Top Banner
Pg. 1 Energy Intelligence Program Monitor your industrial facility and save energy! Tool that provides real-time feedback to help you manage energy in your manufacturing plant. Determine how much and when you use energy. CEE helps you interpret your energy patterns to improve the efficiency of your operation.
24

Energy Intelligence for Industry

May 24, 2015

Download

Engineering

Energy Intelligence for Industry helps small industrial customers manage their energy usage by providing real-time energy feedback and alerts.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Energy Intelligence for Industry

Pg. 1

Energy Intelligence ProgramMonitor your industrial facility and save energy!

• Tool that provides real-time feedback to help you manage energy in your manufacturing plant.

• Determine how much and when you use energy.• CEE helps you interpret your energy patterns to

improve the efficiency of your operation.

Page 2: Energy Intelligence for Industry

Pg. 2

Track And Get Real-Time Feedback

Page 3: Energy Intelligence for Industry

Pg. 3

Create Energy Thresholds and Alerts

Page 4: Energy Intelligence for Industry

Pg. 4

Compare Usage Day-Over-Day

Page 5: Energy Intelligence for Industry

Pg. 5

What Are The Benefits Of Participating?

• Determine how much and when you use energy:• Identify wasted energy during non-production periods• Identify demand peaks that cause high energy bills

• CEE assessment of building and equipment• We develop energy strategies to optimize your energy use• We make suggestions to lower your baseline energy use

• Save money by implementing strategies• Our goal is to find a minimum of 5% in energy savings

Page 6: Energy Intelligence for Industry

Pg. 6

How Much Does It Cost?

The program requires a customer time commitment and a small electrician expense that is reimbursed by CEE.• Program is paid for by Xcel Energy.

• All participants in pilot must be approved by Xcel Energy

• Electrician cost is reimbursed by CEE.• Electrician bills customer; Customer bills CEE.• Approximately $500 - $1000 per meter.

Page 7: Energy Intelligence for Industry

Pg. 7

How Much Time Does It Take?

• Off and on site engagement will require about 8 hours of a facility managers time over the 4-8 month program period.

Page 8: Energy Intelligence for Industry

Pg. 8

How Does The Program Work?

1. Install Monitoring

2. Conduct Assessment; Collect Data

3. Energy Patterns Meeting

4. Low-cost/No-cost Energy Experiments

5. Energy Impacts Meeting

6. Equipment and Rebate Recommendations

7. Uninstall Monitoring

Page 9: Energy Intelligence for Industry

Pg. 9

Install Monitoring

CEE works with your licensed electrician to install monitoring equipment at your electric service.

Page 10: Energy Intelligence for Industry

Pg. 10

Conduct Assessment

CEE conducts an energy assessment with your staff to understand equipment and schedules.

Page 11: Energy Intelligence for Industry

Pg. 11

Energy Patterns MeetingAfter about three months, CEE meets with you to review Energy Patterns and provide training on the Energy Intelligence dashboard.

Page 12: Energy Intelligence for Industry

Pg. 12

Low-cost/No-cost Energy Experiments

CEE and customer experiment to lower energy usage over the next two months and see the impact on the dashboard.

Page 13: Energy Intelligence for Industry

Pg. 13

Energy Impacts

Impacts from experiments are validated on dashboard and quantified in $ savings.

$50 energy savings

Page 14: Energy Intelligence for Industry

Pg. 14

Equipment and Rebate Recommendations

In addition to identifying low-cost/no-cost operational savings, CEE provides suggestions for equipment upgrades and studies.• Equipment assessment and recommendations• Coordination with Xcel Energy for:

• Equipment rebates• Study funding

Page 15: Energy Intelligence for Industry

Pg. 15

Example Energy Patterns

• The next slides are examples of energy patterns found with real-time monitoring and feedback.

Page 16: Energy Intelligence for Industry

Pg. 16

How Low Can You Go?Weekend Use

How come the energy use from Midnight to 6 AM (non-production) varies?

Page 17: Energy Intelligence for Industry

Pg. 17

Night Moves! What is going on when you are not there?

Cleaning crew turns on lights at 9 PM and they stay on until morning.

Page 18: Energy Intelligence for Industry

Pg. 18

Working for the Weekend?Equipment left running

Air compressor left on over weekend. Leaks cause it to run during non-production time period.

Page 19: Energy Intelligence for Industry

Pg. 19

Start Me Up!Excessive start-up time

Electrically-heated tanks are turned at noon during a non-production day.

Page 20: Energy Intelligence for Industry

Pg. 20

This One Goes to Eleven.Spikes During Production

Electric resistance heat in an air curtain causes a large demand spike (and charge).

Page 21: Energy Intelligence for Industry

Pg. 21

Fight the Power!Sags/Outages during Production

Customer experienced a loss of a phase at 2:30 PM.

Page 22: Energy Intelligence for Industry

Pg. 22

Who Is Eligible To Participate?

• An Xcel Energy (MN Territory) electric customer.• Small to Mid-Sized:

• You pay between $5000 - $25000 per month for electricity.• Your peak electric demand is less than 600 KW.

• Your business takes raw materials and uses machinery to produce a finished product.

• Acceptance into the pilot program is subject to approval by Xcel Energy.

Page 23: Energy Intelligence for Industry

Pg. 23

How Do I Sign Up?

• Sign Participant Agreement and Bill History Release• Collect Electrician Contact Information

MAIL/EMAIL TO:

Kevin Bengtson

Project Manager

Center for Energy and Environment

212 3rd Avenue North, Minneapolis MN 55401

[email protected]

Page 24: Energy Intelligence for Industry