Top Banner
Energy Efficiency Policy at CESGA Javier García Tobío , Ignacio López Cabído, Carlos Fernández Sánchez, Javier Cacheiro López Centro de Supercomputación de Galicia Zaragoza, January 2013
87
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Energy Efficiency Policy at CESGA

Energy Efficiency Policy at

CESGA

Javier García Tobío , Ignacio López Cabído, Carlos

Fernández Sánchez, Javier Cacheiro López

Centro de Supercomputación de Galicia

Zaragoza, January 2013

Page 2: Energy Efficiency Policy at CESGA

INDEX CESGA:

- Institution

- Infrastructures

- Evolution of uses

- Activities and Services

- Some Projects

Page 3: Energy Efficiency Policy at CESGA

INDEX CESGA:

- Energy Efficiency Policy:

- Reasons and Objective

- Before the Plan

- The Plan:

- Acivities

- Metrics

- Results

- Next Actions

Page 4: Energy Efficiency Policy at CESGA
Page 5: Energy Efficiency Policy at CESGA

CESGA MISSION STATEMENT

To provide high performance computing and advanced

communications resources and services to the

scientific community of Galicia and to the Spanish

National Research Council (CSIC), as well as, to

institutions and enterprises with RTD activity.

To promote high quality research in Computational

Science in close collaboration with the research

community from Galicia as well as from other

regions or countries all over the world; contributing in

this way to the advancement of science, to transfer

technology to industry and administrations, and

as consequence, to the wellbeing of society as a

whole.

Page 6: Energy Efficiency Policy at CESGA

CESGA BOARD OF TRUSTEES

• Non Profit Foundation

• Regional Government of Galicia

• National Reseach Council of Spain

PARTNERS

Page 7: Energy Efficiency Policy at CESGA

CESGA USER COMMUNITY

Universities of Galicia

Regional Research Centres

Spanish National Research Council Centres

Other National and Foreign Institutions:

Hospitals: RTD Departments

Private Companies

Technological Centres

Other Non Profit RTD Centres

Excellence in Management

ISO

9001:2008 Quality Management

UNE166002

R&D Management

Page 8: Energy Efficiency Policy at CESGA

CESGA IS:

• Service Provider

Page 9: Energy Efficiency Policy at CESGA

CESGA IS:

Research Centre:

Joint RTD&i Project Promoter

Projects (2001-2011)

-UE 30

-National 19

-Regional 70

-With Industry & Others 31

Total 150

Page 10: Energy Efficiency Policy at CESGA

CESGA IS:

Outstanding e-Infrastructures for RTDi

– Computing platforms

– Data storage servers

– Communications network

Page 11: Energy Efficiency Policy at CESGA

CESGA IS:

Government Advisor

-Participation in EC prospective activities

-Co-author of the Spanish e-Science White Paper

-Galician Representative in Spanish e-Science Initiative

-Galician Representative in IBERGRID

-Galician Representative in RedIRIS

-Galician Representative in National Grid Initiative (Spanish NGI)

-Promoter of the Galician Universities Library Consortium (BUGALICIA)

-Promoter of the Galician Open Software Initiative (Mancomun)

-Advisor in the drafting of Galician Research Technological Development &

Innovation Plans

-Advisor in the drafting of Galician Information Society Plans

- …

Page 12: Energy Efficiency Policy at CESGA

CESGA IS:

Promoter of Scientific Thematic Networks &

Technological Platforms

-Promoter of Galician Technology Centres Network (RETGALIA)

-Promoter of Galician ICT Technology Platform (Vindeira)

-Partner & Promoter of “Instituto Tecnológico de Matemática Industrial (ITMATI)”

-Partner & Promoter of various scientific thematic networks:

• Galician Colorectal Cancer Research Network

• Galician Bioinformatics Network

• Galician Network of High Perfomance Computing

• Mathematica Consulting: Transfering Math to Industry

• Galician e-learning Thematic Network

• …

Page 13: Energy Efficiency Policy at CESGA

CESGA IS:

European Project Best Practice

– eBSN: European e-Business Support Network (e-MINDER Project).

– Lifelong Learning Initiatives (e-HOSPITAL Project).

– Youth Employment Support, New Skills Network (YES Project).

– European Grid for e-Science Production Site 2008 (EGEE Project).

– European Grid Initiative (EGI Project)

Page 14: Energy Efficiency Policy at CESGA

CESGA IS:

Partner to Universities’ Excellence Campuses

- Partner of International Campus of Excellence in

Ocean Science for the EuroRegion Galicia – North of

Portugal

- Partner of International Campus of Excellence for Life

Science

Page 15: Energy Efficiency Policy at CESGA

CESGA IS:

Promoter of e-Infrastructure Knowledge

- Partner of Official Post Graduate Programmes

74 Ph.D. Theses defended using CESGA computing resources (2003 – 2011)

- Masters Programme in Mathematical Methods and Numerical Simulation in Engineering and Applied Sciences.

- Masters Programme in High Performance Computing

Page 16: Energy Efficiency Policy at CESGA

Technology evolution at CESGA

Page 17: Energy Efficiency Policy at CESGA

Evolution of CPU usage

Page 18: Energy Efficiency Policy at CESGA
Page 19: Energy Efficiency Policy at CESGA

Computing users

Page 20: Energy Efficiency Policy at CESGA

Users scientific production

Page 21: Energy Efficiency Policy at CESGA

RECETGA exchanged traffic

Page 22: Energy Efficiency Policy at CESGA

CESGA USER TECHNICAL HELPDESK SERVICE REQUEST IN 2011

Page 23: Energy Efficiency Policy at CESGA

HPC SERVICES USER SATISFACTION LEVELS

Page 24: Energy Efficiency Policy at CESGA

CESGA’S STAFF

Page 25: Energy Efficiency Policy at CESGA

CESGA: A selection of significant Projects

Page 26: Energy Efficiency Policy at CESGA

Galician Regional Weather Forecasting Service

Page 27: Energy Efficiency Policy at CESGA

Galician Regional Weather Ocean Service

Page 28: Energy Efficiency Policy at CESGA

More detailed Climate simulations to better inform the Intergovernmental Panel on Climate Change (IPCC)

UVIGO

Juan Antonio Añel Cabanelas

Page 29: Energy Efficiency Policy at CESGA

Puertos del Estado

Spanish Port Authority

Enrique Álvarez Fanjul

European IBI Area: Ocean Forecasting Service

Page 30: Energy Efficiency Policy at CESGA

Oceanographic simulation to better understand fisheries population dynamics

Instituto Español de Oceanografía

Manuel Ruiz Villarreal

Page 31: Energy Efficiency Policy at CESGA

Galician Public Health Administration

ULTRASEQUENCING SERVICE: complete genome sequencing

FGMX – USC – CHUS - CESGA

Ángel Carracedo

Fundación Galega de Medicina Xenómica

Page 32: Energy Efficiency Policy at CESGA

Molecular Docking for fast track malaria drug design

Scientists Against Malaria

Hugo Gutierrez de Terán

Fundación Galega de

Medicina Xenómica

Page 33: Energy Efficiency Policy at CESGA

Molecular Docking techniques aimed at design of Alzheimer drugs

UAB – USC - FGMX

Xavier Daura

Hugo Gutierrez de Terán

Page 34: Energy Efficiency Policy at CESGA

Simulation aimed at the optimization of radiotherapy treatment dosage

CHUVI-CHUS-USC-CESGA

Proxecto e-IMRT

Page 35: Energy Efficiency Policy at CESGA

New material Design for nuclear plant safety

Instituto de Fusión Nuclear UPM

Sergio Eduardo Courtin Vega

Page 36: Energy Efficiency Policy at CESGA

Computational fluid dynamics for new turbine design

CENER

Sugoi Gómez

Page 37: Energy Efficiency Policy at CESGA

CTAG : Galician Automotive Technology Centre

Numerical Simulation

for Engineering

Page 38: Energy Efficiency Policy at CESGA

Large scale electromagnetism simulation for improved radar systems

UVIGO – UNEX – CESGA

Fernando Obelleiro Basteiro

Page 39: Energy Efficiency Policy at CESGA

Exploring complexity to better describe Ecological networks

Estación Biológica de Doñana

CSIC

Jordi Bascompte

Page 40: Energy Efficiency Policy at CESGA

European Grid Initiative (EGI): Monitoring & Accounting Service

Page 41: Energy Efficiency Policy at CESGA

CESGA DATA CENTRE

Page 42: Energy Efficiency Policy at CESGA

FINIS TERRAE SUPERCOMPUTER

Page 43: Energy Efficiency Policy at CESGA

CESGA DATA CENTRE: FinisTerrae

Page 44: Energy Efficiency Policy at CESGA

CESGA ENERGY EFFICIENCY PLAN (CEEP)

Page 45: Energy Efficiency Policy at CESGA

CEEP: REASONS

THE MOST IMPORTANT COSTS AT CESGA:

- PERSONNEL

- ELECTRICITY

- MAINTENANCE

Page 46: Energy Efficiency Policy at CESGA

CEEP: REASONS

IMPACT OF COST OF ENERGY AT CESGA:

- INCREASING OF IT RESOURCES

- INCREASING OF KW COST

- BUDGET RESTRICITIONS

- CONTRIBUTION TO REDUCTION OF CO2 EMISION

Page 47: Energy Efficiency Policy at CESGA

CEEP: OBJECTIVE

OBJECTIVE OF THE ENERGY EFFCIENCY PLAN:

ACHIEVE SIMILAR INDICATORS TO THE MOST

EFFICIENT SUPERCOMPUTING CENTRES

Page 48: Energy Efficiency Policy at CESGA

CEEP: BEFORE THE PLAN

SOME CONDITIONS:

- PLAN DEVELOPED AN MANAGED BY SYSTEMS DPT.

- SPECIAL SUPPORT BY THE DIRECTION

- IMPLICATION OF ALL DPTS.

- ROI IN SHORT-MEDIUM TERM

- SPECIAL ATTENTION TO RAS

- TIME PERIOD: 2010-2015

Page 49: Energy Efficiency Policy at CESGA

CEEP: BEFORE THE PLAN

SOME PREVIOUS ACTIONS:

- TECHNOLOGY OBSERVATION.

- ANALYSIS THERMOGRAPHIC OF COMPUTERS

ROOM AND INFRASTRUCTURES.

- INITIAL STUDY MADE BY AN EXTERNAL AUDITOR

Page 50: Energy Efficiency Policy at CESGA

CEEP: BEFORE THE PLAN

- INITIAL STUDY MADE BY AN EXTERNAL AUDITOR

Page 51: Energy Efficiency Policy at CESGA

INITIAL STATUS ANALYSIS (2009)

51

Page 52: Energy Efficiency Policy at CESGA

CLIMATISATION

Chilled Water Plants: 2 x 580 KW8

CRAH: 8 x 150 Kw

Page 53: Energy Efficiency Policy at CESGA

GENERATOR & UPS

Page 54: Energy Efficiency Policy at CESGA

DATA INTAKE

54

Electrical line schemas

Building blueprints

Equipment technical data & manuals

Energy consumption data

Consumption and billing registry

Page 55: Energy Efficiency Policy at CESGA

55

ELECTRIC MEASUREMENTS

1. General Switch

2. PP SAI 1

3. PP SAI 2

4. UPS 60

5. UPS 120

6. CPD Climatisation

7. Centre Climatisation

8. Chiller Plant 2

9. UPS Climatisation unit 2

10. Lighting General Switch

11. Basement Lighting General

Switch (IGALS)

12. Exterior Lighting

13. CPD Lighting

14. Corridor Lighting

15. Main Floor Lighting

16. First Floor Lighting

Page 56: Energy Efficiency Policy at CESGA

56

Puntos existentes que favorecen el ahorro energético • Free Cooling- Enfriadoras

• Recuperación Calor-Enfriadora

• Bomba de calor

Sistema de Climatización

1 2 3 4 5 6 7 8

EQUIPOS L-15

ENFRIADORAS

RECUPERACIÓN

CALOR ENFRIADORA

SALA CPD

GF1

GF2

FAN-COILS

OFICINAS

SIST. PASILLOS

B.C

DATA CENTRE CHILL DEMAND

Page 57: Energy Efficiency Policy at CESGA

57

• Detectores de presencia sala CPD

• Lámparas fluorescentes con balasto electrónico zona centra planta primera

Sistema de Iluminación

Page 58: Energy Efficiency Policy at CESGA

58

LIGHTING, TEMPERATURE AND HUMIDITY

MEASUREMENTS (1/3)

Page 59: Energy Efficiency Policy at CESGA

59

LIGHTING, TEMPERATURE AND HUMIDITY

MEASUREMENTS (2/3)

Page 60: Energy Efficiency Policy at CESGA

60

LIGHTING, TEMPERATURE AND HUMIDITY

MEASUREMENTS (3/3)

Page 61: Energy Efficiency Policy at CESGA

61

THERMOGRAPHIC MEASUREMENTS

Page 62: Energy Efficiency Policy at CESGA

62

BUILDING CONSUMPTION DISTRIBUTION

Page 63: Energy Efficiency Policy at CESGA

63

POWER CONSUMPTION DISTRIBUTION

Page 64: Energy Efficiency Policy at CESGA

64

CLIMATISATION CONSUMPTION DISTRIBUTION

Page 65: Energy Efficiency Policy at CESGA

65

LIGHTING CONSUMPTION DISTRIBUTION

Page 66: Energy Efficiency Policy at CESGA

ADVISE FOR IMPROVEMENT

66

.

Improvements in control

Improvements in lighting

Improvements in climatisation

Improvements in computing servers

Improvements in the water

Substituting energy sources

Page 67: Energy Efficiency Policy at CESGA

CEEP: PLAN OF ACTIVITIES

ACTIVITY TYPE DATE COST IMPACT

- Monitor & Management integrated System Inf Q4, 10 Medium High

- Closing cold aisles Inf Q1, 10 Medium High

- Interface for temperature monitoring Inf Q3, 10 Medium

- Measurement of impact increasing of temperature in EDP Inf Q1, 11 Low

- Measurement of impact of increasing of temperature of water Inf Q1, 11 Low

- Increasing of temperature in EDP room Inf Q2, 11 Low High

- Increasing of temperature in water Inf Q2, 11 Low High

- Chillers watering cooling Inf Q2,11 Low Low

- Updating heating system Inf Q2, 12 High Medium

- Updating fan systems Inf Q4, 11 High High

- Free cooling optimisation and heat recovering Inf Q1, 12 Medium High

- Improvement of cold / hot aisles Inf Q1-Q4, 12 Low Medium

- Improvement of wires under floor deployment Inf Q2, 10 Low Low

- Deployment of comfort temperature. Management System Inf Q1, 11 Medium Medium

-Techno-económic study of diabatic system Inf 3Q,13

- Improvement of Humidity Management Inf Q3,12 Low Low

- Techno-economic study of hot water system Inf/IT Q1,13

- Effective acomplishment of rules for public buildings climatization Inf Q2, 11 Low Medium

- Climatization System

Page 68: Energy Efficiency Policy at CESGA

CEEP: PLAN OF ACTIVITIES

ACTIVITY TYPE DATE COST IMPACT

- Interface for energy monitoring Inf. Q4, 10 Low High

- Installation of capacitors Inf. Q2, 10 Medium Medium

- SAI's substitution Inf. Q4, 12 High Medium

- Photovoltaic deployement Inf. Q1, 14 High Low

- Reduction of standby energy comsumption in power generator Inf. Q1,14 Medium Low

- Techno-economic three generation energy study Inf. Q4,14

- Techno-economic study of DC vs AC Inf. Q3,15

- POWER SUPPLY

Page 69: Energy Efficiency Policy at CESGA

CEEP: PLAN OF ACTIVITIES

ACTIVITY TYPE DATE COST IMPACT

- Identification of low productive equipments IT 4Q, 10 Low

- Updating of critical low productive equipments IT 1Q11-4Q11 High High

- Updating of critical low productive storage systems IT 4Q, 11 High High

- Consolidating servers IT 2Q11-2Q12 High High

- Analysis of cloud for HPC IT 3Q, 10 Low

- Cloud deployment IT 1Q, 11 Low Low

- IT EQUIPMENTS

Page 70: Energy Efficiency Policy at CESGA

CEEP: PLAN OF ACTIVITIES

ACTIVITY TYPE DATE COST IMPACT LEADER

- Technology Observation IT/Inf Monthly Low

- Periodic External Auditories IT/Inf Yearly High Medium

- Following Auditories recommendations IT/Inf Yearly

- Best Practices: education and training IT/Inf Yearly Low

- Including energy efficiency like a value in public tenders IT/Inf Permanent Low High

- UNE-EN 16001:2010 Inf. Q4, 12 High Medium

- Integration of CESGA in GreenStart Network IT/Inf Q3,13

- Development of R&D in this field IT/Inf Permanent Low Low

- Staff awakening: seminars, information, etc. IT/Inf Permanent Low Low

- GENERAL ACTIVITIES

Page 71: Energy Efficiency Policy at CESGA

CEEP: MAIN METRICS

- PUE (Power Usage Effectiveness)

- KWh consumed

- Computational performance (GFLOPS) by kw

- Monthly budget for electricuty

- Temperature in computational nodes

- Temperature in water circuit

- Relative humidity in EDP room

Page 72: Energy Efficiency Policy at CESGA

CLOSURE OF COLD AISLES

Page 73: Energy Efficiency Policy at CESGA

CLOSURE OF COLD AISLES

Page 74: Energy Efficiency Policy at CESGA

CLOSURE OF COLD AISLES

Page 75: Energy Efficiency Policy at CESGA

CLOSURE OF COLD AISLES

Page 76: Energy Efficiency Policy at CESGA
Page 77: Energy Efficiency Policy at CESGA
Page 78: Energy Efficiency Policy at CESGA
Page 79: Energy Efficiency Policy at CESGA
Page 80: Energy Efficiency Policy at CESGA
Page 81: Energy Efficiency Policy at CESGA
Page 82: Energy Efficiency Policy at CESGA
Page 83: Energy Efficiency Policy at CESGA
Page 84: Energy Efficiency Policy at CESGA

CONCLUSIONS: savings obtained

-Mechanisms for server’s power saving:

33.900 €/year

- Consolidation of SVG nodes:

6.300 €/year

- Disk consumption vs Tape consumption:

575 €/year

- Free-AIR Cooling:

260.000 €/year

Page 85: Energy Efficiency Policy at CESGA

- Enclosing of cold aisles: 6 ºC temperature decrease

and increase of cold aisle temperature up to 27ºC

105.000 €/year

- CRAHs: variable speed fans

30.000 €/year

- Automatic suspension/turn off of inactive nodes:

22.000 €/year

- Partial renovation of FinisTerrae nodes

70.000 €/year

CONCLUSIONS: savings obtained

Page 86: Energy Efficiency Policy at CESGA

CURRENT AND FUTURE WORK

- Optimisation of the use of memories

internal hierarchy.

- Job planner that takes into account the

cost of KWh depending on the hour and

date.

- Renewable energy supply.

Page 87: Energy Efficiency Policy at CESGA