Reference/Date Environmental Project Preparation Facility in the Western Balkans An EU funded facility to support environmental investment in the Western Balkans Wider Objectives: • Improve living conditions by •Accelerating financing of priority pollution abatement projects Specific Objectives • Support Project Preparation Benefits of Facility • No delays in procurement of consultancy services • No costs to beneficiary and IFI’s
18
Embed
Environmental Project Preparation Facility in the Western Balkans
Environmental Project Preparation Facility in the Western Balkans. An EU funded facility to support environmental investment in the Western Balkans Wider Objectives: Improve living conditions by Accelerating financing of priority pollution abatement projects Specific Objectives - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Reference/Date
Environmental Project Preparation Facility in the Western Balkans
An EU funded facility to support environmental investment in the Western Balkans
Wider Objectives:• Improve living conditions by
•Accelerating financing of priority pollution abatement projects
Specific Objectives• Support Project Preparation
Benefits of Facility• No delays in procurement of consultancy services
• No costs to beneficiary and IFI’s
Reference/Date
The Beneficiaries & Participating IFIs
Beneficiaries
• Albania
• Bosnia and Herzegovina
• Croatia
• Macedonia
• Serbia, including Kosova
• Montenegro
Participatiing IFIs
• World Bank
• EBRD
• EIB
• Council of Europe Development Bank
Reference/Date
Project Preparation and Eligibility
Factors assessed in project preparation studies include
• Strategic long term development needs and priority investments • Cost effectiveness and efficiency of investments • Pollution reduction objectives• Environmental impact• Consumer affordability• Financial capacity of recipients• Long term sustainability of operations• Consistency with national and regional policies• Trans-boundary issues
Eligible projects are expected to be in the fields of:• Wastewater treatment• Solid Waste Management• Air pollution• Water Supply (as a precursor to pollution abatement)• Agricultural pollution
Reference/Date
Duration of EPPF
• Between 5 – 10 studies)
• Programme period = 2 years, ending in October 2008
• No allocation to IFIs or countries • Therefore first come first served.
Main ActivitiesM A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
Developmement of pipelinesInception ReportProgress meetingsStudy implementation
Project 10Target deadline for last project
200820072006Time Frame
Project 7
Project 5
Start up meeting with EU and IFIs
Project 3Project 4
Project 1
Commencement date
Project 6
Agreement of EPPF proceduresVisits to beneficiary countries
Project 9
Project 2
Project 8
e
TOR and study proposal
Study period (variable)
Workshop and Finalisation of studyIdentification and EU
approval as EPPF study
ee e e e
e
Reference/Date
Belgrade Wastewater Development Project – Batajnica Wastewater Treatment Plant
11/2007 5
Belgrade Water and Wastewater Development Project – Batajnica Wastewater Treatment Plant
Feasibility Study
Study funded by European Commission under the Environmental Project Preparation Facility for Western Balkans
Study Implemented by EBRD
Razvojni projekat Beogradskog vodovoda i kanalizacije – Postrojenje za prečišćavanje otpadnih voda u Batajnici
Studija izvodljivosti
Studija finansirala Evropska Komisija u okviru Pripreme projekta za zaštitu životne sredine za Zapadni Balkan
Studiju implementirala EBRD
Reference/Date
Belgrade Existing and Planned Sewerage Coverage
Existing Sewered Areas within Master Plan Boundary
Batajnica SystemBanat System
Central System
Bolec System
Ostruznica System
PLANNED SEWERAGE SYSTEMS IN BELGRADE
Planned Sewerage Areas
Reference/Date
Veliko Selo WWTP
Krnjaca WWTP
OstruznicaWWTP
Vinca WWTP
Batajnica North WWTP
BatajnicaSouth WWTP
Veliko Selo WWTP
Krnjaca WWTP
OstruznicaWWTP
Vinca WWTP
Batajnica North WWTP
BatajnicaSouth WWTP
Proposed Wastewater Treatment PlantsPredloženo postrojenje za prečišćavanje otpadnih voda
11/20077
Belgrade
System WWTP Recipient Inflow (l/sec)
Central „Veliko selo“ Danube right bank
8,500(6,200 dry weather)
Batajnica „Batajnica“ Danube right bank 600
Ostruznica „Ostružnica“ Sava right bank 600
Banat „Krnjača“ Danube left bank 1,200
Bolec „Vinča“ Danube left bank 1,000
11/2007 7
Reference/Date
Design ParametersParametri projekta
11/2007 8
Parameter Value Unit Parametar
Population Served 88,500 Broj korisnika
Population Equivalent 154,000 Ekvivalentni stanovnik
Average Dry Weather Flow 36,800 m3/d Prosečni protok po suvom vremenu
Total Incoming BOD Load 9,240 Kg/d Ukupno dolazno BPK otperećenje
Wastewater influent 250 mg/l BOD5 Influent otpadnih voda
Wastewater influent 46 Mg/l N Influent otpadnih voda