Environmental and Social Impact Assessment Railway Corridor VIII
- Eastern section
Contract No:C21196/EBSF-2010-07-101
Macedonian Railways: Feasibility Study for Corridor VIII Eastern
section and ESIA
Republic of Macedonia
SUBMITTED BY:
IN ASSOCIATION WITH:
February 2012
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection i
TABLEOFCONTENTS
1 INTRODUCTION 11.1 Introduction 11.2
LegalandPolicyRequirementsfortheESIA 21.3 TheProject 21.3.1
CorridorVIII 21.3.2 MacedonianRailCorridorVIIIEasternSection 41.3.3
InvestmentDeliveryPhases 51.4 PurposeoftheESIA 51.5
ProjectProponentandESIATeam 71.6 ContentoftheESIA 8
2 LEGALANDPOLICYREQUIREMENTS 112.1
NationalLegislation(&relatedEUDirectives) 112.1.1
NationalEnvironmental&SociallegislationandEUDirectives 112.1.2
FuturePlannedNationalLegislationRelevanttoESIA 222.1.3
CurrentStatusofImplementationofNationalLegislationRelevanttoESIA
222.1.4 NationalESIAProcedure 232.1.5
NationalLandAcquisition/ExpropriationProcedure 272.1.5.1
MacedonianExpropriationLaw 272.1.5.2 Landtenureandpropertyrights
272.1.5.3 RelevantLegislationonRailwaySystems 282.1.5.4
Procedureforlandexpropriation 282.1.5.5 CutoffDate 292.2
InternationalRelatedTreaties,GuidanceandPolicies 302.2.1
InternationalTreaties&Conventions 302.2.2 AarhusConvention
302.2.3 ESPOOConvention 312.3
InternationalLenderpolicies,Guidance&Requirements 322.4
EBRDEnvironmentalandSocialPolicy 332.4.1
EIBEnvironmentalandSocialPolicy 33
2.5SummaryofDifferencesbetweenNationalmacedonianlegislationandEBRD/EIB/IFC/EuropeanEnvironmental&Socialstandards
34
2.6 CompliancewithEuropeanRailwayStandards 46
3 PROJECTDESCRIPTION&CONSIDERATIONOFALTERNATIVES 493.1
BackgroundtotheProject 493.2 NeedfortheProject 493.3
ObjectivesoftheProjeCT 513.4 ProjectExpectedbenefits 513.5
ConsiderationofAlternatives 523.5.1 SummaryofAlternatives 523.5.1.1
DoNothingAlternative 563.5.1.2 ReferenceAlignmentAlternative
563.5.1.3 AlternativeAlignment 643.5.2 SelectionofAlignment
703.5.2.1 AlignmentSelectionCriteria 70
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection ii
3.5.2.2 AnalysisofPreliminaryEnvironmentalImpactofAlternatives
703.5.2.3 AnalysisofPreliminarySocialImpactofAlternatives 743.5.2.4
SummaryofMultiCriteriaAnalysisofAlternatives 763.6
SelectedAlignment(theProject) 773.7
TechnicalDescriptionofCurrentRailwayInfrastructure 783.8
LandUse&LandTake 823.8.1 LandUseAlongRoute 823.8.2 LandTake
833.8.2.1
DescriptionofPastandCurrentLandAquisition&ExpropriationActivities
833.8.2.2 LandTake(AffectedLand&Structures) 843.9
InvestmentDeliveryPhases 853.1
TechnicalDescriptionofProposedConstructionWorksfortheProject
863.10.1 ConstructionActivities&Works 863.10.2
ConstructionWorkstobeUndertakenPerSection 873.10.3
ConstructionofRailwayElements 1013.11
TechnicalDescriptionofOperationalRailwayElements 1163.11.1
Signaling&Telecommunication 1163.11.2
PowerSupplyandTractionPower 1273.11.3 Stations 1293.11.4
RollingStock(Passenger&Freight)Movements&Types 1303.11.5
RailwayMaintenanceOperations 133
4 ASSESSMENTMETHODOLOGY&SCOPINGASSESSMENT 1374.1
GeneralApproachtotheAssessment 1374.2 Screening 1394.3
ScopingOpinion&Assessment 1404.3.1
ScopingOpinion&GuidancefromRegulator(MOEPP) 1404.3.2
StakeholderScopingMeetings 1404.3.3 ScopingMatrix 1414.3.4
ConclusionstoProjectScopingAssessment 1454.4
Spatial&TemporalScope 1454.4.1 SpatialStudy/InvestigationArea
1454.4.2 TemporalScopeofAssessment 1464.5
BaselineEnvironmental&SocialConditions 1464.5.1
BaselineDataGathering 1464.5.2 SourcesofData 1474.6
AssessmentMethodology 1474.6.1
AssigningValue(orSensitivity)ofEnvironmental&SocialResourcesandReceptors
1484.6.2 IdentificationofPotentialEnvironmental&SocialImpacts
1484.6.3 SignificanceCriteria 1504.6.4 ApproachtoMitigationMeasures
1524.6.5 AssessmentofResidualEffects 1534.6.6
AssessmentofLabour&WorkingConditions 1534.6.7
AssessmentofRailwaySafety 1534.6.8
AssessmentofCumulative,Synergistic&TransboundaryEffects
1534.6.9 AssessmentSummaryTables 1544.7 StakeholderEngagement
1564.8 Resettlement 156
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection iii
5 ENVIRONMENTAL&SOCIALBASELINE 1575.1 EnvironmentalBaseline
1575.1.1 Topography&Landscape 1585.1.1.1
StudyArea(InvestigationArea) 1585.1.1.2
Legislation,Regulatory&PolicyConsiderations 1585.1.1.3
DataSources 1585.1.1.4
BaselineDataCollectionMethodology(includingSurvey/FieldVisits)
1595.1.1.5 BaselineAssumptions&Limitations 1595.1.1.6
TopographyBaselineConditions 1605.1.1.7 LandscapeBaselineConditions
1615.1.2 Geology,GeomorphologyandSoils 1725.1.2.1
StudyArea(InvestigationArea) 1725.1.2.2
Legislation,Regulatory&PolicyConsiderations 1725.1.2.3
DataSources 1725.1.2.4
BaselineDataCollectionMethodology(IncludingSurvey/FieldVisits)
1735.1.2.5 BaselineAssumptions&Limitations 1735.1.2.6
Geology,GeomorphologyandSoilBaselineConditions 1735.1.3
Hydrology(SurfaceWater)&Hydrogeology(Groundwater) 1875.1.3.1
StudyArea(InvestigationArea) 1875.1.3.2
Legislation,Regulatory&PolicyConsiderations 1875.1.3.3
DataSources 1905.1.3.4
BaselineDataCollectionMethodology(IncludingSurvey/FieldVisits)
1915.1.3.5 BaselineAssumptions&Limitations 1915.1.3.6
Hydrology(SurfaceWater)BaselineConditions 1915.1.4
ClimateandAirQuality 2125.1.4.1 StudyArea(InvestigationArea)
2125.1.4.2 Legislation,Regulatory&PolicyConsiderations
2125.1.4.3 DataSources 2155.1.4.4
BaselineDataCollectionMethodology(IncludingSurvey/FieldVisits)
2165.1.4.5 BaselineAssumptions&Limitations 2165.1.4.6
AirQualityBaselineConditions 2165.1.4.7
ClimateintheNorthEasternRegion 2215.1.4.8 ClimateChange 2235.1.5
NoiseandVibration 2235.1.5.1 StudyArea(InvestigationArea)
2235.1.5.2 Legislation,Regulatory&PolicyConsiderations
2245.1.5.3 DataSources 2285.1.5.4
BaselineDataCollectionMethodology(includingSurvey/FieldVisits)
2285.1.5.5 BaselineAssumptions&Limitations 2315.1.5.6
NoiseBaselineConditions 2315.1.6 WasteManagement 2465.1.6.1
StudyArea(InvestigationArea) 2465.1.6.2
Legislation,Regulatory&PolicyConsiderations 2465.1.6.3
DataSources 2485.1.6.4
BaselineDataCollectionMethodology(IncludingSurvey/FieldVisits)
2485.1.6.5 BaselineAssumptions&Limitations 2495.1.6.6
WasteManagementBaselineConditions 249
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection iv
5.1.7 NatureConservation&Biodiversity 2565.1.7.1
StudyArea(InvestigationArea) 2575.1.7.2
Legislation,Regulatory&PolicyConsiderations 2575.1.7.3
DataSources 2585.1.7.4
BaselineDataCollectionMethodology(IncludingSurvey/FieldVisits)
2595.1.7.5 BaselineAssumptions&Limitations 2595.1.7.6
Protected&DesignatedAreas 2595.1.7.7 HabitatBaselineConditions
2695.1.7.8 FloraBaselineConditions 3215.1.7.9
FaunaBaselineConditions 3215.1.8 CulturalHeritageandArchaeology
3225.1.8.1 StudyArea(InvestigationArea) 3225.1.8.2
Legislation,Regulatory&PolicyConsiderations 3225.1.8.3
DataSources 3235.1.8.4
BaselineDataCollectionMethodology(IncludingSurvey/FieldVisits)
3235.1.8.5 BaselineAssumptions&Limitations 3235.1.8.6
CulturalHeritage&ArchaeologyBaselineConditions 3245.2
BaselineSocialConditions 3405.2.1 Introduction 3405.2.2
DataSources&Methodology 3405.2.3
SocioEconomicStudyAreaDefinition 3425.2.4
SocioEconomicRegionalStudyArea 3425.2.5 SocioEconomicLocalStudyArea
3445.2.6 Assumptions&Limitations 3465.2.7
LanduseBaselineConditions 3465.2.7.1 Introduction 3465.2.7.2
LandUseTypes 3465.2.7.3 Legal,Regulatory&PolicyConsiderations
3475.2.7.4 LandUseTypesalongRailCorridorperSection 3475.2.7.5
AgriculturalLandUse 3525.2.8
LocalSettlements&CommunityFacilities/ServicesBaseline
3535.2.8.1 LocalSettlements&CommunitiesperProjectSection
3535.2.8.2 CommunityFacilities&Services 3615.2.8.3
LocalTransportroutes,PublicTransportandPedestrianRoutes 3655.2.9
Regional/NationalSocioEconomicBaseline 3675.2.9.1
DemographicCharacteristics 3675.2.9.2 Education 3755.2.9.3
Employment 3785.2.9.4 Unemployment 3825.2.9.5 EconomicActivities
3875.2.9.6 Agriculturearea 3895.2.9.7 VulnerableGroups 392
6 POTENTIALENVIRONMENTALANDSOCIOECONOMICIMPACTS 3976.1
Introduction 3976.2 PotentialEnvironmentalImpacts 3976.2.1
PotentialImpactsonSoil 3986.2.1.1 AssessmentofSoilResources 398
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection v
6.2.1.2 PotentialImpactsandLikelySignificance 3996.2.2
PotentialImpactsonSurfaceWater 4046.2.2.1
AssessmentofSurfaceWaterResources 4046.2.2.2
PotentialImpactsandLikelySignificance 4076.2.3
PotentialImpactsonGroundwater 4186.2.3.1
AssessmentofGroundwaterResources 4186.2.3.2
PotentialImpactsandLikelySignificance 4196.2.4
PotentialImpactsonClimateandAirQuality 4236.2.4.1
AssessmentofAirQualityReceptors 4236.2.4.2
PotentialImpactsandLikelySignificance 4266.2.5
PotentialLandscapeandVisualImpacts 4366.2.5.1
AssessmentofLandscapeSensitivity 4366.2.5.2
PotentialImpactsandLikelySignificance 4396.2.6
PotentialImpactsofNoiseAndVibration 4506.2.6.1
AssessmentofNoiseandVibrationSensitivity 4506.2.7
PotentialImpactsonHabitats 4736.2.7.1
AssessmentofHabitatsSensitivity 4736.2.7.2
PotentialImpactsandLikelySignificance 4786.2.8
PotentialImpactsonFlora 4856.2.8.1 ValueofVegetation 4856.2.8.2
PotentialImpactsandLikelySignificance 4866.2.9
PotentialImpactsonFauna 4886.2.9.1 ValueofFaunaReceptors 4886.2.9.2
PotentialImpactsandLikelySignificance 5036.2.10
PotentialImpactsonProtectedandDesignatedAreas 5106.2.10.1
ValueofProtectedandDesignatedAreas 5106.2.10.2
PotentialImpactsandLikelySignificance 5126.2.11
PotentialImpactsonCulturalHeritage 5166.2.11.1
ValueofCulturalHeritageReceptors 5166.2.11.2
PotentialImpactsandLikelySignificance 5166.3 PotentialSocialImpacts
5186.3.1 Introduction 5186.3.2 PotentialImpactsonLandAndProperty
5186.3.2.1 SummaryofResources/Receptors 5186.3.2.2
AssessmentofTheSensitivityofLandandProperty 5196.3.2.3
PotentialImpactsandLikelySignificance 5216.3.2.4
SummaryofPotentiallySignificantEffects 5306.3.3
PotentialImpactsonCommunityHealthandSafetyandSecurity 5316.3.3.1
SummaryofResources/Receptors 5316.3.3.2
AssessmentoftheSensitivityofHealthandSafety 5316.3.3.3
PotentialImpactsandLikelySignificance 5326.3.3.4
SummaryofPotentiallySignificantEffects 5396.3.4
PotentialImpactsonCommunityTensions 5396.3.4.1
SummaryofResources/Receptors 5396.3.4.2
AssessmentoftheSensitivityofCommunityTensions 5396.3.4.3
AssessmentofTheSensitivityofCommunityTensions 5406.3.4.4
PotentialImpactsandLikelySignificance 5416.3.4.5
SummaryofPotentiallySignificantEffects 544
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection vi
6.3.5 PotentialImpactsonAccess&SeveranceEffects 5446.3.5.1
SummaryofResources/Receptors 5446.3.5.2
AssessmentoftheSensitivityofAccess&SeveranceEffects 5446.3.5.3
PotentialImpactsandLikelySignificance 5466.3.5.4
SummaryofPotentiallySignificantEffects 5486.3.6
PotentialImpactsonDisruptionofUtilities 5486.3.6.1
SummaryofResources/Receptors 5486.3.6.2
AssessmentoftheSensitivityofAccess&SeveranceEffects 5486.3.6.3
PotentialImpactsandLikelySignificance 5506.3.6.4
SummaryofPotentiallySignificantEffects 5516.3.7
PotentialEconomicImpacts 5526.3.7.1 SummaryofResources/Receptor
5526.3.7.2 AssessmentoftheSensitivityofEconomicImpacts 5526.3.7.3
PotentialImpactsandLikelySignificance 5546.3.7.4
SummaryofPotentiallySignificantEffects 5606.3.8
PotentialImpactsonEmployment 5606.3.8.1 SummaryofResources/Receptor
5606.3.8.2 AssessmentoftheSensitivityoftheImpactsonEmployment
5606.3.8.3 PotentialImpactsandLikelySignificance 5616.3.8.4
SummaryofPotentiallySignificantEffects 5666.3.9
PotentialImpactsonEducationandTraining 5666.3.9.1
SummaryofResources/Receptor 5666.3.9.2
AssessmentoftheSensitivityoftheImpactsonEducationandTraining
5666.3.9.3 PotentialImpactsandLikelySignificance 5676.3.9.4
SummaryofPotentiallySignificantEffects 5716.3.10
PotentialImpactsonVulnerableGroups 5716.3.10.1
SummaryofResources/Receptor 5716.3.10.2
AssessmentoftheSensitivityoftheImpactsonVulnerableGroups
5726.3.10.3 PotentialImpactsandLikelySignificance 5736.3.10.4
SummaryofPotentiallySignificantEffects 5766.3.11
PotentialImpactsonWorkforce 5766.3.11.1 SummaryofResources/Receptor
5766.3.11.2 AssessmentoftheSensitivityofWorkforce 5766.3.11.3
PotentialImpactsAndLikelySignificance 5786.3.11.4
SummaryofPotentiallySignificantEffects 5806.3.12
PotentialImpactsonCommunitiesQualityofLife 5806.3.12.1
SummaryofResources/Receptors 5806.3.12.2
AssessmentoftheSensitivityofCommunitiesQualityofLife 5806.3.12.3
PotentialImpactsandLikelySignificance 5816.3.12.4
SummaryofPotentiallySignificantEffects 5926.3.12.5
SummaryofMagnitudeofImpactsonQualityofLife 593
7 POTENTIALENVIRONMENTAL&SOCIOECONOMICIMPACTS 5997.1
EnvironmentalMitigationMeasuresandAssessmentofResidualEffects
5997.1.1 Soils,SurfaceWaterandGroundwater 5997.1.1.1
MitigationsMeasuresforSoils 5997.1.1.2
MitigationMeasuresforSurfaceWater 6027.1.1.3
MitigationMeasuresforGroundwater 604
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection vii
7.1.1.4 AssessmentofResidualEffects 6047.1.2 AirQuality
6067.1.2.1 MitigationsMeasuresforAir 6067.1.2.2
AssessmentofResidualEffects 6077.1.3 NoiseandVibrations 6087.1.3.1
MitigationsMeasuresforNoise 6087.1.3.2
MitigationMeasuresforVibrations 6097.1.3.3
AssessmentofResidualEffects 6107.1.4 Landscape 6117.1.4.1
MitigationsMeasuresforLandscape 6117.1.4.2
AssessmentofResidualEffects 6117.1.5
Habitats,FaunaandFloraAndProtected&DesignatedAreas 6127.1.5.1
MitigationsMeasuresforFlora 6127.1.5.2 MitigationsMeasuresforFauna
6157.1.5.3 MitigationsMeasuresforHabitats 6167.1.5.4
MitigationsMeasuresforProtectedandDesignatedSites 6177.1.5.5
AssessmentofResidualEffects 6177.1.6 CulturalHeritage 6187.1.6.1
MitigationMeasures 6187.1.6.2 AssessmentofResidualEffects 6197.1.7
AssessmentSummaryTable 6217.2
SocialMitigationMeasuresandAssessmentofResidualEffects 6257.2.1
LandandProperty 6257.2.1.1 MitigationMeasures 6257.2.1.2
AssessmentofResidualEffects 6267.2.2
CommunityHealth,SafetyandSecurity 6277.2.2.1 MitigationMeasures
6277.2.2.2 AssessmentofResidualEffects 6297.2.3 CommunityTensions
6307.2.3.1 MitigationMeasures 6307.2.3.2
AssessmentofResidualEffects 6317.2.4 Access&Severance
6327.2.4.1 MitigationMeasures 6327.2.4.2
AssessmentofResidualEffects 6327.2.5 Economy 6337.2.5.1
EnhancementMeasures 6337.2.5.2 AssessmentofResidualEffects 6347.2.6
Employment 6347.2.6.1 EnhancementMeasures 6347.2.6.2
AssessmentofResidualEffects 6357.2.7 Education&Training
6367.2.7.1 EnhancementMeasures 6367.2.7.2
AssessmentofResidualEffects 6377.2.8 Utilities 6377.2.8.1
MitigationMeasures 6377.2.8.2 AssessmentofResidualEffects 6387.2.9
VulnerableGroups 6387.2.9.1 MitigationMeasures 638
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection viii
7.2.9.2 AssessmentofResidualEffects 6397.2.10
WorkforceRelatedImpactsandIssues 6407.2.10.1 MitigationMeasures
6407.2.10.2 AssessmentofResidualEffects 6437.2.11 QualityofLife
6447.2.11.1 MitigationMeasures 6447.2.11.2
AssessmentofResidualEffects 6467.2.12 AssessmentSummaryTable 6477.3
Cumulative,SynergyandTransboundarySocioEconomicImpacts 6537.3.1
ExistingandForeseenProjectsintheRailwayProjectArea 6537.3.2
AssessmentofCumulativeImpacts 6587.3.3
AssessmentofTransboundaryImpacts 664
8 ENVIRONMENTALANDSOCIALMANAGEMENTANDMONITORINGPLAN 6678.1
Responsibilites 6678.2 StructureoftheEsmmp 6688.3
Environmental&SocialManagementPlan 6698.4
Environmental&SocialMonitoringPlan 697
9
ANALYSISOFTECHNICALINSUFFICIENCY&NEEDFORUPDATEOFTHEESIASTUDY
7079.1 EnvironmentalIssues 7079.2 SocialIssues 709
10 CONCLUSIONS 71110.1 Introduction 71110.2
SummaryofPotentiallySignificantResidualEnvironmentalEffects
71210.2.1 constructionphase 71210.2.2 OperationalPhase 71210.2.3
SummaryofCumulative&TransboundaryResidualEnvironmentalEffects
71410.3 SummaryofPotentiallySignificantResidualSocialEffects
71410.3.1 ConstructionPhase 71410.3.2 OperationalPhase 71710.3.3
SummaryofCumulative&TransboundaryResidualSocialEffects 72010.4
Summary 721
11 NONTECHNICALSUMMARY 72311.1 Introduction 72311.2 Background
72411.2.1 CorridorVIII 72411.2.2 RationalefortheProject 72511.2.3
HistoryoftheProject 72611.2.4 ConsiderationofAltErnatives 72611.3
SummaryofLegalandPolicyFramework 73111.3.1
NationalEnvironmentalandSocialLegislation 73111.3.2
NaTureProtection 73111.3.2.1 NatureProtectionLegalFramework
73111.3.2.2
EBRD&EIBBiodiversityProtection&ConservationPolicy
73211.3.2.3 ESIA&PermittingRequirements 732
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection ix
11.3.2.4 LandAcquisitionLegalFramework 73211.4
StakeholderEngagement&Consultation 73311.5 ProjectDescription
73411.6 AssessmentMethodology 73511.6.1 ESIAMethodology 73511.6.2
AssessmentofEFfectsonEmerald&Natura2000Sites 73611.7
SummaryofBaselineEnvironmental&SocialConditions 73611.7.1
EnvironmentalBaseline 73711.7.2 SocialBaseline 73911.8
Environmental&SocialBenefits&AdverseImpacts&Mitigation
74011.8.1 SummaryofEnvironmental&SocialImpacts&Mitigation
74011.9 Cumulative&TransboundaryImpacts 74911.1
Environmental&SociaLManagement&Monitoring 74911.11 Contacts
750
12 STAKEHOLDERENGAGEMENTPLAN 75112.1 Introduction 75112.1.1
Background 75112.1.2 Summaryoftheproject 75212.1.1.1
DescriptionoftheProject 75212.1.1.2 HistoryoftheProjectOverview
75412.2 RegulatoryContext 75412.2.1
Macedonianrequirementsforstakeholderengagement/publicconsultation
75412.2.2
EBRDrequirementsforstakeholderengagementandpublicconsultation
75612.3 StakeholderIdentification 75612.4
StakeholderCharacteristics 75912.4.1 Macedonianstakeholders
75912.4.2 Bulgarianstakeholders 76112.5
CommunicationProcessandmethods 76212.5.1
StakeholderEngagementStrategy 76212.5.2 InformationDisclosure
76312.6 GrievanceMechanism 76512.7 Listofstakeholders 76912.8
Commentform 77212.9 Grievanceform 77312.1 Contactpoints 774
13 RESETTLEMENTCOMPENSATIONFRAMEWORKPLAN 77713.1 Introduction
77713.2 ProjectDescription 77713.3 PolicyandRegulatoryBackground
77813.3.1 LegislationGoverningRailwaySystems 77813.3.2
MacedonianExpropriationLaw 77813.3.3 LandTenureandPropertyRights
77813.3.4 InternationalRequirements 77913.3.5
ProcedureforLandExpropriation 78013.4
OrganisationalResponsibilities 78113.5 CutoffDate 783
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection x
13.6GapAnalysesLegalFrameworkforExpropriationandEBRDEnvironmentalandSocialPolicy
783
13.6.1 PoliciesandPrinciples 78313.7
DescriptionofPastandCurrentExpropriationActivities 78813.8
DefinitionofAffectedPeopleandProperties 79013.8.1
SocioEconomicSurvey 79113.8.2 Census 79113.9
RealEstateFrameworkforLandAcquisitionandCompensation(InventoryOfLosses)
79113.9.1 AffectedLandandStructures 79213.9.2 ProcessofSurvey
79313.1 ExpropriationandCompensationCosts 79313.11 Entitlements
79513.12 GrievanceManagement 80313.12.1 Overview 80313.12.2
GrievanceManagement 80313.12.3 DisputeResolution 80413.13
MonitoringAndReporting 80413.13.1 Monitoring 80413.13.2 Reporting
80613.14 RolesandResponsibilities 80613.15
PublicConsultationandDisclosure 80713.16 Conclusion 80713.17
GapAnalysisPreparedbyEbrd 80813.18 GrievanceForm 813
14 COMMENTSONDRAFTESIASTUDY&LISTOFINTRODUCEDCHANGES 815
15 REFERENCES 816
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection xi
ABBREVIATIONS
AEWA AfricanEurasianMigratoryWaterbirdsAEWA
AgreementontheConservationofAfricanEurasianMigratoryWaterbirdsAGTC
EuropeanAgreementonInternationalCombinedTransportLinesAGTC
EuropeanAgreementonInternationalCombinedTransportLinesARS
AutomaticRouteSettingATP AutomaticTrainProtectionBC
BernConventionBDZ BulgarianrailwaysCAPEX CapitalExpensesCBI
ComputerbasedInterlockingCEN
ComiteEuropendeNormalizationEuropeanCommitteeforStandardization
CENELEC
ComitEuropendeNormalizationElctrotchniqueEuropeanCommitteeforElectrotechnicalStandardizationCITES
ConventionofInternationalTradingofEndangeredSpeciesCOP
CorporateOperationalPlan
CRTSIINS
ConventionalRailInfrastructureTechnicalspecificationforinteroperabilityrelatingtothesubsysteminfrastructureCTC
CentralizedTrafficControlCWR ContinuousWeldedRailDMU
DieselMultipleUnitDTM DigitalterrainmodelEBRD
EuropeanBankforReconstructionandDevelopmentECNC
EuropeanCentreforNatureConservationEEC EuropeanUnionCommisionEHS
Environmental,Health&SafetyEIA EnvironmentalImpactAssessmentEIB
EuropeanInvestmentBankEMEP
EuropeanMonmitoringandEvaluationProgrammeEMER
theProgramformonitoringtheairinEuropeEMU
ElectricMultipleUnitTrainsERTMS
EuropeanRailTrafficManagementSystemESIA
EnvironmentalSocialImpactAssessmentETS EuropeanThreatStatusETS
BirdLifeInternationalEuropeanThreatStatusETSI
EuropeanTelecommunicationsStandardsInstituteEU EuropeanUnionFTA
FederalTransitAdministrationGDP GrossDomesticProductGFC
GrossFixedCapitalGFCF GrossFixedCapitalFormationGHG
NationalgreenhousegasGIS GeographicInformationSystemsGoM
GovernmentofMacedoniaH&SPlan Health&SafetyPlan
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection xii
HD HabitatsDirectiveHPI2 HumanpovertyindexIBAs
ImportantBirdAreasIFC InternationalFinanceCorporationILO
InternationalLabourOrganizationIM InfrastructureRailwayManagerIPAs
ImportantPlantAreasIPPC IntegratedPollutionPreventionandControlIUCN
InternationalUnionforConservationofNatureK.P. KilometerpointLEAP
LocalEnvironmentalActionPlanLER LocalEconomicDevelopmentLEU
LinesideEncoderUnitLRF LivelihoodrestorationframeworkMES
MacedonianEcologicalSocietyMKD MacedonianMoEPP
MinistryofEnvironmentandPhysicalPlanningEnvironmentalAdministrationMoTC
MacedonianMinistryofTransportandCommunication
MoU
MemorandumofUnderstandingfortheDevelopmentoftheCoreRegionalTransportNetworkMZT
MacedonianRailwaysTransportNARDS
NATIONALAGRICULTURALANDRURALDEVELOPMENTSTRATEGYNEAP
NationalEnvironmentalActionPlanNGOs NonGovernmentOrganizationsNHMS
NationalHydrologicalMetrologicalServicesNMVOCs
NonmethanevolatileorganiccompoundsNPAA
NationalProgrammeforAdoptionoftheAcquisCommunautaireNSEA
NationalStrategyforEnvironmentalApproximationNTS
NonTechnicalSummaryNUTS3
EurostatNomenclatureofTerritorialUnitsforStatisticsOH&S
OccupationalHealthandSafetyOJT OnthejobtrainingOPEX
OperationalExpensesPAH PolycyclicAromaticHydrocarbonsPCA
PeopleCenteredAnalysisPCBs PolychlorinatedbiphenylesPCE
PublicCommunalEnterprisePEBLDS
PanEuropeanBiologicalandLandscapeDiversityStrategyPEEN
PanEuropeanEcologicalNetworkPERI
MacedonianRailwaysInfrastructurePERI
PublicEnterpriseforRailwayInfrastructurePOP
PersistentorganicpollutantsPR PerformanceRequirementRCC
RemoteControlCentreRCF ResettlementActionPlan(RAP)RCF
ResettlementCompensationFrameworkRIC
RegolamentoInternazionaledelleCarrozzeInternationalCoachRegulationsRIMSYS
RiverMonitoringSystem
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection xiii
RIV
RegolamentoInternazionaledeiVeicolInternationalWagonRegulationsRMS
RootmeansquareSEA StrategicEnvironmentalAssessmentSEE
SouthEastEuropeSEP StakeholderEngagementPlanSFRY
SocialFederalRepublicofYugoslaviaSIA StrategicImpactAssessmentSMEs,
SmallMediumEnterprisesSNAP SelectedNomenclatureonAirPollutantsSPEC
SpeciesofEuropeanConservationConcernTEN TransEuropeanNetworkTRACECA
TransportCorridorEuropeCaucasusAsiaTSI
TechnicalSpecificationforInteroperabilityTSISRT
SafetyinRailwayTunnelsUIC
UnionInternationaledesCheminsdeferInternationalUnionofRailwaysUPS
UninterruptiblepowersupplyWEEE
WasteElectronicsandElectricalEquipmentWFD
WaterFrameworkDirectiveWHO WorldHealthOrganizationWS
WaterStrategyofRepublicofMacedonia
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection xiv
-
Chapter1Introduction
ProvidesgeneralinformationabouttheProject,thelegal&policybasisoftheESIA,theProjectproponentandESIAassessmentteam,andthepurposeandcontentoftheESIA.
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 1
1 INTRODUCTION
1.1 INTRODUCTION
As part of the governments national transport strategy the
Macedonian Ministry of Transport andCommunication (MoTC) intends to
improve transport capacities of the Country by reconstructing
andconstructing the Railway Corridor VIII Eastern Section (the
Project) between Kumanovo and
KrivaPalankaattheborderwithBulgaria.TheEasternSectioncomprisesof88.1kmofrailrunningacrosstheNorthEast
region of Macedonia (see Figure 11). The Macedonian Ministry of
Transport
andCommunicationhasapproachedtheEuropeanBankforReconstructionandDevelopment(EBRD)andtheEuropean
Investment Bank (EIB) to finance the rehabilitation and
construction works on the RailwayCorridorVIIIEasternSection.
AspartoftheapplicationforfundsandinordertomeetregulatoryrequirementstheMinistryofTransportand
Communication with EBRD funds have procured the preparation of a
Feasibility Study and theEnvironmental Social ImpactAssessment
(ESIA) for the Project. This draft ESIA is being published
anddisclosedforcommentaspartoftheprocessforfinalisingandgainingregulatoryapprovalandfinancingofthe
Project. Following the comment period the ESIA will be updated to
reflect comments made bystakeholdersand informationwillbeprovided
regardinghowcommentshavebeenaddressed.The
finaldecisionandversionoftheESIAwillbemadepublicallyavailable.
Gostivar
Tetovo
SkopjeDracevo
Kumanovo
Veles Stip
Kocani
Kavadarci
Prilep
Strumica
Blagbevgrad
Kyustendil
Bitola
Ohrid
Struga
Kicevo
Presevo
Lipkovo Karposh
Kriva Palanka
Probistip
Sokolarci
Cheshinovo Vinica
Berovo
Radovic
Negotino
Sveti NicoleStudenicani
LlindenArachinovo
Rankovce
Gradsko
Valandovo
Gevgelija
Kamenica
Zajas
Krusevo
Krivogastani
Makedonski Brod
Debar
Dabilje
Nov DojranBogdanci
0 100
km
Main Road
Highway
existing Railway
Border Macedonia
Railway Projected
Railway Section Focused
Albania
SerbiaBulgaria
Greece
Macedonia
Figure11TheProject(RailwayCorridorVIIIEasternsection)
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 2
1.2 LEGALANDPOLICYREQUIREMENTSFORTHEESIA
AccordingtotheMacedonianLawonEnvironment1withinwhichtherequirementsoftheEUEIADirective(85/337/EECamended2)havebeen
transposed, thepotentialenvironmental impactsof
theProjectmustbeevaluatedbyanEnvironmentalImpactAssessment(EIA)processanddocumentedinanenvironmentalimpactstatement.
ScreeningoftheProjectundertheLawonEnvironmentinrelationtodeterminingtheneedfortheEIAwasundertaken.UnderAnnexIoftheDecreeondeterminingprojectsforwhichthefullEIAprocedureshouldbecarriedout(OfficialGazette3No.74/05),theProjectfallsundersubcategory7(a):Constructionoflinesforlongdistancerailwaytrafficandairportswithabasicrunwaylengthof2,100mormore.Consequently,theRailwayProjecthasbeensubjecttothefullEIAprocedure,accordingtotheMacedonianenvironmentallegislation(listedinChapter2).
As part of their decisionmaking process, EBRD and EIB require an
evaluation of the proposed
ProjectthroughanEnvironmentalandSocialImpactAssessment(ESIA)thatmeetsEBRD,EIBandotherapplicableinternationalguidelinesandrequirements.AccordingtotheEBRDcategorizationofthefinancedprojectsbasedonenvironmentalandsocialcriteriareflectingthelevelofpotentialimpactsandnatureandlevelofassessments,
information disclosure and stakeholder engagement, the Project
fallswithin Appendix
1:CategoryAprojects,subcategory7:Constructionofmotorways,expressroadsandlinesforlongdistancerailway
traffic. Therefore a participatory assessment process was carried
out following the EBRDPerformance Requirements given in their
Environmental and Social Policy (20084), aswell as the
EIBsenvironmental and social requirements outlined in their
Environmental and Social Practices
Handbook(Version2:24/02/2010).ThedevelopmentoftheMacedonianEIAandEBRDsESIAhasbeenconsolidatedintooneprocessanddocumentedinthissinglereport.
In line withMacedonian law on public participation in the EIA
process (contained within the Law ofEnvironment), the EU Public
Participation Directive (2003/4/EC), the Aarhus Convention5,
EBRDEnvironmental and Social Policy6 and EIB requirements7
theremust be public involvement in the
ESIAprocedure.ThereforethedraftESIAisbeingpublishedforcommentaspartoftheprocessforfinalisingandregulatorygainingofapprovalandfinancingoftheProject.
1.3 THEPROJECT
1.3.1 CORRIDORVIII
Corridor VIII is amultimodal transport network comprising of sea
and river ports, airports, roads andrailways running along the
eastwest axis starting in the southern ItalianportsofBari
andBrindisi
andbeforecrossingthroughAlbania,MacedoniaandBulgariatotheBlackSeaportsofVarnaandBurgas.
In1995,theGovernmentofMacedoniastartedthepreparationofanewSpatialPlanforthecountryasaresultofthepolitical,economicandstrategicchanges
inthestate.TheSpatialPlanaddressedthespatialarrangement of
transport and other infrastructures, and included Corridor VIII as
a very
importanttransportcorridorforthecountry.TheSpatialPlanwasfinallyadoptedin2004withanexpiringhorizonin2020.ItwasestablishedbytheParliamentoftheRepublicofMacedonia,followinganexpertconsultation
1MacedonianLawonEnvironment1(OfficialGazetteofRMNo.53/05,81/05,24/07,159/08,83/09,124/10,51/11)2EIADirective(85/337/EEC)amendedwithDirectives97/11/EC,2003/35/ECand2009/31/EC.3OfficialGazette:OfficialGazetteofRepublicofMacedonia4Environmental&SocialPolicy(May2008);EuropeanBankforReconstructionandDevelopmenthttp://www.ebrd.com/downloads/about/sustainability/2008policy.pdf5ConventiononAccesstoInformation,PublicParticipationinDecisionmakingandAccesstoJusticeinEnvironmentalMatters(AarhusConvention)whichwasratifiedbyFYRMacedoniain1999(LawonRatifications(OfficialGazetteofRMNo.40/99)6Environmental&SocialPolicy(May2008);EuropeanBankforReconstructionandDevelopmenthttp://www.ebrd.com/downloads/about/sustainability/2008policy.pdf7IncludingtheEIBCorporateOperationalPlan20112013,theEIBStatementofEnvironmental&SocialPrinciples&Standards;2009andtheEIBEnvironmental&SocialPracticesHandbook(Version2of24/02/2010).
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 3
processwithparticipationofpublicexpertise,representativesfromdepartmentsoftheStategovernment,representativesoflocalselfgovernments,institutionsresponsibleforthepreservationofculturalheritage,scientific
institutions, communal enterprises, and NonGovernment Organizations
(NGOs).
However,becausetheSpatialPlanwaspassedbeforetheenactmentin2005oftheLawonEnvironment,itwasnotsubjecttoaStrategicImpactAssessment(SEA).
TheNationalStrategyofTransportfrom2009fortheRepublicofMacedonia(Macedonia)confirmedthehighgovernmentalpriorityforCorridorVIIIforthecountry.TherailwayCorridorVIIIthroughMacedoniaispartly
finishedwith 2 incomplete sections; the firstWestern section
towards Albania and the EasternsectiontowardsBulgaria.
CorridorVIII starts in thewest from the southern
ItalianportsofBari andBrindisi and crossing to theAlbanian ports of
Durres and Vlora then overland through Albania, Macedonia and
Bulgaria to
theBulgarianportsontheBlackSeaofBurgasandVarna.TherailwaycorridorEastWest,otherwiseknownasCorridorVIII,wasdefinedinitspresentformatthePanEuropeanConference,heldinHelsinki(1997),andwasincludedaspartofoneoffivenewEuropeanTransnationalAxesin20058.AlongitsrouteCorridorVIIIconnectswithPanEuropeanCorridorsIV,IXandX,asshowninFigure12.
Figure12PanEuropeanCorridorsintheBalkanRegion
8ThePanEuropeanTransportCorridorsandAreaswereestablishedduringthreePanEuropeanTransportconferences.TheoverallconceptwasdevelopedatthefirstconferenceinPraguein1991.NinelongdistancetransportcorridorsasprioritiesforinfrastructuredevelopmentweredefinedatthesecondconferenceinCretein1994,includingCorridorVIII.AtenthcorridorandthePanEuropeanTransportAreasformaritimebasinswereaddedatthethirdconferenceinHelsinkiin1997,wheretheCorridorsweredefinedintheirpresentform.Therefore,thesecorridorsaresometimesreferredtoasthe"Cretecorridors"or"Helsinkicorridors",regardlessoftheirgeographicallocations.ThePanEuropeanCorridorVIIIMemorandumofUnderstanding(MoU),signedinBarionSeptember9,2002,byAlbania,Bulgaria,Macedonia,ItalyandTurkey,gavenewimpulsetotheaccomplishmentoftheCorridor.TheEUenlargement,withtheaccessionsof10newMemberStatesonMay1,2004andofRomaniaandBulgariaonJanuary1,2007,madetheexternalbordersoftheUnionmovefurthertowardsEastandSouth,bringingseveralnewneighbouringCountriestotheEU.In
this new situation, EU transport policy to connect neighbouring
countries needed to be redefined, asmost of Pan
EuropeanTransportCorridorswerenowincludedintheEUandbecamepartoftheTransEuropeanNetwork.InthisgeneralframeworkoftheEUenlargementtonewMemberStates,theprocessofdefinitionofanewEuropeanTransportPlanningStrategywascompleted
inDecember2005withthepublicationofthereportNetworksforPeaceandDevelopmentExtensionofthemajortransEuropeantransportaxestotheneighbouringcountriesandregions(November2005),whereCorridorVIIIwasconfirmedasintegralpartofoneofthefivenewEuropeanTransnationalAxes,namelytheSouthEasternAxis.Thetaskofcoordinatingandpromotingtheinitiativesforthe
realizationofCorridorVIIIare carriedoutby theSteeringCommittee
(SC), comprisedofMemberStates representativesandchairedbyItaly.
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 4
1.3.2 MACEDONIANRAILCORRIDORVIIIEASTERNSECTION
The Project comprisesof the rehabilitation and constructionof
the eastern sectionof
railCorridorVIIIwithintheRepublicofMacedonia.Figure13showstheplannedalignmentofrailCorridorVIIIandotherrailcorridorsintheRepublicofMacedonia.
Figure13RailwayCorridorsintheRepublicofMacedonia
Plansandactivities
forconstructionandoperationoftheeasternpartofrail line
fromKumanovototheBulgarianborderbeganasearlyas
theXIXcenturyand,albeitwith
interruptions,werecontinuousuntil2004,whenworks started in1994
stoppeddue to the lackof funds. TheProjecthasbeendivided
intothreesections:
Section 1: Kumanovo to Beljakovce (31km): the first 31km of the
railway line was previouslyoperational (until1994)however,
rehabilitationof this section is required inorder for it
tobecomeoperationalagain;
Section2:BeljakovcetoKrivaPalanka(34km):themiddlesectionofthealignmentrunsfromK.P.31toK.P.65
justbefore the townofKrivaPalanka. In this sectionmanyof the
structuresarepartiallycompleted. It can be estimated that
approximately one third of all construction works has
beencompleted. Construction is required of the missing railway
structures and rehabilitation is
alsonecessarytotherailwaystructurespreviouslyconstructed;and
Section3:KrivaPalankatotheBulgarianBorder (23.5km):The
lastsectionof therailway
linerunsfromKrivaPalankaatK.P.65uptoDeveBairattheBulgarianborderlocatedatK.P.88.5.Therehavebeen
no previous railwayworks undertakenwithin this section and
therefore construction of
therailwaylineandstructuresisrequiredalongentireroute.
ThesesectionsarerepresentedinFigure14.
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 5
Figure14SectionsofProjectRailwayCorridorVIIIEasternSection
TheESIAassesseswithin
itsscopethe3sectionsoftheProject.ThesesectionsarecommontoboththeESIAandtheFeasibilityStudy.
1.3.3 INVESTMENTDELIVERYPHASES
TheProject is tobedelivered in twomainphasesof
investment,whichare referred towithin
theESIAasStage1andStage29:
Stage1: Comprises the rehabilitation of Section 1 between
Kumanovo to Beljakovce for
dieseltractionandwithoutelectrification.Theenvisagedconstructionperiod
is from2013 to theendof2014.The operational period is expected to
be from the end of 2014 to 2018 for diesel traction and
localpassengerservicesbutnofreightservices;andStage2:
Rehabilitation and construction of the Beljakovce to Deve Bair
section (comprising of both
Sections 2 and 3) and the electrification of the whole route
from Kumanovo to Deve
Bair(includingSections,1,2and3).Theenvisagedconstructionperiodisfrom2015to2018withthecommencement
of railway operations by the end of 2018. Electric tractionwill be
deliveredduring this phase from Kumanovo up toDeve Bair on
theMacedonian side of the
Bulgarianborder,andwilllinkwithelectrictractionuptoGuyeshevo,justaftertheBulgarianborder.ItisunderstoodthoughcurrentlythatdieseltractionfromGuyeshevothroughBulgaria,whichisnotincluded
in thescopeof thisESIA, isenvisageduntil2024with thechangeof
tractivestock toelectricenvisagedfrom2025ontheBulgarianside.
1.4 PURPOSEOFTHEESIA
ThepurposeoftheESIAistoidentifyandassessthepotentialpositiveandadverseimpactsthatmayarisefrom
theRailwayCorridorVIII EasternSection railwayProject (Figure15)on
thephysicalandnatural
9Stage2nowcoversthepreviousProjectpreparationStages2and3.
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 6
environment, on the socioeconomic wellbeing and conditions of
the population (community andworkforce) at the local
(municipalities), regional (North Eastern region), national
(Macedonia) andtransboundary levels, including an assessment of
railway accidents and identification of railway
safetyprovisions.
TheProjectactivitiesthathavebeenconsideredaspartoftheESIAincludethosetobeundertakenduringthe
design, rehabilitation/construction and operation of the railway,
including the interim operation
ofSection1usingdieseltractionandoperationofthewholeeasternsection(Sections1to3)usingelectrictraction.Decommissioningofconstructionsitesandtemporaryfacilitiesisalsoconsideredwithinthescopeoftheassessment.However,decommissioningoftherailwaylinehasnotbeenconsideredwithintheESIAat
this stagedue toboth limited informationbeingavailableat this
stagewith regard to the ceasingofoperationof the railwayandgiven
the intention thatwithmaintenance the railway linewillcontinue
tooperate beyond its design life. In the event that the railway
line ceases operation and needs to
bedecommissionedrelevantapprovalswillbesoughtandifrequiredanESIAwillbeprepared.
Identified impacts have been assessed taking into account the
environmental and social baselineconditions analyzed for the study
area, and,where necessary and appropriate,mitigationmeasures
toavoid,prevent,mitigateorcompensatesignificantlyadverseimpactsandenhancebeneficialimpactshavebeen
proposed. In this regard, a mitigation and monitoring plan to both
monitor and evaluate
theimplementationofmitigationmeasuresandtheProjectperformanceonenvironmentalandsocialbaselineconditionshasbeenincludedasanintegralpartoftheESIA.Furthermore,theassessmentdeterminesthesignificanceof
residualeffects remainingon theenvironmentand communityasa resultof
theProjectfollowingimplementationofthemitigationmeasures.
Figure15AreapotentiallyaffectedbytheProjectwithintheNorthEastregionofMacedonia
The ESIA has been prepared in line with the national EIA
requirements withinMacedonia, and withreference to EBRD and EIB
requirements and other international applicable standards, such as
theInternationalFinanceCorporation(IFC)Environmental,Health&Safety(EHS)GuidelinesforRailways(April2007).
The scoping assessment andmethodology for the ESIA is presented in
Chapter 4 AssessmentMethodology&Scoping.
The draft ESIAwill be disclosed to the public. The comment
periodwill be 120 days, ensuring that
allstakeholdershaveanopportunitytoexpresstheirviews.AStakeholderEngagementPlan(SEP)hasbeendevelopedasa
communication tool for theProjectandusing this the stakeholderswere
identifiedandhavebeen
involvedduringthedevelopmentofthedraftESIA.Uponcompletionofthecommentperiod,the
ESIA Studywillbeupdated to reflect the commentsmadeby stakeholders
and informationwillbe
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 7
providedabouthow commentshavebeenaddressed. Inaddition, these
commentswillbe fed into
thefutureworkonthedetaileddesignandconstructionoftheProject.ThefinaldecisionandversionoftheESIAwillbemadepublicallyavailable.
1.5 PROJECTPROPONENTANDESIATEAM
The Railway Corridor VIII Eastern Section Project proponent is
the Ministry of Transport andCommunication, Government of the
Republic of Macedonia. Eptisa with DB International have
beenselected by the Macedonian Ministry of Transport and
Communication as the Consultant for thepreparationof the
Feasibility Study and theESIA for theProject.Thisdraft
ESIAhasbeenpreparedonbehalf of theMacedonianMinistry of Transport
& Communication by Eptisa consulting firm with
DBInternational.AspartofConsultantsteam,thefollowingtechnicalenvironmentalandsocialexpertshaveparticipatedinthepreparationoftheESIA.
Consultantsteamofexperts
Name Organization Role/Tasks
MrsMaraCarlotaArquiaga Eptisa
ESIA expert acting as associated environmental
consultant/ESIAreview
MrBertoldWeitz DBInternationalEnvironmental specialist
/Topography, landscape,geomorphology, Geology, soils baseline and
assessment,mitigationmeasures
MrsGitteAndersen Eptisa
Social Impact Specialist / socioeconomic baseline,assessment of
social impacts, mitigation measures,resettlement compensation
framework, Stakeholderengagementplan
MrsSlavjankaPejcinovskaAndonova
Eptisa
Local Environmental Specialist / Surface water &Groundwater,
air quality, noise & vibrations, wastemanagement, cultural
heritage& Archeology, baseline andassessments of
impacts,mitigationmeasures, Stakeholderengagementplan
DrJovanPejkovski EptisaLocal Social Impact Specialist /
socioeconomic baseline,assessment of social impacts, mitigation
measures,resettlementcompensationframework,
MrsSvetlanaKirevska Eptisa
LocalSocialImpactSpecialist/socioeconomicbaseline
MsTatjanaTodoroska Eptisa
Projectassistant/CoordinationofESIAworks,assistancefor:socioeconomic
baseline, assessment of social impacts,mitigation measures,
Resettlement
compensationframework,Stakeholderengagementplan,Projectleaflet
MrVasilAnastasovski Eptisa Consultant/Geology,hydrology
DrMitkoKaradelev Eptisa Coordinator of works on natural
environment / Naturalenvironment,fungi,coordinationandsynthesis
DrLjupcoMelovski Eptisa Assistant to Dr Karadelev / Habitat and
flora description,relatedimpactassessmentandmitigationmeasures
DrSlavcoHristovski EptisaAssistant toDrKaradelev/Fauna
(invertebrate)description,related impact assessment and mitigation
measures, andsynthesis
MrBogoljubSterjovski Eptisa Assistant to Dr Karadelev / Fauna
(fishes, amphibians andreptiles) description, related impact
assessment and
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 8
Consultantsteamofexperts
Name Organization Role/Tasks
mitigationmeasures
MrMetodijaVelevski Eptisa
AssistanttoDrKaradelev/Fauna(birds)description,relatedimpactassessmentandmitigationmeasures
Mr.DimceMelovski
EptisaAssistanttoDrKaradelev/Fauna(mammalsandbutterflies)description,
related impact assessment and mitigationmeasures
MrLjubomirStefanov Eptisa
AssistanttoDrKaradelev/Fauna(grasshoppers)description,relatedimpactassessmentandmitigationmeasures
MsDanielaJovanovska Eptisa Drafter/GIS,cartography
1.6 CONTENTOFTHEESIA
TheESIAhasbeenstructuredtofollowacommonlyacceptedimpactassessmentformatandisreflectiveofthestageswithintheMacedonianEIAprocedure.TheESIAisorganizedinto15chapterswiththefollowingcontent:
Chapter1 Introduction:provides general information about
theProject, the legal&policybasisof
theESIA,theProjectproponentandESIAassessmentteam,andthepurposeandcontentoftheESIA.
Chapter 2 Legal & Policy Requirements: describes
environmental and social policy, legislation
andstandardsrelevanttotheProject,atbothnationalandEU
levels,aswellasmultilateralagreementsandconventionssigned/ratifiedbytheRepublicofMacedonia.
Chapter3ProjectDescription&ConsiderationofAlternatives:describesthetechnicalspecificationoftheProject
and its background, need and objectives along with outlining the
expected benefits from theProject, the landuse and land take, the
Project phases andprogramme, and theproposed labour
andworkforcearrangementsand facilities.TheChapteralsodescribes the
routealternativesconsideredandtheselectionofthefinalroute.
Chapter4AssessmentMethodology&ScopingAssessment:definesthescopeoftheassessmentbasedonthe
issues which have the potential to cause significant effects on the
receiving environment
andcommunities,thescopingopinionoftherelevantauthority(MinistryofEnvironmentandPhysicalPlanningEnvironmentalAdministration)andtheopinionsofstakeholders.Describesthemethodologyappliedfortheassessmentofpotentialenvironmentalandsocialimpactsandthedeterminationofthesignificanceofresidualeffects.
Chapter 5 Baseline Environmental & Social Conditions:
describes baseline environmental and
socialconditions,focusingonsensitiveissuesandvulnerablegroups.
Chapter 6 Potential Environmental& Social Impacts: describes
the potential environmental and socialimpacts resulting from the
railway project activities, including cumulative, synergy and
transboundaryimpacts.
Chapter 7 Environmental& SocialMitigationMeasures and
Residual Environmental& Social Effects:presents
theenvironmentaland socialmitigationmeasuresproposed
toavoid,prevent,mitigateand/orcompensatetheadverseimpactsandenhancethebeneficialimpactsoftherailwayProject.Describesthepotential
residual environmental and social effects remaining from the
Project following
theimplementationofmitigationmeasuresandpresentsthelikelysignificanceoftheseresidualeffectsalongwithasummaryofthelikelysignificantresidualenvironmentalandsocialeffects.
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 9
Chapter8Environmental&SocialManagement&Monitoring:presentstheproposedenvironmentalandsocialmanagementandmonitoringprogramdesignedtoevaluatetheimplementationandperformanceofthemitigationmeasuresandtheoverallenvironmentalandsocialperformanceoftheProject.
Chapter9AnalysisofTechnicalInsufficiency&NeedforUpdateoftheESIAStudy:describesthevarioustechnical
insufficiencies encountered during the ESIA development in terms of
data availability (lack ofdata)andcollection.
Chapter 10 Conclusion: summarizes the key findings and
conclusions of the assessment including
thepotentialsignificantresidualenvironmentalandsocialeffects.
Chapter 11 NonTechnical Summary (NTS): presents the NonTechnical
Summary of the ESIA of theproposedProject.
Chapter12StakeholderEngagementPlan(SEP):describestheStakeholderEngagementPlan,showingthecommunication
channels with stakeholders, and the active public participation
during the entire ESIAprocess.
Chapter13ResettlementCompensationFramework:describestheprinciplestobeappliedintheeventofland
acquisition leading to physical and/or economic displacement
(resettlement),
involuntaryresettlementandlandacquisitionissuesandmeasures.
Chapter 14 Comments onDraft ESIA Study& List of Introduced
Changes:will include the commentsreceived on the draft ESIA during
the public disclosure/comment period, and a list of the
changesintroducedinthefinalversionoftheESIAStudy.
Chapter15References:presentsalistofthereferencesusedduringthepreparationoftheESIAStudy.
AnnexestotheESIA
Annex1PartfromFutureTrafficScheme
Annex2DecisionfromtheGovernmentoftheRepublicofMacedoniafortheselectedalignment
Annex3Siteinspection
Annex4DecisionofMoEPforscopeoftheESIA
Annex5Habitatsmaps
Annex6Plantspecies
Annex7Fungi&Lichens
Annex8.1Vertebrates(Amphibians,Reptiles,Birds,Mammals)
Annex8.2Invertebrates(Dragonflies,Groundbeetles,Dailybutterflies,Grasshoppers
Annex9Landusetypes
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 10
-
Chapter2Legal&PolicyRequirements
Describesenvironmentalandsocialpolicy,legislationandstandardsrelevanttotheProject,atnationalandEUlevels,aswellasmultilateralagreementsandconventionssigned/ratifiedbytheRepublicofMacedonia.
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 11
2 LEGALANDPOLICYREQUIREMENTS
2.1 NATIONALLEGISLATION(&RELATEDEUDIRECTIVES)
2.1.1
NATIONALENVIRONMENTAL&SOCIALLEGISLATIONANDEUDIRECTIVES
Recognizingthedamagingeffectsofenvironmentalpollutiononhumanbeingsandthequalityoflife,theRepublic
ofMacedonia has developed constitutional provisions that guarantee
the right to a healthyenvironment. Article 43 of the Constitution
of the Republic ofMacedonia (OfficialGazetteNo.
52/91)prescribeseveryone
isobligedtopromoteandprotecttheenvironment;theStateprovidesconditionstoapply
the right of citizens to a healthy environment. Macedonia has
become a Party to the mainmultilateral conventions andprotocols
explicitly recognising the linkbetween environmentalprotectionand
the human rights norms covering many environmental issues like EIA,
Strategic EnvironmentalAssessment (SEA) in the national and
transboundary context, climate change, biodiversity,
publicinformation,publicparticipation in
thedecisionmakingprocessandaccess to justice,
transboundaryairpollution and air monitoring, ozone layer,
chemicals like persistent organic pollutants (POP),
natureprotection,etc.KeyrelevantlegislationislistedinTable21.
AtthesametimetheRepublicofMacedoniahasconfirmeditscommitmenttowardsEUaccessionthroughthedevelopmentoftherelationshipwiththeEUsinceOctober1992,andhasposedtheEUMembershipon
its political agenda as a national goal of highest priority from
the very beginning of independence,obtained
in1991.In2005theRepublicofMacedoniawasgrantedbytheEUthecandidatestatusforfullEUmembership.
In order to fulfil the criteria for full membership, the
Republic of Macedonia adopted the
NationalProgrammeforAdoptionoftheAcquisCommunautaire(NPAA)in200710.TheNPAA,which
isperiodicallyrevised, comprises the plans for harmonization of the
national legislationwith the EU legislation, thenecessary
institutional strengthening for implementation of the legislation,
as well as the necessaryresources for realization. Chapter 3.27 of
the NPAA addresses the achievements and the remainingobligations in
the fieldofEnvironment. Inearly2008, theRepublicofMacedoniaadopted
theNationalStrategyforEnvironmentalApproximation(NSEA)inordertorespondtothecomplexobligationsoftheEUenvironmentalacquisandatthesametimecontributetothesustainabledevelopmentofthecountry.TheNSEA
provides a roadmap for a full and effective approximation process,
including a sustainable,comprehensive
frameworkofactionswithassociated costsneeded for legal
transpositionand technicalimplementation in all ten environmental
sectors. The transposition of the main obligations of
theenvironmentalEUDirectives,EUstandardsand
internationalorganisationsstandards (e.g.WorldHealthOrganization
(WHO)) into the national primary legislation started in 2003/2004
with the Law
onEnvironment(OfficialGazetteNo.53/05,81/05,24/07,159/08,83/2009,124/2010,51/2011).TheLawonEnvironment
contains the basic principles of environmental protection with both
precautionary
andpolluterpaysprinciplesandprovidesthelegalbasisforissuingofnecessarysecondarylegislation.
During 2004 to 2008, other primary legal acts related to air
quality and air management,
watermanagementandwaterquality,wastemanagement,natureprotection,industrialpollutioncontrol,noise,havebeenpreparedandadoptedbytheMacedonianParliamentintheformofthelegalactsgiveninTable21.
The EU environmental legislation has been transposed into the
national legislation and, almost for
allenvironmentalsectors,theprescribedstandardsandemissionlimits,orwastemanagementprinciplesarethe
same (chemicals,waste, IPPC, EIA, SEA, noise, air quality). In some
sectors there is still a lack ofsecondary legislation
prescribingwhere the applicable standardswill be prescribed
(e.g.water quality,
10National Programme forAdoption of theAcquis Communautaire
Revision 2009,Government of theRepublic
ofMacedonia,Skopje,29May2009.http://www.sobranie.mk/en/WBStorage/Files/00%20NATIONAL%20PROGRAMME%202009%20%2029.05.2009.pdf
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 12
emissionstowaterandgroundwaters,emissionstosoilandsoilquality);someofthissecondarylegislationisintheprocessofpreparation.
Thekey relevantnational legislation,EUDirectivesand
internationalstandardsaresummarized
inTable21,withspecificstandardsbeingreferencedintherelevantenvironmentalandsocialchapters.
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 13
Relevantenvironmental/socialissuesfortheproject
RelevantnationallegislationAct,Regulation,Degree(date&ref.)
RelevantEUlegislation/Goodpractice/Internationalorganizationsstandards
ESIAprocedure
LawonEnvironment(OfficialGazetteNo.53/05,81/05,24/07,159/08,83/2009,124/2010,51/2011);
RulebookonthecontentoftherequirementsthatneedtobefulfilledbythestudyonEIA(OfficialGazetteNo.33/06);
Rulebookontheform,contentprocedureandmannerofdevelopingthereportontheadequacyofthestudyonEIAoftheprojectandtheprocedureforauthorizationofpersonsfromtheListofExpertsforEIAresponsibleforthepreparationofthereport(OfficialGazetteNo.33/06);
DecreeondeterminingprojectsforwhichandcriteriaonthebasisofwhichthescreeningforEIAshouldbecarryout(OfficialGazetteNo.74/05);
Rulebookonthecontentofannouncementofthenotificationoftheintentiontoimplementaproject,onthenecessityofanEIA,onthestudyonprojectEIA,ofthereportontheadequacyofthestudyonEIA(OfficialGazetteNo.33/06);
RulebookontheinformationcontainedinnotificationofintenttoimplementaprojectandtheprocedurefordeterminingtheneedforEIAofaproject(OfficialGazetteNo.33/06);
EIADirective(85/337/EEC)amendedwithEUDirective97/11/EC,EUDirective2003/35/EC,EUDirective2009/31/EC;
EUGuidelines:
GuidanceonEIAScreening/Scoping/EISReview,June2001
GuidelinesfortheAssessmentofIndirectandCumulativeImpactsaswellasImpactInteractions,May1999
EIBEnvironmentalandSocialPracticesHandbook,Version2:24/02/2010;
EBRDEnvironmentalandSocialPolicy,May2008:
IFCsPolicyonSocial&EnvironmentalSustainability,April30,2006;
Accesstoenvironmentalinformationandpublicparticipationinenvironmentaldecisionmakingprocess
LawonEnvironment(ChapteronEIAprocedureandtransboundarycontextandinformationdissemination,publicparticipationandaccesstojusticerequirements)(OfficialGazetteNo.53/05,81/05,24/07,159/08,83/09,124/10,51/11);
EspooConventionwasratifiedbyMacedonia(OfficialGazetteNo.44/99);
TheAarhusConventionwasratifiedbyMacedonia(OfficialGazetteNo.40/99);
DirectiveonAccesstoEnvironmentalInformation(2003/4/EC);
DirectiveforpublicparticipationinrespectofthedrawingupofcertainplansandprogramsrelatingtotheenvironmentandamendingwithregardtopublicparticipationandaccesstojusticeCouncilDirectives85/337/EECand96/61/EC(2003/35/EC);
ConventiononEnvironmentalImpactAssessmentinaTransboundaryContext(Espoo,February1991);
ConventiononAccesstoInformation,PublicParticipationinDecisionMakingandAccesstoJusticeinEnvironmentalMatters(AarhusConvention,June1998);
EIBEnvironmentalandSocialPracticesHandbook,Version2:24/02/2010;
EBRDEnvironmentalandSocialPolicy,May2008:(PerformanceRequirement10);
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 14
Relevantenvironmental/socialissuesfortheproject
RelevantnationallegislationAct,Regulation,Degree(date&ref.)
RelevantEUlegislation/Goodpractice/Internationalorganizationsstandards
Water
LawonEnvironment(OfficialGazetteNo.53/05,81/05,24/07,159/08,48/10,124/10,51/11);
LawonWaters(OfficialGazetteNo.87/08,6/09,161/09,83/10,51/11);
LawonWaterManagement(OfficialGazetteNo.85/03,95/05,103/08);
LawonAquaticCommunities(OfficialGazetteNo.51/03,95/05113/07);
Decreeonclassificationofwaters(OfficialGazetteNo.18/99);
Regulationoncategorizationofwaterstreams,lakes,accumulationsandgroundwater(OfficialGazetteNo.18/99,71/99);
Rulebookonmonitoringofsedimentinreservoirs(OfficialGazetteNo.4/99);
Rulesforreportingonthestatelevelandquantityofwateraccumulatedinreservoirs,andtheamountofwaterreleasedbythem(OfficialGazetteNo.8/99);
Rulebookonthecontentandmethodofpreparingmanagementplansforriverbasins(OfficialGazetteNo.148/09);
Regulationonmethodologyforassessmentofriverbasins(OfficialGazetteNo.148/09);
Rulebookonthecontentandmethodofpreparingtheprogramofmeasures(OfficialGazetteNo.148/09);
Rulesforspecialsecurityrequirementsfornaturalmineralwater(OfficialGazetteNo.32/06);
Rulebookondeterminationandmaintenanceofprotectivezonesaroundsourcesofdrinkingwater(SFRYOfficialGazetteNo.17/83);
RulesAmendingtheRulesofthemannerofdeterminationandmaintenanceofprotectivezonesaroundsourcesofdrinkingwater(SFRYOfficialGazetteNo.15/89);
Rulesforwatersafety(OfficialGazetteNo.46/08);
Lawonratificationoftheconventionforassessingenvironmentalimpactsinatransboundarycontext(OfficialGazetteNo.44/99);
EUDirective2001/60/ECWaterFrameworkDirectiveandDecision2455/2001/ECestablishingthelistofprioritysubstancesinthefieldofwaterpolicy;
EUDirective2008/105/EConenvironmentalqualitystandardsinthefieldofwaterpolicy;
EUDirective2006/11/EConpollutioncausedbycertaindangeroussubstancesdischargedintotheaquaticenvironment;
UrbanWastewaterTreatmentDirective(91/271/EEC);
NitratesDirective(91/676/EEC);
DangerousSubstancestoWaterDischargesDirective(76/464/EEC)asemissioncontrolorientedlegislation;
Directive98/83/EEConthequalityofwaterintendedforhumanconsumption;
Directive1991/271/EECconcerningurbanwastewatertreatment;
Directive80/68/EEContheprotectionofgroundwateragainstpollutioncausedbycertaindangeroussubstances;
WasteManagement
LawonWaste(OfficialGazetteNo.68/04,71/04,107/07,102/08,134/08,124/10and51/11);
ListofWasteTypes(OfficialGazetteNo.100/05);
LawonPackagingandPackagingWaste(OfficialGazetteNo.161/1009);
TheLawontheRatificationoftheBaselConventionontheControlofTransboundaryMovementsofHazardousWastesandtheirDisposal(OfficialGazetteNo.48/97)
Decreefordeterminingtheactivitiesofinstallations(landfillsoperation)requiringanintegral
WasteFrameworkDirective2006/12/ECamendedwithEUDirective2008/98/EConwastemanagement;CommissionDecision2000/532/ECof3May2000,replacingDecision94/3/ECestablishingalistofwastespursuanttoArticle1(a)ofCouncilDirective75/442/EEConwasteandCouncilDecision94/904/ECestablishingalistofhazardouswastepursuanttoArticle1(4)ofCouncilDirective91/689/EEConhazardouswaste;
Decisions2001/118/EU,2001/119/EUand2001/573/EU;
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 15
Relevantenvironmental/socialissuesfortheproject
RelevantnationallegislationAct,Regulation,Degree(date&ref.)
RelevantEUlegislation/Goodpractice/Internationalorganizationsstandards
environmentalpermit(OfficialGazetteNo.89/05)
Rulebookonthemannerandtheconditionsforwastestorage,aswellasontheconditionstobemetbythesitesonwhichwastestorageisperformed(OfficialGazetteNo.29/07);
Rulebookontheminimumtechnicalrequirementswithregardtoenvironmentalprotectiontobemetbywastetransferstations,requirementstobemetbythesiteswherewastetransferstationsarebuiltorplaced,aswellasonthetermsforthewastestorageinwastetransferstationsdependingonthetypesofwaste(OfficialGazetteNo.39/07);
Rulebookonthelandfilloperation,monitoringandcontrollingintheoperationalandclosingphaseaswellasontheclosureandaftercareprocedures(OfficialGazetteNo.156/07);
Rulebookforcriteriaforacceptanceofwastetolandfillineachlandfillclass,preparationprocedureforacceptanceofwaste,basictestingprocedures,samplingprocedureandacceptanceofwaste(OfficialGazetteNo.8/08);
RulebookonthemannerandtheconditionsforhandlingPCBs,theconditionstobemetbyinstallationsandfacilitiesforPCBsdisposalanddecontamination,onusedPCBsandonthemanneroflabelingtheequipmentthatcontainsPCBs(OfficialGazetteNo.48/07);
Rulebookontheproceduresandmannerofcollection,transport,processing,storage,treatmentanddisposalofwasteoils,andthemannerofkeepingrecordsandsubmissionofdata(OfficialGazetteNo.156/07);
Rulebookofdetailedconditionsonthehandlingofhazardouswaste,andonthemannerofpackagingandlabeling(OfficialGazetteNo.15/08);
Rulebookontheformandcontentoftherequestforissuingapermitforthelandfilloperatoraswellastheformforandcontentofthepermit(OfficialGazetteNo.140/07);
DisposalofWasteOilsDirective(75/439/EEC)asamendedbyDirectives87/101/EEC,91/692/EECandpartiallyrepealedbyDirective2000/76/EC;
EULandfillDirective99/31/EC;
RegulationoflabelingtheequipmentthatcontainsPCBsEUPCBSDirective96/59/EC;
EUWasteOilsDirective75/439/EEC;
HazardousWasteDirective(91/689/EEC)andPackagingandPackagingWasteDirective94/62/EC;
EIBEnvironmentalandSocialPracticesHandbook,Version2:24/02/2010;
EBRDEnvironmentalandSocialPolicy,May2008:(PerformanceRequirements3,4&6);
IFCsEnvironmental,Health&SafetyGuidelinesforRailways,April30,2007;
ProtectedNaturalAreasandBiodiversity
LawonNatureProtection(OfficialGazetteNo.67/06,16/06,84/07)andsecondarylegislationonNatura2000andemeraldnetwork;
(EmeraldNetwork:Launchedin1998bytheCouncilofEurope,ofwhichtheRepublicofMacedoniaisamember,aspartoftheworksundertheBernConventionontheConservationofEuropeanWildlifeandNaturalHabitats.ThisecologicalnetworkisbasedonthesameprinciplesasNatura2000,andrepresentsitsdefactoextensiontononEUcountries.NationalEmeraldNetworkintheRepublicofMacedoniawasimplementedbetween2002and2008.11);
EUDirective92/43/EECof21May1992ontheconservationofNaturalHabitatsandofWildFaunaandFlora,asamendedbyDirectives97/62/ECandRegulationEC1882/2003;
EUDirective2009/147/ECof30November2009ontheconservationofwildbirds(codifiedversionofEUDirective79/409/EECasamended);
CouncilRegulation(EC)No338/97of9December1996ontheprotectionofspeciesofwildfaunaandflorabyregulatingtradetherein,
11Thiswasanimportantenablingactivity/mechanismfortheestablishmentofacoherentEuropeanNatura2000network.Intheperiodbetween1948and1960,11areasandobjectswereprotectedasnaturalraritiesonthebasisoftheLawonProtectionofMonumentsofCultureandNaturalRaritiesapplicableinthatperiod,withatotalsurfaceareaof131599ha5.11%ofthenationalterritory.UndertheLawon
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 16
Relevantenvironmental/socialissuesfortheproject
RelevantnationallegislationAct,Regulation,Degree(date&ref.)
RelevantEUlegislation/Goodpractice/Internationalorganizationsstandards
(MacedoniaratifiedtheRioConventionin1997);
(MacedoniaratifiedtheBonnConventionin1999);
(MacedoniaratifiedtheRamsarConventionin1977);
(MacedoniaratifiedtheBernConventionin1997);
(MacedoniaratifiedtheCITESConventionin2000);
(MacedoniaratifiedtheAgreementontheConservationofBatsinEurope(London)in1999,amendedin2002)
asamendedbyRegulations(EC)938/97,2307/97,2214/98,1476/99,2724/2000,1579/2001,2476/2001,1497/2003,1882/2003,834/2004,252/2005and1332/2005;
ConventiononBiologicalDiversity(RiodeJaneiro),1992;
ConventionontheConservationofMigratorySpeciesofWildAnimals(Bonn),1979;
ConventiononWetlandsofInternationalImportanceespeciallyasWaterfowlHabitats(Ramsar),1971
ConventionontheConservationofEuropeanWildlifeandNaturalHabitats(Bern),1972;
ConventiononInternationalTradeinEndangeredSpeciesofWildFaunaandFlora(WashingtonCITESConvention),1973;
AgreementontheConservationofBatsinEurope(London),1991;
NoiseandVibration
LawonNoiseProtection(OfficialGazetteNo.79/07,)
Rulebookonnoiseindicatorsandtheareaofapplicationofadditionalnoiseindicators(OfficialGazetteNo.107/08);
Rulebookonthepermissiblelevelofnoiseintheenvironment(OfficialGazetteNo.147/08);
Rulebookonthepreparationandcontentsofstrategicnoisemaps(OfficialGazetteNo.120/08);
Rulebookonthemethod,conditionsandprocedureforestablishingandoperatingnetworks,monitoringmethodology,conditions,methodandprocedureforsubmittingnoisemonitoringinformationanddata(OfficialGazetteNo.1/09);
EUDirective2002/49/EConAssessmentandManagementofEnvironmentalNoise;
EUDirective2000/14/EConnoiseemissionsfromoutdoorequipment;
EIBEnvironmentalandSocialPracticesHandbook,Version2:24/02/2010;
IFCsEnvironmental,Health&SafetyGuidelinesforRailways,April30,2007
AirQuality
LawonAmbientAirQuality(OfficialGazetteNo.67/04withamendmentsNos.92/07,35/10and47/11);
Decreeonlimitvaluesoflevelsandtypesofpollutantsinambientairandalertthresholds,deadlineforachievinglimitvalues,marginsoftoleranceofthelimitvalue,targetvaluesandlongtermgoals(OfficialGazetteNo.19/05);
Rulebookonestablishingtheemissionupperlimitsonnationallevel(OfficialGazetteNo.10/90);
AmbientAirQualityFrameworkDirective(96/62/EC),asamendedbyRegulation(EC)1882/2003;
BenzeneandCarbonMonoxideDirective(2000/69/EC);
Directive2002/3/EConozoneinambientair;
EUDirective(1999/30/EC)onlimitvaluesforsulphurdioxide,nitrogendioxideandoxidesofnitrogen,particulatematterandleadinambient
NaturalRaritiesProtectionenactedin1960anditsamendmentsof1965and1973,afurther58objectswereprotected,resultinginatotalnumberof69protectedareasandobjects,withatotalareaof184137ha7.16%oftheterritoryoftheRepublic.WiththeestablishmentofaseparateMinistryofEnvironmentinDecember1998,theprocessofnaturalheritageprotectioncontinuedduringtheperiod19992008.AdoptionoftheLawonNatureProtectionin2004,incorporatingtheEuropeanDirectivesrelatedtonaturalheritageprotection,hasbeenofparticularsignificance.
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 17
Relevantenvironmental/socialissuesfortheproject
RelevantnationallegislationAct,Regulation,Degree(date&ref.)
RelevantEUlegislation/Goodpractice/Internationalorganizationsstandards
MacedoniaratifiedtheConventiononClimateChangeon28January1998,entranceintoforceon28Apr1998;
MacedoniaratifiedtheKyotoProtocolon18November2004,entranceintoforceon16February2005;
Decreeonlimitandtargetvaluesforlevelsandtypeofpollutantsintheambientair,alertandinformationthresholds;deadlinesforachievinglimitandtargetvaluesforspecificsubstances;marginsoftoleranceforlimitvalueandtargetvalueandlongtermobjectivesforspecificpollutants(OfficialGazetteNo.50/05);
Rulebookoncriteria,methodsandproceduresforevaluationoftheambientairquality(OfficialGazetteNo.82/06);
Rulebookoninventoryanddeterminationofthelevelsofthepollutantemissionsintheambientairintonnesperyear,foralltypesofduties,aswellasotherdataneededforsubmissionoftheProgramformonitoringtheairinEurope(EMEP)(OfficialGazetteNo.142/07);
Listsofzonesandagglomerationsforambientairquality(OfficialGazetteNo.23/2009);
Rulebookformethodologyforinventorytakingandidentificationofthelevelsofemissionsofpollutantsintheambientairintonsperyearforalltypesofactivities,aswellasotherdatarequiredtobesubmittedundertheProgramforairmonitoringinEurope(EMEP)(OfficialGazetteNo.2/2010);
Rulebookonestablishingtheemissionupperlimitsonnationallevel(OfficialGazetteNo.10/90);
Rulebookforairemissionlimitvaluesfromstationarysources(OfficialGazetteNo.141/10);
(TheRulebookforairemissionlimitvaluesfrommobilesourcesisnotadoptedyet,itisplannedtobeadoptednextyear(2012)wherethelimitvaluesfordieseltractionlocomotiveswillbetransposed(EUDirective2004/26/EConmeasuresagainsttheemissionofgaseousandparticulatepollutantsfrominternalcombustionenginestobeinstalledinnonroadmobilemachinery));
ThedieselfuelspecificationareprescribedbyRulebookonliquidfuelquality(OfficialGazetteNo.88/2007,91/2007,97/2007,105/2007,157/2007,15/2008,78/2008,156/2008,81/2009);
air;
EUDirective(98/70/EC)relatingtothequalityofpetrolanddieselfuelsandamendingCouncilDirective93/12/EEC;
EIBEnvironmentalandSocialPracticesHandboo,Version2:24/02/2010;
EBRDEnvironmentalandSocialPolicy,May2008:(PerformanceRequirements3,4&6);
IFCsEnvironmental,Health&SafetyGuidelinesforRailways,April30,2007;
UnitedNationsFrameworkConventiononClimateChange(NewYork,May9,1992);
KyotoProtocolonClimateChange(Kyoto,December1997);
CulturalHeritageandArchaeology
LawonProtectionofCulturalHeritage(OfficialGazetteNo.20/04);
RegulationforNationalRegistryofCulturalHeritage(OfficialGazetteNo.25/05);
(MacedoniaratifiedtheConventionfortheprotectionoftheWorldCulturalandNaturalHeritagein1991);
EuropeanLandscapeConvention(Florence)ratifiedbyMacedoniain2003;
ConventionfortheprotectionoftheWorldCulturalandNaturalHeritage,UNESCO,1972;
EIBEnvironmentalandSocialPracticesHandbook,Version2:24/02/2010;
EBRDEnvironmentalandSocialPolicy,May2008:(Performance
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 18
Relevantenvironmental/socialissuesfortheproject
RelevantnationallegislationAct,Regulation,Degree(date&ref.)
RelevantEUlegislation/Goodpractice/Internationalorganizationsstandards
Requirement8);
RailwaySystems
LawontheRailwaySystem(OfficialGazetteNo.48/2010);
LawontheSafetyofRailwaySystems(OfficialGazetteNo.48/2010);
LawonInteroperabilityofRailwaySystems(OfficialGazetteNo.17/2011):Articles(2145)coverthetraindrivinglicensewhichisincompliancewithDirective2007/59/EC;
LawforTransportofHazardousMaterialsandamendments(OfficialGazetteNos.92/2007,17/2011and54/2011);
EURailwayPolicyandEUDirectiveonRailwaySafety(2004/49/EC)andamendmentsDirective2008/57/EC(forinteroperability)andDirective2008/110/EC;
EUDirective2007/59/EConthecertificationoftraindriversoperatinglocomotivesandtrainsontherailwaysystemintheCommunity;
IFCsEnvironmental,Health&SafetyGuidelinesforRailways,April30,2007;
CommunityHealthandSafety
LawonSafetyofRailwaySystems(OfficialGazetteNo.48/10);
LawforHealthProtection(OfficialGazetteNo.07/07);
LawforTransportofHazardousMaterialsandamendments(OfficialGazetteNos.92/2007,17/2011and54/2011);Lawforpreventingthespreadingoftheinfectiousdiseases(OfficialGazetteNo.21/11);
LawonHealthProtectionintheRepublicofMacedonia(OfficialGazetteNo.17/97,latestamendmentswithinOfficialGazetteNo.44/2011);
LawforWages(OfficialGazetteNo.70/94withlatestamendmentwithinNo.97/2010);
LawonEqualOpportunitiesforMenandWomen,andtheNationalActionPlanforGenderEquality(OfficialGazetteNo.48/10);
LawforSocialProtection(OfficialGazetteNo.79/09);
LawforChildrenProtection(OfficialGazetteNo.170/10);
CrisisPreparednessPlanning,June2009(forabnormalworkingconditionslikehightemperatures,floodsandsimilar);
EURailwayPolicyandEUDirectiveonRailwaySafety(2004/49/EC);
OutdoorEquipmentDirective(2000/14/EC);
EIBEnvironmentalandSocialPracticesHandbook,Version2:24/02/2010;
EBRDEnvironmentalandSocialPolicy,May2008:(PerformanceRequirement4);
OccupationalHealthandSafety
LawonOccupationalHealthandSafety(OfficialGazetteNo.92/07);
Rulebookonminimalrequirementsforoccupationalhealthandsafetyonworkingplace(OfficialGazetteNo.154/2008,Art.2);
Rulebookforpersonalprotectiveequipmentthatusesemployeesatwork(OfficialGazetteNo.92/07);
Rulebookforoccupationalhealthandsafetyatworkforworkersexposedonriskofnoise(OfficialGazetteNo.21/2008);
Directive89/654/EEConworkplacerequirementsconcerningtheminimumsafetyandhealthrequirementsfortheworkplace(firstindividualdirectivewithinthemeaningofArticle16(1)ofDirective89/391/EEC);
Directive(2003/10/EC)nominimumhealthandsafetyrequirementsregardingtheexposureofworkerstotherisksarisingfromphysicalagents(noise)(6February2003);
Directive1989/391/EEContheintroductionofmeasurestoencourageimprovementsinthesafetyandhealthofworkersatwork;
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 19
Relevantenvironmental/socialissuesfortheproject
RelevantnationallegislationAct,Regulation,Degree(date&ref.)
RelevantEUlegislation/Goodpractice/Internationalorganizationsstandards
EIBEnvironmentalandSocialPracticesHandbook,Version2:24/02/2010;
EBRDEnvironmentalandSocialPolicy,May2008:(PerformanceRequirement4);
Labour&WorkingConditions
LabourRelationsAct(OfficialGazetteNo.158/2010);
LawonOccupationalHealthandSafety(OfficialGazetteNo.92/07);
LawforCivilOrganisations(OfficialGazetteNo.52/10);
LawforWages(OfficialGazetteNo.92/07)andsecondarylegislation(Nos.121/07and92/09);
LawonEqualOpportunitiesforMenandWomen,andtheNationalActionPlanforGenderEquality(OfficialGazetteNo.48/10);
LawforSocialProtection(OfficialGazetteNo.79/2009);
LawforChildProtection(OfficialGazetteNos.98/00,17/03,and65/04);
LawonProtectionDuringWork(OfficialGazetteNo.13/98);
LawonEmployment&WorkofForeigners(OfficialGazetteNo.70/07);
Lawoninspectionforimplementationoflawsforlabourandworkingconditions(OfficialGazetteNo.35/97);
Collectiveagreementforrailways;
Collectiveagreementforconstructionindustry;
In1991MacedoniaratifiedanumberofInternationalLabourOrganization(ILO)conventionsincludingthefollowing:C2UnemploymentConvention,1919C3MaternityProtectionConvention,1919C8UnemploymentIndemnity(ShipwreckC11RightofAssociation(Agriculture)Convention,1921C12Workmen'sCompensation(Agriculture)Convention,1921C13WhiteLead(Painting)Convention,1921C14WeeklyRest(Industry)Convention,1921C16MedicalExaminationofYoungPersons(Sea)Convention,1921C17Workmen'sCompensation(Accidents)Convention,1925C18Workmen'sCompensation(OccupationalDiseases)Convention,1925C19EqualityofTreatment(AccidentCompensation)Convention,1925C24SicknessInsurance(Industry)Convention,1927
Directive89/654/EECworkplacerequirements,concerningtheminimumsafetyandhealthrequirementsfortheworkplace(firstindividualdirectivewithinthemeaningofArticle16(1)ofDirective89/391/EEC);
Directive2003/10/EConminimumhealthandsafetyrequirementsregardingtheexposureofworkerstotherisksarisingfromphysicalagents(noise);
Directive1989/391/EEContheintroductionofmeasurestoencourageimprovementsinthesafetyandhealthofworkersatwork;
EIBEnvironmentalandSocialPracticesHandbook,Version2:24/02/2010;
EBRDEnvironmentalandSocialPolicy,May2008:(PerformanceRequirement2);
ILOConventions;
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 20
Relevantenvironmental/socialissuesfortheproject
RelevantnationallegislationAct,Regulation,Degree(date&ref.)
RelevantEUlegislation/Goodpractice/Internationalorganizationsstandards
C25SicknessInsurance(Agriculture)Convention,1927C27MarkingofWeight(PackagesTransportedbyVessels)Convention,1929C29ForcedLabourConvention,1930C32ProtectionagainstAccidents(Dockers)Convention(Revised),1932C45UndergroundWork(Women)Convention,1935C48MaintenanceofMigrants'PensionRightsConvention,1935C80FinalArticlesRevisionConvention,1946C81LabourInspectionConvention,1947C87FreedomofAssociationandProtectionoftheRighttoOrganiseConvention,1948C88EmploymentServiceConvention,1948C89NightWork(Women)Convention(Revised),1948C90NightWorkofYoungPersons(Industry)Convention(Revised),1948C94LabourClauses(PublicContracts)Convention,1949C97MigrationforEmploymentConvention(Revised),1949C98RighttoOrganiseandCollectiveBargainingConvention,1949C100EqualRemunerationConvention,1951C102SocialSecurity(MinimumStandards)Convention,1952C103MaternityProtectionConvention(Revised),1952C106WeeklyRest(CommerceandOffices)Convention,1957C109Wages,HoursofWorkandManning(Sea)Convention(Revised),1958C111Discrimination(EmploymentandOccupation)Convention,1958C113MedicalExamination(Fishermen)Convention,1959C116FinalArticlesRevisionConvention,1961C119GuardingofMachineryConvention,1963C121EmploymentInjuryBenefitsConvention,1964C122EmploymentPolicyConvention,1964C129LabourInspection(Agriculture)Convention,1969C131MinimumWageFixingConvention,1970C132HolidayswithPayConvention(Revised),1970C135Workers'RepresentativesConvention,1971C136BenzeneConvention,1971C138MinimumAgeConvention,1973C139OccupationalCancerConvention,1974C140PaidEducationalLeaveConvention,1974C142HumanResourcesDevelopmentConvention,1975C143MigrantWorkers(SupplementaryProvisions)Convention,1975C148WorkingEnvironment(AirPollution,NoiseandVibration)Convention,1977C155OccupationalSafetyandHealthConvention,1981C156WorkerswithFamilyResponsibilitiesConvention,1981C158TerminationofEmploymentConvention,1982C159VocationalRehabilitationandEmployment(DisabledPersons)Convention,1983
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 21
Relevantenvironmental/socialissuesfortheproject
RelevantnationallegislationAct,Regulation,Degree(date&ref.)
RelevantEUlegislation/Goodpractice/Internationalorganizationsstandards
C161OccupationalHealthServicesConvention,1985C162AsbestosConvention,1986AdditionallythefollowingconventionshavebeenratifiedbyMacedonia:2002:C182WorstFormsofChildLabourConvention,19992003:C105AbolitionofForcedLabourConvention,19572005:C144TripartiteConsultation(InternationalLabourStandards)Convention,1976
LandAcquisition
TheLawonExpropriation(OfficialGazetteNos.33/95,20/98,40/99,31/03,46/05,10/08,106/08and76/10);
LawonPropertyCadastre(OfficialGazetteNos.40/08,158/10and51/11);
LawonSurveyandLandCadastre(OfficialGazetteNos.34/72and13/78);
LawfortheTreatmentofIllegallyConstructedObjects;(OfficialGazetteNos.23/11,54/11)
LawonOwnershipandOtherMaterialRights(OfficialGazetteNo.18/01);
LawonNatureProtection(OfficialGazetteNos.67/06,16/06and84/07);
LawonAgriculture&RuralDevelopment(OfficialGazetteNo.49/10);
LawonAgriculturalLand(OfficialGazetteNo.135/07);
LawonForests(OfficialGazetteNo.64/2009);
TheLawonVine(OfficialGazetteNo.69/2004);
TheLawonOrganicAgriculturalProduction(OfficialGazetteNo.16/2004);
TheLawonAgriculturalInspection(OfficialGazetteNo.38/2004);
TheLawonPlantHealth(OfficialGazetteNo.29/2005);
TheLawonSeedandSeedlingmaterial(OfficialGazetteNo.41/2000);
EIBEnvironmentalandSocialPracticesHandbook,Version2:24/02/2010;
EBRDEnvironmentalandSocialPolicy,May2008:(PerformanceRequirement5);
Table21RelevantNationalLegislation,EUDirectivesandInternationalTreaties
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 22
2.1.2 FUTUREPLANNEDNATIONALLEGISLATIONRELEVANTTOESIA
InordertotransposetherelevantEUDirectivesandadoptthesewithintheMacedonian
legalframeworkduring the period 2011 to 2013 secondary
legislationwill be prepared. Thiswillmainly focus on
thefollowingsectorsthatarerelevanttotheProjectsESIA:
WaterSector(withintheLawonWaters):
o Degree on criteria for determination of the good ecological
status of the surfacewaters
physical/chemical,biologicalandmorphologicalconditions;
o Degree on criteria for determination of the good ecological
status of the groundwaters
physical/chemical,biologicalandmorphologicalconditions;
o Degreeonclassificationandcategorizationofwaters;ando
Rulebooksonthedeterminationofthesensitivewaterzonesandwaterbodies.
NoiseandVibration(withintheLawonNoiseProtection):
o
Rulebookonthetechnicalmeasuresandconditionsthattheconstructionobjectsshouldfulfilregardingprotectionagainstnoise;
o Rulebookonthenoiseprotectionmeasuresthatshouldbe
includedwithinurbanandspatialplans;
o Rulebookonthenoiseemissionsofoutdoorequipment;o Rulebookon
thepreparationof thenoise strategicplans for larger agglomerations
(Skopje,
Bitola,Kumanovo,Tetovo);ando
Secondarylegislationonvibration.
Waste(withintheLawonWaste):
o
LawonWasteElectronicsandElectricalEquipment(WEEE),whichisgoingtobeincompliancewithEUDirective2002/96/EC);and
o
Rulebookonwasteshipments,andtheimport,exportandtransitofwaste.
2.1.3
CURRENTSTATUSOFIMPLEMENTATIONOFNATIONALLEGISLATIONRELEVANTTOESIA
AlthoughforsomesectorsrelevanttotheProjectthelegislationhasbeenpreparedandadopted,someofthe
legislationhasnotbeenfully implementeddueto lackof
institutionalcapacityatanationaland locallevel,anddueto limits
inhumanresources.There isalsostilla
lackofknowledge,professionalskillsandfinancialresourcestosupporttheimplementation.SomeoftheissuesrelevanttotherailwayProjectthathavenotbeenimplementedyetaresummarizedbelow:
TherearenoinertwastelandfillsinallmunicipalitieswithintheNorthEasternregionofMacedonia;
ThereisnolandfillsforthehazardouswastewithintheNorthEasternregionofMacedonia;
TherearenumerouswastedumpsnearbytheriverbedsalongtheProjectroute;
Theexistingmunicipal landfillsarenot
incompliancewithstrictnationalandEUstandardsandpose
veryhighhealthandenvironmentalrisks;
ThereisnofacilityformedicalwastetreatmentintheNorthEasternregionofMacedonia;
There isa lackof strategicnoisemaps formajor roadsand railways
(e.g.CorridorX) for thebigger
agglomerations;
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 23
Therearenopermanentmeasurementsofnoise level
inallthesettlementswithintheNorthEasternregion of Macedonia , with
measurements only being performed and reported for the City
ofKumanovo;
ThereisaneedforadditionalairqualitymonitoringstationsintheNorthEasternregionbasedonthepreliminaryassessmentofairqualityperformedseveralyearsago;
There are nowastewater treatment plants for urbanwastewater in
any of the settlements in theNorthEasternregionofMacedonia;and
NowatersensitivezoneshavebeenidentifiedalongthewatershedwithintheNorthEasternregionofMacedonia.
2.1.4 NATIONALESIAPROCEDURE
The Environmental Impact Assessment procedure has been
prescribed into the Law on
Environment(ChapterXI/Articles7694)wheretherequirementsoftheEUDirectivesonEIA
(Directive85/337/EECasamendedbyDirectives97/11/EC,2003/35/ECand2009/31/EC)havebeentransposed.
The national EIA procedure includes socioeconomic aspects as
well and therefore is referred
tosubsequentlyastheESIAprocedure.TheESIAprocedure ispresented
inFigure21.TheprocedurestartswhentheInvestor(ProjectProponent)whointendstoimplementaprojectsubmitsaNotificationLetter,inwrittenandelectronicformtotheMinistryofEnvironmentandPhysicalPlanning(MoEPP)(Administrationfor
Environment),which is the responsible authority for the entire
procedure. The Administration forEnvironment
isobligatedtopublishtheNotification inat
leastonedailynewspaperavailablethroughouttheterritoryoftheRepublicofMacedonia,andonthewebsiteoftheMoEPP.
Figure21ESIAprocedureintheRepublicofMacedoniaScreening:TheScreeningprocedureisastageoftheESIAprocedureduringwhichtheMoEPPdetermineswhetheranESIAshouldbecarriedoutornotforacertainproject.ForthedevelopmentofprojectsthatdonotbelongtothelistoftheprojectsforwhichtheESIAprocedurehastobecarriedout,thereisarequirementforthepreparationofanEnvironmentalImpactReportElaborate.Thedecisionfromthescreeningstagehastobe
published in at least one daily newspaper available throughout the
territory of the Republic ofMacedonia, and on thewebsite, aswell as
on the notice board of theMoEPP. The Investor, the legal
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 24
entitiesornaturalpersonsconcerned,aswellastheenvironmentalNonGovernmentOrganizationsmayappeal
against the decision to the Second Instance Commission of
theGovernment of the Republic
ofMacedoniaresponsibleforresolutionofadministrativemattersintheareaofenvironment.
Afterthescreeningprocedure,theMoEPPinformstheInvestorofthedecisiononwhetherornotanESIAshallbecarriedout.Basedonsuchinformation,theInvestorappliesforascopingopinionfortheESIA.
Scoping:The Scoping phase is the process duringwhich theMoEPP
determines the content and extent of thematters which should be
covered by the environmental impact assessment study.While drafting
theopiniononthescopeofthestudy,theMoEPPshalltakeintoaccounttheopinionsoftheInvestorandtheopinions
obtained after publication of the decision for screening.Once
scoping is completed, the
ESIAStudycanbeundertaken.TheInvestorpreparestheESIAStudyaccordingtotherequirementsprescribedintothesecondarylegislationandsubmitsittotheMoEPPinbothwrittenandelectronicformat.PreparationofESIAStudy:The
Investor preparing the ESIA Study is obliged to engage at least one
person from the List of
ESIAExperts,whoshallsigntheESIAStudyasaresponsiblepersonwithregardtoitsquality.PublicDisclosure:ThepublicdisclosurestartswhentheMoEPPannouncesthatthedraftversionoftheEIAStudyonacertaindevelopmentprojecthasbeenprepared
and is available to thepublic in at
leastonedailynewspaper,availablethroughouttheterritoryoftheRepublicofMacedoniaandlocalradio/TVstation,whiletheNonTechnical
Study (NTS) is published on the website of the MOEPP. This ESIA
Study is submitted
forconsultationtothemunicipalitieswheretheprojectwillbeimplementedinordertocollecttheirremarksandopinions.Duringthisphase,theMoEPPisobligedtoorganizeaPublichearingonthedraftESIAStudyandtoensureavailabilityofinformationneededtothepublicandpublicparticipationinthepublichearingevent.TheMoEPP
submits theESIAStudy to thebodiesof the stateadministration
responsible for
theperformanceoftheactivitiesofthedevelopmentproject.ESIAReview&Decisions:TheReviewistheprocessofcheckingtheadequacyoftheESIAStudy.TheReportoftheadequacyoftheESIAStudyispreparedbytheMoEPPorbypersonsappointedtherebyfromtheListofExpertsforESIA.Onthebasisofthestudy,theReportontheadequacyoftheESIAStudy,thepublicdebateandtheopinionsobtained,
theMoEPP issues aDecision onwhether or not to grant consent for the
application of theprojectimplementation.
TheDecisioncontainsanassessmentofwhether theESIAStudy fulfils
therequirements,and
thepermitconditionsfortheprojectimplementationaswellasmeasuresforpreventionandreductionoftheharmfuleffects.
The MoEPP submits the Decision to the Investor, to the body of the
state
administrationresponsibleforissuanceofthepermitordecisionontheprojectimplementationandtothemunicipalitieswheretheprojectwillbeimplemented.
TheDecisionhastobepublishedinatleastonedailynewspaperavailablethroughouttheterritoryoftheRepublicofMacedonia,onthewebsiteaswellasonthenoticeboardoftheMOEPP.
BasedontheDecisionforgrantingconsentfortheproject
implementation,theAuthorityresponsibletoissue the permit for
project implementation, issues the Consent for project
implementation to theInvestor.
PublicinvolvementintotheESIAprocedure:PublicinvolvementinnationalEIAandSEAproceduresisregulatedintheLawonEnvironment,secondarylegislationonpublic
information (provided inTable21),publicparticipationandaccessto
justiceand
inaccordancewithInternationalConventionssignedandratifiedbyMacedonia(e.g.AarhusConventionandEspooConvention).
-
MinistryofTransportandCommunications,RepublicofMacedonia
RailwayCorridorVIIIEasternsection 25
Practicalpublicinvolvementisperformedthrough:
disclosingoftheinformationabouttheprojectandESIAprocesstothepublic;
publicparticipationwherepubliccanactivelybeinvolvedinpublicdiscussionsandsubmittheirwritten
opinionwithinthedifferentESIAphasesoftheprocedures;and
throughthemechanismofaccesstojustice,whenthepubliccaninfluencethedecisionmakingby
submittingappealstotheCourtorSecondInstanceCommissionoftheGovernment.According
to the national legislation, the public is involved in every step
of the ESIA procedure.
Everydecisionmadeduringtheprocessshouldbepublishedintheappropriatemediaandthepubliccanfollowandparticipatethroughthefollowingstepsofth