Top Banner
Solution Overview Mobile Workforce Management Capital | Service Projects
24

Enterprise mobilelogix overview

May 27, 2015

Download

Software

Ron Babich

Field Service Workforce Management
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Enterprise mobilelogix overview

Solution OverviewMobile Workforce Management

Capital | Service Projects

Page 2: Enterprise mobilelogix overview

Select Customers

o CH2MHill

o Shell

o WW Williams

o Home Depot

o Granite Communications

o Enterprise Car Rental

o Xclusive Telecom and Cable

o Mitel CommunicationsMining

Page 3: Enterprise mobilelogix overview

Cloud Based Delivery…Integration Power

• Cloud Based - Mobility Solution (no software/no install /no IT needed/back up/recovery/security)

• Scalable - 10,000 users+

• Finance Integration - Oracle/JD Edwards/SAP/Viewpoint/Quickbooks/Dexter Chaney/CGC/CMIC

• Schedule Integration – MS Project, P6 Primavera

• Estimating – Hard Dollar, Timberline, RIB MC2, Cleopatra, and more…

• Fast - Rollout (1-2 Day Training)

100% Web Based Platform

Page 4: Enterprise mobilelogix overview

Focus on Field Progress / Integration

Plan Work Activities Progress / Productivity

?History / Benchmark

Field ExecutionLeast Visibility/Automation - Highest Risk

Where?What?How?

Page 5: Enterprise mobilelogix overview

Revolutionizing H2H in the New Age

Customer

CorporateBack Office

Field Resource

LegacyERP, CRMSchedule

Plan/Estimate

Page 6: Enterprise mobilelogix overview

Customer Profile – Customer Wins

• Real Time Progress (Daily)

• Customer Portal

• Map View of Past/Current/Future

• History of Work Performed

• Notified en-Route Activity

• Picture of Field Rep / Foreman

Project Owner

Field Resources

Page 7: Enterprise mobilelogix overview

Field Profile – Field Wins

• Notified when Scheduled

• “10-4” Accept Work, Status Work

• Spec Attachment

• Direct Work Entry into Mobile Device

• Map View of Work Location

• Proof of Service (GPS, Photo, Signature)

• Directory Assist - Employee/Customer

Field Resources

Page 8: Enterprise mobilelogix overview

HQ Profile

• Resource Availability / Schedule

• Repeatable Work Package Steps / Training

• Real time view of work status

• Map View of Work Location(s), Equipment, Vehicles

• Proof of Location (GPS, Photo, Signature)

• Proof of Time (Planned / Logged / Actual)

• Expedited Invoicing / Change Approvals (field signature)

• Satisfaction Survey

• Historic Costs/Production Central Access (Sales, Support, Training, Customers)

Behind Schedule

Behind Costs

On Track

Project Admin

Page 9: Enterprise mobilelogix overview

Manage Across All Project Types

Capital Projects

Service/Short TermProjects Warranty

Schedule Resource/Cost Load

Schedule Daily/Weekly

Schedule Daily/Weekly/Annual

Page 10: Enterprise mobilelogix overview
Page 11: Enterprise mobilelogix overview

Quick Cost Reduction Results…

Revolutionize Field Expectations

• Arrival Verification

• Time of Work (Planned/Actual)

• Elimination of Wait Time 18% (Customer Validate)

• Reduction in Operating Costs 33% / Time on Tools

Increase Sales by 16%. Improve Productivity 34%.

Page 12: Enterprise mobilelogix overview

360 Real Time Performance Insight

Increase Productivity

• Unit of Measure Plan vs. Actual

• Schedule Plan vs. Actual

• Labor Hours Plan vs. Actual

Page 13: Enterprise mobilelogix overview

Project / Job / Phase Code / Activity

Hours Hours

Quantities

Job Level Activity Activity Detail

Equipment

Quantities

Hours

Page 14: Enterprise mobilelogix overview

Owner / Subcontractor Portal

• Project Status

• Plan vs. Progress

• % Complete/Qty Update

• Cash Flow, Earned Value

• Resource Planning

• Exception Alerts

• Expedite Invoicing

Visibility:

How the Project/Work is doing….

Page 15: Enterprise mobilelogix overview

Attach Images and Notes from Field

Insert User Based Reminder Notes for Daily / Weekly

Tasks

Page 16: Enterprise mobilelogix overview

Activity Scheduler

Activity by Expertise

Schedule by Expertise

Page 17: Enterprise mobilelogix overview

Material / Inventory Reorder Alerts

MaterialInventory

Page 18: Enterprise mobilelogix overview

Vehicle/Equipment Maintenance Management

Vehicle / EquipAssigned to Sub /

Supervisor

Update / AlertVehicle / Equipment

Page 19: Enterprise mobilelogix overview

Field to Control Tower Workflow

Field Select ActivitySelect In ProgressSelect Complete

Time/GPS Reflected in Record

Updates from Field on All Activities Are displayed in

Control Tower Status

Page 20: Enterprise mobilelogix overview

Safety Certification Reports / Meetings

Sub Contractor Insurance On File

Safety Qualification

Meeting Requirements:Pre Construction Meeting

Site Safety OrientationForeman’s Site Requirement Review

Foreman’s MeetingSafety Review

Daily Safety Walk Around Checklist

Page 21: Enterprise mobilelogix overview

Transparent Field to Plan Comparison

Schedule of Activities

Work Package A

Work Package B

Work Package C

Planned / Estimated Execution / Controls Owner / Reporting

Cost / ProductivityQty / % Complete

Planned vs. Actual Performance Comparison

Page 22: Enterprise mobilelogix overview

Transparent Field to Plan Comparison

Schedule of Activities

Planned / Estimated Execution / Controls Owner / Reporting

ACTIVITY ID / WORK PACKAGE Schedule ID

Cost Code / Account Code Rollup

Schedule ID ACTIVITY ID / WORK PACKAGE

Owner ReportsCost Overrun

Past Due ActivitiesRoll Up Cost Codes

Page 23: Enterprise mobilelogix overview

Easy Integration Start Set Up…

Leverage existing•Configure All Master Data

– Employee Master– Inventory Master– Vendor Master– Equipment Master– Material Master

Connect master data with Event Monitor for Master Data Updates

Page 24: Enterprise mobilelogix overview