07/11/2013 ENTSO-E Network Codes WG System Operations ENTSO-E Network Codes WG System Operations Kristof Sleurs
26

ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

Mar 22, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

07/11/2013 ENTSO-E Network Codes – WG System Operations

ENTSO-E Network Codes

WG System Operations

Kristof Sleurs

Page 2: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations 2

Page 3: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

07/11/2013 ENTSO-E Network Codes – WG System Operations

ENTSO-E Network Codes

Operational Planning & Scheduling

WG System Operations

Kristof Sleurs

Page 4: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Agenda

• NC OPS timeline & status

• Summary of the ACER opinion

• Overview of the code and impact on Belgian stakeholders

Page 5: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

NC Operational Planning & Scheduling: Timeline & status

• 19/06/2013: ACER opinion

• 07-08/2013: Code & Supporting document have been amended

by the DT

• 24/09/2013: Code resubmitted to ACER

• 05/11/2013: ACER final opinion

• ???: Comitology

Page 6: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Agenda

• NC OPS timeline & status

• Summary of the ACER opinion

• Overview of the code and impact on Belgian stakeholders

Page 7: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

NC Operational Planning & Scheduling: Amending the NC OPS

Motivations for a second Edition of OPS

ACER issued its Opinion on OPS first edition, on June 19th

Despite that “the NC is broadly in line with the Framework Guidelines”

ACER stated that improvements were required before the Agency could

recommend its adoption to the Commission

ENTSO-E has informed ACER that it will resubmit a second Edition for ACER Opinion

Objectives

Improve (i) clarity, (ii) readability of the NC

Improve (iii) consistency with other NCs

Without changing fundamental choices (principles and processes) described

in edition 1 of the NC

Page 8: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

NC Operational Planning & Scheduling: Summary of ACER opinion

• National scrutiny

legal wording for explicit role of national authorities

• Transparency

request for additional indicators on accuracy of forecasted variables

• Coherence and compatibility with other NCs

request for improving coherence with OS

• Performance indicators and forecasting obligations

concerns about the TSOs roles and responsibilities on forecast use and

checking of adequate accuracy

• Scope and application

concerns about Self-Planned Interconnector concept and

responsibilities when multiple TSOs exist + isolated systems

• Drafting quality

2 pages of detailed comments

Page 9: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Agenda

• NC OPS timeline & status

• Summary of the ACER opinion

• Overview of the code and impact on Belgian stakeholders

Page 10: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Overview of NC OP&S

10

General Provisions

(Common) Grid Models Coordinated Security Analysis

Outage Coordination Adequacy

Ancillary Services Scheduling

ENTSO-E Operational Planning Data Environment

Page 11: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Overview of NC OP&S

11

General Provisions

(Common) Grid Models Coordinated Security Analysis

Outage Coordination Adequacy

Ancillary Services Scheduling

ENTSO-E Operational Planning Data Environment

Page 12: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

General Provisions

Includes:

- Definitions

- Regulatory approvals

- Delegation of tasks (incl. RSCIs)

- Impact for Elia:

– Limited, generally in line with current practices

– Some additional methodologies to be approved by CREG

- Impact for ARPs:

– No direct requirements for ARPs in this section

12

Page 13: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Overview of NC OP&S

13

General Provisions

(Common) Grid Models Coordinated Security Analysis

Outage Coordination Adequacy

Ancillary Services Scheduling

ENTSO-E Operational Planning Data Environment

Page 14: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Data for operational security analysis

Includes:

- TSOs shall establish IGMs and CGMs

- Timescales: Year-ahead, Week-ahead, Day-ahead and Intraday

- Impact for Elia:

– For Grid Models, infeed from distributed generation needs to be differentiated

according to primary energy source

– More Grid Models to build

– Monitor accuracy of Grid Models

– Setting up a European Merging Function

- Impact for ARPs:

– No direct requirements for ARPs in this section

14

Page 15: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Overview of NC OP&S

15

General Provisions

(Common) Grid Models Coordinated Security Analysis

Outage Coordination Adequacy

Ancillary Services Scheduling

ENTSO-E Operational Planning Data Environment

Page 16: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Operational security analysis

Includes:

- TSOs shall coordinate operational security analysis

- Timescales: Year-ahead, Week-ahead, Day-ahead and Intraday

- Coordination of Remedial Actions

- Impact for Elia:

– Formalization of current practices necessary in the form of multi-party agreements

- Impact for ARPs:

– No direct requirements for ARPs in this section

16

Page 17: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Overview of NC OP&S

17

General Provisions

(Common) Grid Models Coordinated Security Analysis

Outage Coordination Adequacy

Ancillary Services Scheduling

ENTSO-E Operational Planning Data Environment

Page 18: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Outage Coordination

Includes:

- Setting up Outage Coordination Regions & procedures

- Assessing relevance of assets

- Year-ahead outage planning

- Updates up to real-time

- Handling Forced Outages

18

Page 19: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Outage Coordination

The Network Code only applies for Relevant Assets:

- Direct impact of the Availability Status on cross-border power flows

- (Small) subset of Significant Grid Users

- Methodology & thresholds to be approved by NRAs

- For Elia:

– Small subset of all Power Generating Modules with CIPU contract;

– probably no Demand Facilities;

– no DSO or CDSO grid elements;

– no non-TSO owned interconnectors.

19

Page 20: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Outage Coordination – Link with CIPU

Outage Planning Agent (NC) = Access Responsible Party (Elia)

Availability Plans:

- Only treats the Availability Status CIPU treats status, Pmin/max, prices, …

- Three statuses: Available – Unavailable – Testing

- Granularity: Hourly & per Power Generating Module (but aggregation is allowed)

- Consistent granularity if Schedules are also provided

- Consistency between provided & published information is enforced

Coordination Process:

- OPA proposal before August 1st ARP proposal before Tue W33 (August 13th);

- Updates can be initiated up to real-time CIPU procedures RV, SB, RTR, NOM;

- All CIPU financial compensation rules are compatible with the Network Code;

- Detailed test plan to be submitted 1 month in advance;

- Forced Outages: TSO can inform ARP of potential Operational Security issues,

ARP has to inform TSO if it cannot adhere to the provided timeframe.

20

Page 21: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Overview of NC OP&S

21

General Provisions

(Common) Grid Models Coordinated Security Analysis

Outage Coordination Adequacy

Ancillary Services Scheduling

ENTSO-E Operational Planning Data Environment

Page 22: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Adequacy & Ancillary Services

Includes:

- Summer & Winter Outlooks

- Responsibility Area Adequacy on all timeframes

- General provisions on Ancillary Services

- Monitoring of Reactive Power Ancillary Services

- Impact for Elia:

– More monitoring requirements on Reactive Power capacities

- Impact for ARPs:

– No direct requirements for ARPs in this section

22

Page 23: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Overview of NC OP&S

23

General Provisions

(Common) Grid Models Coordinated Security Analysis

Outage Coordination Adequacy

Ancillary Services Scheduling

ENTSO-E Operational Planning Data Environment

Page 24: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Scheduling – Link with current practices

Scheduling Agent (NC) = Access Responsible Party (Elia)

All requirements are compatible with current scheduling practices

implemented at Elia.

24

Page 25: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013 ENTSO-E Network Codes – WG System Operations

Conclusion – impact on stakeholders in Belgium

25

General Provisions

(Common) Grid Models Coordinated Security Analysis

Outage Coordination Adequacy

Ancillary Services Scheduling

ENTSO-E Operational Planning Data Environment

• Generally in line with current practices • Some (minor) changes might be necessary in CIPU procedures

Page 26: ENTSO-E Network Codes - Elia System Operatorpublications.elia.be/upload/UG_upload/6WOWBSESS3.pdf · 07/11/2013 ENTSO-E Network Codes – WG System Operations NC Operational Planning

ENTSO-E Network Codes – WG System Operations 07/11/2013

Thank you for your attention

26