Top Banner
ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGN (Ref: FHWA PSC Girder Design) C. C. Fu, Ph.D., P.E. The BEST Center University of Maryland December 2008
12

ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGNccfu/ref/ENCE 717abutment...ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGN (Ref: FHWA PSC Girder Design) C. C. Fu, Ph.D., P.E. The

Mar 31, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGNccfu/ref/ENCE 717abutment...ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGN (Ref: FHWA PSC Girder Design) C. C. Fu, Ph.D., P.E. The

ENCE 717 BRIDGE ENGINEERING

ABUTMENT/PIER DESIGN(Ref: FHWA PSC Girder Design)

C. C. Fu, Ph.D., P.E.The BEST Center

University of MarylandDecember 2008

Page 2: ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGNccfu/ref/ENCE 717abutment...ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGN (Ref: FHWA PSC Girder Design) C. C. Fu, Ph.D., P.E. The

Integral Abutment Design (1)Pile Cap (7.1.2)

Stage I (noncomposite)PSI = 1.25 x (girder + slab + haunch)

Final Stage (composite)PFNL = 1.25(DC) + 1.50 (DW) + 1.75(LL + IM) (Nlanes)/Ngirders

Pile (7.1.3)Case A – Capacity of the pileCase B – Transfer load to the groundCase C – Ground to support the load(assume rock, only Case A needs to be investigated.)

Page 3: ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGNccfu/ref/ENCE 717abutment...ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGN (Ref: FHWA PSC Girder Design) C. C. Fu, Ph.D., P.E. The

Integral Abutment Design (2)

Backwall (7.1.4) (80% of simple beam moment)Case A -Pu = 1.5 x (girder + slab)wu = 1.5 x (pile cap + diaphragm)

Case B -PStr-I = factored girder reactionwStr-I = 1.25(pile cap + end diaph. + approach slab) + 1.50 (approach FWS) + 1.75(approach slab lane load) (Nlanes)/Ngirders

Page 4: ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGNccfu/ref/ENCE 717abutment...ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGN (Ref: FHWA PSC Girder Design) C. C. Fu, Ph.D., P.E. The
Page 5: ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGNccfu/ref/ENCE 717abutment...ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGN (Ref: FHWA PSC Girder Design) C. C. Fu, Ph.D., P.E. The
Page 6: ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGNccfu/ref/ENCE 717abutment...ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGN (Ref: FHWA PSC Girder Design) C. C. Fu, Ph.D., P.E. The

Integral Abutment Design (3)

Backwall (7.1.4)Passive pressure -wp = 1/2 x γz2kp

wu = 1.5 x wp

Page 7: ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGNccfu/ref/ENCE 717abutment...ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGN (Ref: FHWA PSC Girder Design) C. C. Fu, Ph.D., P.E. The

Integral Abutment Design (4)

Wingwall (7.1.5)Passive pressure (kp=3) -wu at bottom of slab=0.2k/ft2; at bottom of wall=3.24 k/ft2

Mp = (Rect. Volume x ½ base length) + (pyramid volume x ¼ base length)

Active pressure (ka = 0.333) –Ma = (ka/kp)*Mp +Mcollision

½ base length

1/4 base length

Page 8: ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGNccfu/ref/ENCE 717abutment...ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGN (Ref: FHWA PSC Girder Design) C. C. Fu, Ph.D., P.E. The

Integral Abutment Design (5)

Approach Slab (7.1.6)Single lane loadedE = 10 + 5 √(L1W1)

Multiple lane loadedE = 84 + 1.44 √(L1W) ≤ 12W/NL

Mu = wl2/8 + 1.75 (LL+IM Moment)

Page 9: ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGNccfu/ref/ENCE 717abutment...ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGN (Ref: FHWA PSC Girder Design) C. C. Fu, Ph.D., P.E. The

Intermediate Pier Design (1)

Page 10: ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGNccfu/ref/ENCE 717abutment...ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGN (Ref: FHWA PSC Girder Design) C. C. Fu, Ph.D., P.E. The

Intermediate Pier Design (2)

Page 11: ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGNccfu/ref/ENCE 717abutment...ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGN (Ref: FHWA PSC Girder Design) C. C. Fu, Ph.D., P.E. The

Intermediate Pier Design (3)

Longitudinal –Braking force (BR)

Wind load along axes of superstructure

Wind load on sub = Wcap + Wcol

Transverse –Wind load transverse to the

superstructure

Wind load on sub

Wind on live load

Page 12: ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGNccfu/ref/ENCE 717abutment...ENCE 717 BRIDGE ENGINEERING ABUTMENT/PIER DESIGN (Ref: FHWA PSC Girder Design) C. C. Fu, Ph.D., P.E. The

Intermediate Pier Design (4)

Moment –σ1, σ2 = P/LW ±

Ml(L/2)(L3W/12)

σ5, σ6 = P/LW ±Mt(L/2)(W3L/12)

Shear –Vux = σ4L2 + 0.5(σ1 – σ4)L2

Vuy = σ8L4 + 0.5(σ5 – σ8)L4

Two-way (punching shear)