1 Engineering, Design & System Integration 3,000 HP Wind Tunnel Blower, Motor, VFD & PLC Control System OEA PRESENTATION December 1, 2016 Philadelphia, PA P 215.542.8700 F 215.542.5652 Visit us online www.Maidaeng.com
26

Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

Jan 02, 2017

Download

Documents

hakhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

1

Engineering, Design &

System Integration

3,000 HP Wind Tunnel

Blower, Motor, VFD &

PLC Control System

OEA PRESENTATIONDecember 1, 2016

Philadelphia, PA

P 215.542.8700 F 215.542.5652

Visit us online

www.Maidaeng.com

Page 2: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

2

PROJECT CRITERIA

Engineering, Design and System Integration

� Subcontractor to Aerolab to provide a “Turnkey” Open Jet Wind

Tunnel Air Delivery System for Honeywell

� Responsible from Concept through Commissioning

� Designed in Philadelphia, PA and Built in Mexicali, Mexico.

� Components and Systems

� 415,000 CFM Blower with Dampers and Silencers

� 3,000 HP Medium Voltage Motor

� Coupling (Drive Train)

� 3,000 HP Medium Voltage Variable Frequency Drive

� PLC Based Monitoring and Control System

Page 3: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

3

PROJECT ANALOGY

Would be similar to a 3,000 HP Vehicle

� Runs at speeds from 0 MPH to 230 MPH, + 1 %.

� Can go from 230 MPH to 0 MPH in less than 18 seconds.

� Can operate continuously in an ambient temperature of 125°F

� Designed for Seismic Zone 4

� Custom Dashboard (HMI)

� Cruise Control

� Has a life expectancy of 25 year.

� Comes with a One to Four Year Warrantee

� Global Procurement and Assembly of Custom Components

� Runs like a Well Designed Machine

Page 4: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

4

PROJECT EXECUTION

SCHEDULE

Conceptual Engineering June to Sept, 2015

Blower, Motor and VFD Procurement Sept to Nov 2015

Factory Inspections March to June 2016

Detailed PLC Panel Installation Design Feb to June 2016

WTC/PLC Fabrication Procurement May 2016

Equipment Shipped to Mexico June and July 2016

Equipment and System Installations June to Nov 2016

PLC Programming and HMI Screens Aug to Nov 2016

Site Inspections and Acceptances June to Nov 2016

Commissioning ` Oct and Nov 2016

Warrantee Through Nov 2017

Page 5: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

5

CONCEPTUAL ENGINEERING

Concept:

Proposed 4 alternative

arrangements and

based on discussions

with the client, selected

the this arrangement.

Page 6: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

6

PROCUREMENT

Equipment Specifications and Selection

� Approach

� Performance Criteria

� Installation Criteria

� Desired Equipment Subcomponents

� Bearings – Blower and Motor

� Silencers - Blower

� Actuators - Blower

� Instrumentation – Blower, Motor and VFD

� Cooling Systems – Motor and VFD

� MV Input and Output Disconnects - VFD

� MV and LV Terminal Boxes – Motor and VFD

� Shafts

Page 7: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

7

DESIGN AND ANALYSIS

�Studies:

�Power Flow

�Torsional Analysis

�Harmonic

Analysis

�Coordination

�Arc Flash

�Coordination

�Aerolab

�Manufacturers

�Packaging

�Shippers

�Building Design Firm

�Contractors

Engineering Requirements – Maida’s Responsibility

Page 8: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

8

FAT AND SHIPPING

415,000 CFM Blower - Parts

built in Tennessee and

elsewhere were assembled in

Mexico

FACTORY INSPECTION, PACKAGING AND SHIPPING

Page 9: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

9

FAT AND SHIPPING

Came together for 1st time in

Mexicali, Mexico

3,000 HP, 4 KV TEWAC

Motor – Built in Helsinki,

Finland

3,000 HP, 4.16 KV

VFD Built in New

Berlin, Wisconsin

Page 10: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

10

FAT AND SHIPPING

WTC/PLC Control Panel –

Built in Bethlehem, PA

PLC System –

Programmed in

Philadelphia

FACTORY INSPECTION, PACKAGING AND SHIPPING

Page 11: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

11

DESIGN AND ASSEMBLY

Mechanical

Procurement

� Blower

� Coupling

� Damper

� Damper Actuator

Mechanical Design

�Wall Air Filters

� Cooling Water

System

� Foundation Details

� Baseplates

Page 12: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

12

FOUNDATION - PEDESTAL

BLOWER BUILDING

MAJOR EQUIPMENT

ARRANGEMENT

Page 13: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

13

FOUNDATION - PEDESTAL

Page 14: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

14

FOUNDATION - PEDESTAL

Page 15: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

15

FOUNDATION – BED PLATES

Page 16: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

16

AIR FILTERS

Page 17: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

17

DETAILED DESIGN

5 KV VFD MOTOR BRANCH CIRCUIT

INSTALLATION DETAIL

Page 18: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

18

DESIGN AND ASSEMBLY

Electrical Procurement

� 3,000 HP Motor

� 3,000 HP VFD

Electrical Design

� 5 KV VFD Branch

Circuit

Page 19: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

19

WTC/PLC PANEL

WTC/PLC Panel

Design

Procurement

Programming

Commissioning

Page 20: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

20

INSTRUMENT AND CONTROL

Page 21: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

21

DETAILED DESIGN

Page 22: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

22

PLC PROGRAM & HMI SCREENS

Page 23: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

23

OEA AWARD CRITERIA

� Demonstrates engineering challenges and

innovative solutions

� Integrate a Blower, Motor and VFD that will

perform as required under harsh conditions

with no mistakes, thereby enabling

Honeywell to maintain its commitments.

� Modify commercially available equipment to

meet the operational requirements of the

wind tunnel.

Page 24: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

24

OEA AWARD CRITERIA

� Demonstrates the importance of the

engineering profession to society

� The wind tunnel will be used for

performance and endurance testing of

equipment enhancing the safety of large

commercial and military aircraft.

� The wind tunnel would not exist without the

blower, motor, VFD and PLC System which

are engineered products and systems.

Page 25: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

25

OEA AWARD CRITERIA

� Demonstrate a clear and tangible benefit to

the Delaware Valley Region 2.

� Local engineering and design talent

enabled us to perform this project without

no issues, within schedule and within

budget.

� Awaiting future turnkey projects to design

and build the power and control systems for

many more 2,000 to 3,000 HP Wind

Tunnels in the next five year.

Page 26: Engineering, Design & System Integration 3,000 HP Wind Tunnel ...

26

OEA AWARD WINNER

LOW SPEED OPERATION

Smoke 1.m4v

Smoke 2.m4v

QUESTIONS