1 Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007
Jan 25, 2016
1
Entergy Gulf States, Inc.(Texas)
Proposed Transmission Reliability Projects
Entergy Transmission Planning Summit
New Orleans, LA
July 31, 2007
2
2007 EGSI-TX Completed Transmission Projects
Grimes 345/138 kV Substation Reconfiguration
AUTO #1
AUTO #2 FRO
NTIE
RC
RO
CK
ETT
RECONFIGURE 345kV BUS
RECONFIGURE 345kV BUS
INSTALL 138kV
BREAKER
INSTALL 138kV
BREAKER
INSTALL 345kV
BREAKER
INSTALL 345kV
BREAKER
345kV
138kV
3
2007 EGSI-TX Completed Transmission Projects
Hanks and Kolbs 230 kV Upgrades
HanksKolbs
4
2007-08 EGSI-TX Proposed Transmission Reliability Projects
69kV Blue WaterAdd Cap Bank
69kV CalvertExpand Cap Bank
Calvert
Blue Water
Replace Fawil 138/69 kV
Autotransformer
Fawil
EGSI-TX Underrated Breaker
Replacement
Helbig & West End
Cow & Orange
S. Beaumont, Dupont & Pt.
Neches
5
EGSI-TX Breaker UpgradesScenario:• Based on asymmetrical fault current analysis, various circuit breakers have
been identified as underrated.
Recommended Solution:• Replace the identified underrated circuit breakers with appropriately sized
breakers.– 2007
o Cow 69kV #5515, #5510o Orange 69kV #3165, 3145
– 2008o Orange 69kV #3365o South Beaumont 69kV #3700o Port Neches 138kV #3345
– 2009o Dupont Bulk 69kV #3255, #3260o Helbig 69kV #5585o Orange 69kV #3370
o Estimated cost: $2.7 MM
6
EGSI-TX 69kV Voltage Support
Calvert 69kV Substation • Loss of 69kV Line 159 (Bryan – APL Hearne) causes undervoltages at
Calvert 69kV Substation. • Expand existing capacitor bank to 12MVAr• Proposed In-Service Date: 2008• Approximate Cost: $600 k
Blue Water 69kV Substation• Multiple contingencies cause undervoltages on 69kV Line 175 “Beach
Line.”• Install 11MVAr capacitor bank• Proposed In-Service Date: 2008• Estimated Cost: $500 k
7
EGSI-TX 69kV Voltage Support
INSTALL 11MVAR
CAP BANK
INSTALL 11MVAR
CAP BANK
EXPAND EXISTING CAP BANK
EXPAND EXISTING CAP BANK
8
Fawil: Replace 138/69 kV Autotransformer
Scenario:• Contingency events along 69 kV Line 81 (Fawil-Deweyville-Echo)
cause loads on Line 81 to be served radially through the Fawil 138/69 kV autotransformer, resulting in overloads on the transformer during peak load conditions. The transformer is currently rated at 20 MVA.
Recommended Solution:• Replace the autotransformer with a system spare 138/69 kV, 45 MVA
unit, located at Meaux substation in Louisiana.• Proposed In-Service Date: 2008
Estimated Cost: $350 k
9
Fawil: Replace 138/69 kV Autotransformer
10
2009-10 EGSI-TX Proposed TransmissionReliability Projects
S. Beaumont
69kV Beaumont UpgradesYankee Doodle,
69kV Line 876 & Line 98
Porter
138kV Line 823/886Upgrade
Cedar Hill
11
69 kV Beaumont Network Upgrades
Scenario:• In the 69kV Beaumont area there exists several single contingency
thermal overloads including:o 69kV Line 581 (Helbig – Rosedale)o 69kV Line 468 (Elizabeth – Gallier)o 230/69kV Helbig Autotransformerso 69kV Bus Tie Breakers (Helbig & Amelia)
Recommended Solution:• Add line breakers at Yankee Doodle 69kV Substation.• Close normally open points at Lincoln and Crockett 69kV Substations.• Rebuild 69kV Line 576 (Lincoln – South Beaumont) & 69kV Line
98/190 (Dupont Beaumont – South Beaumont) to 106MVA capacity.o Approximately 5.5 miles of 69kV transmission lines
o Proposed In-Service Date: 2009
Estimated Cost: $8 MM
12
69 kV Beaumont Network Upgrades
CARDINAL
LAMAR
SOUTH BEAUMONTBULK
VIRGINIALINCOLN
YANKEEDOODLE
CROCKETT
DUPONT BEAUMONT
NITROCDT
L-458
L-458
L-1
55
UPGRADE LINE 576
UPGRADE LINE 576
UPGRADE LINE 190
UPGRADE LINE 190
UPGRADE LINE 98
UPGRADE LINE 98
CLOSE N.O.
SWITCH
CLOSE N.O.
SWITCH
CLOSE N.O.
BREAKER
CLOSE N.O.
BREAKER
ADD LINE BREAKERS
ADD LINE BREAKERS
13
138 kV Line 823/886(Porter – Tamina – Cedar Hill) Upgrade
Scenario:• 138 kV Line 823/886 (Porter – Tamina - Cedar Hill) is one of the
primary sources into the Montgomery County load pocket.• The single contingency loss of 138 kV Line 582 (Oak Ridge - Porter)
causes 6.3% thermal overloads on 138 kV Line 823/886 (Porter to Cedar Hill).
Recommended Solution:• Re-conductor approximately 6 miles of 138kV Line 886 (Tamina –
Cedar Hill) to 531 MVA capacity.• Upgrade station equipment at Tamina to bring rating of Line 823
Porter-Tamina up to 531 MVA capacity.• Proposed In-Service Date: 2009
Estimated Cost: $7.4 MM
14
138kV Line 823/886(Porter – Tamina – Cedar Hill) Upgrade
UPGRADE TO 531MVA CAPACITY
UPGRADE TO 531MVA CAPACITY
15
2011-12 EGSI-TX Proposed TransmissionReliability Projects
Jacinto
Cypress
Western Region Reliability Improvement
Plan - Phase 3
Lewis Creek
Inland Orange
Hartburg
230kV Line 195 Upgrade
Western Region Reliability Improvement
Plan - Phase 3A
RivtrinQuarry
GrimesHuntsville
16
Western Region ReliabilityImprovement Plan
Phase 3 * • Convert 138 kV Lines 524/824 (Jacinto-Lewis Creek) to 230 kV operation.• Construct a 230 kV transmission line from Cypress to Jacinto.• Install static and dynamic VAR support in the Western Region.• Projected In-Service Date: 2011
Phase 3A (Alternative to Phase 3)• Construct new Quarry 345 kV Substation on Line 119.• Construct a new 345 kV transmission line from Quarry to Rivtrin.• Upgrade 138 kV transmission Line 485 (Grimes to Huntsville).• Additional firm network resources• Projected In-Service Date: 2011
Phase 4 (Projected ISD – 2013) *• Build new 230 kV line from Porter to Lewis Creek.
* Note: This set of projects may be modified based on further activities and developments occurring at the Louisiana and Texas Commissions.
17
JACINTO
NEW 230kV LINE
NEW 230kV LINE
CONVERT LINE
824/524
CONVERT LINE
824/524
Western Region Reliability Improvement Plan
Phase 3
18
Western Region Reliability Improvement Plan - Phase 3A
QUARRY
• Projects identified in Phases 3 and 4 of the WRRIP result in greater reliance on and strengthening of the transmission corridor between the Western Region and the Beaumont area.
• Because of recent events such as the isolation of the Western Region from the rest of the Entergy System, the Company has developed Phase 3A, which would strengthen the Western Region’s ties to the west.
19
230 kV Line 195 (Hartburg-Inland Orange) Upgrade
Scenario:• 230 kV Line 195 (Hartburg – Inland Orange) is one of the primary
sources into the Beaumont/Port Arthur area.• The single contingency loss of 500 kV Line 547 (Cypress – Hartburg)
causes thermal overloads on Line 195.
Recommended Solution:• Re-conductor approximately 4 miles of 230kV Line 195 (Hartburg –
Inland Orange) to 1042 MVA capacity.• Projected In-Service Date: 2012
20
230 kV Line 195 (Hartburg-Inland Orange) Upgrade
21
Long Term Reliability Target Areas (2013 – 2017)
• The following transmission lines experience thermal overloads for various contingencies in the 2013 - 2017 time frame.
– 230 kV Line 496 (China – Sabine)• For the loss of Line 599 (China – Amelia)
– 138 kV Line 88 (Dayton – Cheek)• For the loss of Line 496 (China – Sabine)
– 138 kV Line 571 (Jacinto – Porter)• For the loss of Line 822 (China – Porter)
– 138 kV Line 150 (Dayton – Long John)• For the loss of Line 579 (Jacinto – Cleveland)
– 138 kV Line 561 (Gulfrich – Crown Orange)• For the loss of Line 590 (Gulfrich – Ausimont)
– 138 kV Line 582 (Oak Ridge – Porter)• For the loss of Line 886 (Tamina – Porter)
– 138 kV Line 86 (Dayton – Eastgate)• For the loss of Line 882 (China – Porter)
– 138 kV Line 515 (Sabine – Port Neches)• For the loss of Line 516 (Sabine – Port Neches)
– 138 kV Line 516 (Sabine – Port Neches)• For the loss of Line 515 (Sabine – Port Neches)
– 230 kV Line 195 (Helbig – Inland Orange)• For the loss of Line 547 (Cypress – Hartburg)
• The following substations experience under-voltages for various contingencies in the 2013 – 2017 time frame.
– Lacon 138 kV Substation
22
230 kV Line 496 (China –
Sabine)
230 kV Line 496 (China –
Sabine)
138 kV Line 88 (Dayton -
Cheek)
138 kV Line 88 (Dayton -
Cheek)
138 kV Line 150 (Dayton – New Long
John)
138 kV Line 150 (Dayton – New Long
John)230 kV Lines 515 & 516
(Sabine – Port Neches)
230 kV Lines 515 & 516
(Sabine – Port Neches)
138 kV Line 86 (Dayton -
Eastgate)
138 kV Line 86 (Dayton -
Eastgate)
Long Term Reliability Target Areas (2013 – 2017)
230 kV Line 195 (Helbig –
Inland Orange)
230 kV Line 195 (Helbig –
Inland Orange)
23
138 kV Line 571 (Jacinto -
Porter)
138 kV Line 571 (Jacinto -
Porter)
138 kV Line 582 (Porter – Oak Ridge)
138 kV Line 582 (Porter – Oak Ridge)
Lacon 138 kV
Substation
Lacon 138 kV
Substation
Long Term Reliability Target Areas (2013 – 2017)