Top Banner
Client: Total E&P Angola; DSME Entities: KBR; Granherne Location: South Atlantic - Offshore Angola Block B17 Scope: FEED Competition, Topsides Detailed Engineering Status: Completed - 2014 Details: • Both FEED and Detailed Design was handled as a multi-center execution between our Singapore and Leatherhead offices. • The Shortening of the Hull at the end of the design competition meant that KBR had to be adaptive to change. KBR engineering disciplines adapted the Topsides design to remove the blast gaps between modules and were receptive to a change in philoso- phy for the fire and explosion design. • This project initiated a good working relationship with DSME. • Prioritization of key design deliverables to achieve the aggressive overall 41 week project schedule, focus on timely delivery of technical requisitions and technical bid evaluations to support DSME Procurement with effort and overall schedule. • Storage capacity of 1.78 MM bbl • Gas compression capacity of 6.5 Mm3/d • Liquid treatment capacity of 229,000 bpd • Oil production rate 169,000 bpd • Estimated Topsides Weight 38,000 tonne (dry, gross) CLOV FPSO Angola
2

Entities: KBR; Granherne CLOV Scope: FEED … Profiles/ProjectProfile_ClovFPSO.pdfClient: Total E&P Angola; DSME Entities: KBR; Granherne Location: South Atlantic - Offshore Angola

Apr 17, 2018

Download

Documents

buihuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Entities: KBR; Granherne CLOV Scope: FEED … Profiles/ProjectProfile_ClovFPSO.pdfClient: Total E&P Angola; DSME Entities: KBR; Granherne Location: South Atlantic - Offshore Angola

Client: Total E&P Angola; DSME

Entities: KBR; Granherne

Location: South Atlantic - Offshore Angola Block B17

Scope: FEED Competition, Topsides Detailed Engineering

Status: Completed - 2014

Details:• Both FEED and Detailed Design was handled as a multi-center execution between our

Singapore and Leatherhead offices.

• The Shortening of the Hull at the end of the design competition meant that KBR had to be adaptive to change. KBR engineering disciplines adapted the Topsides design to remove the blast gaps between modules and were receptive to a change in philoso-phy for the fire and explosion design.

• This project initiated a good working relationship with DSME.

• Prioritization of key design deliverables to achieve the aggressive overall 41 week project schedule, focus on timely delivery of technical requisitions and technical bid evaluations to support DSME Procurement with effort and overall schedule.

• Storage capacity of 1.78 MM bbl

• Gas compression capacity of 6.5 Mm3/d

• Liquid treatment capacity of 229,000 bpd

• Oil production rate 169,000 bpd

• Estimated Topsides Weight 38,000 tonne (dry, gross)

CLOV FPSO

Angola

Page 2: Entities: KBR; Granherne CLOV Scope: FEED … Profiles/ProjectProfile_ClovFPSO.pdfClient: Total E&P Angola; DSME Entities: KBR; Granherne Location: South Atlantic - Offshore Angola

Client: Total E&P Angola; DSME

Entities: KBR; Granherne

Location: South Atlantic - Offshore Angola Block B17

Scope: FEED Competition, Topsides Detailed Engineering

Status: Completed - 2014

Highlights:• Cravo-Lirio-Orquidea-Violeta, (CLOV) is a group of four oil reservoirs located in deep

waters ranging from 1,050m to 1,350m within Block 17 approximately 140km off the Angolan Coast.

• Multi Center working between Leatherhead and Singapore offices to optimize KBR worldwide resources to meet project objectives.

CLOV FPSO

Angola