Top Banner
Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006
21

Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Dec 17, 2015

Download

Documents

Felicia Carr
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Elm Street Rockslide Repairs

Montpelier City Council MeetingFebruary 22, 2006

Page 2: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Rockslides Happen

Page 3: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

THE PROBLEM:

Toppling of steeply dipping rock strata Sliding of toppled strata on lower slope

Page 4: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Historic Slide Area

Slide scarp (light gray) at right crest, debris at toe of slope.

Lower chevron toppled debris set in motion

Page 5: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Historic Slide Area

Page 6: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Slide Mechanisms

Flexural Toppling at Crest

Lower chevron toppled debris set in motion

Page 7: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Slide Mechanisms

Flexural Toppling at Crest

Lower chevron toppled debris set in motion

Page 8: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Proposed Repairs

Stabilize Flexural Toppling at Crest with Un-tensioned Rock Bolts called Rock Dowels; Scale slide debris and chevron toppled debris on the lower slope that could provide a source of future slide

debris; Stabilize and repair Cliff Street slide scarp with a rock nail retaining wall; Stabilize adjacent steep soil slopes with a Tecco® soil retention system; and Reduce the potential for further toppling with spot rock dowels, scaling, tree removal, dental shotcrete.

Page 9: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Project Progress

Temporary Rockfall Protection Measures

Page 10: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Project Progress

Stabilization of Cliff Street Slide Scarp Drainage Installation and Shotcrete Facing

Page 11: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Project Progress

Utilities Relocation Shotcrete Application Monitoring of Loose Rocks

Page 12: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Project Progress

Layout, Anchor installation and Setup of Rockfall Catch Fence

Page 13: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Project Progress

Rock Nail Installation

Page 14: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Project Progress

Water Main Relocated

Page 15: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Project Progress

A Large Boulder…..

Page 16: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Project Progress

Highwall Scaling and preparation of foundation area for

new retaining wall.

Page 17: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Project Progress

Cliff Street Reopened February 14th.

Page 18: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Project Progress

First layer of shotcrete and rock nails installed, Scaling progressing downslope

Page 19: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

What’s Next?

Completion of the retaining wall Rock Bolting of the Highwall

Drain hole drilling

Page 20: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

What’s Next?

Stabilization of soil slope transitions - Tecco Final Scaling

Installation of Concrete Barrier and paving on Cliff Street.

Page 21: Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.

Acknowledgements

Tom McArdle – DPW Police Chief Doug Hoyt, Department and Fire

Department Mayor Mary Hooper & City Manager William Fraser VTrans – Tom Eliassen, Chris Benda, Bill McManus Vermont Geological Survey – Larry Becker and Jon

Kim Vermont Survey and Engineering

Dubois Construction

Special Thanks to Montpelier and State Folks