Page 1: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

QUIT

Page 2: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

MM_Eliminator USA, SG Revision, 010705

SPRAY APPLIED WATERPROOFING MEMBRANES

New and Rehab Bridge

Decks using Spray Applied

Waterproofing Membranes

www.stirlinglloyd.com

QUIT

Page 3: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Why waterproof ?

Protection of Steel From Corrosion

www.stirlinglloyd.com

Protection of Saltand Chloride Attack

Protection of Carbonation and Freeze Thaw Issues

to fulfil the bridge design life and reduce maintenance of the bridge structure

Page 4: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

It is clear that the primary

function of a waterproofing

membrane is to ensure the

concrete and steel elements of a

bridge structure to enable it to

fulfil its design life of over 100

years

Page 5: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

The effects of water in asphalt act like a sponge holding the water thru freeze thaw and create bond failure of asphalt to membrane .

Page 6: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

Some waterproofing membranes bonds to asphalt deteriorate rapidly when subject water under pressure

Page 7: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

Bituminous Membranes have limited life expectancyand other downfalls

• Cannot be used for multiple paving cycles

• Cannot be applied in cold temperatures

• Blistering and moisture problems

• Puncturing, from aggregate in asphalt and deck

• Joint Failures in between each seam

• Poor Adhesion To Deck

• Poor Adhesion to Asphalt Overlay

• Sensitivity to Weather Conditions

• Slowness of Application.

• Lack of Bond can cause asphalt shoving

18TH WORLD ROAD CONGRESSBrussells, 1987

SOURCE:

Page 8: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Spray Applied Membranes offer seamless applications Compared to traditional sheet membranes.

www.stirlinglloyd.com

Page 9: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

Spray Applied Membranes offer long term waterproofing protection with asphalt overlay

• Will last and perform the design life of structure – “100 years”

• Allows repaving over the Eliminator for Multiple Life-Cycles

• Can reduce long-term bridge deck maintenance cost by 50%

• High bond to substrate and asphalt surfacing

• Applied all year round at cold temperatures

• Intimate adhesion to curb verticals and drains

• Excellent durability: Will not soften under hot paving/compaction

• Applicable to the roughest and most irregular substrate

conditions

Page 10: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

• 2nd Coat of membrane optionalSome membranes broadcast aggregate

• Membrane Coat

• Primer

Pavement Asphalt

• Tack Coat:

• Bridge Deck or Substrate

www.stirlinglloyd.com

Spray Membranes sequence for Highway Application

Page 11: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Surface Preparation: Concrete Specification

ELIMINATOR APPLICATION GUIDELINESQA 104/BD47/1M

REF:

•Surface to be abrasively cleaned in accordance with ASTM D4259

•Prior to application of the system all voids must be filled with suitable repair material

•Any weak bonded residues must be cleaned to satisfy adhesion requirements. Adhesion Testing offers a good indicator of substrate strength.

•Responsibilities of each party regarding the removal of old asphalt and membrane and surface preparation must be clearly spelled out.

www.stirlinglloyd.com

Page 12: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

Rehab Bridge Deck: Considerations for Waterproofing

• Surface Preparation

• Application Speed with Quality Control

• Weather

• Box Beam Applications

• Phased Construction

• Night work with day traffic

• Tack Coat and Paving

• Pre Construction Meeting

• Long Term Thinking

Page 13: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

SURFACE PREPARATION

Page 14: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

Sharps Aggregates Should Be Ground Down To Reduce Mechanical Damage: Otherwise, This Substrate is Suitable

Page 15: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Some Milled Surfaces Leave Asphalt Remains…

www.stirlinglloyd.com

Page 16: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Weak-bonded Materials Must Be Removed: Many Fast Mechanical Tools Can Be Used

www.stirlinglloyd.com

Page 17: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Thorough, High Quality Preparation Ensures Long Life

www.stirlinglloyd.com

Page 18: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Ride-On Vacuum Shot Blast Equipment removes laitance .

www.stirlinglloyd.com

Page 19: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Larger Units Are Available For Even Faster Surface Prep10,000 – 15,000sf/ hour

www.stirlinglloyd.com

Page 20: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Cleaning Of Verticals Is Very Important And Can Be Sandblasted or Grinded clean:

www.stirlinglloyd.com

Page 21: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Surface Prep Is Confirmed By Adhesion Testing

www.stirlinglloyd.com

Page 22: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

ASTM D4541 Standard Tensile Adhesion Test, ASTM D4541: 2” Diameter Dollies Provide More Accurate Results

www.stirlinglloyd.com

RESULTS FOR CONCRETE:

> 100psiwith failure in concrete

RESULTS FOR STEEL:

> 290psi

Page 23: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Failure of the concrete above 100 psi indicates good bond. This makes a good litmus test when bond is in question.

www.stirlinglloyd.com

Page 24: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Primers must be used to promote bond adhesion to both concrete or steel substrates after mechanical cleaning.

www.stirlinglloyd.com

Page 25: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

The Spray Membranes terminates up vertical curbs at critical waterproofing areas.

Page 26: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

They can be installed very quickly with little overcoating time.

www.stirlinglloyd.com

Page 27: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Multiple Sprayers increase production for larger projects.

www.stirlinglloyd.com

Page 28: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Installation of Spray Applied on New Tappan Zee Bridge

www.stirlinglloyd.com

Page 29: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Installation of Spray Applied on New Tappan Zee Bridge

www.stirlinglloyd.com

Page 30: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Installation of Spray Applied on New Tappan Zee Bridge

www.stirlinglloyd.com

Page 31: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Installation of Spray Applied on New Tappan Zee Bridge

www.stirlinglloyd.com

Page 32: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Installation of Spray Applied on New Tappan Zee Bridge

www.stirlinglloyd.com

Page 33: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

The Spray Applied Membranes can accommodate very rough substrate conditions and milled surfaces.

www.stirlinglloyd.com

Page 34: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

ABCDEFG

Box Beam Construction

Page 35: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Poor grouted joints are more than commonly found.

www.stirlinglloyd.com

Page 36: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

It is important these joints are grouted properly

www.stirlinglloyd.com

Page 37: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Added reinforcement over these joints are recommended

www.stirlinglloyd.com

Page 38: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

The reinforcement is added into the spray membranes over vulnerable joints

www.stirlinglloyd.com

Page 39: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

The grouted joints on this box beam bridge has been reinforced before the application of the spray membrane.

www.stirlinglloyd.com

Page 40: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

The spray membrane offers a seamless solution

www.stirlinglloyd.com

Page 41: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

…for long term protection

www.stirlinglloyd.com

Page 42: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Spray membranes terminates easily at expansion joints

www.stirlinglloyd.com

Page 43: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

Phased Construction

Page 44: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Phased Construction remains jointless for spray membranes.

www.stirlinglloyd.com

Page 45: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

ABCDEFG

Temporary trafficking Eliminator

Page 46: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

Spray Applied Membranes can be temporarily trafficked before paving with an aggregate broadcast into the membrane.

Page 47: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

This allows night construction and reduces cold joints with paving.

www.stirlinglloyd.com

Page 48: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

ABCDEFG

Polymer Modified Tack Coat

Page 49: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

Spray Applied Membranes require a tack coat to promote bond of the paving overlay.

Page 50: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Pavement can commence as soon as tack coat cools, typically One Hour

www.stirlinglloyd.com

Page 51: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Multiple Life Cycles: Replacing Asphalt/Retaining Spray Membranes

www.stirlinglloyd.com

Page 52: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

Multiple Life Cycles: Replacing Asphalt/Retaining Eliminator

www.stirlinglloyd.com

Page 53: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

Conclusion- Spray Applied Membranes

• Will last and perform the design life of structure – “100 years” • Allows repaving over the Eliminator for Multiple Life-Cycles• Can reduce long-term bridge deck maintenance cost by 50%• High bond to substrate and asphalt surfacing• Applied all year round at cold temperatures• Intimate adhesion to curb verticals and drains• Excellent durability: Will not soften under hot paving/compaction• Applicable to the roughest and most irregular substrate conditions

Page 54: eliminator Bridge Deck Waterproofing

QUIT MENU

eliminator eliminator

®Bridge Deck Waterproofing

www.stirlinglloyd.com

PDH Questions

• Minimum average results for ASTM D4541 Standard Tensile

Adhesion Test?

• 150 PSI Concrete/250 PSI Steel

• 100 PSI Concrete/290 PSI Steel

• 50 PSI Concrete/290 PSI Steel

• Spray applied membranes allow you to retain the membrane

while repaving allowing multiple life cycles of the membrane?

• True

• False

• Spray applied membranes can prevent premature failures within

the deck by preventing attacks from salts, water, and chlorides.

• True

• False