LIQUID SOIL STABILISER & STRENGTHENER Envir green Road Building Technology Mktd. By : Prime Options The Marketing Genie !
22

Envirogreen

Jun 10, 2015

Download

Documents

Envirogreen

ALTERNATIVE ROAD BUILDING TECHNOLOGY
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Envirogreen

LIQUID SOIL STABILISER & STRENGTHENER

Envir green Road Building Technology

Mktd. By : Prime Options The Marketing Genie !

Page 2: Envirogreen

About Products

Cutting Edge Road Building soil compacting &

stabilisation Technology for India.

Envirogreen is a liquid soil stabilizer and

Strengtheners for the installation of durable

virtually weatherproof unpaved roads and

exceptionally strong, long lasting bases for paved

roads.

A proven unique patented blend of organic and

inorganic compounds, with a track record of over

12 years

Uses water as a carrier to evenly spread and bind

and bond soil particles forming a durable,

exceptionally strong road bases for both paved

and unpaved roads

Non-biodegradable and thus stays with the

treated soil for years to maintain its stabilizing

effects. Life over 20 years.

Page 3: Envirogreen

ENVIROGREEN:

EG 1015 -soil strengtheners.

EG 1020 -dust suppressant

Cell containment system called

Envirogreenkerb for slope

stabilisation used in hilly and

mountainous terrains.

ENVIROGREENKERB :

Products

Page 4: Envirogreen

Easy to apply using standard road equipment

No need to import base material

Works with virtually all types and combinations of material

Large application area - approx. 4,000 Sqmt/200 litres.

Entirely non-polluting, non-hazardous, non-corrosive, non-allergenic and non-flammable.

Ships in the cheapest, non-regulated category

Treated surfaces can be used immediately - least interruption to traffic.

Treated surfaces typically increases CBR by 250-300%

Reduction in annual maintenance costs

Productivity increases with faster travelling time

Better soil gradation

Reduction of plasticity index or swelling potential

Increases road durability and strength

Safe carrier for hydro-seeding

Preserves the natural look of the application site

Treated roads constructed are highly impermeable and compacted

In most situations, no additional surface is required

Envirogreen Advantage

Page 5: Envirogreen

Application Fields

MINE HAUL ROADS

PLANTATION ROADS

HELI-PADS AND AIRSTRIPS

SOIL EROSION CONTROL

DUST SUPPRESSANT

ROADS , UNPAVED AND PAVED FOR NEW TOWNSHIPS, ETC.

HARD STANDINGS AND AREA STABILISATION

GARDEN/PARK PATHS

SPORTING SURFACES WITH ARTIFICIAL TURFS

FARM-TO-MARKET ROADS

AND MANY MORE……….

Page 6: Envirogreen

Envirogreen vs. Normal Roads Dominating Over Normal Roads

Common problems with paved

roads:

Pot holes

Common problems with unpaved

roads:

Serious rutting

Muddy

Dusty

Unsuitable for heavy vehicles

Advantage with Envirogreen:

Non-toxic, non-flammable, non

allergenic

Inhibits corrosion – less

corrosive than tap water

Improve CBR by about 300%

in a single layer and about

800% in double layer

Page 7: Envirogreen

Dilution rate will depend on the moisture content within the existing soil:

Envirogreen Dilution Rate

Soil Water Envirobase

Dry Soil 100 -110 1

Normal Soil 80 1

Wet Soil 40-60 1

We can gauge the treated soil’s OMC (optimal moisture

content) by hand forming a ball with the soil. If the soil ball

can be formed without crumbling (too dry) or sticking to

your hands (too wet), OMC is reached.

Page 8: Envirogreen

Requirements Difference

Normal Road Requires Concrete, Charcoal and huge Machineries which takes a lot of money and time and also produces harm to the nature.

Page 9: Envirogreen

Requirements Difference

Envirogreen requires only the water tanker with fresh water and it is Eco-friendly too.

Page 10: Envirogreen

Working of Envirogreen

Envirogreen when thoroughly mix into the

soil and compacted well will form a layer

of treated soil so dense it can resist water

infiltration both from the ground (below

the pavement) and from the surface as

well.

The ability to resist water penetration will

result in huge increase in road durability

with minimal maintenance requirement.

Page 11: Envirogreen

Area to be treated should be smoothed out and rocks and tree trunks removed and compacted. If there are any low spots, holes or bumps, it’s best to level them before proceeding.

Diluting Envirogreen & Filling The Water Tanker

Be sure the water tanker is at least partially full before adding any Envirogreen from the drum.

Sequence of installation

Step 1 Begin loosening the

soil with a

scarifier/rotovater to

a depth of about

100 mm

Step 2 Spray the loosened

soil with diluted

envirogreen solution .

Soil should be more

wet than OMC to mix

any lumps with

solution

Step 3 Blade the treated

material into a windrow

at the shoulder

1’st Top Layer

Page 12: Envirogreen

Sequence of installation

Step 4

Repeat steps 1-2 for

the next 10cm layer of

soil

Step 5

Grade and shape the

bottom layer material

and lightly compact

Step 6

Blade the treated top layer

material onto the bottom

layer and continue blading

to shape and form the

desired contour / crown.

Step7

Begin compacting the shaped

and formed road. Use the

reserved material to fill in any

small holes or low spots.

Continue compacting with

full vibratory until the

installation is very tight and

then static roll for at least

one hour

2’nd Bottom Layer

Page 13: Envirogreen

Second Day

• Usually, the finished road can be re-compacted on the second day. One or two passes with vibratory followed by an hour or so of static rolling.

• If the weather is hot, a light spray of plain water is recommended to retard the curing process.

• In the meantime, the road can be opened to traffic.

• Note: If it rains the night before, it is normal to see the treated area being more soggy. The reason is that the treated soil is continuing to push out water from within while at the same time preventing water ingress. Thus water stays at the surface. Wait till dry, then re-compact.

Sequence of installation

Page 14: Envirogreen

Mine Haul Roads

Partial Projects Reference

Newmont gold/copper mine, Indonesia

Completion year : 1998

Page 15: Envirogreen

Plantation Roads

Partial Projects Reference

PTPN5 Plantation, Indonesia

Completion year : 2004

Page 16: Envirogreen

Plantation Roads

Partial Projects Reference

IOI Plantation, Malaysia

Completion year : 1996

Page 17: Envirogreen

Light Aircraft Runway

Partial Projects Reference

Total Oil Company, Myanmar

Completion year : 2002

Page 18: Envirogreen

Light Aircraft Runway

Partial Projects Reference

Chevron Oil Company, Kazakhstan

Completion year : 1994

Page 19: Envirogreen

Bypass Roads

Partial Projects Reference

Caltex Oil Company, Indonesia

Completion year : 1993

Page 20: Envirogreen

Resort Roads

Partial Projects Reference

Phu Yen Resort, Vietnam

Completion year : 2005

Page 21: Envirogreen

Go green……….. Let the greenery spread all over the world.

Go green Go Envirogreen……..

Marketed By : Prime Options ! The Market Genie

Page 22: Envirogreen

PRIME OPTIONS !

THE MARKETING GENIE !