CON9537 - Oracle Open Customers Present DRM Enabling Business Transformation with DRM & FDMEE A M&A Customer Success Story at WestRock Moscone West Oct 26, 2015 Business Analytics Solutions Provider Using Oracle EPM and BI Technologies Tim Walsh Director of Financial Systems [email protected]
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
CON9537 - Oracle Open Customers Present DRM
Enabling Business Transformation with DRM & FDMEEA M&A Customer Success Story at WestRock
Moscone West
Oct 26, 2015
Business Analytics Solutions Provider Using Oracle EPM and BI Technologies
Produce Consolidated Financial Statements generated by JDEReport Profits by Business Unit in JDE & HyperionReport Balance Sheet by Legal Entity in JDE & Hyperion
4
Goal
Have all general ledger summary level data (balance sheet and business unit revenue/expense) in JDE and Hyperion for the July 31, 2015 financial close.
Multiple Challenges to Overcome
Organizations needed to be integrated within 100 days (81 sources to 1 Financial System)
Prior mapping processes were time consuming and required rigid one-to-one maps from source to target using Excel spreadsheets
Methods and tools utilized in prior mappings differed – skills were not transferable
Key validations were required prior to loading of mapped data to the JDE GL to reduce significant delays in the closing process
5
But What Path To Take?
Option 1 – Perform High Level Consolidations and Focus on External Reporting Only
Option 2 – Ensure Consistency in Performance Management Reporting at the Plant Level so the business can be properly managed
Senior Leadership Weighed in and Provided Critical DirectionSteve Meadows, CAO – “Our internal business partners rely on Hyperion to support their performance management reporting needs around Divisional and Plant Profitability. We have a mandate to provide this same level of reporting capability, and must strive to do so, in the new organizational structure, until we know that we can not.”
With support from Key Leadership, a dedicated combined finance team, and the DRM-FDMEE accelerators from Edgewater Ranzal, Option 2 was approved as the way forward.
6
The Project Mandate
Financial reports are accurate and complete
Consolidations are complete in time for the July 31st close and subsequent quarterly filings, preferable in a single consolidations tool
Management Reporting processes remain in place until transition is planned and implemented
For day 1, as little upstream processes as possible are changed, and full transitions are considered only after day 1
As much detail as possible is put into the financial system
A tool is used to facilitate the mapping process in a way that can be completed and tested before the deadline and can be efficiently maintained
7
8
Financial Systems Overview at WestRock
Hyperion PlanningCubes
• Operational• Financial• Capital• Std Cost• Sales• Freight• Rolling Forecast
• Salary• Expense
Multiple Billing
Systems
JDEdwardsG/L – A/R – A/P
Purchasing / Job CostFixed Assets / EPAM
Legacy RockTenn
Multiple Purchasing
Systems
PeopleSoftPayroll
SAP 1
SAP 2
SAP Templates
Non SAP Templates
45 Sources, 34% of Revenue
Corporate Entries
18 Sources, No Revenue
SAP BW2 Systems plus 16 templates
66% of revenue
Financial Systems Overview at WestRock
9
SAP BCS 81 Sources
Legacy MWV
10
Use Edgewater Ranzal COA Approach as Accelerator for M&A Implementation
Hyperion Planning
Cubes• Operational• Financial• Capital• Std Cost• Sales• Freight• Rolling Forecast
• Salary• Expense
JDEdwardsG/L – A/R – A/P
Purchasing / Job CostFixed Assets / EPAM
SAP 1
SAP 2
SAP Templates
Non SAP Templates
45 Sources, 34% of Revenue
Corporate Entries
18 Sources, No Revenue
SAP BW2 Systems plus 16 templates
66% of revenue
?????
Hyperion
FDM Map execution
DRM Hierarchy & Map
Management
ReconCube
RanzalCOA
Framework
Results & Benefits Realized
11
Summary of Project Results
Delivered an integrated FDMEE/DRM/Essbase mapping platform to map disparate
sources into one common JDE GL
Architected and implemented solution within 100 days and under budget
Effectively transferred knowledge ensuring that functional admins were able to update
and run the model autonomously
Benefits Realized
Developed framework for quickly integrating future companies into the organization
Standardized mapping processes regardless of source
Increased traceability, versioning, audit, management and control within the mapping process
Pre-validation of data prior to loading into the GL leading to less voiding and reloading of
batches
Proposed Timeline
Mar 15th: Project Kick Off.
April 30th: Requirements & Conceptual Design Phase Complete.
May 11th
Initial mapping within DRM complete within Edgewater Ranzal Lab
One source mapped, loaded, and viewable by Corporate Finance within Essbase
May 29th: Initial Build complete
FDM & DRM
JDE load file Process
Data extraction process from source systems
Software Upgrade of Dev & Test Environment to 11.1.2.3.
Month of June: Testing & Cut Over. Complete Upgrade.
End-to-End System Integration testing
Acceptance Testing w/ preliminary training
Production Cut-Over 12
Team Composition
13
Executive SponsorCAO
GovernanceProject Manager
DRM FDM Essbase JDEdwards
(1) Consultant
(1) Manager
(11) COA Maps Business
(1) Consultant (1) Manager (1) Manager
EngagementManager
(1) IntegrationSpecialist
Steering CommitteeAccounting, Tax, Audit, IT
Key: Blue = WestRockGreen = Consulting
What’s Next? Future Phases
14
Feed of DRM master data back to JDE
DRG Workflow to support new JDE master data request process
Feed of hierarchies from DRM
Custom Audit/transaction history packaged standalone