Eni Field Trip Libya October, 2004
Eni Field Trip
Libya
October, 2004
Wafa Coastal Plant
October 28th, 2004
Maremi KashimMellitah Complex Manager
3
Western Libya Gas Project Overview
SabrathaPlatform
Zuwarah
G.S.P.L.A.J
Tunisia
Gadames
Wafa Desert Plant
Algeria
Sabratha
C1 C2
Tripoli
SPM
Gas Line
(36“) 110 km
Cond. Line
(10“) 110 km
Mediterranean Sea
Local Gas Line
Subsea Clusters
Mellitah ComplexWafa Coastal Plant, Mellitah Plant and Gas Compression
Station
Gas Export Line(32”) 516 km to
Italy
Onshore Pipelines32” + 16”
4
Wafa Coastal Plant
September 2002
September 2004
1.1. WafaWafa Field Development Field Development CostCost
2.2. WafaWafa Field Key DatesField Key Dates
4.4. WafaWafa CoastalCoastal Plant Block Plant Block Flow DiagramFlow Diagram
5.5. WafaWafa CoastalCoastal Technical Technical InformationInformation
3.3. WafaWafa Coastal ManpowerCoastal Manpower& Materials& Materials
5
Wafa Coastal Plant Highlights
WAFA FIELD DEVELOPMENT COST
2.6 BnEuro
Wafa Desert 1,350 MMEuro
Pipelines 350 MMEuro
Wafa Coastal 900 MMEuro
6
Wafa Coastal Plant Highlights
KEY DATES
PLANNED ACTUAL
Construction Start Sept. 2002 Sept. 2002
First Sales Gas Delivery Sept. 2004 9th Sept. 2004
First Oil Shipment Sept. 2004 10th Oct. 2004
7
Wafa Coastal Plant Highlights
MANPOWER & MATERIALS
Manpower 5,000
Equipment, Piping & Structures 38,000 t
Cables 1,900 km
Concrete 150,000 m3
8
Wafa Coastal Plant – Block Flow Diagram
GAS FROMWAFA
EXPORT GAS COMPRESSOR
STATION
OIL/LPGFROMWAFA
OILSHIPPING
EXPORT GAS TO ITALY
LPG DRYING &FRACTIONATION
C4
C3
C4 SHIPPING
C3 SHIPPING
EXPORT GAS METERING
LPG
C5 HEAVIER
LPG FROMMELLITAH
PLANT
GAS FROMMELLITAH
PLANT
DOMESTIC GAS
BUTANESTORAGE
PROPANESTORAGE
EXPORT GAS METERING
OILSTORAGE
OIL SHIPPING
SPM
BUTANE SHIPPINGSYSTEM
PROPANE SHIPPINGSYSTEM
OILSTABILIZER
9
Wafa Coastal Plant – Technical Information
8
6 7
5
43
192
10
1 2 43 5 6 7 8 9 10
10
Wafa Coastal Plant – Technical Information
POWERGENERATION
TECHNICAL DATA
Purpose:Produce electric power for all plant users
Details:Gas Turbo Generator 3 x 25 MW
1
11
Wafa Coastal Plant – Technical Information
Diesel Oil
Waste Heat Recovery& Steam Production
UTILITIES
TECHNICAL DATADIESEL OIL
Purpose:provide DO to main EDG, jetty EDG, GTG as auxiliary fuel, fire water pumpsDetails: storage 500 m3
WHRU & STEAMPurpose:produce steam to desalination units, LPG splitter reboilers by means of 3 WHRBDetails: 35 T/h of steam
2
12
Wafa Coastal Plant – Technical Information
OIL & LPG TREATMENT
TECHNICAL DATAPurpose:produce stabilised oil, commercial propane and butane as per product transportation specification
Details:
• No 2 Oil Treatment Trains – 30,000 bb/d each
• No 2 LPG Splitter Train 12,000 bbl/d each
3
13
Wafa Coastal Plant – Technical Information
Desalinated Water Cooling Tower
Utility Air
UTILITIES
TECHNICAL DATA
DESALINATED WATERPurpose:produce desalinated water by multiple expansionDetails: 220 t/h, storage 56,000 m3
UTILITY AIRPurpose:provide utility and instrument air to plant users by means of 5 compressors Details: 3,000 Nm3/h
COOLING TOWERPurpose:cool down water from 42degc to 32degcDetails: 4,300 m3/h
4
14
Wafa Coastal Plant – Technical Information
TECHNICAL DATA
Purpose:storage of stabilised oil prior to delivery to export facilities
Details:• 2 Buffer Tanks -
250,000 bbl each• 2 Main Tanks -
600,000 bbl each
OIL STORAGE
5
15
Wafa Coastal Plant – Technical Information
BUTANE & PROPANE STORAGE
TECHNICAL DATA
Purpose:storage of propane and butane ready for export
Details:• 2 Propane tanks
30,000 bbl each• 2 Butane tanks
27,000 bbl each
6
16
Wafa Coastal Plant – Technical Information
PROPANE & BUTANE EXPORT
TECHNICAL DATA
Purpose:meter and deliver propane and butane from storage tanks to Tankers
Details:3 + 3 export pumps, 3000 bbl/h each 4+4 Loading Arms
7
7
17
Wafa Coastal Plant – Technical Information
OIL EXPORTSYSTEM
TECHNICAL DATA
Purpose:Meter and deliver stabilised oil from storage tanks to Tankers
Details:• 3 export pumps -
20,000 bbl/h each• Subsea pipeline 28”• Single Point Mooring
35,000 bbl/h
8
18
Wafa Coastal Plant – Technical Information
GAS EXPORTFACILITIES
TECHNICAL DATAPurpose:Gas metering prior to the delivery to buyers
Details:• No 1 metering station for
sales gas to Greenstream, 5 runs, 22 MMscm/d
• No 1 metering station for sales gas to local market, 3 runs, 6 MMscm/d
• No 1 metering station for fuel gas to Greenstream 2 runs, 1 MMscm/d
9
19
Wafa Coastal Plant – Technical Information
TECHNICAL DATA
LOGISTIC
Accommodation for 120 personsMosqueRecreation & CinemaCanteenStoresClinicLaundrySwimming Pool
10
20
Greenstream Pipeline
GREEN STREAMFACILITIES
TECHNICAL DATAPurpose:Gas transportation gas to Italy
Details:• No 4 turbocompressor
290,000 SCM/h 31 Mw each
• 520 km 32” pipeline• Transportation capacity: 8
billion SCM/y
21
Wafa Coastal Plant - HSE
Actions deliveredChallenge
Ensure safety of 5,000 workers
More than 20 million work hours
Prevent and reduce unsafe acts
60,000 hours of safety training to date
Focus on preventing unsafe acts
LTIF* 0.0 since project inception
* Lost time injury frequency
Sabratha and Bahr Essalam Field
23
Sabratha and Bahr Essalam FieldHighlights
DEVELOPMENT COST 3.5 B Euro
Sabratha Field 1,300 MMEuro
Sealine and Gathering 700 MMEuro
Bahr Essalam Subsea 600 MMEuro
Mellitah Plant 900 MMEuro
24
Sabratha and Bahr Essalam FieldHighlights
KEY DATES
Planned Actual/Forecast
Project Kick-off June 2002 June 2002
Production System ready for Start-up May 2005 May 2005
First offshore sales gas June 2005 June 2005
25
Sabratha and Bahr Essalam FieldHighlights
26
Sabratha and Bahr Essalam FieldHighlights
MAIN FEATURES
5000 m
CW01
C7CW10
CW02CW03
CW11
CW08
C1
CW04 CW06
CW07CW05
CW09
CC16CC17
C4
C3 CC09 CC10
CC07 CC15CC05
CC13CC11
CC03
CC06C2
CC12CC01 CC04
CC02 CC08
CC14
C6 C5CE06
CE05
CE04
CE03
CE02
CE01
CE10
CE09CE08
CE07
C8
LEGEND= Drilled Appraisal Wells
= Gas Development Well
Number of wells 27
Equipment & Structures 50,000 t
Cables 410 km
Manpower 4000
Sealine & Gathering 300 km
27
Sabratha and Bahr Essalam FieldHighlights
Deck sail away 27th September 2004