.

Page 48: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

48

Testsshouldbeconductedtodeterminethepotentialefficacyoftheplanneddispersants(DASICSlickgoneNSandSea-Brat4)oncondensate,bothfreshandweathered.Otherwise,itshouldbeassumedthatchemicaldispersantswouldnotbeeffectiveoncondensatesthatreachtheseasurface,particularlyastheyweather.Furthermore,nochemicaldispersantsshouldbepermittedtobeusedinwaterslessthan100mdepth,andcloserthan10milesfromshore,orwheresurfacecurrentsmaycarrydispersantsintowatersshallowerthan100morwithin10kmofshore.

Andeveniflaboratorytestsdemonstratedispersanteffectiveness,adispersibilitytestkitshouldbeusedinanyreal-timecondensatetoconfirmeffectivenessonprecisecondensatesurfacefilmsencountered.Again,itisunlikelythatdispersantswouldbeeffectiveonamajoroffshorecondensaterelease.

Theoperatorshouldalsoexaminethepotentialtoinjectdispersantintoawellheadblowout,aswasdoneinthe2010DeepwaterHorizonblowout.Thiswouldincludemethodologiesthatmightbeemployed,andthepotentialenvironmentaleffectsofsuchdeepwaterdispersantapplication.9.4 In-situburning

TheOSCPdoesnotdiscussin-situburning(ISB)-acontrolledignitionofsurfacehydrocarbonslicks-asapotentialcondensatespillresponsetool.Itisnotclearfromtheequipmentlist,referredtointheOSCP,whatspillignitionorISBequipmentisonhand.AnISBplanmustidentifyspecificignitionstrategies(Heli-torches,gels,etc.),herdingagents,fireboomdeploymentstrategies,andspecificapproachestobeused.Itisthusindeterminatehowin-situburningwouldbeconsideredormanaged,particularlyforaTierIIIresponse.Inamajorblowoutscenario,ISBwillalmostcertainlybeconsideredasanoptionforfar-offshoreresponse,andshouldbediscussedintheplan.ItmustalsobeacknowledgedthatinmanycondensatespillscenariosISBwillremainineffective.

Inaddition,theriskoffire/explosionwithasurfacecondensatereleasemustbecarefullyconsidered.SINTEFreportsthatSigyncondensateposesafirehazardduringthefirst2hoursafterrelease,undercalm(lessthan2m/sec.)windconditions,withaflashpointbelowambientseatemperature.47AsimilarriskmayexistwithanoffshorereleaseofLeviathancondensate.Inparticular,ignitionmaypresentsignificantriskifcondensateisspilledontotheseasurfaceattheLeviathanProductionPlatform,thusjeopardizingthesafetyoftheentireplatformandseabedinfrastructurecontrolsystems.Thismustbemethodicallyconsideredinanyspillrisk/responsescenario.

9.5 AdditionalOSCPConsiderations

InOSCPsection5.3ReleaseScenarios,thepossibilityofawellblowoutiscited,buttheonlyreleasescenariosdiscussed–operationalfailure,equipmentfailure,shipallision/collision–arediscussedonlyintermsoftheLPP.Thepossibilityofa

Page 49: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

49

catastrophicwellblowoutoffshoreisnotdiscussedintheresponsescenarios.Thisshouldberemedied.

Appendix5oftheOSCPlackssufficienttransboundarycontingenciesandarrangementsforspillsthatmaydrifttoterritorialwatersandcoastsofLebanon,EgyptorCyprus.Aswell,insection8.1,thereisnoprovisionforstakeholderengagementinspillresponseexercises,orinactualresponse.Noristhereprovisionforsurprisedrillscalledbythegovernment.Theseomissionsmustberemedied.

NEML’smainresponsefleetandbaseisinAshod,withadditionalrapidresponsefacilitiesinHaifaandHadera,yetthevesselparticularsandequipmentonhandarenotitemized.Appendix6liststheinstallationvessels,yetfewvesselparticulars.Appendix7listsvesselcontactsandeightresponsevessels,butnofurtherinformationontheirresponsecapabilities.Appendix8liststhespillresponseequipmentonhand.Itisimportantthatgovernmentauthoritiesconfirmthemaintenanceandoperabilityofallresponseequipmentwithinspectionsanddrills.

ThereisnowildliferesponseplanintheOSCP,whichneedstoberemedied.TheWildlifeResponseplanshouldincludeplansforhazingwildlife(seabirds,marinemammals,etc.)awayfromthefrontofaspreadingplumeofcondensateornaturalgas(surfaceorsubsurface),andcontainplanstocaptureandtreatoiledwildlife.

Finally,theOCSPshoulddiscusspotentialforamajorcondensateorgasreleasetocontaminateseawaterintakeatdesalinationplantsonshore(oneisonly20kmfromtheLPP),andthepotentialforaffectingdrinkingwaterquality.Studieshaveraisedvarioustechnicalconcernsregardingremovalofoilpollutionfromseawaterpriortodesalination.48Inparticular,thesestudiesfoundthatwater-solublecomponentswithsmallmolecularsizearedifficulttoremove.ThisriskshouldbeexaminedbytheLeviathanOSCP,andacontingencyshouldbedevelopedformonitoringandclosingtheintaketodesalinationplantsifthepotentialforgas/condensateexposurepresentsitselfinaspill.

NoteagainthattheprimaryTierIIandIIIresponsecontractorforLeviathan–OSRLintheUK–agreeswiththeauthorthatthereexistsnoeffectiveresponsemethodologyformarinecondensatespills.TheOSCPshouldhonestlyadmitsuch.

9.6 Vaporemissionsabovecondensatespills

Dependingonthepreciseconditionsofrelease,condensatesreachingtheseasurfacewillundergovolatilization/evaporationintotheoverlyingatmosphere,anddispersedownwind.Itisassumedthatroughly50%ofacondensatespillwillevaporateintooverlyingairasVolatileOrganicCompounds(VOCs),whichareacutelytoxic.Ifthereleaseisdirectlyontheseasurfaceorfromashallowsubsurfacepipeline,alargeramountwillevaporate.However,ifthereleaseisfromadeepwaterwellhead(1,600–1,700mwaterdepth)orpipeline,theevaporationpercentagewillbereduced,andamountremaininginthewatercolumnincreased.Regardless,fromthemodeledreleaseofapproximately175,000bbls,itcanbe

Page 50: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

50

assumedthatperhaps85,000bbls(12,500tons)ofcondensateevaporationcomponents(VOCs)willtransferintooverlyingairmasses.

However,noneofthedocumentsreviewedcontainadiscussionofthisatmosphericVOCplumethatwilldevelopoveracondensatespill.Detailmustbeprovidedonthis,includingmodelingthedispersionoftheVOCplumeasthecondensatereleasespreadsandweathers.

Someheavierresidualcomponentsofacondensaterelease(e.g.decane,C10H22)canpersistonthewatersurface,providingacontinuoussourceofVOCemissionsintooverlyingair.TheU.S.CAMEO(Computer-AidedManagementofEmergencyOperations)chemicaldatabasereportsthattheProtectiveActionCriteria(PAC),PAC3acutetoxicityindexfordecane(e.g.alife-threateningatmosphericconcentration)is440ppm,andaPAC2(causingdebilitatingeffects)isaslowas73ppm.49EPAreportsthatheaviercomponentsofcondensates(suchasdecane)generallyexertgreatertoxicity.Decaneexposurecancausethefollowingsymptomsinhumans: “Contactwitheyesmayproducemildirritation.Contactwithskinmaycause defatting,redness,scaling,andhairloss.Ingestionmaycausediarrhea,slight centralnervoussystemdepression,difficultyinbreathingandfatigue. Inhalationofhighconcentrationsmaycauserapidbreathing,fatigue, headache,dizziness,andotherCNSeffects.”50 Regardingatmosphericemissionsovercondensatereleases,IsraeliscientistshaveconductedpreliminaryanalysesusingtheUSEPAALOHA(AerialLocationsofHazardousAtmospheres)computersimulationtool,predictingthatinsomespillscenariosfromtheLeviathanProductionPlatform(LPP):

“Coastalinhabitantsmaybeexposedtoatoxiccondensatecloudabovethe PAC2AcuteExposureGuidelineLevelsforAirborneChemicalsaspublished bytheEPA.”51

Giventheknownacutetoxicityofcondensatecomponents,thisatmosphericplumethatformsoveracondensatereleasewillposerisktoair-breathingorganismsexposed,includingseabirds,marinemammals,andhumans.AlthoughseveralLeviathandocumentsrepeattheclaimthatthisatmosphericplumewouldnotpresenttoxicologicalriskfurtherthan200mfromthereleasepoint,theEnvironmentCanadasynthesisonNaturalGasCondensates(NGCs)concludesthat:

“Basedontheavailableinformation,NGCscontaincomponentsthatmay persistinairandundergolong-rangeatmospherictransport.”52

Regardless,anycondensatespillresponseplanmustincludeprovisionstoprotectresponsepersonnel,thepublic,andair-breathinganimalsfromthetoxicatmosphericplumeabovethespill.

Page 51: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

51

9.7 Spilltrackingandmonitoring

TheJan.2018NobleOSCPdoesnotpresentplansormethodologiestotrackandmonitoranoffshorecondensatespill,andthisisasignificantgapthatmustberemedied.Therearemanyproceduresandtechnologiesavailableforspilltrackingthatshouldbeitemizedandpreparedinadvanceofprojectpermitting.53Theseincludeaerialsurveillancewithdigitalcameras;aircraft-mountedinfraredandultravioletsensors;multispectralsatelliteremotesensing;veryhighresolutionradiometrysatellitesensors;aircraft-mountedSyntheticApertureRadar(SAR)andSide-LookingAirborneRadar(SLAR);shipboardobservation;driftbuoys;HighFrequency(HF)andmicrowaveDopplerRadartomapsurfacecurrents;waterhydrocarbonsampling;hydrocarbonsamplingbuoyarrays;etc.Forsubsurfacespillcomponents,additionaltechnologiesshouldbediscussed,includingsonar,watercolumnsampling,laserfluorosensors,geophysical/acoustictechniques,insitufluorometricdetectors,RemotelyOperatedVehicles(ROVs),AutonomousUnderwaterVehicles(AUVs),etc.54Thedocumentsdonotdiscusstheneedtopre-planacomprehensiveNaturalResourceDamageAssessment(NRDA,asitisknownintheU.S.)withwhichtomethodicallydocumentenvironmentaldamagefromalargecondensateornaturalgasreleasefromtheproject.55Suchacomprehensivescientificdamageassessmentisnecessarytodeterminetheextentofecologicalinjury,informthepublicandallstakeholdersoftheextentofinjury,providedetailedinformationuponwhichtobaseclaimstoResponsibleParty,andtoformulateanenvironmentalrestorationplan.Thedocumentsshoulddevelopanddiscussapre-spillNRDAplan;aRapidAssessment,MidtermAssessment;andLong-termAssessmentplan;andNRDAorganizationalandmanagement.Aswell,theenvironmentalmonitoringplansproposedinthedocumentslackdetail,andremaininsufficient.ItissuggestedthatenvironmentalmonitoringforallaspectsoftheprojectbefundedbyNobleandpartners,butbeconductedindependentlythroughIOLR(IsraelOceanographicandLimnologicalResearchInstitute),incooperationwithanIsraelOffshoreCitizens’AdvisoryCouncil(IOCAC,describedinStakeholderEngagementPlansectionbelow). 10. MarineDischarge

10.1 ProducedWaterDischargeProducedwater(condensedwater,formationwater,and‘breakthrough’water)fromthereservoirwillflowinsubseapipelinesalongwithproducedgasandcondensatetotheLPP.ProducedwaterwillbeseparatedanddischargedattheLPP.Israel’sMoEPreports(5/5/2018letterfromMoEPtoGuardians)thattheLPPproducedwatercapacitywillbeonly800m3(8,700bbl)/day,andisexpectedto

Page 52: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

52

dischargeapproximately550m3(3,850bbl)/dayofproducedwater.TheLPPwillbefittedwithaproducedwatertreatmentunit,consistingoftwosorbenttanksandonebackuptank.Thisunitisexpectedtobringdischargedpollutantconcentrationsdowntorequiredlimits:under5mg/LBTEX,andunder15mg/Ltotalhydrocarbons.

Still,producedwaterdischargeshouldbeconductedfurtheroffshore.

TheTAMAOffshoreEIAstates(4.8.3):

“…producedwaterisacomplexmixtureoforganicandinorganicsubstances inasolutionandinparticulateform,withawatersalinityrangingfrom almostsweetwatertohighlyconcentratedbrines.Treatedproducedwater containsdispersedoil,awiderangeofnaturalsubstancesinsolution,and lowresidualconcentrationsofgastreatmentadditivessuchascorrosionand sedimentationinhibitors,MEG,andbiocides.Thenaturalsubstancesin typicalproducedwateralsoincludesmallamountsoftoxicsubstancessuch asheavymetals,aromatichydrocarbons,alkyl-phenols,andradioactive substances(OGP2002;OGP2005;Neffetal.2011).”

“Ofmostconcernarethethreegroupsofmicro-components:heavymetals (inorganic),andpolycyclicaromatichydrocarbons(organic),duetotheir toxicityandenduranceinthemarineenvironment,andalkylphenolswhich areknowntodisruptendocrineactivity(Neffetal2011;OGP2005).”

Producedwatertoxicityderiveslargelyfromacombinationofresidualcondensate,iron,ammonia,andhypoxia.Heavymetalsinproducedwatersincludemercury,cadmium,iron,copper,lead,nickel,andchromium,generallyinconcentrationsbetween1mg/Land4mg/L.

Evenwithapredicteddilutionfactorof10,000:1at100mfromthedischargepoint,itisadvisablethatproducedwaterbedischargedfurtheroffshore,offthecontinentalshelf.Adischargepipelineshouldbeextendedatleast10kmoffshore(totalof20kmoffshore),ataminimumof500mdepth,inordertodischargeallproducedwatersfurtherfromproductiveshallowcontinentalshelfwaters.ThephysicaloceanographyintheDrillingEIAreportswatersintheregionarerelativelyisothermalandisohalinebelow500m.Aswell,fluorescencemeasurementsreportpeakphytoplanktonbiomassfrom50m–200mdepth.Thus,dischargeat500mdepth,belowthethermoclineandproductivephoticzone,wouldlimitexposureoftheshallowwatershelfecosystemtotoxicdischargecomponents.

ProducedWaterReinjection(PWRI),inwhichproducedwaterwouldbeseparatedfromthegasstream,pipedbacktotheoffshorefieldandreinjectedintospecificreinjectionwells,wasconsideredanddeclinedintheNOP37/H.WhileadmittingthatPWRIistechnicallyfeasibleandwouldreduceimpacttothemarineenvironment,theoptionisdeclinedastoocostly(100millionEuros)andoflittlenetenvironmentalbenefit.ThedocumentconcludesthatPWRIcannotbeconsidered

Page 53: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

53

BestAvailableTechnology(BAT)duetotheircontentionthatthetechnicalfeasibilityofdeepwaterPWRIforgasfields“cannotbeconsideredasproven”;wouldcost100millionEuros;andtheimpactofsuchdischargeis“lowandlimitedtothedirectvicinityofthedischargepoint.”Thisshouldbereconsideredforalloffshoregasprojects,includingLeviathan.BATshouldnotbejudgedbycost,butratherwhetheritindeedisBAT.Clearly,PWRIisBAT.Andregardingtheassertionthatimpactswouldbelowandlimitedtothedirectvicinity,themultiyearimpactofformationwaterreleasedfromthefailedLeviathan2wellshouldbeconsidered.AsdiscussedintheEIA,impactsfromthis2011release(offormationwater,notpetroleum)continuedatleastfor5years.However,evenifPWRIisnotadopted,theprojectshouldatleast,asmentionedabove,berequiredtoconstructadischargepipelinefromtheLPPoffshoreatleast10km(totalof20kmfromshore),inordertodischargeproducedwateroffthecontinentalshelf,inwatersatleast500mdeep.Thisiseasytodesignandaccomplish,andmanycoastalminingcompaniespracticeDeepSeaTailingsDisposal(DSTD)inthismanner,dischargingalltailingsfromcoastalminesoffthecontinentalshelfindeepoceanwaters.Thisisverycost-effective,andwillminimizeimpactstoecologicallyproductivewatersonthecontinentalshelf.10.2 NorwayandU.S.OffshoreDischargeRegulationsTheU.S.EnvironmentalProtectionAgencysummarizesoffshoreoilandgasdischargeregulationsinboththeUnitedStatesandNorway(2011).56Section402oftheU.S.CleanWaterActauthorizestheU.S.EPAtoregulatemarinedischargesthroughtheNationalPollutantDischargeEliminationSystem(NPDES),requiringcompliancewithOceanDischargeCriteriaguidelines.Norway’sPollutionControlActauthorizestheNorwayClimateandPollutionAgencytoregulateoffshoredischarges,includingdrillingfluidsandmuds,producedwater,andotherchemicals.Norwayrequireszerodischargeof“environmentallyhazardoussubstances,”usingBestAvailableTechniques,yetimposesastrictzerodischargerequirementinmoreecologicallysensitiveArcticwatersabove68°N.Forcoastalfacilities(within3milesofshore),U.S.regulationprohibitsdischargeofalldrillingfluids,cuttings,anddewateringeffluent(exceptCookInletAlaska,wherespecificacutetoxicityrequirementsmustbemet).Foroffshorefacilities(outsideof3miles),waterbaseddrillingfluidsandcuttings,andoil-basedcuttingsarerequiredtomeettheacutetoxicitystandard,anddischargeofoil-baseddrillingfluidsisprohibited.Forproducedwaters,theU.S.prohibitsdischargenearshore(exceptCookInletAlaska,whereoillimitsare42mg/L(ppm)daily,and29mg/Laverageoveramonth),asisrequiredoffshore.Israelilawsimilarlylimitshydrocarbondischargeconcentrationto29mg/Laverageoveronemonth.Southof68°N,Norwaypermitsproducedwaterdischargewithcomponentsthat“PoseLittleorNoRisk”(PLONOR),

Page 54: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

54

andlessthan30mg/Lofoilmonthlyaverage.Northof68°N,producedwaterdischargeisnotpermitted(exceptfor“operationaldeviations,”andthenamaximumof5%ofproducedwatersmaybedischarged).WhileIsraelirequirementsfortotalhydrocarbonconcentrationinproducedwaterdischargearesimilartothoseofcoastalU.S.andNorwaybelow68°N,Israeldoesnotregulateheavymetalconcentrationindischarge.Clearly,thehigheststandardiszerodischarge,suchasinNorwegianArcticwaters.ItisrecommendedthattheGovernmentofIsraelconsiderincorporatingtheNorwayArcticstandardintoIsraeliregulation,prohibitingmarinedischargeofalldrillingfluids,cuttings,andproducedwaters.10.3 EmissionsMonitoringandReportingItisunclearwhetherIsraelregulationrequiresreal-timeemissionsmonitoringandreportingbyoffshoregasfacilities,bothatmosphericandmarine.Thismustbeclearlyprovidedinregulation,asitconstitutesbestgovernment/industrypractice.IntheU.S.GulfofMexico(wheremostU.S.offshoreproductionoccurs),theU.S.BureauofOceanEnergyManagement(BOEM)requiresevent-basedreportingofairemissionsfromalloffshoreoilandgasfacilitiesthroughitsGulfwideOffshoreActivityDataSystem(GOADS).57Thissystemrequiresoperatorstoreportairemissionsthroughstandardizedcomputersoftwaresystem.AsimilarmonitoringandreportingsystemshouldberequiredbylawinIsraelforalloffshoreoperators,forbothatmosphericemissionsandmarinedischarges.11. FinancialLiability

Animportantcomponentofoffshoredrillingsafetyisanadequateliabilityregimethatimposessufficientfinancialliabilityforcorporatenegligence,inordertomotivateeffectivesafetymanagementbythecompany.Whilethereareinternationalliabilityregimescoveringoiltankerspills,bunkerspills,andhazardousandnoxiouschemicalspills,thereispresentlynointernationalliabilityregimecoveringoffshoreoilandgasdevelopment.Fornow,thisislefttocoastalstatejurisdiction.

WhileIsraelisapartytothe1992IOPCFundConventionandthe1992CLC,itisnotpartytotheSupplementaryFundProtocolprovidinggreatercoverageforcrudeoiltankerspills;the2001BunkerSpillConvention(coveringheavybunkerfuelspills);orthe2010HazardousandNoxiousSubstances(HNS)Convention(coveringnaturalgasandcondensatereleases.)

Directive2013/30/EUonSafetyofOffshoreOilandGasOperations(EU,2013)requiresallmemberstatestoensurethatanoffshoreoilandgasoperator:

“…isfinanciallyliableforthepreventionandmediationofenvironmental damage...fromoffshoreoilandgasoperations.”

Page 55: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

55

ThisshouldbethecaseinIsraelaswell.Inthisregard,Israel’snationalliabilityprovisionsforoffshoregasdevelopmentandtransportationshouldbethoroughlyreviewedandupdatedtoensuresufficientcoverageofaWorstCaseDischargefromanyoftheoffshoregasprojects.Thiscanbedoneeitherthroughtheinternationalregimes,ormoreappropriately,throughnationallegislation.GiventhattheBPspillintheGulfofMexicohascostBPover$61billionUSD58,theGovernmentofIsraelshouldestablishunlimitedliabilityforoffshoredrillingprojects(atleastincasesofgrossnegligence).ThegovernmentshouldalsoensurethatNoble,itspartners,rigowners,andsubcontractorsarejointlyliable,andhavesufficientinsurancecoverageand/orbondingtocoverallcosts(includingenvironmentaldamage)foraWorstCaseDischarge.Aswell,Israel’scriminalliabilityforgrossnegligenceinindustrialoperationsshouldbereviewedandenhancedasappropriate.Thisshouldbediscussedinthedocuments.

TheGovernmentofIsraelshouldestablishanationalOilSpillPreventionandResponseFund,derivedfromanominal(e.g.,0.10Euro/bbl)assessmentonalloilandgasproducedorimportedintothecountry,asmanyothergovernmentshavedone.ThisFundshouldbeusedbythegovernmenttoenhanceitsoversightofoilandgasspillpreventionandresponsepreparedness,inparticularitsoversightcapabilitiesregardingoffshoregasexplorationandproduction.ThecomparablefundintheU.S.istheOilSpillLiabilityTrustFund,derivedfroma$0.09/bblfee,currentlywitha$5billioncurrentbalance.59

12. CO2EmissionsThedocumentspredictthetotalCO2(equivalent)emissionfromconstructionphaseoftheprojectwillbe911,397tons;fromoperationspre-2024atotalof2,416,105tons;andfrom2025–2050(projectdesignlife)atotalof15,416,825tons.Thus,totalCO2eemissionspredictedfromtheprojectperseareestimatedat18,744,327tons.However,thisestimatedoesnotincludeemissionsfromthe22TcfofnaturalgasthatwillbeproducedbytheLeviathanproject.UsingtheUSEPAconversionof0.0550tonCO2/Mcfgas,combustionof22Tcfofgaswillemitapproximately1.2billiontonsCO2e.Inaddition,theprojectestimatelikelydoesnotincludemethaneleakagefrompipelinesoverthe30+yearlifetimefortheproject.Thesesourcesshouldbeaccuratelyandhonestlyreflectedinprojectdocuments.Thepotentialfinancialimplicationoffuturecarbonpricingforthisamountofemissionsshouldbeconsidered,andfactoredintotheproject’sfinancialfeasibilityanalysis.TheGovernmentofIsraelshouldestablishacarbontaxofatleast$60/tonCO2e(comparabletoNorway)onallcarbonemissions.

Page 56: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

56

13. SecurityRiskIngeneral,thesignificantsecurityandterrorismriskposedbytheproject,inparticularattheLPP,hasnotbeenadequatelyaddressedinprojectdocuments.Giventhewell-knownsecuritythreatsintheregion,thisisasignificantgapinprojectriskassessmentandmustberemedied.Infact,theentireIsraelNaturalGasLine(INGL)systemshouldbesubjectedtorigorousandcomprehensivesecurityassessmentandplan(ifithasn'talready).Ascurrentlydesigned,theLeviathanprojectpresentssignificantsecurityrisktothepublicandenvironmentofIsrael,includingthepotentialforprojectinfrastructuretobeintentionallydamagedordestroyed,leadingtodisruptionofenergyservicesonshore;masscasualtiesand/orhealthimpacts;anddisruptionofcommerceandpublicservices.Securitymeasuresshouldbeintegratedintoprojectdesignandconstruction.Thisissuedeservesconsiderablymoredetailinprojectdocuments.Asdiscussedabove(inProjectDesign,Platformvs.FLNG),acentralissueinriskevaluationoftheLeviathanProductionPlatformisthepotentialforhostilitiesbetweenHezbollahandIsraelalongtheborderwithLebanon(asin2006).Insuchasituation,anFPSO/FLNGfacility125kmoffshoreissignificantlylessatriskthanaprocessingplatformonly10kmoffshore.Ifhostilitiesweretoensueagain,anearshoregasprocessingplatformclosetotheborder(e.g.,LPP)wouldlikelybehighonanadversary’stargetlist.Asdiscussedabove,thisriskwouldbesignificantlyreducedbyselectinganFPSO/FLNGfacility125kmoffshoreforLeviathan.

Israel(andNobleEnergyanditspartners)nowfacesignificantsecuritychallenges,whichwillincreasesubstantiallyasthenewdiscoveriesaredeveloped.

ThesecurityriskposedbyLeviathan(andotheroffshoregasfieldsofIsrael)wasdiscussedin2011byformerNobleEnergyofficialAbrahamD.Sofaer,asfollows60:

• Israelisalreadyavictimofterroristattacksinavolatilelocation.ThedevelopmentofnaturalgasaddsanothertargetforterroristsseekingtodamageIsrael’seconomyandinfrastructure.

• Thelogisticsofoffshoreexplorationanddevelopmentaswellastherelativelylimitedrequirementsforterroristattacksaddsanotherlayerofdifficultyinmaintainingsecurity.

• Althoughtheterroristattacksontheoilandgassectorarearelativelysmallproportionofterroristattacksoverall,thedatashowthatasignificantnumberofattackshaveoccurredovertheperiod1990-2005.Thenumberofattacksonthesectorappearstobeincreasinginsomecountries.(InstituteforInformationInfrastructureProtection,“TrendsinOilandGas:TerroristAttacks”)

• Platformsfromwhichdrillingandrecoveryoperationstakeplaceneedtobeprotected,alongwithtransmissionlinesandinstallationsinIsraelorelsewheretotransport,liquefyandshipgastopurchasers.Astablegas

Page 57: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

57

supplynetworkisnecessaryforefficientmarkets,agrowingeconomyandenergysecurity.

• Typesofpossibleattacksincludethefullrangeofthreatsposedbywarandterroristactivities:rockets,explosives,torpedoes,bombings,suicideattacksfromtheairorsea,communicationshacking,kidnappingofpersonnel,andhostagetaking.

• Planningaterroristattackonanunprotectedoilplatformisassimpleascharteringboats,trainingdivers,andprovidingthemwiththeexplosivesrequired.

• Sabotagingtransmissionlinesisevensimplerthanattackingplatforms,withlogisticalrequirementsaslowasobtainingshapedchargesandthemeansfortheirdeliveryatanyvulnerablepoint.

Sofaernotedthatoffshoreplatformsandrelatedfacilitieshaveoftenbeenattackedbystateandnon-stateforces.Hewentontonotethat:

“Optionstoreduceriskandmaximizeflexibilitycouldincludeusingafloating platformcapableofprocessinggasintoLNG.Allsecurityeffortswouldbe concentratedatthedrillingplatformandFLNGfacility,therebyreducing other,greaterrisksinnaturalgasproductionandtransportation(Potenand Partners).ExpertsregardtherisksofprotectingvesselstransportingLNG significantlylowerthanthoseofprotectingpipelinesandotherstationary facilities.AnFLNGfacilityiscurrentlybeingconstructedbyShelloffthe coastofAustralia(tobecompleteby2017),andcontractsareinplaceforup to10moreFLNGfacilitiesthroughouttheworld.”61

Asdiscussedabove,anFLNGfacilityshoulddevelopacontingencyplanintheeventofhostilities,inwhichitwouldclosedownallproductionandmoveoffsiteandoutofrangeofpotentialhostileaction.SucharesponsewouldbeunavailabletothestationaryLPP.Atveryleast,NobleshoulddevelopacontingencyplanforshuttinginandevacuatingtheLPPintheeventofseriousthreatduringarmedconflict.

UseofLNGshuttletankerstotransportLNGfromanoffshoreFLNGfacilitytoportsandoffshorebuoysintroducesdifferentrisksintotheproject.Theseriskscanbereducedandmitigatedwithstandardmaritimesecuritytechniques,includingexclusionzones,varied(unpredictable)transitschedules,noticesofsailing/arrival,intelligence,tugescorts,armedsecurity,sweeps(divers,sonar,boarding),surveillance,crewbackgroundchecks,shipsecurityplansandofficers,etc.62

Onbalance,fromasecurityriskstandpoint,risksposedbyFLNGandLNGtankerswouldbesignificantlylessthanrisksfromanearshoreplatform.

Alsointhisregard,itishighlyadvisableforIsraelandLebanontoresolvethedisputedmaritimeboundaryregion(330mi2)betweenthetwocountries,alongwhichLebanonhasrecentlyofferedoffshoregasdevelopmenttenders.63

Page 58: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

58

Apost-911(2004)studybySandiaNationalLaboratory(U.S.DepartmentofEnergy)reportsthatrisksfromintentionaldamagefromterroristattackstoLNGinfrastructurecanbemoreseverethanthosefromaccidents.64AlthoughtheanalysisfocusedonLNGrisks,itcanapplyaswelltoallnaturalgasinfrastructure,suchasLeviathan.TheSandiastudyitemizedintentionalattackrisksfromvesselramming,triggeredexplosion,insidertakeoverorhijacking,andexternalterroristattackwithexplosivevessels(e.g.USSCole),rocket-propelledgrenades,missiles,orattacksbyplanes.Itrecommendedseveralriskreductionandmitigationmethodsforeach,includinginspections,crewvetting,searchandsurveillance,improvedintelligence,etc.AlloftheserisksexistforelementsofLeviathan,particularlytheLPP.TheU.S.TransportationSecurityAdministration(TSA)issuedin2018itssecurityguidelinesforoilandgaspipelines,whichprovidesacomprehensiveguideforsecurityonallcomponentsoftheLeviathanproject.65TheU.S.securityguidelinesrecommendadoptionofanoverallCorporateSecurityProgram,includingthefollowingelements:

1. Developacorporatesecurityplan;2. Ensuresufficientresources,toincludetrainedstaffandequipment,are

providedtoeffectivelyexecutethecorporatesecurityprogram;3. Ensureidentifiedsecuritydeficiencieshaveappropriatefinancialresources

allocatedinthecorporatebudgetingandpurchasingprocesses;4. Assignaqualifiedprimaryandalternatestaffmembertomanagethe

corporatesecurityprogram;5. Developandmaintainacyber/SupervisoryControlandDataAcquisition

(SCADA)securityplan,orincorporatecyber/SCADAsecuritymeasuresinthecorporatesecurityplan;

6. Developandmaintainsecurityelementswithinthecorporateincidentresponseandrecoveryplan;

7. ImplementappropriatethreatlevelprotectivemeasuresuponreceiptofapertinentNationalTerrorismAdvisorySystem(NTAS)BulletinorAlert;and

8. NotifyTSAofsecurityincidentsmeetingthecriteriaprovidedinAppendixBbyphoneoremailassoonaspossible.

TheLeviathanprojectSecurityPlanshouldincludeadetailedsystemforsecuritymanagementandadministration;securityriskanalysisandcriticalityassessments;accesscontrolmeasures;equipmentmaintenanceandtesting;personnelscreening;drillsandexercises;securityincidentprocedures;responseproceduresintimesofheightenedthreatlevels;cyber/SCADAsystemsecuritymeasures;testingandaudits;andoutreach.Asecurityriskassessmentshoulddetailfacilitycriticality(primarilyfornearshoreinfrastructuresuchastheLPPandpipelines),nottoexceedevery18months;threatassessmentsidentifyingknownandunknownadversaries;asecurityvulnerability

Page 59: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

59

assessments(SVA)identifyingallpotentialsecurityweaknesses;riskassessmentsbasedonthreat,vulnerability,consequence;riskmitigationcountermeasures;andongoingadaptiveriskmanagement.Securitymeasuresforprojectoffshoreandonshorefacilitiesincludeadoptionofenhanced,site-specificsecuritymeasures(bulletinsandalerts,etc.);measurestoimpedeunauthorizedaccess;24/7intrusiondetectionandmonitoring;personnelidentification;personnelbackgroundscreening;equipmentmaintenanceandtesting;personneltraining.Cybersecurityisaparticularconcern,andmustbeaddressed.TheU.S.,theNationalInstituteofStandardsandTechnology(NIST)hasdevelopeda“FrameworkforImprovingCriticalInfrastructureCybersecurity,”whichprovidesgeneralguidancerelevanttoLeviathan(andtheentireINGLsystem).Inaddition,severalothersecurityguidancedocumentsfromtheU.S.shouldbeconsideredfortheLeviathanproject,includingthefollowing:

• AmericanChemistryCouncil,GuidanceforAddressingCyberSecurityintheChemicalIndustry

• AmericanGasAssociation(AGA)ReportNumber12,CryptographicProtectionofSCADACommunications,Part1:Background,PoliciesandTestPlan

• AmericanNationalStandardsInstitute(ANSI)/InternationalSocietyofAutomation(ISA)–99.00.01–2007,SecurityforIndustrialAutomationandControlSystems:Terminology,Concepts,andModels

• ANSI/ISA–99.02.01–2009,SecurityforIndustrialAutomationandControlSystems:EstablishinganIndustrialAutomationandControlSystemSecurityProgram

• AmericanPetroleumInstitute(API)Standard1164PipelineSCADASecurityANSI/APIStandard780,SecurityRiskAssessmentMethodologyforthePetroleumandPetrochemicalIndustries

• U.S.DepartmentofCommerce,NationalInstituteofStandardsandTechnology(NIST),FrameworkforImprovingCriticalInfrastructureCybersecurity

• U.S.DepartmentofCommerce,NIST,SpecialPublication800-82,GuidetoIndustrialControlSystems(ICS)Security

• U.S.DepartmentofHomelandSecurity,OfficeofInfrastructureProtection,Risk-BasedPerformanceStandardsGuidance:ChemicalFacilityAnti-TerrorismStandards,May2009

• U.SDepartmentofEnergy,OfficeofElectricityDeliveryandEnergyReliability,EnergySectorCybersecurityFrameworkImplementationGuidance,January2015

• U.SDepartmentofHomelandSecurity,TransportationSystemsSectorCybersecurityFrameworkImplementationGuidance,June2015

Page 60: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

60

14. StakeholderEngagementTheStakeholderEngagementPlan(SEP)outlinedinprojectdocuments(inparticularAppendix2oftheSLIP),isclearlyinsufficient.Noblestates: “NobleEnergyiscommittedtoestablishingandmaintainingtransparent, respectfulandregularengagementpracticestounderstandandmanage stakeholderconcernsandinterests.Thesepracticesareaboveandbeyond theengagementactivitiesmanagedbyIsraeligovernmentagenciesasapart ofthepermittingprocesses.”

First,giventheextensiveamountofredactionofsystems-criticalinformationinprojectdocuments,aswellasthefailuretopubliclyreportthe2011Leviathan2explorationwellfailure,theaboveassertionisquestionable.Moreimportantly,theStakeholderEngagementPlanreliesontraditionalpassiveengagement,whichforaprojectofsuchcomplexityandpotentialconsequenceisinsufficient.Passiveengagementconductedbytheproponentstodate(citedinthe2016SLIP)providessimplythat: “…thirdpartiespotentiallyaffectedbyprojectdevelopmentareprovided withopportunitiestoreviewprojectinformationandprovidecomment.”

Theoilandgasindustry’sconventionalpassivestakeholderengagementprocessprovidesthousandsofpagesofdetailed,technicaldocumentsforpublicreviewandcomment,publichearings,publicrelationscampaigns,etc.,butthisisknowntobeaninsufficientmethodforobtainingauthentic,informedpublicengagement.Foraprojectwiththetechnicalcomplexity,risk,andpotentialconsequencetothepublicinterestofIsrael,amoredeliberateSEPprocessmustbeestablished.Forthat,IrecommendestablishmentoftheIsraelOffshoreCitizens’AdvisoryCouncil.66Large-scaleresourcedevelopmentprojectssuchasLeviathan(Tamar,andotheroffshoregasdevelopments)generallyreceiveinsufficientoversightby,andengagementwith,civilsociety.Whileindustryandgovernmentmayprovidetransparency,thisinitselfdoesnotconstituteeffectivecivilsocietyengagement.Membersofthepublicoftenhaveinsufficienttime,financialability,andtechnicalexpertisetoengageeffectivelyincomplexresourcedevelopmentandpolicyissuessuchasLeviathan.

TherecanbeanoverwhelmingamountofinformationavailableregardingprojectssuchasLeviathan,muchofittechnicalandunfamiliar,andevenmultipleprojectsandpolicyissuesintersectingsimultaneously,makingitdifficultforcitizenstoassimilatepertinentinformationandprovideinformedcomment.Whileoutside

Page 61: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

61

technicalexpertscanconductsite-visitsandconsultanciestoprovidetheirtechnicalreviewandrecommendations,ifthereisnostandingcitizencapacitytofollowthroughontherecommendations,suchprocessesmayhavelimitedimpact.

Andintheabsenceofeffectivepublicengagement,corporateandgovernmentvigilancecanweaken,complacencyincreases,environmentalandsocialstandardsdecline,andrisksincrease.Suchinsufficientoversight,lowerstandards,andcomplacencycanresultinacuteandcatastrophicresults;suchasoilspills;long-term,chronicenvironmentaldegradation;andsocialtension,mistrust,litigation,andevenviolencebetweenlocalpeopleandindustry.

Tocorrectthisproblem,localcivilsocietystakeholdersneedtobedirectlyinvolvedinthereviewandoversightofresourceindustryoperationsthatpotentiallyaffecttheirlives,inparticularextractiveindustriessuchasoil,gasandmining.Andtoeffectivelyengage,citizenstakeholdersneedtheirownorganizationwithsufficientfunding,staff,authority,broadrepresentation,andindependence.

Additionally,astheGovernmentofIsraelisbothfinancialbeneficiaryandregulatoroftheproject,ithasaninternalconflictofinterestinprovidingeffectiveoversight.

14.1 IsraelOffshoreCitizens’AdvisoryCouncil

Thus,itisproposedherethattheGovernmentofIsraelrequiretheestablishmentofanIsraelOffshoreCitizens'AdvisoryCouncil(IOCAC)asapre-conditionforfinalgovernmentapprovaloftheLeviathanproject.Modeledlooselyonthetwooiloversightcitizens’councilsinAlaska(www.pwsrcac;www.circac.org),aswelltheShetlandOilTerminalEnvironmentalAdvisoryGroup,or“SOTEAG”,inScotland(www.soteag.org.uk/),theIOCACwouldprovidestructured,non-binding,informedpublicadvice,oversight,andengagementwithalloffshorepetroleumdevelopmentinIsrael’sEEZ.

ItisproposedthattheIsraelCouncilbeguaranteedabudgetofapprox.$5millionUSD/year,eitherfromgovernmentresourcerevenuesfromtheprojects,ordirectlyfromtheoffshorepetroleumindustry(e.g.,Nobleanditspartners).Bycomparison,ourPWSRCACreceivesapproximately$4million/yearfromtheownersandoperatorsoftheTransAlaskaPipelineSystemMarineTerminalinValdezAlaska.Asproposed,theIsraelCouncilwouldhaveabroadermandate,andcovertheentireoffshoreEEZofIsrael.Thus,abudgetof$5million/yearseemsappropriate.

TheIsraelCouncilshouldbecomprisedofallmajorstakeholderconstituenciespotentiallyaffectedbyoffshoreindustry–e.g.,fishing,aquaculture,conservation,tourism,women,youth,science,andlocalcommunities.Properlystructured,theIOCACwillbecometheeyes,ears,andthevoiceforlocalcitizensregardinglarge-scalepetroleumdevelopmentinIsrael’sEEZ,andaugmentgovernmentandindustryoversightoftheoffshoreprojects.

TheCouncilshouldhaveaBoardofDirectorsrepresentingallmajorstakeholders,

Page 62: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

62

paidstaffforday-to-dayoperation,andsub-committeesasappropriatetoitsmission.ThebroadmissionoftheIOCACwouldbetoenablecitizenstakeholderstoensurethehigheststandardsofenvironmentalandsocialresponsibilityofalloffshoreindustrialprojectsand/orallindustrialactivityinIsrael’sEEZ.Itsgoalistoreducethedeleteriousenvironmentalandsocialimpactandriskofresourcedevelopment,andenhancecommunicationandengagementbetweencivilsociety,industry,andgovernment.

Specifically,theCouncilshouldprovideoversight,advice,andadvocacyonissuessuchaswheretopermitadditionaldevelopment,BestAvailableandSafestTechnology(BAST)standards,biodiversityconservation,riskassessmentandaccidentprevention,responsepreparedness,liabilitystandards,environmentalmonitoring,biodiversityoffsets,invasivespeciescontrol,socialimpactmitigationprograms,transportroutesandmethodologies,regulatoryreform,governmentrevenuesandtaxes,wastemanagement,remediationandrestoration,laborpractices,humanrights,humanhealth,andsoon.TheCouncilshouldreviewandsubmitwrittencommentsonallexistingandproposedprojectoperations.Thiscanincludelegislation,regulationsandpermits,andindustrypolicy,procedures,andfinancialmatters.

AttherequestofitsBoardorcommittees,theIOCACshouldcommissionindependentscientificstudies,consultancies,andreportsonissuesofinterestorconcerntoitsstakeholders.Thisresearchshouldcontributetothefactualbasisofthecouncil’spolicyrecommendationstoindustryandgovernment.

TheCouncilwillprovideanon-going,structuredmechanismforgreatercommunication,collaboration,andtrustbetweencitizens,government,andoffshoreindustry,andshouldreduceindustry’senvironmentalimpact,risk,andfootprint.Thecitizens’councilwillnotsubstituteforeffectivegovernmentaloversight,butwillcomplementandenhancesuch.TheestablishmentofthisproposedCouncilisfundamentaltoindustry’s“sociallicensetooperate,”genuinecorporatesocialresponsibility,citizenempowerment,environmentaljustice,governmentlegitimacy,andsustainabledevelopment.Assuch,thecitizencouncilwillprovidelong-termbenefittothepublic,government,andindustry.

15. GovernmentRevenue-IsraelPermanentFundWhileoutsidethescopeofworkforthisreview,anotherimportantconsiderationthatmustbeaddressedisasufficientgovernmentroyalty/taxationregimeforhydrocarbondevelopment,andtheneedtosaveaportionofthesenon-renewablerevenuesinanationalhydrocarbonrevenuesavingsfund.Thisisdonebyseveralothergovernmentsaroundtheworld,includingAlaska,Alberta(Canada),andNorway.67Ashydrocarbonreservesarefinite,soistherevenuetheyprovide.Thus,intheinterestofitscitizenry(presentandfuture),theGovernmentofIsraelshouldestablishasufficienttaxationregimeforoffshoregasdevelopment,

Page 63: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

63

collectingatleast50%ofgrossrevenuefromtheprojects;andsettingasideatleast50%ofthesegovernmenthydrocarbonrevenuesinanIsraelPermanentFund,perhapsmodeledaftertheAlaskaPermanentFund(nowworthover$65billionUSD).AportionofthegovernmentrevenuesfromgasdevelopmentshouldbecommittedtosubsidiesforrenewableenergyinIsrael.16. ConclusionGiventheabovesubstantiveconcerns,itistheauthor’srespectfulrecommendationthattheGovernmentofIsraelimmediatelysuspendpermittingfortheLeviathanproject,pendingsatisfactoryresolutionofallissuesdiscussedherein.Inparticular,theprojectshouldberedesignedtoeliminatethenearshoreLeviathanProductionPlatform(LPP)andextensiveseabedpipelineinfrastructure,optinginsteadforanFLNGfacilityoffshoreatthegasfieldanduseofshuttletankerstodeliverLNGandcondensatetoIsraelandothermarkets;oranFPSO.AnoffshoreFPSO/FLNGoptionwoulddramaticallyreducenearshorerisksandimpactsoftheproject.ThemostenvironmentallyresponsibleoptionforLeviathandevelopmentisforNobletodesignandconstructanFLNGfacility,usingLNGandcondensateshuttletankers.Alternatively,inordertoavoidconstructiondelays,thecompanyshouldconsiderleasinganFPSOforinitialLeviathandevelopment(asitdoesatitsAsengoilandgasfieldoffEquatorialGuinea),andtie-intoitsseabedgaspipelinesystem(nowinconstruction)totransportgastoshoreandtheINGLsystem.NobleshouldsellthenewlyconstructedLPPtoanotheroffshoregasprojectelsewhere.

Aswell,manysystems-criticaltechnicaldetailsareeithernotreported,orredactedfromtheprojectdocuments.Thismustberemediedbeforepermitting.Again,whiletheabovereviewfocusesontheinsufficienciesoftheLeviathandocuments,itisofferedrespectfully,andinthesincerehopethatitwillassistIsraelicivilsociety,theGovernmentofIsrael,thecompanies,andpotentiallendersbetterunderstandtherisksinvolvedintheproject,thepotentialeffectivenessofproposedriskmitigationmeasures,andcontributetoinformeddecisions.ThisreviewisofferedinrecognitionofIsrael’slaudablegoalofsecuringenergyindependence.17. References1EnvironmentCanada,2016.NaturalGasCondensates:ScreeningAssessment PetroleumSectorStreamApproach.Dec.140pp.2EnvironmentCanada,2016.Ibid3EnvironmentCanada,2016.Ibid.4EnvironmentCanada,2016.Ibid.5Moshel,Ariel,GiladKozokaro.2018.LeviathanPlatform–CheckofMaximum BenzeneConcentrationsintheEnvironment.NobleEnergy,March.

Page 64: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

64

6Banerjee,S.1984.Solubilityoforganicmixturesinwater.EnvironmentalScience andTechnology18:587-5917S.L.RossEnv.Research,1982.Thebehaviorandfateofgascondensatespills,for MobilOilCanadaVenturegasfielddevelopmentontheScotianShelf,85pp.8SINTEF,2017.SigynCondensate–propertiesandbehavioratsea.SINTEFReport, OC2017A-137.EnvironmentalTechnology.9Joye,SamanthaB.,I.MacDonald,I.Leifer,V.Asper,2011.Methaneoxidation potentialofhydrocarbongasesreleasedfromtheBPoilwellblowout. NatureGeoscience,Vol.4,pp.160-16410EnvironmentCanada,2016.NaturalGasCondensates:ScreeningAssessment.11EnvironmentCanada,2016.Ibid.12Villanueva,RD,M.N.E.Montano,H.T.Yap,2008.Effectsofnaturalgascondensate– wateraccommodatedfractiononcorallarvae.MarinePollutionBulletin(56) 20081422-142813Bobra,A.M.,ShiuWY,MackayD.1983.Acutetoxicityoffreshandweatheredcrudeoils.Chemosphere.12(9),pp.1137-114914Lewis,et.al.2000(a)(b).Mortalityamongthreerefinery/petrochemicalplant cohorts.1970-1982,Active/terminatedworkers.J.Occupationaland EnvironmentalMedicine,42(7),pp.721-72915Adler,R.,BoermansHJ,MoultonJE,MooreDA,1992.Toxicosisinsheepfollowing ingestionofnaturalgascondensate.Vet.Pathology,29:11-20/16EVOSTC,2014.ExxonValdezOilSpillUpdateonInjuredResourcesandServices, ExxonValdezOilSpillTrusteeCouncil,www.evostc.gov17Matkin,C.O.,2013.Monitoring,Tagging,FeedingHabitats,andRestorationof KillerWhalesinPrinceWilliamSound/KenaiFjords2010-2012.Exxon ValdezOilSpillTrusteeCouncilRestorationProject,FinalReport(Project 10100742),NorthGulfOceanicSociety,HomerAlaska18EnvironmentCanada,2016.NaturalGasCondensates:ScreeningAssessment.19ExxonMobil,2008.PointThomsonOilSpillContingencyPlanandEIS,Alaska.20Schaps,Karolin,2012.TotalshutsElgingas,oiloutputafterleak.Reuters.Mar.26.21MoEP,2018.LettertoGuardiansoftheCoastalPlain,May5.IsraelMinistryof EnvironmentalProtection.22WWF,2011.DrillingforgasinMediterraneanSeawillthreatenvaluablemarine life,saysWWF.MediaStatement,9Feb.23Galil,B.andHerutB.,2011.Marineenvironmentalissuesofdeepseaexploration andexploitationactivities(oilandgas)offthecoastofIsrael.IOLRReport H15/201124BSEE,2012.OilandGasandSulphurOperationsontheOuterContinentalShelf- IncreasedSafetyMeasuresforEnergyDevelopmentontheOuterContinental Shelf.U.S.Dept.ofInterior,BureauofSafetyandEnvironmentalEnforcement (BSEE),30CFRPart2,Aug.25EU,2013.Directive2013/30/EUonSafetyofOffshoreOilandGasOperations, EuropeanUnion.26EU,2013.Ibid.

Page 65: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

65

27OSC,2011.Deepwater:theGulfOilDisasterandtheFutureofOffshoreDrilling. NationalCommissionontheBPDeepwaterHorizonOilSpillandOffshore Drilling.Deepwater,January.28NAE,2011.MacondoWellDeepwaterHorizonBlowout,NationalAcademyof EngineeringandNationalResearchCouncil.29API,Standard53.AmericanPetroleumInstitute30USDOT,2003.PipelineSafety:PipelineIntegritymanagementinHigh ConsequenceAreas(GasTransmissionPipelines);FinalRule.Dec.15.U.S. DepartmentofTransportation,OfficeofPipelineSafety.31Alloui,TaharEng.,2015.10worstissuesaffectingfieldinstruments:pressure transmitters.MIET,Nov.28.32RatioOil,2014.RatioOilExplorationLP(1992)PartnershipPresentation.33Petronas,2018.PetronasFloatingLiquefiedNaturalGas(FLNG). www.petronasofficial.com34Reuters,2018.StartofGolar’sfloatingLNGinCameroonmaydrawmoreAfrican clients.March12.35Shell,2018.ShellPreludeFLNG,www.shell.com36Shell,2018.Ibid.37BWOffshore,2017.www.bwoffshore.com38Energean,2017.KarishandTaninFieldDevelopmentPlan.Doc.No.ISR-GEN-RP- PJM-0025.15June.www.energean.com39Energean,2017.Ibid.40Huddy,JohnT.,2018.Rockets,Missiles,andMore:PredictingtheThirdLebanon War.TheJerusalemPost,Feb.9.41Reuters,2017.Shell’sPreludeFLNGfacilitysetssailfromSouthKoreatoAustralia. epmag.comJune29.42Holland,R.2018.OSRL,Personalcommunicationviaemail,May17.43SINTEF,2017.SigynCondensate–propertiesandbehavioratsea.SINTEFReport, OC2017A-137.EnvironmentalTechnology.44Tremblay,J.et.al.,2017.Chemicaldispersantsenhancetheactivityofoil-andgas condensate-degradingbacteria.ISMEJournal(2017)11,2793-2808, InternationalJournalforMicrobialEcology.45SINTEF,2017.SigynCondensate–propertiesandbehavioratsea.SINTEFReport, OC2017A-137.EnvironmentalTechnology.46SINTEF,2017.Ibid.47SINTEF,2017.Ibid.48Wen,Jianet.al.1999.Removalofpollutantsinseawateraspretreatmentof reverseosmosisdesalinationprocess.WaterResearch,Vol.33,Issue8,June49USNOAA,2018.CAMEOChemicals.U.S.NationalOceanicandAtmospheric Administration(NOAA).50USNOAA,2018.Ibid.51Adel,Mike.2017.CondensateFog.ABriefbyDr.MikeAdel.Nov.15.52EnvironmentCanada,2016.NaturalGasCondensates:ScreeningAssessment.

Page 66: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

66

53Klemis,Victor.2010.Trackingoilslicksandpredictingtheirbehaviorusing remotesensorsandmodels:CasestudiesoftheSeaEmpressandDeepwater HorizonOilSpills.JournalofCoastalResearch,Vol.26,Issue5.pp.789-797.54NAP,1999.SpillsofNon-FloatingOils,RiskandResponse.NationalAcademies Press.55Steiner,2004.UNguidancemanualontheassessmentandrestorationof environmentaldamagefollowingmarineoilspills.DRAFTforUNEP/UNIMO, Sept.;publishedbyUNEP/IMO2009.56USEPA,2011.RegulatingPetroleumIndustryWastewaterDischargesinthe UnitedStatesandNorway.EnvironmentalProtectionAgencyInformation Sheet,Jan.57BOEM,2016.GulfwideOffshoreActivityDataSystem(GOADS),U.S.Bureauof OffshoreEnergyManagement(BOEM),NTL2016-No358Mufson,Steve,2016.BP’sbigbillfortheworld’slargestoilspillreaches$61.6 billion.WashingtonPost,July14.59OSLTF,2018.OilSpillLiabilityTrustFund,U.S.NationalPollutionFundsCenter.60Sofaer,AbrahamD.2011.SecuringIsrael’sOffshoreGasResources.Presentation toLloyd’sConference:“SpecialistSolutionsintheFaceofChangingRisks.” TelAviv,June23.61Sofaer,AbrahamD.2011.Ibid.62SandiaReport,2004.GuidanceonRiskAnalysisandSafetyImplicationsofaLarge LiquefiedNaturalGas(LNG)SpillOverWater.SAND2004-6258,December63Reuters,2018.Lebanonvowstoblockborderwall,Israeleyesdiplomacyongas field.Feb7.64SandiaReport,2004.GuidanceonRiskAnalysisandSafetyImplicationsofaLarge LiquefiedNaturalGas(LNG)SpillOverWater.SAND2004-6258,December65USTSA,2018.PipelineSecurityGuidelines.U.S.TransportationSecurity Administration,Mar.,p30.66Steiner,R.2013.Citizens’AdvisoryCouncilstoenhancecivilsocietyoversightof resourceindustries.UnitedNationsEnvironmentProgram(UNEP) Perspectives,IssueNo.10.67IMF,2001.StabilizationandSavingsFundsforNonrenewableResources: ExperienceandFiscalPolicyImplications.InternationalMonetaryFund, April13.AppendixI–AuthorBiographySummaryofrelevantprofessionalexperienceofauthor,ProfessorRichardSteiner,AnchorageAlaska(www.oasis-earth.com):Theauthorhasworkedextensivelyinthefieldofmarineoilspillprevention,response,damageassessment,restoration,andpolicyaroundtheworld,advisinggovernments,industry,theU.N.,NGOs,andthepubliconenvironmentalissuesofoffshoreoilandoilspills,assummarizedbelow:

Page 67: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

67

• Alaska–ProfessorandmarineconservationbiologistatUniversityofAlaska

from1980–2010,stationedintheArctic;PrinceWilliamSound;andAnchorage.Inearly1980sconductedworkshopsinArcticcommunitiesre:risksofoffshoreoildevelopment;participatedin1989ExxonValdezoilspill--advisedemergencyresponse,helpeddeveloptheU.S.OilPollutionActof1990,co-foundedthePrinceWilliamSoundScienceCenter,initiatedestablishmentoftheRegionalCitizensAdvisoryCouncils(RCACs),andproposedsettlementofgovernment/Exxonlegalcaseanduseoffundsforhabitatprotection;continuedpublicoutreachonoffshoreoil/environmentissues.HelpedfoundandservedasFacilitatorofShippingSafetyPartnershiptoreduceriskofshipcasualtiesinAleutiansandArctic.

• Russia–Co-PrincipalInvestigatorforprojectonoilspillpreventionandresponseonSakhalinIsland;servedasforeigntechnicalexpertonpublicreviewcommissionfortheSiberiaPacificPipelineproject;taughtoilspillworkshopsinRussiaFarEast,Siberia,andWesternRussia;advisedRussiangovernmentandDumaonoilroyaltyandtaxationissues;andservedasoilspillexpertonIUCN/ShellIndependentScientificReviewPaneltoreviewtheSakhalinIIprojectanditsthreattothecriticallyendangeredWesternPacificGrayWhale.

• KazakhstanandAzerbaijan-Workedwithcivilsocietygroupstoenhanceoilsectorandgovernmenttransparency,andenhancegovernmenttakeofoilrevenues.

• Africa–Nigeria,workedwithNigeriaMinistryofEnvironment,NGOs,andstategovernmentsinassessingandmitigatingdamagefromoildevelopmentinNigerDelta;advisedDeltaStategovernor;andservedasexpertwitnessinlawsuitsre:environmentaldamagefromoil;organizedanddirectedNaturalResourceDamageAssessmentofoilspillsinNigerDelta.InMauritania,workedtoenhancecitizeninvolvementinoffshoreoilsectoroversight.

• Pakistan-DevelopedandservedforPakistanEnvironmentalProtectionAgencyandUNDPasChiefTechnicalAdvisorforfirstcomprehensiveoilspillNaturalResourceDamageAssessmentinadevelopingnationin2003–2004,forTasmanSpiritoilspillinArabianSea.

• Lebanon-DuringIsrael/Hezbollahwarof2006,advisedthegovernmentofLebanononissuesregardingtheJiyehoilspill,includingresponseanddamageassessment;briefedtheIsraeligovernmentandU.S.EmbassyinTelAvivonthespill.

• China–ConductedrapidresponsemissiontoDalianoilspill,advisedChineseNGOsandmediaonspill,2010.AdvisedNGOs,media,andgovernmentsre:SanchicondensatetankerdisasterinEastSea,2018.

• GulfofFinland–Conductedworkshopsin2005onbehalfofU.S.StateDepartmentonoilspillprevention,response,damageassessment,andrestorationinFinland,Russia,Estonia.

• Canada–AdvisedIndigenoustribesinB.C.re:risksofoiltransportandpipelinesproposedtonorthcoast.

Page 68: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

68

• U.K.–AdvisedShetlandIslandgovernment,mediaonBraerOilSpill,1993.• U.S.–ConductedseveralprojectsinU.S.re:oilspillpreventionandresponse,

includingforStateofHawaii,advisedgroupsinGulfofMexicoBPspillin2010,manyspeakingengagementsre:environmentalrisksofoil,etc.

• Belize–ConductedrapidassessmentofenvironmentalaspectsofoildevelopmentinBelizeforcitizen’scoalition(2011).

• Japan–Conductedoilspillprevention,response,andimpactworkshopsaroundHokkaidoIsland(2004).

• Spain/CanaryIslands–ServedastechnicalexpertforFuerteventuraCouncil,CanaryIslands,inreviewofdeepwaterdrillingproposalinCanaryIslands2013.

• NewZealand–Providedexpertwitnessaffidavitsforoffshoreoilexploratorydrillinglegalcases,2012and2015.

• Norway/Svalbard–Co-principalscientistonresearchcruisere:offshoreoildrillingoffSvalbardNorway,BarentsSeain2014.

• Other-Authoreddozensoftechnicalandpopularpublicationsonenvironmentalrisksofoil,includinginternationalmanualonenvironmentaldamageassessmentandrestorationafterlargemarineoilspillsforUNEPandIMO,commentedregularlytomediaonoilrisks,etc.

AppendixII–HydrocarbonInfluenceontheMarineEnvironment(citedhereverbatimfromTAMAOffshoreEIA,pp.250-255)Theimpactofpresenceofhydrocarbonsinamarineenvironmentmaybeacuteorchronic.

Acutetoxicity–immediateshort-termimpactofasingleexposuretoatoxinChronictoxicity-ongoingexposuretoatoxin

Hydrocarbons’acuteandchronictoxicitytomarineorganismsdependsonseveralfactors:

1. Hydrocarbonconcentrationandlengthofexposure2. Bioavailabilityandpersistenceofthespecifichydrocarbon3. Abilityoftheorganismtoaccumulateandmetabolizethehydrocarbons4. Abilityofthehydrocarbonmetabolitestointerferewithvitalphysiological

processes(growth,reproduction,survivability)5. Narcoticeffectonneuralconductance

AstudyconductedinAustraliaundercontrolledlaboratoryconditions(Neffetal.,2000)testedchemicalandphysicalchangesinvariousoilsasaresultofevaporationandtheimpactofthesechangesontheirchemicalcompositionandtoxicitytomarineorganisms.Condensatewasoneofthetestedsubstances.Studyresultsshowthatinafreshcontamination,MAH(monocyclicaromatichydrocarbons)arethemostsubstantialcontributorstoacutetoxicity,andwhenweatheringprocesses

Page 69: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

69

havehadsometimePAH(polycyclicaromatichydrocarbons)becomemoreprominentcontributors.

PAHtoxicitydependsamongotherfactorsonmolecularstructure.Ingeneral,thelightaromatichydrocarbons(includingMAH)areconsideredacutelytoxicbutnotcarcinogenictomarineorganisms.Heavyaromatichydrocarbons,ontheotherhand,arenotacutelytoxicbutseveralofthemareknowncarcinogens(seeCanadianCouncilofMinistersoftheEnvironment,1999).Thehighacutetoxicityoflightaromatichydrocarbonsismainlyascribedtotheirbeinghighlywater-soluble.Inahydrocarbonmixture(suchasthatincondensate)overallacutetoxicityisthecumulativeproductoftheindividualcomponents'toxicity.Narcoticeffectsofhydrocarbonsaremainlyascribedtolightvolatilehydrocarbons.

Consideringthatthetestedscenariointhepresentsurveyoutlinesanextremeincidentwithdamagetoacondensatestoragetankandaone-timedumpingofliquidintothesea,andbasedontheinformationregardingthechemicalpropertiesoftheliquid(highcontentoflighthydrocarbons)weestimatethattheexpectedimpactonorganismsintheshoreareawillbeclassifiedasacute.

Environmentalimpact

Theimpactofhydrocarbonpollution,includingthatofcondensate,onthemarineenvironmentvariesdependingonalargerangeoffactors,themainonesbeing:theexactchemicalcompositionofthespilledliquid,weatherconditionsatthetimeofcontaminationandafterward,propertiesofthereceivingmedium(water,sand,rock),andthecompositionoftheexposedpopulation.Topredictthenatureoftheexpectedtraumatosomehabitatasaresultofhydrocarboncontaminationitisadvisabletoreviewstudiesconductedinthefieldinthewakeofsimilarcontaminationincidents,andfindrelevantinformationfromlabexperiments.Pertinentdatamustbecross-referencedregardingimpactonsimilartaxa,evenifthegeographicalregionsaredifferent.

Openseaenvironment

Condensatecontaminationoriginatesintheopenseaenvironmentsothecontaminationisexpectedtotravelonthewatersurface.Atthispointweatheringprocesseswillbeintheirearlystagesandthemostimpactedwillbeorganismsthatinhabittheopenwatersandtheupperportionofthewatercolumn.Mostimpactedorganismsatthisstagearepopulationsofplankton,fish,andbirdsthatcomeintocontactwiththewater,butalsomarinemammalsandseaturtlesareatriskofexposure.

Plankton

Phytoplanktonandzooplankton,includinglarvalformsofmanyinvertebratesaswellasfisheggsandlarvaehaveacentralroleinprimaryproductioninthemarine

Page 70: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

70

environment.AstudyconductedinAustraliaundercontrolledlaboratoryconditions(Neffetal.,2000)thattestedtoxicityofcondensateandthreeotheroilshasshownthatacutetoxicityofthetwolightoilswashigherthanthatoftheheavyoilsinallsixspeciesoforganismsthatweretested(2speciesoffish,anelongated-abdomendecapod,amysid,aseaurchin,andseaurchinlarvae).Trackingtheimpactofpollutiononplanktonpopulationsintheopenseaisdifficulttounachievable,soitisimpossibletoruleoutlong-termeffectsofsuchpollutionwhichmaymanifestinharmtotheadultpopulationofcertainspecies(asaresultofinjurytothelarvalstages).

Birds

Seabirdsareconsideredtobehighlyvulnerabletohydrocarbonpollutionbecausetheycomeindirectcontactwiththesubstancesfloatingonthewatersurface.Speciesthatconcentrateatthewatersurfaceand/ordiveinsearchoffoodareathighriskofinjury.Maincausesofdeathonexposuretopollutionare:drowning,starvation,poisoning,andlossofbodyheatcausedbyfeathersbeingcoveredintar.Althoughtherehavebeenattemptstocleanbirdswhowereaffectedfewsurvivetheprocess,andittranspiresthattheirchancesofreproducingsuccessfullyaresmall.DetailedinformationregardingthebirdpopulationoftheCarmelbeachareaisavailableinAppendixN,attachedbelow.

Marinemammalsandseaturtles

Marinemammalsandseaturtlesbreatheairandmustcomeuptothesurfacetodoso.Incaseofalargeoilslick,thesecreatureswillbeexposedtochemicals'toxicfumesparticularlyiftheyareexposedduringthespill'sfirsthours.Inhalingtoxicfumesmayinjuretherespiratorysystemandcauseirritationtoavaryingdegree.Organismsmayalsobeexposedtooilpollutionthroughfeedingandskincontact.Digestingchemicalsafterconsumingcontaminatedorganismsoraccidentalingestionofoilmayinjuretheliverandkidneys,causeanemia,immunedepression,reproductivedysfunction,andevendeath.

Terrestrialenvironmentontheshore

Theslick'sfinaldestinationisthebeach,whereitwilllandonasandyorarockybed(seebelow).Thesandyenvironmentintheshallowsandinthesurfzoneisahomogenoushabitat(withrelativelyfewecologicalniches)andithasalowstabilitywhichdictatesarelativelysmallvarietyofspeciescomparedtorockyhabitatsandsandyhabitatsindeeperwater.Nevertheless,pollutionreachingthesandybeachwilllargelycontainamixtureofhydrocarbonsatadvancedweatheringstages.Asnotedearlier,atthispointweknowthatthemixture'sacutetoxicitycanbeascribedtoPAHs.WefurtherknowfromastudyconductedfollowingtheExxonValdezdisasterthatexposingfisheggstodegradationproductsofthespilledoilcauseddevelopmentalandgeneticdamageaswellasdeath(atexposurelevelsof0.4-

Page 71: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

71

0.7ppbPAH).Otherstudieshavedemonstrateddevelopmentaldamagealsoininvertebrateswhenexposedtolowerconcentrationsofhydrocarbons.

Organismsthatinhabitthebeachsuchasthetuftedghostcrab(Ocypodecursor)andcrabsthatliveonthewave-washedswashzonesuchasGastrosaccussanctus)canbeexpectedtosufferharmfromexposuretopollution,asarebirdsthatfeedinthisareabyfeedingoncontaminatedorganisms.Seaturtlesmayalsobeexposedtopollutionimpactintheirlayingareas;thisposesahazardtoadultturtles,eggdevelopment,aswellassurvivaloftheyoungturtles.

Ifhydrocarbonsarealsopresentonthesandybed,thenthebenthicpopulationofthesoftbed,meiofaunainparticular,willbeadverselyaffectedbythepresenceofPAHs.ExperimentsconductedinclosedsystemshavefoundthatPAHshaveaninhibitoryeffectonphysiologicalprocessesalsoinmicroalgae.Whenpresentinsediment,PAHsmayalsoaffectthecompositionofspeciesinthebenthiccommunitybyboostingthenumbersofresistantspeciessuchasnematodes,aneffectthatcouldcascadeupthefoodchain.

Intertidalzone

Therockyintertidalzone'svulnerabilitytohydrocarboncontaminationanditsabilitytorecoverisdirectlyrelatedregionalgeomorphology.Shorestructureanddegreeofexposuretowaveenergyinadditiontothefactorsnotedabovearealsosignificant(seealsothetableofoilspillsensitivities,below).Onarockybeachthatisexposedtowaveenergytheslick'sretentiontimewillbelimitedandrecoveryisexpectedtoberapid.Ifarockybeachhasanirregularfront,withmanysmallbaysandareasthatareprotectedfromwaveaction,theslickcanbeexpectedtogettrappedintheprotectedareascausingongoingdamageandslowedrecovery.Underthecondensatepollutionscenario,physicalcoatingandasphyxiationoforganismsbyheavyhydrocarbonsisnotexpected,buttoxiceffectsfromwater-solublecomponentsareapossibility.Theseeffectsmaybeshort-lived(afewhours)butinprotectedareaslikesmallbaysandtidalpoolssuchasthosefoundintheabrasionplatformareamayincreasethewater'sretentiontime(withtoxinspresent)andthereforealsoorganisms'exposuretimetotoxins.Organismsfromawidevarietyofgroupsarevulnerable,algae,clams,crabs,worms,sponges,bryozoa,cnidaria,fish,andothers(seeAppendixN).Notethatsedentaryorganismsthatareincapableofmovementwillbeharderhitthanmotileorganismsthatcanmoveawayfromthecontamination.DatagatheredinstudiesofintertidalzonesinNorthAmericawithsimilarbiologicalland-coverseemtoindicatethatdespitetheseorganisms'sensitivitytohydrocarboncontamination,almostcompleterecoverywasobservedwithinapproximatelytwoyears.Atthesametime,thereisariskofharmtokeyspecies,andharmingthesecouldsetinmotionlongertermchanges.

Itisworthnotingthatweatherconditionsatthetimethecontaminationreachestheshoreandafterwardhassignificantbearingonitsimpactonbiota.Aviolentstorm

Page 72: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

72

accompaniedbyastormyseawillmixanddispersethecontaminationandwillprobablylessenorganismexposure(mostlysedentaryones)totoxins.Acalmseaandadryheatwavecancauseextendedexposuretotoxins;ifthisisaccompaniedbyanextremelowtide,damagetotherockyintertidalzoneorganismswillbelethal.

ImpactofpollutionontheCarmelbeacharea

TheshorebetweenMaaganMichaelandGevaCarmelbeachiscomposedofKurkarislandsofftheshore,sandybeachareas,rockybeaches,andabrasionplatformsofthemostcomplexandvaluablealongtheIsraelicoast.Theseareas,someofwhichhavebeendeclarednaturereserves(DorislandandMaaganMichaelnaturereserve,Habonimbeachreserve)andsomeareslatedtobecomenaturereservesinthefuture(DaliaRiverestuary,andtheareafromGivatMichalatDortoTaninimRiver,alonga7kmsectionofshore)includeagreatvarietyoranimalsandplantsinmanydifferenthabitats(seeindetailAppendicesMandNofthisdocument).Incaseofacondensateleakfromastoragetankinthesoutherncompound(Compound2)wherethegastreatmentplatformisplanned,contaminationwillmakelandfallbetweenMaaganMichaelandGevaCarmelwithin12to24hours(seemodelresultsabove).Ifthereisaleakincidentinthenortherncompound(Compound1)thecontaminationisexpectedtomakelandfallbetweenNeveYamandDadobeach(onthesouthernoutskirtsofHaifa).Alsoalongthisshoresegmentarerockyandsandyhabitatsaswellasseaturtlelayinggrounds,aslistedinAppendixM.Marineorganismsareexpectedtosufferharmfromthetimethesubstanceisdischargedtoseaanduptoanunknowntimepost-discharge.Initially,thedominantsourceofacutetoxicitywillbeMAH,andasthecontaminationadvancesandweatheringprogresses,PAHconcentrationwillincreaseandtheywillbecomethechiefcontributorstotoxicity.Organismsfirstinlinetobehurtarethoseinhabitingthetopwatercolumn(plankton,fish,marinemammals,andseaturtles)andthesurface(birds).Next,asthecontaminationnearstheshore,DorandMaaganMichaelbeachislandswillbeimpacted(rockybedhabitatandbirdpopulation)aswellastherockyareaoppositeNeveYam(leakscenarioinCompound1)andimmediatelyafterwardthesandyshorebetweenMaaganMichaelandDor,andtheareanorthoftheAtlitfortressontoDadobeachinHaifa,andtherockyarea/abrasionplatformsofDor/Habonimnaturereserveandalittlefurthernorthofthere,andtheareaadjacenttoAtlit(leakscenarioinCompound1).

ItisimportanttonotethatduetotheabsenceofclosedbaysthatareprotectedfromwaveenergyonthesandyshorelinebetweenMaaganMichaelandDorbeach,hydrocarboncompoundsareunlikelytobefoundaccumulatinginthesediment.However,evenifsedimentationoccursfollowingdecompositionandadhesiontoparticulatematter,thesedimentarymaterialisexpectedtocontinuemixingintothebodyofwaterandbecarriedawaywiththecurrents.

Itisdifficulttoestimatethedegreeofinjury,capacityforrecovery,andduration.Allthesevarywiththespecies,weatherconditions,andbiologicalprocesses

Page 73: Environmental Risks of Condensate Releases - Leviathan ... · Water Reinjection (PWRI) is widely recognized as BAT, but was declined for Leviathan due to cost. The Leviathan project

73

(reproduction,recruiting,nutrition).Wemustalsoemphasizethatuntilactualproductionfromthesubmarinereservoirsbeginsandtheexactcompositionofthecondensatebecomesknown,treatmentmethodsremainunknown.Condensatecontaminationisexpectedtoharmvariousorganisms(aslistedabove)asitprogressestowardtheshore.Amongtheseareinvertebratesaswellasvertebratesfromawiderangeofsystemsandhabitatsintheopensea,ontheislandsneartheshore,andontheshoreinhighlyvaluablesandyandrockyareas.NotethatsignificantportionsoftheshorebetweenMaaganMichaeltothesouthandDadobeachtothenortharenaturereserves,andadditionalsectionsareslatedtobeincludedinfuturenaturereserves.