Halliburton Int .Inc.,Russia 693012 Yuzhno-Sakhalinsk Ukrainskaya St.37 Tel. reception +7 4242 453600, fax +7 4242453693 Halliburton Bid Ref: 22-PPS-SAK-25/08/2011 25 August 2011. ENL 3 rd floor, 24B, Kommunisticheskliy Ave 693000 Yuznho-Sakhalinsk For the attention of Jack Renfrow Proposal to Supply: Nitrogen Purging Services at Oduptu. Client Ref: N/A Halliburton International Limited Sakhalin thanks ENL for the opportunity to quote for the above service and is pleased to present the enclosed proposal for your consideration and evaluation. All prices quoted are in US Dollars and are valid until 25 th September 2011 Should you have any questions or require any clarifications to this proposal, please do not hesitate to contact our Operational Manager Alfie Hay +7.914.759.8487 or e-mail [email protected]Yours faithfully, For and on behalf of Halliburton International Limited.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Proposal to Supply: Nitrogen Purging Services at Oduptu.Client Ref: N/A
Halliburton International Limited Sakhalin thanks ENL for the opportunity to quote for the above service and is pleased to present the enclosed proposal for your consideration and evaluation.
All prices quoted are in US Dollars and are valid until 25th September 2011
Should you have any questions or require any clarifications to this proposal, please do not hesitate to contact our Operational Manager Alfie Hay +7.914.759.8487 or e-mail [email protected]
Yours faithfully,For and on behalf of Halliburton International Limited.
4.1 Conditions of Offer....................................................................................................10
5 Company Information...........................................................................................................11
5.1 About Halliburton.......................................................................................................115.2 Pipeline and Process Services Provided Globally......................................................12
Halliburton Pipeline and Process Services (HPPS) scope of work is understood as performing Nitrogen Purging Operation at ENL Odoptu Facilities, based on performing 4 purge cycles to reduce the hydrocarbon gas concentration (LEL) to 2% minimum requirement.
The Halliburton work scope includes the supply of suitable and certified equipment, instrumentation, hoses, relief systems etc, in adequate numbers and capacities to complete the work in a timely and safe manner.
Skilled personnel are to be fielded for the purposes of equipment safe operation.
This proposal is designed to perform the Nitrogen Purging Operation at ENL’s Odoptu facility and is based on the following supplied information:
1. System Volume = 170.000 scf2. Number or Purges at 1 bar “cycles” = 4.3. Total Volume = 680.000scf4. Rate required = 1500 to 2500cfm5. Max concentration of hydrocarbon gases (LEL) = 2%6. Operation Commence : 20/09/2011
HPPS propose to dedicate a Multi Skilled Supervisor, experienced in carrying out similar work, to interface with the client and co-ordinate all aspects of the work scope.
HPPS will submit a final report upon completion of work scope. The report will contain a detailed log of all activities carried out and contain all necessary charts, data sheets on job report sheets, instrument calibration certificates.
Halliburton request that the following services and items of supply are issued free of charge by SEIC or their Client:
Item Description
1 Electric Power, 220V, to site cabin2 Air source minimum 7 bar at 50 meters max distance from the test area3 Suitable lighting in Equipment Operating Area if Night shift will be required4 Medical Assistance (if necessary)5 Site ablution/toilets
6All passes and permits to allow free entry and departure from site of personnel, vehicles and equipment, including supply tankers
7 Permits to work in the operating area.
8Cranage/forklifts for offloading, positioning and reloading equipment (Max wt 40 Tones)
9 Safe working areas, including any Gas Testing.
10Designated person for liaison regarding the works, responsible for co-ordinating with the Owner/Engineer.
11 Fire and site safety equipment12 Access to telephone, internet and fax facility for business use
1. All work will be charged as per Unit Rates quoted in Section 3.2. All resources are subject to availability at time of the contract award.3. Mobilisation is based on delivery of equipment, personnel & consumables to site on
Client written instruction. 4. Should there be any delays for any reason out with of Halliburton’s control the applicable
daily rates will apply for equipment and personnel and unit rates for consumables.5. The proposal has been based on limited information to hand, and should any significant
changes to that previously supplied Halliburton reserves the right to review this tender. 6. All charges for equipment are exclusive of VAT which will be invoiced separately.7. Equipment charges shall apply from the day it leaves Yuzhno and ceases upon its return.8. All Partial days shall be charged as full days.9. Customer or its appointed Contractor is responsible for supplying equipment to move
Halliburton equipment at work location at no cost to Halliburton.10. Customer should provide three days notification to Halliburton prior to any equipment
mobilization or demobilization. 11. If any delays are incurred due to the availability of crane operations or weather conditions
the standby rates will apply.12. Halliburton will load 25 Tonnes of Liquid Nitrogen in Russia Mainland all transportation
loses due to evaporation, will be assumed by ENL.13. Halliburton have organized logistics to carry out the operation starting from 20th of
September 2011 provided the official confirmation (PO, Letter of Intent, etc) is received by Halliburton from ENL no later than 26th of August.
14. Should operation be cancelled and mobilization has been in progress, mobilization charges will be invoiced to ENL.
Halliburton has been providing Process and Pre-commissioning services in the Middle East for over 30 years.
Halliburton has a strong track record in providing controlled bolting, video inspection, cleaning, chemical cleaning, oil cleanliness and N2 / He leak testing services to the oil and gas, process industries.
Halliburton is the Market Leader in the Pre-commissioning, Commissioning, Chemical Cleaning and Decommissioning Industry – Worldwide.
5.2 Pipeline and Process Services Provided Globally
In the Middle East, Halliburton Pipeline and Process Services have offices and yards in the United Arab Emirates, Qatar, and Saudi Arabia but have carried out the above mentioned services in most of the Middle East countries with the support of our many oilfield camps which are located through-out the region. Furthermore, HPPS operates worldwide including the USA, Gulf of Mexico, United Kingdom, The Netherlands, Norway, Asia Pacific, Venezuela, Brazil, Australia, Egypt, West Africa and Azerbaijan.