ELVIS - substation maintenance

Hannu Hätönen

Page 2: ELVIS substation maintenance Hannu Hätönen

SAP Work Manager Mobile

Oracle Primavera Project Portfolio &

Management

Primavera adapter

Maximo Spatial

IBM Maximo Asset Management

ESRI ArcGIS GIS

Electron CAPE Relay simulation

IPS RelexRelay Management

Siemens PSS®ODMS Grid modeling

Siemens PSS®E Grid calculation

OSIsoft PI AF & ProcessBook

Asset health

OSIsoft PI Real-time & data storage

other integrations to Accounting, Metering, Document Management, Business Intelligens, Invoicing, among others

SCADA

ELVIS– THE NEW PLATFORM FOR ASSET AND OPERATION MANAGEMENTIntegrated best-of-breed standard software products

ELVIS

integrations to Accounting, Document Management, Business Intelligens, Invoicing

Page 3: ELVIS substation maintenance Hannu Hätönen

Anttila substation in Maximo:- 450 operating locations- 1321 operating assets- 496 active preventive maintenance records- 4587 active measurement points- 1150 historical workorders with 5993 tasks

Anttila substation450 kV HVDC + 400 kV AC + 110 kV AC

Page 4: ELVIS substation maintenance Hannu Hätönen
Page 5: ELVIS substation maintenance Hannu Hätönen

5

Outsourced model with digitalization

Work process:

1.Generation

2.Planning

3.Execution

4.Approval

5.Invoicing

Page 6: ELVIS substation maintenance Hannu Hätönen

Long history of maintenance data

N = 23 955

Page 7: ELVIS substation maintenance Hannu Hätönen

Long history of maintenance data

Page 8: ELVIS substation maintenance Hannu Hätönen

Long history of maintenance data

Page 9: ELVIS substation maintenance Hannu Hätönen

Long history of maintenance data

Page 10: ELVIS substation maintenance Hannu Hätönen

N = 64 921

200k+ measurement results

Page 11: ELVIS substation maintenance Hannu Hätönen

Summary

Page 12: ELVIS substation maintenance Hannu Hätönen

FO AC03AQ0 found 414,3 kV – 117,2 A

[2 open deviations][1 open workorder][Create new deviation][Go to measurements][Cancel]

GPS [OK]Microphone [OK]

Database connection [OK]Camera [OK]

3G

Page 13: ELVIS substation maintenance Hannu Hätönen