LIQUID SOIL STABILISER & STRENGTHENER Envir green Road Building Technology Mktd. By : Prime Options The Marketing Genie !
Jun 10, 2015
LIQUID SOIL STABILISER & STRENGTHENER
Envir green Road Building Technology
Mktd. By : Prime Options The Marketing Genie !
About Products
Cutting Edge Road Building soil compacting &
stabilisation Technology for India.
Envirogreen is a liquid soil stabilizer and
Strengtheners for the installation of durable
virtually weatherproof unpaved roads and
exceptionally strong, long lasting bases for paved
roads.
A proven unique patented blend of organic and
inorganic compounds, with a track record of over
12 years
Uses water as a carrier to evenly spread and bind
and bond soil particles forming a durable,
exceptionally strong road bases for both paved
and unpaved roads
Non-biodegradable and thus stays with the
treated soil for years to maintain its stabilizing
effects. Life over 20 years.
ENVIROGREEN:
EG 1015 -soil strengtheners.
EG 1020 -dust suppressant
Cell containment system called
Envirogreenkerb for slope
stabilisation used in hilly and
mountainous terrains.
ENVIROGREENKERB :
Products
Easy to apply using standard road equipment
No need to import base material
Works with virtually all types and combinations of material
Large application area - approx. 4,000 Sqmt/200 litres.
Entirely non-polluting, non-hazardous, non-corrosive, non-allergenic and non-flammable.
Ships in the cheapest, non-regulated category
Treated surfaces can be used immediately - least interruption to traffic.
Treated surfaces typically increases CBR by 250-300%
Reduction in annual maintenance costs
Productivity increases with faster travelling time
Better soil gradation
Reduction of plasticity index or swelling potential
Increases road durability and strength
Safe carrier for hydro-seeding
Preserves the natural look of the application site
Treated roads constructed are highly impermeable and compacted
In most situations, no additional surface is required
Envirogreen Advantage
Application Fields
MINE HAUL ROADS
PLANTATION ROADS
HELI-PADS AND AIRSTRIPS
SOIL EROSION CONTROL
DUST SUPPRESSANT
ROADS , UNPAVED AND PAVED FOR NEW TOWNSHIPS, ETC.
HARD STANDINGS AND AREA STABILISATION
GARDEN/PARK PATHS
SPORTING SURFACES WITH ARTIFICIAL TURFS
FARM-TO-MARKET ROADS
AND MANY MORE……….
Envirogreen vs. Normal Roads Dominating Over Normal Roads
Common problems with paved
roads:
Pot holes
Common problems with unpaved
roads:
Serious rutting
Muddy
Dusty
Unsuitable for heavy vehicles
Advantage with Envirogreen:
Non-toxic, non-flammable, non
allergenic
Inhibits corrosion – less
corrosive than tap water
Improve CBR by about 300%
in a single layer and about
800% in double layer
Dilution rate will depend on the moisture content within the existing soil:
Envirogreen Dilution Rate
Soil Water Envirobase
Dry Soil 100 -110 1
Normal Soil 80 1
Wet Soil 40-60 1
We can gauge the treated soil’s OMC (optimal moisture
content) by hand forming a ball with the soil. If the soil ball
can be formed without crumbling (too dry) or sticking to
your hands (too wet), OMC is reached.
Requirements Difference
Normal Road Requires Concrete, Charcoal and huge Machineries which takes a lot of money and time and also produces harm to the nature.
Requirements Difference
Envirogreen requires only the water tanker with fresh water and it is Eco-friendly too.
Working of Envirogreen
Envirogreen when thoroughly mix into the
soil and compacted well will form a layer
of treated soil so dense it can resist water
infiltration both from the ground (below
the pavement) and from the surface as
well.
The ability to resist water penetration will
result in huge increase in road durability
with minimal maintenance requirement.
Area to be treated should be smoothed out and rocks and tree trunks removed and compacted. If there are any low spots, holes or bumps, it’s best to level them before proceeding.
Diluting Envirogreen & Filling The Water Tanker
Be sure the water tanker is at least partially full before adding any Envirogreen from the drum.
Sequence of installation
Step 1 Begin loosening the
soil with a
scarifier/rotovater to
a depth of about
100 mm
Step 2 Spray the loosened
soil with diluted
envirogreen solution .
Soil should be more
wet than OMC to mix
any lumps with
solution
Step 3 Blade the treated
material into a windrow
at the shoulder
1’st Top Layer
Sequence of installation
Step 4
Repeat steps 1-2 for
the next 10cm layer of
soil
Step 5
Grade and shape the
bottom layer material
and lightly compact
Step 6
Blade the treated top layer
material onto the bottom
layer and continue blading
to shape and form the
desired contour / crown.
Step7
Begin compacting the shaped
and formed road. Use the
reserved material to fill in any
small holes or low spots.
Continue compacting with
full vibratory until the
installation is very tight and
then static roll for at least
one hour
2’nd Bottom Layer
Second Day
• Usually, the finished road can be re-compacted on the second day. One or two passes with vibratory followed by an hour or so of static rolling.
• If the weather is hot, a light spray of plain water is recommended to retard the curing process.
• In the meantime, the road can be opened to traffic.
• Note: If it rains the night before, it is normal to see the treated area being more soggy. The reason is that the treated soil is continuing to push out water from within while at the same time preventing water ingress. Thus water stays at the surface. Wait till dry, then re-compact.
Sequence of installation
Mine Haul Roads
Partial Projects Reference
Newmont gold/copper mine, Indonesia
Completion year : 1998
Plantation Roads
Partial Projects Reference
PTPN5 Plantation, Indonesia
Completion year : 2004
Plantation Roads
Partial Projects Reference
IOI Plantation, Malaysia
Completion year : 1996
Light Aircraft Runway
Partial Projects Reference
Total Oil Company, Myanmar
Completion year : 2002
Light Aircraft Runway
Partial Projects Reference
Chevron Oil Company, Kazakhstan
Completion year : 1994
Bypass Roads
Partial Projects Reference
Caltex Oil Company, Indonesia
Completion year : 1993
Resort Roads
Partial Projects Reference
Phu Yen Resort, Vietnam
Completion year : 2005
Go green……….. Let the greenery spread all over the world.
Go green Go Envirogreen……..
Marketed By : Prime Options ! The Market Genie
PRIME OPTIONS !
THE MARKETING GENIE !
To make your own road
Contact US
Mail : [[email protected]]
M : [+91-9717500111]
[+91-7827684048]
L : [+91-124-4205699]
F : [+91-124-4379086]
Take the road less travelled