0 Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING Richard De La Cruz, P.E. DIRECTOR OF ENGINEERING Engineering Services NORTHSIDE INDEPENDENT SCHOOL DISTRICT April 2018
0
Leroy San Miguel
ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS
Henry Acosta
EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING
Richard De La Cruz, P.E.
DIRECTOR OF ENGINEERING
Engineering Services
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
April 2018
1
PROJECTS IN CONSTRUCTION
2
Track & Field Upgrades at Jay HS
ATHLETICS UPGRADES
Engineering Firm – Cude Engineers, LLC
NISD Project Manager – Richard De La Cruz, P.E.
Contract Amount – $1,895,356
Contractor – Field Turf USA, Inc.
Construction Period – April 2017- TBD
Construction Status – 80%
Project Scope – Full replacement of track and football field with synthetic turf and synthetic track surfacing. (2007/2014 Bond Funds).
3
Tennis Court Upgrades at Sul Ross MS & Stevens HS
Engineering Firm – Moy Tarin Ramirez Engineers, LLC
NISD Project Manager – Troy Spear Contract Amount – $103,875 Contractor – Premier Courts Limited Company Construction Period – September 2017 – April 2018
Construction Status – 100% for Sul Ross MS and 98% for Stevens HS
Project Scope – Tennis court resurfacing at both campuses.
Tennis Court Upgrades at Taft HS
Engineering Firm – Moy Tarin Ramirez Engineers, LLC
NISD Project Manager – Richard De La Cruz, P.E.
Contract Amount – $56,846
Contractor – Premier Courts Limited Company
Construction Period – May 2018 – August 2018
0% Construction
Project Scope – Tennis court resurfacing
4
CHILLER REPLACEMENTS
Chiller Replacement, Electrical & Lighting Upgrades at Carlos Coon ES and PE/Athletics Dressing/Locker Room AC Installation at Stevens HS
Engineering Firm – Silber & Associates Consulting Engineers, Inc.
NISD Project Manager – Rob Ibarra Contract Amount – $947,228 Contractor – Flo-Aire Service, Inc. Construction Period – February 2018 – July 2018
15% Construction at Carlos Coon ES and 85% at Stevens HS
Project Scope – Carlos Coon ES – Replace chiller, main electrical panel and motor control
centers. Replace 32 watt lamps with 28 watt lamps throughout campus. Stevens HS - Install air conditioning and heating in boy’s and girl’s locker
rooms.
Carlos Coon ES – Steel reinforcement for concrete slab
in preparation of the chiller installment
5
Chiller Replacement, PE/Athletics Dressing/Locker Room AC Installation, Energy Savings & Lighting Upgrades at Health Careers HS
Engineering Firm – Alderson & Associates, Inc.
NISD Project Manager – Rob Ibarra Contract Amount – $2,415,000 Contractor – R.E.C. Industries, Inc. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replace chiller, cooling tower, condenser and chilled water pumps. Install air conditioning and heating in boy’s and girl’s locker rooms. Replace existing lamps in Gym with LED lamps.
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Rob Ibarra Contract Amount – $1,599,000 Contractor – R.E.C. Industries, Inc. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Re-lamping of interior lighting, locker room AC installations, and
Building D mechanical renovations of the classrooms.
Electrical, Lighting, Mechanical Upgrades and PE Athletics Dressing/Locker Room AC Installation at Pease MS
6
ENERGY CONTROLS
Energy Controls, Fire Alarm System & Lighting Upgrades at Burke ES
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Ramiro Guerrero Contract Amount – $474,208 Contractor – HJD Capital Electric, Inc. Construction Period – June 2018 – August 2018
0% Construction
Project Scope –
Jay HS – Upgrade network cabling. Carson ES – Upgrade network cabling and install new Native programming
system.
Energy Controls at Helotes ES & Nichols ES
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Ramiro Guerrero Contract Amount – $188,000 Contractor – Climatec, LLC Construction Period – June 2018 – August 2018
0% Construction Project Scope –
Helotes ES – Upgrade cabling and full HVAC control system. Nichols ES – Upgrade network cabling.
7
FENCING UPGRADES
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Troy Spear Contract Amount – $87,335 Contractor – Clearfield Construction Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Improve exterior perimeter fencing at three campuses.
Fencing Upgrades at NW Crossing ES, Westwood Terrace ES & Marshall HS
Energy Controls at Jay HS & Carson ES
Engineering Firm – Wallis Engineering Group, Inc.
NISD Project Manager – Ramiro Guerrero Contract Amount – $423,900 Contractor – Central Electric Contractors Construction Period – June 2018 – August 2018
33% Construction Project Scope – Upgrade network cabling and install new Native programming
system; replace fire alarm system. Replace 32 watt lamps with 28 watt lamps throughout campus. Replace existing lamps in Gym with LED lamps.
8
Fire Alarm System Upgrades at Stevenson MS & Mary Hull ES
FIRE ALARM SYSTEM UPGRADES
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor – Central Electric Contractors Ent. & Co. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replace fire alarm systems.
Fire Alarm System Upgrades at Maintenance
Purchasing Warehouse
Engineering Firm – KCI Technologies, Inc.
NISD Project Manager – Carlos Rodriguez Contract Amount – $118,700 Contractor – Central Electric Contractors Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Upgrade the fire alarm system entirely, and upgrade the lighting
including new ballast and disconnects.
9
Fire Alarm System Upgrades at Howsman ES, Transportation North & Transportation South
Engineering Firm – MS2 Inc. Consulting Engineers
NISD Project Manager – Carlos Rodriguez Contract Amount – $155,000 Contractor – CRI Electric, Inc. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replace fire alarm systems.
Fire Alarm System Upgrade at Holmes HS
Engineering Firm – Wallis Engineering Group, Inc.
NISD Project Manager – Ramiro Guerrero Contract Amount – $189,400 Contractor – Central Electric Contractors Ent. & Co. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replacement of the FCI 7300 series F/A panels to the FCI S3 series panel in the following buildings: B, C, D, E, F, G, H, and I.
10
HVAC RENOVATION
LIGHTING UPGRADES
Lighting Upgrades at Jay HS & Police Station and Energy Controls at Neff MS
Engineering Firm – Silber & Associates Consulting Engineers, Inc.
NISD Project Manager – Ramiro Guerrero Contract Amount – $180,000 Contractor – CRI Electric, Inc. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Jay HS –Replace existing lamps in Gym with LED lamps. Police Station – Replace ballasts and 32 watt lamps with 28 watt lamps
throughout campus. Neff MS – Upgrade network cabling.
Engineering Firm – Wallis Engineering Group, Inc.
NISD Project Manager – Richard De La Cruz, P.E., Rob Ibarra
Contract Amount - $16,200,000
Contractor – Bartlett-Cocke General Contractors
Construction Period – June 2016 – June 2018
Construction Status – 80% Construction Phase VIII (Last Phase to Complete)
Project Scope – Replace HVAC system including boiler and piping; install air
conditioning and heating in boy’s and girl’s locker rooms.
HVAC Renovation/Boiler Replacement/PE/Athletics Dressing/Locker Room AC Installation
at Clark HS
11
Lighting Upgrades at Locke Hill ES
Lighting Upgrades at Howsman ES, Transportation Rhodes & Transportation South
Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $85,173 Contractor – HJD Capital Electric, Inc. Construction Period – April 2018 – August 2018
60% Construction
Project Scope – Replace 32 watt lamps with 28 watt lamps throughout campus. Replace existing lamps in Gym with LED lamps.
Engineering Firm – MS2 Inc. Consulting Engineers
NISD Project Manager – Ramiro Guerrero Contract Amount – $83,242 Contractor – HJD Capital Electric, Inc. Construction Period – June 2018 – August 2018
0% Construction Project Scope – Howsman ES –Replace existing lamps with LED lamps throughout
campus. Transportation Rhodes & South – Replace ballasts and 32 watt lamps with 28 watt lamps throughout campuses. Replace existing lamps in Bus areas with LED lamps.
12
MECHANICAL UPGRADES
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Carlos Rodriguez Contract Amount – $338,120 Contractor – Central Electric Enterprises & Co. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Westwood Terrace ES: Meter loop for portables needs to be upgraded due to age. Light fixture upgrades. Mary Hull ES: Light fixture upgrades and new ballast and
disconnects.
Lighting Upgrades at Grissom CIT & Purchasing Warehouse
Purchasing Warehouse Engineering Firm – KCI Technologies
NISD Project Manager – Ramiro Guerrero Contract Amount – $82,200 Contractor – Central Electric Construction Period – June 2018 – August 2018
90% Construction
Project Scope – Grissom CIT – Replace 32 watt lamps with 28 watt lamps throughout
campus. Replace existing lamps in Bus area with LED lamps. Purchasing Warehouse – Replace 32 watt lamps with 28 watt lamps
throughout campus. Replace existing lamps in Warehouse with LED lamps.
Mechanical & Lighting Upgrades at Mary Hull ES and Electrical & Lighting Upgrades at Westwood Terrace ES
13
Mechanical Upgrades at Jordan MS
Engineering Firm – Wallis Engineering Group, Inc.
NISD Project Manager – Rob Ibarra Contract Amount – $7,465,000 Contractor – D.L. Bandy Constructors, Inc.
Construction Period – June 2018 – August 2020
0% Construction
Project Scope – Install new VAV system throughout campus, replace chiller.
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Ramiro Guerrero
Contract Amount - $2,345,820
Contractor – Comfort-Air Engineering, Inc.
Construction Period – June 2017 – August 2018
Construction Status – 65% Construction Phase III of IV in Progress
Project Scope – Replace unit ventilators throughout the campus with VAV
systems, replace two chillers and HVAC controls throughout the campus.
Mechanical Upgrades & Energy Controls Upgrade at Elrod ES
14
Mechanical Upgrades at Linton ES
Engineering Firm – Cleary Zimmermann Engineers
NISD Project Manager – Rob Ibarra Contract Amount – $1,078,690 Contractor – Comfort-Air Engineering, Inc. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replace air handling unit and install VAV system for Library,
Cafeteria, Admin, Auditorium and Stage.
Engineering Firm – Cleary Zimmermann Engineers
NISD Project Manager – Rob Ibarra
Contract Amount – $2,950,000 Contractor – Baron-Long Construction, LTD. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replace unit ventilators with VAV system in classrooms.
Mechanical Upgrades at Brauchle ES
13
Paving Upgrades at Human Resources
Engineering Firm – Moy Tarin Ramirez Engineers, LLC NISD Project Manager – Richard De La Cruz, P.E.
Contract Amount – $143,360
Contractor – SBM General Contractors, LLC Construction Period – February 2018 – August 2018
10% Construction
Project Scope – Replace paving for staff parking.
PAVING UPGRADES
Engineering Firm – Wallis Engineering Group, Inc.
NISD Project Manager – Rob Ibarra Contract Amount – $2,426,000 Contractor – Baron-Long Construction, LTD Construction Period – April 2018 – July 2018
0% Construction
Project Scope – Taft HS Boy's and Girl's Locker Room: Add 4 AHU's and ductwork, add roof relief hoods, replace exhaust fans and remove unit heaters and ventilation fans. Taft HS Building B Voc: Replace Corridor Unit Ventilator with AHU and ductwork. Stinson MS Boy's and Girl's Locker Room: Add 2 roof AHU's and ductwork, add roof relief hoods, and replace exhaust fans. Remove unit heaters and ventilation fans. Rayburn MS Girl's Locker Room and Weight Room: Add DX rooftop units and ductwork, add roof relief hoods and replace exhaust fans. Remove unit heaters and ventilation fans.
Mechanical Upgrades at Taft HS and PE/Athletics Dressing/Locker Room AC Installation
at Rayburn MS, Stinson MS & Taft HS
14
Paving & Drainage Upgrades at Northside Children Center & Rawlinson MS
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Richard De La Cruz, P.E.
Contract Amount – $274,000
Contractor – R.L. Rohde General Contractors Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Rawlinson MS – Improve drainage system. Northside Children’s Center – Replace paving for staff parking and bus
loop.
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Troy Spear
Contractor Amount – $129,950
Contractor – ADCO Master Builders Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replace paving for staff parking and bus loop.
Paving Upgrades at McDermott ES
15
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Carlos Rodriguez Contract Amount – $507,030 Contractor – Comfort-Air Engineering, Inc.
Construction Period – March 2018 – July 2018
0% Construction
Project Scope – Install air conditioning and heating in boy’s and girl’s locker
rooms.
PE/Athletics Dressing/Locker Room AC Installation at Brandeis HS
P.E. / ATHLETICS DRESSING / LOCKER RM AC INSTALLATION
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Richard De La Cruz, P.E.
Contract Amount – $468,850
Contractor – CGC General Contractors, Inc. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replace paving for staff parking and bus loop at both campuses.
Paving & Drainage Upgrades at Alternative HS & Burke ES
16
Engineering Firm – KCA Engineers, Inc.
NISD Project Manager – Carlos Rodriguez Contract Amount – $190,000 Contractor – Flo-Aire Service, Inc.
Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Install air conditioning and heating in boy’s and girl’s locker
rooms.
Engineering Firm – Cleary Zimmermann Engineers
NISD Project Manager – Carlos Rodriguez Contract Amount – $94,680 Contractor – R.E.C. Industries, Inc.
Construction Period – April 2018 – July 2018
0% Construction
Project Scope – Install air conditioning and heating in boy’s and girl’s locker
rooms.
PE/Athletics Dressing/Locker Room AC Installation at Brennan HS
PE/Athletics Dressing/Locker Room AC Installation at Garcia MS
17
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Rob Ibarra Contract Amount – $652,065 Contractor – Comfort-Air Engineering, Inc.
Construction Period – March 2018 – July 2018
0% Construction
Project Scope – Install air conditioning and heating in boy’s and girl’s locker
rooms.
Engineering Firm – CNG Engineering, PLLC
NISD Project Manager – Carlos Rodriguez Contract Amount – $652,065 Contractor – International Mechanical Services
Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Install air conditioning and heating in boy’s and girl’s locker
rooms.
PE/Athletics Dressing/Locker Room AC Installation at Warren HS
PE/Athletics Dressing/Locker Room AC Installation at Jordan MS
18
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Troy Spear
Contract Amount – $162,500
Contractor – Pronto Sandblasting & Coating & Oil Field Services Co.
Construction Period – April 2018 – June 2018
100% Construction for All Campuses
Project Scope – Geodesic dome replacement with playscape equipment at five
campuses.
Playground Upgrades at Allen ES, Cable ES, Carnahan ES, Nichols ES & NW Crossing ES
Playground Upgrades at Boone ES, Brauchle ES, Burke ES, Carson ES & Scobee ES
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Troy Spear
Contract Amount – $163,775
Contractor – SBM General Contractors, LLC
Construction Period – April 2018 – June 2018
0% Construction for Boone ES and 100% Construction for Brauchle ES, Burke ES,
Carson ES, and Scobee ES
Project Scope – Geodesic dome replacement with playscape equipment at five
campuses.
PLAYGROUND UPGRADES
19
Playground Upgrades at Cody ES, Meadow Village ES, Powell ES & Westwood Terrace ES
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Troy Spear
Contract Amount – $121,400
Contractor – Pronto Sandblasting & Coating & Oil Field Services Co.
Construction Period – April 2018 – June 2018
100% Construction at Cody ES, 100% at Powell ES, 90% at Westwood Terrace ES, and
100% at Meadow Village ES
Project Scope – Geodesic dome replacement with playscape equipment at four campuses.
Playground Upgrades at Behlau ES, Glenoaks ES, Murnin ES, Valley Hi ES & Villarreal ES
Engineering Firm – Moy Tarin Ramirez Engineers, LLC
NISD Project Manager – Troy Spear
Contract Amount – $165,500
Contractor – Pronto Sandblasting & Coating & Oil Field Service, Co. Inc.
Construction Period – April 2018 – June 2018
100% Construction at Murnin ES and 0% Construction at Behlau ES,
Glenoaks ES, Valley Hi, and Villarreal ES
Project Scope – Geodesic dome replacement with playscape equipment at
five campuses.
20
San Antonio Sports School Park at Burke ES and Colonies North ES
Engineering Firm – Moy Tarin Ramirez Engineers, LLC
NISD Project Manager – Richard De La Cruz, P.E.
Contract Amount – $104,324
Contractor – R.L. Rhode General Contracting, Inc.
Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Community fitness park on school grounds to include fitness
equipment and walking paths.
Engineering Firm – Moy Tarin Ramirez Engineers, LLC
NISD Project Manager – Richard De La Cruz, P.E. Contract Amount – $68,000 Contractor – EZ Bel Construction, LLC
Construction Period – May 2018 – June 2018
0% Construction
Project Scope – Installation of flashing beacons and associated signage.
School Flashers at Linda G. Mora ES
SAN ANTONIO SPORTS SCHOOL PARK
SCHOOL FLASHERS
21
PROJECTS IN DESIGN/PLANNING
22
PAVING / DRAINAGE UPGRADES
Paving Upgrades at Transportation South
Engineering Firm – Cude Engineers
NISD Project Manager – Richard De La Cruz, P.E.
Budget Amount – $1,200,000
Contractor – TBD Construction Period – June 2018 – August 2018
60% Design
Project Scope – Reconstruction of existing pavement around the entire transportation station, especially for bus parking.
Lighting Upgrades at Carson ES and Lewis ES
Purchasing Warehouse Engineering Firm – CNG Engineering, PLLC
NISD Project Manager – Carlos Rodriguez Budget Amount – $140,000 Contractor – TBD Construction Period – June 2018 – August 2018
100% Design
Project Scope – Carson ES: Light Fixtures are the shoe box type fixture and will be the T5 High Bay for the Gym and the Campus Lamps are 32 Watt that will go to 28 Watt with new ballast and disconnects. Lewis ES: Light Fixture Technology Requires Upgrade, Light Fixtures are the shoe box type fixture and will be the T5 High Bay for the Gym and the Campus Lamps are 32 Watt that will go to 28 Watt with new ballast and disconnects.
LIGHTING UPGRADES
23
PA Intercom Systems at Mead ES and Murnin ES
Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Carlos Rodriguez
Budget Amount – $80,000
Contractor – TBD Construction Period – June 2018 – August 2018
100% Design
Project Scope – PA systems are in need of an upgrade with two- way communication between the classrooms and front office.
Drainage Upgrades at Warren HS
Engineering Firm – CDS Muery NISD Project Manager – Richard De La Cruz, P.E.
Budget Amount – $200,000
Contractor – TBD Construction Period – June 2018 – August 2018
0% Design
Project Scope – Drainage upgrades adjacent to the existing track due to runoff
from the adjacent parking.
PA INTERCOM SYSTEMS
24
PA Intercom Systems at Carson ES, Ott ES, and Wanke ES
Engineering Firm – DBR Engineering, Inc.
NISD Project Manager – Carlos Rodriguez
Budget Amount – $120,000
Contractor – TBD Construction Period – June 2018 – August 2018
100% Design
Project Scope – PA systems are in need of an upgrade with two- way communication between the classrooms and front office.
PA Intercom Systems at Blattman ES and Hatchett ES
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Carlos Rodriguez
Budget Amount – $80,000
Contractor – TBD Construction Period – June 2018 – August 2018
100% Design
Project Scope – PA systems are in need of an upgrade with two- way communication between the classrooms and front office.
25
PLAYGROUND UPGRADES
Engineering Firm – Moy Tarin Ramirez Engineers, LLC
NISD Project Manager – Troy Spear
Budget Amount – $345,000
Contractor – TBD
Construction Period – June 2018 – August 2018
100% Design
Project Scope – Geodesic dome replacement with playscape equipment at ten
campuses.
Playground Upgrades at Aue ES, Carlos Coon ES, Colonies North ES, Esparza ES, Forester ES, Krueger ES, Lieck ES, Los Reyes ES, Mead ES, Mireles ES