Top Banner
Energy Efficient Water and Wastewater Plant Design and Operation 02 August 2017 Thonhoff Consulting Engineers, Inc. (TCE) Saleem Khan, P.E. CxA Bob Thonhoff, P.E. Texas Energy Engineering Services, Inc. (TEESI Engineering) (www.teesi.com) Presented by:
42

Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

Apr 11, 2019

Download

Documents

doliem
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

Energy Efficient Water and Wastewater Plant Design and Operation

02 August 2017

ThonhoffConsulting

Engineers, Inc. (TCE)

Saleem Khan, P.E. CxA Bob Thonhoff, P.E.

Texas Energy Engineering Services, Inc. (TEESI Engineering)

(www.teesi.com)

Presented by:

Page 2: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

1 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

SECO Facilities and InfrastructureEnergy Management Webinars

Indoor & Outdoor Lighting Retrofit Options Overview (7/20/2017 @ 2:00 PM)

Energy Accounting & Benchmarking  (7/26/17 @ 2:00 PM)

ENERGY STAR Portfolio Manager Overview (7/27/17 @ 2:00 PM)

Preliminary Energy Assessments Overview (8/1/17 @ 2:00 PM)

Energy Efficiency Consideration for Water and Wastewater Systems 

(8/2/17 @ 2:00 PM)

Page 3: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

2 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Welcome

Housekeeping itemsPDF of presentationVideo recording of presentationPollingQuestions

Page 4: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

3 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Introduction

State Energy Conservation Office (SECO)Schools & Local Government Program

Program provides Free Energy Assessments, training, and Technical AssistancePreliminary Energy Assessment (PEA)Energy Efficiency Consideration for Water & Waste Water Treatment Plant

Page 5: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

4 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Energy Audit

One of the first steps involved in energy cost control of facilitiesEnergy Audit or Survey consists of:Examination of how a facility uses energyDetermining cost of energy for the facilityRecommending operational changes (low/no cost measures)Recommendation for cost effective equipment upgradesReport development

Page 6: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

5 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Energy Audit Basic TypesPreliminary Energy Assessment (PEA)Preliminary Energy Audit/AnalysisInitial Energy Audit or SurveyWalkthrough Survey/Assessment

Detailed Energy Analysis (DEA)Comprehensive Energy Analysis (CEA)Investment Grade Audit (IGA)Utility Assessment Report (UAR)

ASHRAE categories (I,II,III)Not relevant to WWTP/WTP

Page 7: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

6 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Poll Question:

Have you conducted any kind of energy audit at any of your facilities in the past

three (3) years?

Page 8: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

7 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

PEA Process Summary

Page 9: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

8 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Establish Energy Performance Indices (WWTP)

Energy Use Index (EUI)Annual energy usage divided by average effluent flowkBtu/GPD/Year

Energy Cost Index (ECI)Annual energy cost divided by average effluent flow $/MGD/Year

Normalization Other factors influence EUI & ECI for WWTP

Page 10: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

9 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Establish Energy Performance Indices (cont.)

16.7

7.5

4.9

3.3

0 5 10 15 20 25

WWTP B

WWTP D

WWTP C

WWTP A

EUI (kBtu/GPD/Yr)

Facility Energy Performance EUI (kBtu/GPD/Yr)

Energy Utilization Index Energy Cost Index

$394,771

$247,226

$131,406

$98,215

$0 $250,000 $500,000 $750,000

WWTP B

WWTP D

WWTP C

WWTP A

ECI ($/MGD/Yr)

Facility Cost Performance ECI ($/MGD/Yr)

EXAMPLE WWTP FACILITIES

Page 11: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

10 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Utility Rate AnalysisAverage Utility Rates

Power Factor Analysis

FacilityElectric

ProviderElectricity

$/kWhHeating Fuel

ProviderFuel

$/MMBTU

Facility A W Provider $0.076 Y Provider $ 5.23

Facility B W Provider $0.079 Y Provider $ 5.00

Facility C X Provider $0.105 Z Provider $ 7.21

Facility D X Provider $0.097 Z Provider $ 7.45

Page 12: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

11 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Utility Rate Analysis (cont.)

Electrical DemandPeak power draw (kW)Demand Charges ($/kW)

Load Factor AnalysisConsistency of facility usage

Page 13: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

12 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Facility Site Visits

Initial MeetingOperators, Engineers, Director of Maintenance, etc.Discuss Plant Operation & Concerns

Walkthrough of Facilities

Identify Energy Savings Measures

Page 14: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

13 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

General Maintenance and Operation Considerations

Low Cost/No Cost MeasuresRoutine MaintenanceEquipment SchedulingSet PointsOperational ProceduresGuidelines for Efficiency Levels of Future Equipment Purchases

Page 15: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

14 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Energy Management (EM) Plan

EM Plan?

Review existing EM Plan

Assist in developing a more comprehensive plan

Page 16: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

15 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Poll Question:

Do your facilities have an Energy Management Plan? If so, how often do you

review and revise it?

Page 17: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

16 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

ConsiderationsPremium Efficiency Pumps & MotorsVFDs or “Soft‐Start” to Pumping SystemsCompare Cost of Chemical to Cost of PowerControl Dissolved Oxygen LevelUtilize Off‐Peak Energy Demand PumpingEvaluate Pipe SizingUtilize Leak Sensing SystemsModify the System OperationsOther…

Page 18: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

17 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Technical Assistance Examples

Thermal ScanningEquipment Inventory &

Visual Inspection

Page 19: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

18 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Technical Assistance Examples (cont.)

Utility Meter MappingPlant Operation &Visual Inspection

Page 20: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

19 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Typical UCRM’s and PaybacksWTP/WWTP Systems

WWTP related O&MMeasures 0 to 1 yearDissolved Oxygen Control 2 to 7 yearsHigh Efficiency Blowers 8 to 12 yearsVariable Speed Drives 8 to 15 yearsOptimize Aeration Design 5 to 10 yearsPower Factor Improvements 3 to 8 yearsSmart Meter Applications 5 to 8 yearsCity Mains Leak Sensing Technology 1 to 6 yearsWWTP Demand Response  *

*Dependent on existing load profile and capital used for automation

Page 21: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

20 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Case Study – City of San Marcos

(Lighting Retrofits, High Eff. Blower & Aeration Flow Control, Occupancy Sensors, HVAC Replacement, Energy Management Systems, Solar Thermal Pool Heating System, Water Conservation Measures)

Page 22: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

21 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Case Study – City of Pharr

(DO Control, High Eff. Blowers, VFDs, Leak Sensing Technology)

Page 23: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

22 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Case Study – New Braunfels Utilities

(Coarse to Fine Bubble Diffusion, DO Sensors, Variable Speed Blowers, City‐wide 5/8” Water Meter Change‐Out to Smart Meters)

Page 24: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

23 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Water Pumping

Use Energy Efficient Pumps and Motors

Typical Maximum Efficient Pump: 80% Typical Maximum Efficient Motor: 94%

Typical Worst Case Pump: 60% Typical Worst Case Motor: 90%

Potential Energy Savings: approx. 15% of annual consumption

Page 25: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

24 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

ELEVATED TANK

WATER SOURCE

WTPPUMP

PUMP

ELEVATED TANK

ELEVATED TANK

PUMP

ELEVATED TANK

Water Pumping -Optimize Pressure Planes

Pump to lowest pressure plane firstEnergy cost: $15,000/MGD/year/100ft head

Page 26: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

25 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Water Pumping –Off-Peak Energy Demand Pumping

Utilize Excess Elevated Storage Capacity During Energy Demand Time Period

Utilize Variable Frequency Drive Pumping

Energy Savings: 25% of cost of pumping during energy demand time period$4,000/MGD/Year

Page 27: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

26 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Water Treatment

Utilize Energy Efficient Pumps & Motors

Utilize Variable Frequency Drive

Optimize Plant’s Hydraulic ProfileEnergy Savings: 

approx. $1,500/MGD/Year/10 Ft. Head

Compare Cost of Chemical to Cost of Energy

Page 28: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

27 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Wastewater PumpingUse Energy Efficient Pumps and Motors

Typical Maximum Efficient Pump: 70%Typical Maximum Efficient Motor: 90%

Typical Worst Case Pump: 40%Typical Worst Case Motor: 85%

Potential Energy Savings: approx. 10% of annual consumption

Page 29: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

28 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Wastewater Pumping

Use Variable Frequency Drives on Large Horsepower (>50HP) Units to save Energy Demand Charges

Potential Energy Savings: 25% Pumping Cost During Demand Period $3,400/MGD/Year

Page 30: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

29 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Wastewater Pumping

Design Gravity Flow Systems Wherever Possible

Potential Energy Savings: $10,000/MGD/Year/30 Ft. Head

Page 31: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

30 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Wastewater TreatmentOptimize Hydraulic Profile

Optimize Aeration Design

Utilize Natural Treatment Processes

Compare Cost of Chemicals to Cost of Power

Control Dissolved Oxygen

Page 32: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

31 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Wastewater Treatment –Optimize Hydraulic Profile

Pump Wastewater OncePotential Energy Savings: $3,000/MGD/Year/10ft Head

CLARIFICATIONDISINFECTION

AERATION

LIFT STATION

DISCHARGE

GRAVITY SEWER

Page 33: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

32 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Wastewater Treatment –Optimize Aeration Design

Potential Energy Savings:approx. 50% of annual consumption

Transfer Rate(# O2/HP∙hr)

Coarse Air Bubble 1.5

Fine Air Bubble 3.3

Mechanical Aeration 3.9

Fine Air Bubble w/Full Floor Coverage & High Efficiency Blowers 6.6

Page 34: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

33 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Coarse Bubble Aeration

Page 35: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

34 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Fine Bubble Aeration

Page 36: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

35 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Bubble Types

Fine Bubble Coarse Bubble

Page 37: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

36 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Mechanical Aeration

Page 38: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

37 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Wastewater Treatment –Utilize Natural Treatment Processes

Facultative LagoonsPotential Energy Savings: approx. 70% of annual consumption

Trickling FiltersPotential Energy Savings: approx. 65% of annual consumption

Anoxic Zones (For Denitrification)Potential Energy Savings: approx. 10% of annual consumption

Page 39: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

38 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Wastewater Treatment –Control Dissolved Oxygen

TCEQ Criteria : 2.0 mg/l of D.O.Process Requirements : 0.5 – 1.0 mg/lGeneral Statement:“Anything over 1.0 mg/l is wasting power”Potential Energy Savings:$1,000/MGD/Year/mg/l D.O.

Page 40: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

39 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Wastewater Treatment –Compare Cost of Chemicals to Cost

of Power

Example:

Ultraviolent Disinfection will become cost‐effective within a 7 year period when compared to chlorination / dechlorination

Page 41: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

40 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Funding

State Energy Conservation Office  (SECO)Texas LoanSTAR Program (low interest revolving loan)https://comptroller.texas.gov/programs/seco/funding/loanstar/

Texas Water Development Boardhttp://www.twdb.texas.gov/

US Department of Agriculturehttps://www.usda.gov/

Page 42: Energy Efficient Water and Wastewater Plant Design and Operation · Energy Efficiency Consideration for Water & Waste Water Treatment Plant. 4of 41 Energy Efficient Water & Wastewater

41 of 41

Energy Efficient Water & Wastewater Treatment Plant Design and Operation

Presented by: TEESI & TCE

Questions?

Saleem Khan, P.E., CxATEESI Engineering

(512) [email protected]

www.teesi.com

Stephen RossState Energy Conservation Office (SECO)

Office: [email protected]

https://comptroller.texas.gov/programs/seco/

BobThonhoff, P.E.Thonhoff Consulting Engineers, Inc.

(512) [email protected]

www.tcetx.com