    Field Tour Experiences on Energy Technology Installations-CLSU-AREC Initiated Projects

    Background:

    Prof. Angelito V. Angeles, Director of CLSU-AREC and our Professor in CPE721 has arranged a field laboratory tour with the group of four (4) MSAE studentsand eleven (11) BSAE students last January 22-23, 2010, as a requirement for thestudents respective subject under him. The formal tour itinerary was to visit theproject installation of solar-assisted irrigation system in Matayumtayum, La Paz,Tarlac, the biogas system in Tibag, Pulilan, Bulacan, AMTEC at UPLB, Los Banos,Laguna and the micro-hydro power system in Aquino, Tiaong, Quezon.

    Objective:

    The activity aims to provide actual technical know-how, experiences and

    exposures on actual energy system ins tallation projects initiated and implemented byCLSU-AREC. Specifically, it aims to know the technical detail of the energyinstallation, its use, theory and application.

    Methodology:

    1. Field tour experience, first hand information gathering from the pro ject site.2. Hands-on learning from the actual project demonstration & implementation.3. Documentation, appreciation of hardware installation of different energy

    systems.

    Highlights of Result:

    There were 3 energy system installations visited, as follows:

    a. Solar energyb. Biomass energy (in terms of biogas)c. Water energy

    1. Solar energy

    The Small Water Impounding Support Project for Water Stress Communities(Tawi-Tawi Model) located at brgy. Matayumtayum, La Paz, Tarlac is a solar -assisted irrigation system and Activity Center funded by the National IrrigationAdministration thru the joint effort of Prof. Angelito V. Angeles of CLSU -AREC andthe Provincial Irrigation Officer, Engr. Prudencio Santos . The project aimed toprovide water for the irrigation of vegetab les that will be planted in the area throughdrip irrigation. Its location is surrounded with rice crop with at least 10 STWsinstallation near the site. No irrigation system in the area and dependent only onrain water during the wet season and pumped w ater during the dry season, asexplained by a farmer spectator.

  • 8/7/2019 EngrSOV Tour Report CPE721

    4/15

    The project consists of a concrete water tank and an activity center. The watertank has a dimension of 6 ft x 18 ft x 10 m. and water that will fill the tank will be rainwater during rainy season and ground water during dry season. The systemcomprises an open-type shed, water depository tank, water well, and the irrigationapplication component which has not yet been started at the time of our visit. Theshed has a floor dimension of about 20 x 20. The water well has a floor size of 18 x

    6, which is used temporarily in pumping water for construction use (gravel/cementmixing, daily use of project workers) through a 5.5hp direct coupled water pump andtemporarily contain in drum prior to using (figure 2). The water depository tank is forimpounding pumped water from the well and precipitation water diverted from theroofing of the shed towards the tank (figure 3). The 5.5 Hp gasoline engine waterpump will be powered by a solar panel, 85 watts capacity temporarily installed at thesite to provide lighting for the workers (figure 4).

    Its location is surrounded with rice crop with at least 10 STWs installationnear the site. No irrigation system in the area and dependent only on rain waterduring the wet season and pumped water during the dry season, as explained by afarmer spectator.

    It was called Tawi Tawi model because when it rains, the place is surroundedwith flood and becomes like an island. A micro hydro will be constructed wherein awater current turbine will be used, a turbine which is not a high pressure type. Thistype of turbine generates power using water current.

    2. Biomass Energy

    The CLSU model biogas digester is a fixed dome type and has a capacity of10 m3. The project was a private contract between CLSU-ANEC and Atty. Calderonlocated at brgy. Tibag, Pulilan, Bulacan. It is implemented through the KilusangPangkalikasan ng Bulacan, Inc. (KPBI), Department of Energy (DOE) and CLSU-AREC.

    The system is utilizing hog waste which is directed to a digester that isconstructed below the ground level. After some period of decomposing such waste itproduces flammable gas in a form of methane gas. Sludge shall necessary becollected from the digester from time to time.

    During our visit at the project site, there were 15 heads of sow which providesource of waste for decomposition which eventually produces methane gas as theprocess progresses. The system was utilized for providing gas for householdcooking .I have observed the placing of water to the top of the digester where the

    gas outlet pipe is located. This is to test for any gas leak. We also witnessed thetesting of flame produced by the biogas from a burner located several meters fromthe biogas digester. This meets the standards in the design of a biogas system . Thetypical process flow of the biogas system which was also observed in Pulilan projectis presented in figure 5.

  • 8/7/2019 EngrSOV Tour Report CPE721

    5/15

    3. Water Energy

    The Micro Hydro Power Plant in Aquino, Tiaong has an installed capacity of30 kVA and having a head of 100 meters. It was designed to generate electricalpower to address lighting requirements, power pumps and charge batteries in thelocality. It was implemented through the CLSU-AREC, Office of Cong. Proceso Alcala and the Local Government Unit of Tiaong, Quezon. It was built to provide

    electrification of the village and for supplementary irrigation of vegetable or cropproduction grown in the area. It has a 20-kW power generating capacity which wasinstalled from the highest location of collecting water (water intake) down the riverchannel at the base of the mountain (power house).

    The power house provides shelter to the turbine which translates the kineticenergy of the flowing water into mechanical energy. A 30-kW generator wasattached to the shaft of the turbine to translate that energy into electrical energywhich can be distributed to the housing units in the village. A huge penstock of 12diameter shall direct water from the surge tank towards the turbine. The surge tankswere constructed from oil drums (figure 6).

    However, the system is not yet functional since it is still under construction.Major parts that we were able to visit are the following: the forebay, surge tank,penstock and the turbine and generator assem bly.

    The Micro Hydro Power Project was located at the mountainous area withrelatively steep terrain down the location of power house and about 8km drive fromthe town of Tiaong, Quezon (figure 7).

    4. Other Activities

    The Agricultural Machinery Testing and Evaluation Center (AMTEC) of theCollege of Engineering and Agro -Industrial Technology (CEAT) in Los Banos,Laguna was also visited by the group. AMTEC is the sole testing center ofagricultural machines and equipment in the Philippines. Machines intended forcommercialization can be evaluated using Philippine Agricultural EngineeringStandards (PAES), and manufacturers can refer to them in improving the design andfabrication of the machines. Engr. Romulo Eusebio who is the head of the testingand evaluation unit of AMTEC gave briefings on what AMTEC are doing, the actualset-up of testing equipment (e.i. pumps, tractor, engine, blower) and the equipmentused for testing and evaluation (figure 8). He discussed how they test agriculturalengines and how they establish a performance curve (i.e. head capacity curve, inputpower curve, efficiency curve) from actual tests performed. The group gathered othersample data during engine testing like torque, speed, fuel consumption, noise level

    and temperature at exhaust. He also demonstrated the procedure on how theydetermine the brake horsepower of agricultural tractors using the prony -brakedynamometer. The

    During the trip we had opportunity to view other energy systems along theroad such as the windpump system near the Pulilan NLEX exit , the solar panelinstallation for lighting at KM47 along NLEX in San Simon, Pampanga and the steamconveying pipes of a geothermal power plant in Bay, Laguna (figure 9).

  • 8/7/2019 EngrSOV Tour Report CPE721

    6/15

    Atty. Jean Calderon invited the group for a boat ride and humbly sponsoredfree lunch for the group when we visited the biogas project in Brgy. Tibag, Pulilan,Bulacan. She likewise explained that such boat is also use not only for picnicactivities but also for monitoring the water condition of the lake (figure 10).

    Summary, Conclusions:

    Prof. Angelito V. Angeles, Director of CLSU-AREC and our Professor in CPE721 has headed a field laboratory tour with the group of four (4) MSAE students andeleven (11) BSAE students last January 22-23, 2010, as a requirement for thestudents respective subject under him. It aims to gain experiences on actual energytechnology installations.

    The group visited three (3) energy systems installation; as follows, 1) a smallwater impounding support project for water stress communities in Matayumtayum,Lapaz, Tarlac, a solar-assisted irrigation system, 2) a biogas system in Tibag,Pulilan, Bulacan for household cooking application, 3) a micro -hydro power systemin Aquino, Tiaong, Quezon for village electrification.

    The Agricultural Machinery Testing and Evaluation Center (AMTEC) of theCollege of Engineering and Agro -Industrial Technology (CEAT) in Los Banos,Laguna was also visited by the group . We also observed other energy systemsalong the highways/expressways such as the solar panel for lighting a long the NLEXat San Simon, Pampanga, the wind pump system near the NLEX Pulilan exit, andsteam conveying pipes of a geothermal power plant in Bay, Laguna.

    Lastly, we must remember the following important lessons whenever there arefield tours to be conducted in the future as far as our field of expertise is concerned;

    1. THINGS THAT SHOULD BE DONE AGAINa. Be prepared always. Bring with you things

    that are needed during the trip like camera,field notes, ball pen, cell phone, water, foodand extra money.

    b. Get enough sleep the night before the trip.c. Prepare an outline on the data that should

    be gathered.d. Follow all instructions given during the trip.

    2. THINGS THAT SHOULD NEVER BE DONE AGAINa. Bringing of unnecessary things.

    b. Talking while discussion is going on.

    3. THINGS THAT SHOULD BE IMPROVEDa. Listening attentively to the discussions during

    the trip.b. Learn how to take down notes faster.c. Being smart and keen observer.

  • 8/7/2019 EngrSOV Tour Report CPE721

    7/15

    References:

    Micro-hydro Power: A guide for Development Workers, P. Fraenkel et. al.

    Philippine Agricultural Scientist Journal (PASJ), Technical and Scientific WritingFormat.

    R.P. Nem Singh, J.O. Calixihan, Fundamentals of Technical Writing.

  • 8/7/2019 EngrSOV Tour Report CPE721

    8/15

    List of Figures:

    Figure 2. The 5.5hp direct coupled gasoline

    engine water pump, 2

    Figure 1. The Small Water Impounding Support Project for

    Water Stress Communities (Tawi-TawiModel)

    Matayumtayum, La Paz, Tarlac.

    a) perspective view of the open-

    type shed

  • 8/7/2019 EngrSOV Tour Report CPE721

    9/15

    igure 3. The on-going construction water depository tank at

    Matayumtayum, Lapaz, Tarlac. January 22, 2010

    Figure 4. The 85w solar panel installation at

    Matayumtayum,La Paz, Tarlac. January 22, 2010

  • 8/7/2019 EngrSOV Tour Report CPE721

    10/15

    1. waste source from animal manure 2. waste collection

    3. waste decomposition& gas4. gas application

    (cooking or heating)

    4. slud e collection5. mixture for or anic fertilizer

    Figure 5. Typical biogas system installation and utilization, Brgy. Tibag,

    Pulilan, Bulacan, January 22, 2010.

  • 8/7/2019 EngrSOV Tour Report CPE721

    11/15

  • 8/7/2019 EngrSOV Tour Report CPE721

    12/15

    a)Prof. Angeles, Engr. Eusebio and AE

    students at AMTEC

    c Set-u of tractor testin d Set-u of en ine testin

    Figure 8. Photos taken from AMTEC, UP Los Banos Campus, Los Banos,

    Laguna, January 22, 2010

    b) New Kubota B7510 Tractor

    e) Set-up of blower testing e) Set-up dynamometer testing

  • 8/7/2019 EngrSOV Tour Report CPE721

    13/15

    b) wind turbine for water pumping c) concrete water tank

    a) solar panel for lighting along NLEX at

    San Simon, Pampanga

    Figure 9. Photos taken along the highways

  • 8/7/2019 EngrSOV Tour Report CPE721

    14/15

    b) steam pipes of geothermal power plant along the highway, Bay, Laguna, January 22, 2010

  • 8/7/2019 EngrSOV Tour Report CPE721

    15/15

    c) view of the lake from the boat d) view of the boat from the shore

    a) the banker assisting the group b) Atty. Calderon giving briefings to the group

    Figure 10. Photos taken from brgy. Tibag, Pulilan, Bulacan, January 22, 2020