ENERGY SYSTEMS FOR THE INTELLIGENT USE OF BIOMASS FUELS ENERGY SYSTEMS FOR THE INTELLIGENT USE OF BIOMASS FUELS THOMAS POLAINER – PROJECT MANAGER
ENERGY SYSTEMS FOR THE INTELLIGENT USE
OF BIOMASS FUELS
ENERGY SYSTEMS FOR THE INTELLIGENT USE OF BIOMASS FUELS
THOMAS POLAINER – PROJECT MANAGER
URBAS Introduction & Overview
2
URBAS Maschinenfabrik
Ges.m.b.hFounded 1929
No. of Employees
Manufacturing Facility
Market Sectors and
Capabilities.
Approx. 450
35,000m2
Energy Technology
Steel Construction
Hydroelectric
Livestock Facilities
Energy Technology Warm Water ≤ 110°C
Hot Water > 110°C
Steam
Combined Heat and Power (CHP)
Introduction to URBAS Woodgas CHP
4
16
Y
EA
RS
D
EV
EL
OP
ME
NT
2001 – Research and development
( 70kWel + 150kWth )
2008 – first customer plant ( 2 x 120kWel + 290kWth )
Series production – 2010
Output range 100 – 400kWel – 2017
Development of output ranges
and market expansion – Future
In house planning and manufacturing.
� Years of expertise and experience combined
with a dedicated workforce enable URBAS
to complete all design, planing and
manufacturing process in house.
Benefits
� Outstanding flexibilty to meet customer
demands.
� Possibility to offer Turn key solutions.
� Fast and reliable reaction times in case of
system shutdowns.
� Largely independant from third parties in
relation to supply of spare and service parts.
5
Correct Biomass for Gasification.
� The correct biomass fuel is essential for long term
functionality and efficiency of the Woodgas CHP.
Forest woodchip.: 100%
Bark.: 5%
Sapwood.: 30%
Moisture Content.: 5 < w < 15 %
Heating Value.: 4,2 – 4,8kWh/kg
Granulation.: 40% 110-130mm
60-100% 60-110mm
20% 20-60mm
5% < 20mm
Solution
� URBAS supply drying and screening systems which enable
the user to operate the plant on fresh materials without
the need for extra unwanted manipulation of material.
13
Project Location Prijedor, Bosnia
Herzegovina
Client Name &
Sector
Toplana AD PrijedorDistrict Heating
Project Facts Type of Installation Woodgas CHP
System Outputs 250kWel
550kWth
Fuel Details 100% Forest woodchip.
Chipped and screened directly on site.
Rated Net Efficiency 78%
Lead Time (Order to site) 5 Months
Construction Period 3.5 Months
Date Commissioned Dec. 2015
Construction Contract Type Turn Key
Operation and Maintenance
Contract Type
Annual service on demand
URBAS – Reference Project: Prijedor
16
URBAS – Reference Project: Mals
17
Project Location Mals, Italy
Client Name &
Sector
FHW MalsDistrict heating
Project Facts Type of Installation Woodgas CHP
System Outputs 2 x 150kWel
2 x 280kWth
Fuel Details 100% Forest woodchip.
Chipped with Screw chipper and screened.
Rated Net Efficiency 79%
Lead Time (Order to site) 6 Months
Construction Period 4 Months
Date Commissioned Feb. 2015
Construction Contract Type Sub Contractor
Operation and Maintenance
Contract Type
Annual service on demand
URBAS – Reference Project: Vals
18
Project Location Vals, Italy
Client Name &
Sector
FHW ValsDistrict heating
Project Facts Type of Installation Woodgas CHP
System Outputs 296kWel
550kWth
Fuel Details 100% Forest woodchip.
Chipped on site with Screw chipper and screened.
Rated Net Efficiency 79%
Lead Time (Order to site) 6 Months
Construction Period 4 Months
Date Commissioned Jan. 2014
Construction Contract Type Sub Contractor
Operation and Maintenance
Contract Type
Annual service on demand
URBAS – Reference Project: Genboku
19
Project Location Tokushima, Japan
Client Name &
Sector
Genboku CO.,LTDPower plant
Project Facts Type of Installation Woodgas CHP
System Outputs 250kWel
530kWth
Fuel Details 100% Forest woodchip.
Chipped on site with Screw chipper.
Rated Net Efficiency 78%
Lead Time (Order to site) 7 Months
Construction Period -
Date Commissioned Planned for November 2017
Construction Contract Type Sub Contractor
Operation and Maintenance
Contract Type
Maintenance carried out by Sub Company