Top Banner
ENTSOG Transparency Platform Kathrine Nygaard Stannov Subject Manager Transparency Overview of publication options and obligations Kyiv, 8 October 2018
36

ENTSOG Transparency Platform

Feb 08, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ENTSOG Transparency Platform

ENTSOG Transparency Platform

Kathrine Nygaard Stannov

Subject Manager Transparency

Overview of publication options and obligations

Kyiv, 8 October 2018

Page 2: ENTSOG Transparency Platform

2

Presentation content

Page 3: ENTSOG Transparency Platform

3

1. Historical overview

2. Legal basis for TP establishment and data publication

o Which regulation?

o What data?

o For which points?

o How should the required data be published?

3. TP Overview

o Main parts and functionalities

o TP data indicators, granularity and frequency of publication, units

o Points identification/information

o Data submission rules

o Technical information

o Statistical information

4. TP related services provided to ENTSOG members

5. Examples of functionalities

Presentation content

Page 4: ENTSOG Transparency Platform

4

1. Historical overview

Page 5: ENTSOG Transparency Platform

5

ENTSOG TP Establishement

HISTORICAL OVERVIEW

GTE +/ ENTSOG TP

Platform

Upgraded TP

ENTSOG TP

Voluntary publications

Mandatory publications

Page 6: ENTSOG Transparency Platform

6

HISTORICAL OVERVIEW

Page 7: ENTSOG Transparency Platform

7

2. Legal basis

Page 8: ENTSOG Transparency Platform

8

Which regulation?

REGULATION (EC) No 715/2009 (Transparency Guidelines)

o COMMISSION DECISIONS

o 10/11/2010 amending Annex I to Regulation (EC) No 715/2009

o 24/08/2012 amending Annex I to Regulation (EC) No 715/2009

o 30/04/2015 amending Annex I to Regulation (EC) No 715/2009

REGULATION (EU) No 984/2013 (CAM NC) REGULATION (EU) No 2015/703 (Interoperability NC) REGULATION (EU) No 2017/460 (Tariff NC)

REMIT and REMIT IMPLEMENTING ACTS

o REGULATION (EU) No 1227/2011

o REGULATION (EU) No 1348/2014

Legal basis

Page 9: ENTSOG Transparency Platform

9

Legal basis

Page 10: ENTSOG Transparency Platform

10

How the required data shall be published?

REGULATION REFERENCE: COMMISSION DECISION of 10/11/2010 on amending Annex I toRegulation (EC) No 715/2009, points 3.1.1

Form of publicationo On a public manner, free of chargeo Without registration/subscription requirements, on a non-discriminatory basiso In a clear, quantifiable, easily accessible wayo On a regular/rolling basiso In a user-friendly mannero In downloadable format that allows for quantitative analyses (e.g.: XML, CSV, XLS)o In consistent units:

⁻ Unit for energy content: kWh (with CRT=298,15 K)

⁻ Unit for volume: m3 (at 273,15 K and 1,01325 bar)

⁻ The constant conversion factor to energy content shall be providedo In the official language(s) of the Member State and in English

Legal basis

Page 11: ENTSOG Transparency Platform

11

For which points?

REGULATION REFERENCE: COMMISSION DECISION of 10/11/2010 on amending Annex I toRegulation (EC) No 715/2009, points 3.2 (1) – (3)

Relevant points, subject to NRA approval, shall include at leasto All entry and exit points to and from the TSO network, with the exception of exit points

connected to a single final customer, and entry points linked directly to a productionfacility of a single producer that is located within the EU

o All entry and exit points between adjacent TSOso All entry and exit points connecting balancing zoneso All connection points between the TSO network and LNG terminal(s)o All connection points between the TSO network and physical gas hub(s)o All connection points between the TSO network and storage facility(s)o All points connecting the TSO network to infrastructure necessary for providing ancillary

services as defined by Article 2(14) of Directive 2009/73/ECo Aggregated exit points to final customers, per balancing zoneo Aggregated entry points from production facilities, per balancing zoneo Other points, subject to NRA’s decision

Legal basis

Page 12: ENTSOG Transparency Platform

12

What data?

REGULATION REFERENCE: COMMISSION DECISION of 10/11/2010 on amending Annex I toRegulation (EC) No 715/2009 , points 3.3.(1) – (5)

Information to be published at all relevant points and point directionso Operational data: Nominations and re-nominations, actual physical flows, gross calorific

value or Wobbe index

o Capacities: Technical capacity, available firm capacity, booked firm capacity, totalinterruptible capacity, available interruptible capacity, booked interruptible capacity

o Interruptions: Planned and actual interruption of interruptible capacity, planned andunplanned interruptions to firm services

o Tariffs for Interconnection Points (where CAM NC is applied):

o Reserve prices, flow-based charges (if applicable) for yearly, quarterly, monthly, daily andwithin-day products,

o Simulations for Y, Q, M and D productions

Legal basis

Page 13: ENTSOG Transparency Platform

13

What data?

REGULATION REFERENCE: Regulation (EU) No 2015/703 (Interoperability NC)

Gas quality information to be published at all physical relevant points:o Link to hourly gas quality data

What data?

REGULATION REFERENCE: Regulation (EU) No 2017/460, Article 31

Tariff information to be published at all interconnection points (where CAM NC is applied):o Reserve prices, flow-based charges (if applicable) for yearly, quarterly, monthly,

daily and within-day products,o Simulations for Y, Q, M and D productions

Legal basis

Page 14: ENTSOG Transparency Platform

14

3. TP overview

Page 15: ENTSOG Transparency Platform

15

ENTSOG TP web-address

https://transparency.entsog.eu/

Page 16: ENTSOG Transparency Platform

16

ENTSOG TP Overview

Page 17: ENTSOG Transparency Platform

17

Main parts and functionalities

o TP Map (Customizable display and filtering options)

o Point and TSO information part

o Points/Balancing zones part (Numeric data part, chart part, time-stamps)

o Calendar with UMMs and Interruptions information including rolling banner

o Search bar

o Advanced search functionality

o Recently viewed items

o TP Export wizard (Manual data export in XLSX, CSV, XML format)

o Favouriteso Quick access to pre-selected set of objects

o For registered users only

o TP API (Automated download tool)

o RSS (Web-feeds for subscription to TP data updates)

o Help section with TP User Manual and tutorial videos

ENTSOG TP Overview

Page 18: ENTSOG Transparency Platform

18

TP Data types

ENTSOG TP Overview

Indicator Granularity of data*

Frequency of publication/update

Units

Nominations Hourly or Daily Hourly or Daily kWh/h or kWh/d

Re-nominations Hourly or Daily Hourly or Daily kWh/h or kWh/d

Allocations** (commercial flow) Hourly or Daily Hourly or Daily kWh/h or kWh/d

Actual physical flow Hourly or Daily Hourly or Daily kWh/h or kWh/d

GCV Hourly or Daily Hourly or Daily kWh/m3

Wobbe Index Hourly or Daily Hourly or Daily kWh/m3

Technical capacity Hourly or Daily When changed kWh/d

Booked firm capacity Hourly or Daily When changed kWh/d

Available firm capacity Hourly or Daily When changed kWh/d

Total interruptible capacity Hourly or Daily When changed kWh/d

Booked interruptible capacity Hourly or Daily When changed kWh/d

Available interruptible capacity Hourly or Daily When changed kWh/d

Page 19: ENTSOG Transparency Platform

19

TP Data types

* Data granularity depends on the smallest reference period for capacity booking and (re-)nomination and the smallest settlement period forwhich imbalance charges are calculated;

** Publication on voluntary basis (non-mandatory)

ENTSOG TP Overview

Indicator Granularity of data*

Frequency of publication/update

Units

Planned interruption of firm capacity

Hourly or Daily Hourly or Daily kWh/h or kWh/d

Unplanned interruption of firm capacity

Hourly or Daily Hourly or Daily kWh/h or kWh/d

Planned interruption of interruptible capacity

Hourly or Daily Hourly or Daily kWh/h or kWh/d

Actual interruption of interruptible capacity

Hourly or Daily Hourly or Daily kWh/h or kWh/d

Percentage of the interrupted firmcapacity**

- Hourly or Daily %

Percentage of the interrupted interruptible capacity**

- Hourly or Daily %

Page 20: ENTSOG Transparency Platform

20

TP Data types

ENTSOG TP Overview

Indicator

Unsuccessful requests for firm capacity products(requested volume, allocated volume, unsuccessful request, number of occurencies)

Auction results(reserved price, cleared price, auction premium)

Unavailable firm capacity(capacity allocation procedure applied)

Capacity made available through the application of a CMP procedure(oversubscription, buy-back, surrender, LT-UIOLI, ST-UIOLI)

Tariff information

Urgent Market Messages

Page 21: ENTSOG Transparency Platform

21

Points information/identification

Point name Point direction Point EIC (Energy Identification Code) Validity period (Date of commissionning – Date of decommissionning) CAM/CMP Relevance

Point types:o Transmission point

o Storage points (connection points TSO transmission system – Storage facility)

o LNG points (connection points TSO transmission system – LNG Terminal)

o Aggregated production point

o Aggregated final customers point

o Aggregated distribution point

o Interconnection point

o Cross-border point

o In-country connection point

o Import point

o Virtual Interconnection point

o Virtual Trading point

ENTSOG TP Overview

Page 22: ENTSOG Transparency Platform

22

Data submission rules

o Always test the new data types submission first on UAT

o Minimise redundant submissions and apply a “Delta” approach:

Messages submitted to the system should only contain values which have actuallychanged compared to the ones submitted through a previous message

o Respect ENTSOG recommendations regarding frequency of data uploads

o All deletion actions need to be carefully prepared and coordinated with ENTSOG inadvance

o New point definition shall be communicated and coordinated with ENTSOG

o Capacity data units – energy units only – kWh/h, kWh/d

o Point identification – through EICs only

ENTSOG TP Overview

Strictly follow the recommendations of “ENTSOG Data Publication Best Practices document”

Page 23: ENTSOG Transparency Platform

23

Technical information

Data submission modes

o Manual

o Automated

Supported communication protocols

o SFTP

o HTTPS Pull

o HTTPS Push

o AS2

Data submission format

o XML files based on private ENTSOG XSD specification (TP18_REG715_XSD_ENTSOG_v3.X.X.xsd)

ENTSOG TP Overview

Page 24: ENTSOG Transparency Platform

24

Statistical information

o 49 TSOs publishing data on the TP

o 1550 TP point sides

o 5600 files processed per day

o 1 725 000 rows integrated per day

o 24 000 rows integrated per hour

o 1200 unique visits per day

o 40 000 downloads per day

o 23-27 minutes average duration of an individual visit

ENTSOG TP Overview

Page 25: ENTSOG Transparency Platform

25

4. Services provided to the ENTSOG members

Page 26: ENTSOG Transparency Platform

26

Services and activities performed by ENTSOG Team

o Kit for new TP Publishers (XSD, Administration guide, Best Practices document)

o Support in the establishement of TSO - ENTSOG TP communication interface

o Testing environment (TST)

o Production environment (PRD)

o TP Back-end system – administration portal (MDM)

o Monitoring of the data processing in TST and PRD

o Monitoring of the TP performance and operability

o Troubleshooting and support for solving publication issues

o Data processing and data quality reports

o Annual TP bulk exports for ACER monitoring activities (CMP and MMR reports)

o ENTSOG REMIT Reporting of aggregared fundamental data to ACER

o Further TP development

TP related services

Page 27: ENTSOG Transparency Platform

27

5. Examples of functionalities

Page 28: ENTSOG Transparency Platform

28

General TSO information

o Contact details

o Links to the TSO‘s web-site

o General technical and commercial data

Example 1a: Operator information

Direct access to various publications on TSOs’ websites

Page 29: ENTSOG Transparency Platform

29

Template applied by all TSOso Following the structure of Annex I of Regulation (EC) No 715/2009

o With links to the required data on the TSO‘s web-site

o In the official language(s) of the Member State and in English

Example 1b: Transparency data on TSO’s web-site

Page 30: ENTSOG Transparency Platform

30

Example 2: Point information via map and data page

Page 31: ENTSOG Transparency Platform

31

Example 3: The (interruption) Calendar

Page 32: ENTSOG Transparency Platform

32

Example 4: Search bar and recently viewed items

Page 33: ENTSOG Transparency Platform

33

Example 5: Advanced search

All columns can be used for filtering

Page 34: ENTSOG Transparency Platform

34

Example 6: The data page

Numerous options for data display

Page 35: ENTSOG Transparency Platform

35

Example 7: Tariffs page

Reserve prices, flow-based charges and simulations for all Interconnection Points

Page 36: ENTSOG Transparency Platform

Thank You for Your Attention

ENTSOG -- European Network of Transmission System Operators for GasAvenue de Cortenbergh 100, B-1000 Brussels

EML:WWW: www.entsog.eu

Kathrine Nygaard StannovSubject Manager, Transparency

[email protected]